Ansi - Ieee STD 1585 - 2002 Series Devices For Compensation of Voltage Fluctuations
Ansi - Ieee STD 1585 - 2002 Series Devices For Compensation of Voltage Fluctuations
IEEE Standards
1585 TM
Published by
The Institute of Electrical and Electronics Engineers, Inc.
3 Park Avenue, New York, NY 10016-5997, USA
Print: SH95021
11 October 2002 PDF: SS95021
IEEE Std 1585™-2002
Sponsor
Substation Committee
of the
IEEE Power Engineering Society
National Electrical Safety Code, and NESC are registered trademarks in the U.S. Patent & Trademark Office, owned by
the Institute of Electrical and Electronics Engineers, Incorporated.
National Electrical Code and NEC are both registered trademarks of the National Fire Protection Association, Inc.
No part of this publication may be reproduced in any form, in an electronic retrieval system or otherwise, without the prior
written permission of the publisher.
IEEE Standards documents are developed within the IEEE Societies and the Standards Coordinating Committees of the
IEEE Standards Association (IEEE-SA) Standards Board. The IEEE develops its standards through a consensus develop-
ment process, approved by the American National Standards Institute, which brings together volunteers representing varied
viewpoints and interests to achieve the final product. Volunteers are not necessarily members of the Institute and serve with-
out compensation. While the IEEE administers the process and establishes rules to promote fairness in the consensus devel-
opment process, the IEEE does not independently evaluate, test, or verify the accuracy of any of the information contained
in its standards.
Use of an IEEE Standard is wholly voluntary. The IEEE disclaims liability for any personal injury, property or other dam-
age, of any nature whatsoever, whether special, indirect, consequential, or compensatory, directly or indirectly resulting
from the publication, use of, or reliance upon this, or any other IEEE Standard document.
The IEEE does not warrant or represent the accuracy or content of the material contained herein, and expressly disclaims
any express or implied warranty, including any implied warranty of merchantability or fitness for a specific purpose, or that
the use of the material contained herein is free from patent infringement. IEEE Standards documents are supplied “AS IS.”
The existence of an IEEE Standard does not imply that there are no other ways to produce, test, measure, purchase, market,
or provide other goods and services related to the scope of the IEEE Standard. Furthermore, the viewpoint expressed at the
time a standard is approved and issued is subject to change brought about through developments in the state of the art and
comments received from users of the standard. Every IEEE Standard is subjected to review at least every five years for revi-
sion or reaffirmation. When a document is more than five years old and has not been reaffirmed, it is reasonable to conclude
that its contents, although still of some value, do not wholly reflect the present state of the art. Users are cautioned to check
to determine that they have the latest edition of any IEEE Standard.
In publishing and making this document available, the IEEE is not suggesting or rendering professional or other services
for, or on behalf of, any person or entity. Nor is the IEEE undertaking to perform any duty owed by any other person or
entity to another. Any person utilizing this, and any other IEEE Standards document, should rely upon the advice of a com-
petent professional in determining the exercise of reasonable care in any given circumstances.
Interpretations: Occasionally questions may arise regarding the meaning of portions of standards as they relate to specific
applications. When the need for interpretations is brought to the attention of IEEE, the Institute will initiate action to prepare
appropriate responses. Since IEEE Standards represent a consensus of concerned interests, it is important to ensure that any
interpretation has also received the concurrence of a balance of interests. For this reason, IEEE and the members of its soci-
eties and Standards Coordinating Committees are not able to provide an instant response to interpretation requests except in
those cases where the matter has previously received formal consideration.
Comments for revision of IEEE Standards are welcome from any interested party, regardless of membership affiliation with
IEEE. Suggestions for changes in documents should be in the form of a proposed change of text, together with appropriate
supporting comments. Comments on standards and requests for interpretations should be addressed to:
Note: Attention is called to the possibility that implementation of this standard may require use of subject mat-
ter covered by patent rights. By publication of this standard, no position is taken with respect to the existence or
validity of any patent rights in connection therewith. The IEEE shall not be responsible for identifying patents
for which a license may be required by an IEEE standard or for conducting inquiries into the legal validity or
scope of those patents that are brought to its attention.
Authorization to photocopy portions of any individual standard for internal or personal use is granted by the Institute of
Electrical and Electronics Engineers, Inc., provided that the appropriate fee is paid to Copyright Clearance Center. To
arrange for payment of licensing fee, please contact Copyright Clearance Center, Customer Service, 222 Rosewood Drive,
Danvers, MA 01923 USA; +1 978 750 8400. Permission to photocopy portions of any individual standard for educational
classroom use can also be obtained through the Copyright Clearance Center.
Introduction
(This introduction is not part of IEEE Std 1585-2002, IEEE Guide for the Functional Specification of Medium Voltage
(1–35 kV) Electronic Series Devices for Compensation of Voltage Fluctuations.)
Several utilities are experimenting with electronic devices to reduce voltage fluctuations. Industrial
customers with sensitive loads are installing different electronic devices to mitigate voltage fluctuations. A
significant number of these devices are installed every year. Most of these devices are bought using specifi-
cations provided by various manufacturers. Technical literature describes the operation of specific devices
and provides results of computer simulations to prove the effectiveness of the devices. However, no docu-
ment defines the technical data that has to be collected and used for the specification of a new device.
The working group collected specifications from different manufacturers and utilities. These documents
have been combined together to define a comprehensive method for the specification of future devices. This
guide is not a tutorial. The application of its content to prepare a specification requires technical knowledge
and understanding. Each user should modify the material to meet with user specific conditions. This guide
does not include all topics necessary for every application and does not address the commercial aspect of the
specifications.
Participants
At the time this guide was completed, the Power Electronics Equipment Working Group had the following
membership:
George G. Karady, Chair
Dale Osborn, Vice Chair
Bharat Bhargava William O. Kramer Duane Torgerson
Hubert Bilodeau Sakis Melispoulos Terry Treasure
Jacques Brochu Stig Nilsson Neil Woodley
Tom Cease Mansour Pourcyrous Teruo Yoshino
Devarajan Srinivasan
The following members of the balloting committee voted on this standard. Balloters may have voted for
approval, disapproval, or abstention.
William Ackerman Thomas LaRose Jeanjean Robert
Michael Baker Stephen R. Lambert James Ruggieri
Stephen Dare Gregory Luri Shigeru Tanabe
Guru Dutt Dhingra Gary Michel Duane Torgerson
Paul Drum Kyaw Myint Donald Volzka
Ahmed Elneweihi Carlos Peixoto James Wilson
Edward Horgan, Jr. Paul Pillitteri Peter Wong
Gerhard Juette Paulo Ribeiro
*Member Emeritus
Catherine K. N. Berger
IEEE Standards Project Editor
1.1 Scope............................................................................................................................................ 1
1.2 Purpose......................................................................................................................................... 1
1.3 Application................................................................................................................................... 1
2. References............................................................................................................................................ 2
3. Definitions............................................................................................................................................ 3
9.1 Rating........................................................................................................................................... 9
9.2 Losses........................................................................................................................................... 9
9.3 Harmonic performance .............................................................................................................. 10
9.4 Audible noise ............................................................................................................................. 10
9.5 Telephone and radio interference............................................................................................... 10
9.6 Cooling and ventilation.............................................................................................................. 10
9.7 Enclosures .................................................................................................................................. 12
1. Overview
1.1 Scope
This guide provides general guidelines for the preparation of a functional specification for solid-state elec-
tronic series devices used mainly for compensation of voltage fluctuation. The guide covers devices rated to
medium voltage (1–35 kV). In general, these devices contain: an inverter, a rectifier or dc-to-dc converter, an
energy storage device, injection transformers connected in series with the load, and a normally open by-pass
switch.
In order to interface these devices with the load, additional equipment should be provided including current
and potential transformers, bypass and isolation breakers, fast acting solid-state bypass switch, and three-
phase low-voltage service for auxiliary power.
1.2 Purpose
This guide includes technical clauses describing the user’s requirements, including operation methods and
environmental conditions. It specifies basic requirements of solid-state electronic devices used for compen-
sation of voltage fluctuations. In addition, the guide covers the required installation and start-up services.
1.3 Application
This guide should be considered as a general-purpose source and does not include all details needed for spe-
cific applications. Likewise, since the electronic device is typically designed to address a specific applica-
tion, not every part of this guide may be applicable. The user of this guide should evaluate how, and to what
extent, each clause applies to the development of a specific device specification.
2. References
This guide shall be used in conjunction with the following publications. If the following publications are
superseded by an approved revision, the revision shall apply. The solid-state electronic device components
should comply with all applicable ANSI and IEEE standards for electrical equipment.
ANSI C57.12.24-2000, American National Standard for Transformers: Underground-Type Three-Phase Dis-
tribution Transformers, 2500 kVA and Smaller; High Voltage, 34 500 GrdY/19 920 Volts and Below; Low
Voltage, 480 Volts and Below—Requirements.2
ANSI C57.12.70-1978 (Reaff 1993), American National Standard for Terminal Markings and Connections
for Distribution and Power Transformers.
IEEE Std 139™-1988 (Reaff 1999), IEEE Recommended Practice for the Measurement of Radio Frequency
Emission from Industrial, Scientific, and Medical (ISM) Equipment Installed on User’s Premises.
IEEE Std 519™-1992, IEEE Recommended Practices and Requirements for Harmonic Control in Electric
Power Systems.
IEEE Std 693™-1997, IEEE Recommended Practices for Seismic Design of Substations.
IEEE Std 1100™-1999 IEEE Recommended Practice for Powering and Grounding Electronic Equipment
(IEEE Emerald Book™).
IEEE Std 1159™-1995, IEEE Recommended Practice for Monitoring Electric Power Quality.
IEEE Std 1250™-1995, IEEE Guide for Service to Equipment Sensitive to Momentary Voltage Disturbances.
IEEE Std C57.12.00-2000, IEEE Standard for General Requirements for liquid-Immersed Distribution,
Power, and Regulating Transformers.
IEEE Std C57.12.80-1978 (Reaff 1992), IEEE Standard Terminology for Power and Distribution
Transformers.
IEEE Std C57.12.90-1999, IEEE Standard Test Code for Liquid-Immersed Distribution, Power, and Regu-
lating Transformers.
1The NESC® is available from the Institute of Electrical and Electronics Engineers, 445 Hoes Lane, P.O. Box 1331, Piscataway, NJ
08855-1331, USA (http://standards.ieee.org/).
2ANSI publications are available from the Sales Department, American National Standards Institute, 25 West 43rd Street, 4th Floor,
New York, NY 10036, USA (http://www.ansi.org/).
3The IEEE standards referred to in Clause 2 are trademarks owned by the Institute of Electrical and Electronics Engineers,
Incorporated.
4IEEE publications are available from the Institute of Electrical and Electronics Engineers, 445 Hoes Lane, P.O. Box 1331, Piscataway,
NJ 08855-1331, USA (http://standards.ieee.org/).
SEMI F47-0200, Specification for Semiconductor Processing Equipment Voltage Sag Immunity.5
ITI (CBEMA) Curve, Revised 2000, Information Technology Industrial Council, Curve 2000.6
3. Definitions
For the purpose of this guide the following terms and definitions apply. IEEE 100, The Authoritative Dictio-
nary of IEEE Standards Terms and IEEE Std C37.100-19929 should be referenced for terms not defined in
this clause.
3.1 voltage sag: A short duration decrease of the rms voltage value, to between 0.1 and 0.9 pu, at the power
frequency, for 0.5–120 cycles in duration. (IEEE Std 1250-1995)
3.2 voltage swell: A short duration increase of the rms voltage value, at the power frequency, for 0.5–120
cycles in duration.
4. System description
The solid-state electronic series device is used in a three-phase or single-phase distribution system (rated
voltage is up to 35 kV) for dynamic compensation of voltage sag (dip) and swell. A step-up transformer may
be required to connect to the utility voltage level.
Figure 1 shows an example of the circuit diagram of a solid-state electronic series device used for compen-
sating voltage fluctuations. In case of a voltage disturbance on the utility distribution feeder, the device
injects an appropriate compensation voltage in the line to maintain the voltage at the terminals of the cus-
tomer’s sensitive load.
5SEMI publications are available from the Semiconductor Equipment and Materials International, 1401 K. Street, NW, Suite 60, Wash-
ington, DC 20005, USA (http://www.semi.org/).
6The Information Technology Industrial Council’s Curve 2000 is available at http://www.itic.org/technical/iticurv.pdf.
7NEMA publications are available from Global Engineering Documents, 15 Inverness Way East, Englewood, Colorado 80112, USA
(http://global.ihs.com/).
8The NEC® is published by the National Fire Protection Association, Batterymarch Park, Quincy, MA 02269, USA (http://
www.nfpa.org/). Copies are also available from the Institute of Electrical and Electronics Engineers, 445 Hoes Lane, P.O. Box 1331,
Piscataway, NJ 08855-1331, USA (http://standards.ieee.org/).
9Information on references can be found in Clause 2.
An inverter generates the compensating voltage and injects it through a transformer whose secondary is con-
nected in series with the sensitive load. The injection transformer may consist of three single-phase, single-
core transformers or a three-phase, five-legged core unit.
A DC link provides the input voltage and energy to the inverter. The inverter uses the energy stored in a
capacitor or other kinds of energy storage devices [e.g., such as batteries, super-conducting magnetic energy
storage (SMES) devices, flywheels] through a dc-to-dc converter, or from an ac source (supply feeder)
through a rectifier.
Under regular, undisturbed system voltage conditions, the device inverter modules can operate in a
“standby” or short-circuit mode or be continuously “on line” (gating) to provide injected voltage to compen-
sate for voltage drop through the series injection transformer. Upon detection of a line side sag or swell, the
inverter compensates for it by injecting the appropriate voltage. Energy may be delivered or absorbed.
The device may or may not require dedicated energy storage, depending on the power factor of the load, the
anticipated depth of sag, and the symmetry of the sag. The device controls should minimize the need for
energy storage during unbalanced sags by charging the dc bus from the high (unaffected or swelled) voltage
phase(s). Sufficient stored energy or power must be provided to allow the device to compensate sags of max-
imum expected duration.
In order to interface the device with the load, additional equipment should be provided, including current
and potential transformers, surge arresters, bypass and isolation breakers, and three-phase low-voltage ser-
vice for auxiliary power. Surge arresters are not required under all conditions.
To SS Device
CT Auxiliary Power
Series Injection
Transformer
Energy Storage
or dc to ac
Inverter
Energy Supply
dc Link
Capacitor
Solid State (SS) Electronic Device
5. Project description
This specification defines the project scope to furnish, install, test, commission, warrant, train user person-
nel, and place into commercial operation an electronic device for compensation of voltage fluctuations at
__________.
The purpose of the device is to correct the voltage of __________, which is a sensitive load, connected to
__________ point. The device should temporarily and dynamically maintain voltage at acceptable levels to
the above three-phase or single-phase loads during voltage sags and swells (both balanced and unbalanced)
that occur on the source side, assuming that the voltage deviation is within the device ratings. As an addi-
tional feature, the device may be used for steady-state voltage regulation of a load and phase balancing of
line voltages.
The nominal kVA rating of the device inverter and associated power electronics is specified as the desired
maximum voltage injection times the nominal load current.
The system voltage is __________ kV, acceptable load voltage variation is ±__________% of nominal volt-
age.
The nominal energy rating or usable stored energy is defined as nominal load current times the desired volt-
age injection during balanced sag times the maximum duration of the sag. Typical value of the maximum sag
duration is 300–500 ms. The manufacturer should describe the idle mode of operation of the device when the
device is not correcting sag or swell. The user should specify the maximum load, maximum voltage sag, and
its duration, for both three-phase and single-phase disturbances.
The user should specify the maximum acceptable sag magnitude versus sag duration ratio, for the specific
industrial process to be protected. In addition, the user should specify the maximum acceptable response
time for the device to act upon detection of voltage sag. There are several existing power quality standards
that address this issue, such as the ITI, Curve 2000 or SEMI F47 criteria, but the user is cautioned that such
standards may not fit his or her application. Therefore, the user is urged to evaluate his or her specific
requirement before specifying the device.
NOTE—Many drive systems restrict voltage change to 10%. This will be relative to the pre-disturbance voltage and not
10% of nominal.
The regional and local site location is shown in Figure __________. The proposed one-line diagram of the
facility after installation of the device is shown on drawing __________. The area of the device facility is
shown on drawing __________.
The point of electric interconnections of the supplier-furnished solid-state electronic device and the user-fur-
nished facilities are shown in the following drawings:
__________ Others
The equipment, materials, and services to be furnished by the supplier include, but are not limited to the
following:
a) DC to AC inverter
b) Solid-state bypass switch
c) Injection transformer
d) Bypass (circuit breaker, and/or solid-state switch)
e) Shorting and disconnect switches
f) Isolation circuit breaker(s) (optional)
g) MOV surge arresters if necessary
h) Current and voltage transformers (optional)
i) Energy storage device including charging unit or transformer and rectifier to supply the dc link
j) Control, protection, alarm, and monitoring system for the device
k) On-line monitoring and annunciation system via common IT systems (modem, Internet)
l) Special maintenance equipment and tools
m) Training program for operation and maintenance personnel
n) Spare parts
o) Testing and commissioning service
p) Documentation including instruction manuals
q) Device dimensions, weight, and center of gravity
The user shall furnish the following equipment, materials, and services:
a) Site suitable for the device available __________ days after contract start
b) Existing facilities and equipment
c) Station service during construction (auxiliary power) for the device at __________ V, __________ A
available __________ days after contract start (if needed)
d) Station service (permanent auxiliary power) for the device at __________ V, __________ A avail-
able __________ days after contract start
e) Project completion is __________ calendar days after contract start. The supplier project schedule is
due __________ days after contract start and should include, but not limited to, the dates for com-
mencement and completion of the work of several controlling features of the project, dates for user
furnished services, dates on which supplier-furnished drawings will be provided and the required
approval dates, and the dates and length of time of any required power outages. Review meetings
should be held between the user and supplier to review and discuss progress of the supply of the
device. The first review should be held within __________ days after contract start.
The device should be designed to meet all ratings and performance requirements specified herein while
operating in the following site and environmental conditions. Usual design values are given in parenthesis.
The ac power system characteristics at the point of connection prior to device installation are listed below.
Usual design values are given in parenthesis.
9.1 Rating
The device should insert positive sequence, negative and zero sequence voltage, if required, into the line.
The functional application of the device is to dynamically maintain line-to-line or line-neutral voltage as
measured prior to an event (fault) and in accordance to IEEE Std 519-1992 or ITIC levels, to three-phase or
single-phase loads during large voltage fluctuations (i.e., balanced or unbalanced sags or swells) that occur
on the source side of the device. The voltage must be self-adjustable to the pre-event voltage between the
specified upper and lower voltage limits.
NOTE—For the short duration upon a voltage sag, harmonics may be of a lesser issue than speed of response.
The response of the device should be such that the device should insert full inverter voltage from a state of
zero inserted voltage within time periods that maintain load voltage. The load voltage should be maintained
within the ITIC curve 2000, or IEEE Std 519-1992 limits, or otherwise specified harmonic and unbalanced
voltage.
The device should be capable of attaining 90% of nominal line to neutral voltage from event (sag or swell)
detection in __________ cycles or less. Energy storage elements should be in sizes compatible with cus-
tomer voltage restoration requirements. Energy storage converters should have a __________ kVA short
term rating. (Typically the energy storage converter rating should be at least as large as the rating of the main
inverter assembly.) The nominal interconnection voltage should be attained by the use of a series insertion
transformer or through direct connection of the inverter if suitable. The system should be designed to
recharge the energy storage either through the main inverter or through a dedicated charging unit.
The device can be built with smaller modules connected in parallel. The manufacturer should specify the
module size and the number of modules.
If the system contains several modules connected in parallel, equal current sharing among the modules
should be achieved by suitable circuits that are incorporated in the inverter modules. The current sharing
should be better than 95% among the in-service modules.
9.2 Losses
a) The supplier should specify the total system losses in idle mode, including transformer losses, in kW
and in percentage of the maximum load. In addition, the losses should include all parasitic loads,
including cooling fans and pumps, buttery chargers, UPS systems, controls, and other auxiliary
loads and losses.
b) Losses evaluation should calculate the __________ $/kW and __________ $/kWh values.
c) The supplier should present alternative methods to reduce losses.
a) Total voltage and current harmonic distortion should be calculated under worst-case conditions in
accordance with the procedure outlined in IEEE Std 519-1992. These calculations should be done
based on the KVA capacity and harmonic impedance of the supplying source, the latter including the
impedance of the transformer supplying the device. The customer should supply this information to
the device supplier.
b) The harmonic distortion should be verified through tests. The test results should be made available to
the customer.
c) The device should be configured to avoid resonance with common power system components,
including shunt capacitors of rating 10 MVAR or less, which may be located at either terminal of the
series insertion transformer.
d) If the device is a “standby design,” the evaluation of harmonics should consider that, most of the
time, the device operates in a transient/sub-transient mode, for a few hundred ms only. The harmon-
ics distortion may be less important under these circumstances.
Noise generated by the device in idle operation should not exceed __________ dBA measured at 3 m from
the nearest surface of the cabinet. The suppliers should establish existing audible noise level prior to installa-
tion of the device. A report should record the audible noise levels prior to and after the installation of the
device. The selection of the noise level should comply with ANSI C57.12.24-2000.
a) Radiated and conducted EMI generated within the device should be suppressed to prevent excessive
interference with nearby electronic equipment. The I·T product should be less than __________,
where I·T is defined as the square root of the sum of the squares of the weighted harmonic current;
the corresponding weights are the Telephone Influence Factor (TIF) weighting factors established in
1960. (IEEE Std 519-1992.)
b) The V·T product should be less than __________, where V·T is defined as the square root of the sum
of the squares of the weighted harmonic voltage; the corresponding weights are the Telephone Influ-
ence Factor (TIF) weighting factors established in 1960. (IEEE Std 519-1992.)
c) The device should not be susceptible to misoperation due to EMI generated by a hand-held general
mobile radio service transmitter from a distance of 61 cm in front of the device with the doors
closed.
d) Higher frequency electromagnetic emissions should be limited to avoid interference with any prop-
erly licensed radio, TV, microwave, or other equipment in service. The radio frequency emission
produced by the device should be less than __________ mV over a range of 0.15–1 MHz, when
measured 500 m from the building. The measurement should be made in accordance with IEEE Std
139-1988, using a quasi-peak detector reading.
b) An air-cooling system should provide full heat rejection with redundancy in blowers, filtering, mon-
itoring, and heat exchangers (if required). The cooling system should permit work on a defective unit
without shutting down the system.
c) The supplier should describe the air filtering system and details of monitoring of the status of blow-
ers, filters, and other components.
d) If filters are used, all air inlets should have exchangeable filters. Filters should be provided with
pressure differential alarms.
a) A closed loop re-circulating system should provide full heat rejection capacity with redundancy for
pumps, heat exchangers, and fans that are appropriate to the device availability requirements. The
cooling system should be able to maintain full capacity at maximum ambient temperature and
maximum device power output. The cooling system should be able to operate at the lowest ambient
temperature and zero output, and the supplier should describe how this is done.
b) If defective, replacement of certain cooling equipment (pumps, fans, cooler unit) should be possible
while the cooling system still operates.
c) If high resistivity is required, purifying loop to maintain liquid resistivity should be provided. The
supplier should state the design value of liquid resistivity and describe methods of detecting and
responding to abnormal conditions.
d) If high resistivity is required, the quantity of deionizing material should be sufficient to operate
safely for a period 1 1/2 times longer than the specified maintenance interval operation without
replacement. Deionizing materials should be replaceable without cooling system shutdown. Instruc-
tions for frequency of inspection and change should be given.
e) The supplier should describe the necessary maintenance actions and their frequency.
f) Maintenance of closed loop systems and make up for loss of liquid should not be required more than
once a year.
NOTE—The evaluation of the cooling system should consider that the devices operates only few ms. Due to the short
duration of operation, most of the heat will be stored in the semiconductor and in the heat sink.
The cooling system should monitor its own operation and the condition of the cooling medium. If the cool-
ing system has no redundancy, the component failure should shut down the system. In a redundant cooling
system, the component failure should activate alarms first. The warning and shutdown alarms should be
modified according the cooling system configuration.
a) For liquid-cooled systems, the protection system should include, as a minimum, the following warn-
ing alarms:
1) Depleted demineralized (deionizing) cell, if high resistivity is required
2) Low water resistivity, if high resistivity is required
3) Low coolant level
4) Primary pump stopped
5) Primary fan stopped
6) High coolant temperature
7) Failure of pump cycling scheme
b) For liquid-cooled systems, the protection system should include, as a minimum, the following shut-
down alarms:
1) Extra high temperature
2) Extra low coolant level
3) Both pumps stopped or blocked flow
c) For air-cooled systems, the protection system should include, as a minimum, the following warning
alarms:
1) Blower transfer if applicable
2) High exhaust air temperature or high heat sink temperature
3) High differential pressure across the filter if applicable
4) Low air flow
d) For air-cooled systems, the protection system should include, as a minimum, the following shut-
down alarms:
1) Excessive exhaust air temperature or high-heat sink temperature
2) Loss of air flow
9.7 Enclosures
a) Design availability of an individual module should exceed 95% for forced outages and should
exceed 99.5% for scheduled outages, after the commissioning period.
10In English units, trailer dimension should not exceed 8.5 ft in width, 48 ft in length, and 14.5 ft in height.
b) Design availability factor for forced outages of devices consisting of multiple modules (including
provisions for de-rating) should exceed 95%, after the commissioning period.
c) Scheduled maintenance, which requires that the unit be taken out of service, should not exceed 8
hours per year, on average, for a 20-year minimum design lifetime.
d) Replacement of any power electronics assembly should be capable of being accomplished in 2 hours
or less, with parts available on site.
e) The device should be able to withstand the loss of one cooling fan or pump with no degradation in
nominal output capability.
f) The device should be capable of operation in high isokeraunic areas (80 or more thunderstorm days
per year). The device should be capable of restoring voltage for multiple (not less than five) sequen-
tial maximum duration, maximum depth sags at 5 s intervals, if required by the user.
a) The device control should achieve the functional objectives outlined in Clause 9. The accuracy of the
voltage should be within 2% of the reference voltage. The response of the control to a disturbance
should be faster than 2 ms.
b) Control interface should provide access to the adjustment of control parameters both locally and
remotely, via a modem or by an Internet/LAN connection. The control interface should allow the
setting of the following parameters both locally or remotely:
1) Start and stop of operation
2) Change of reference voltage
3) Alarm acceptance and if appropriate reset
c) The automatic functions include pre-start verification of the control and protective functions,
synchronization of the control to the bus voltage, closing of the insolation switches, transfer of line
current from the bypass breaker to the inverter, and opening of the bypass breaker. None of these
operations should produce a discernible transient in the load voltage.
d) The device should be able to be shut down from a remote command or from an internal diagnostic or
protective command. The automatic functions include transfer of line current to the bypass breaker,
shutdown of the inverter, discharge of the dc bus and energy storage, and release of protective inter-
locking for the equipment. None of these operations should produce a transient in the load voltage
that exceeds 3% for 2 cycles or more.
e) The device should be able to accommodate momentary outages of source power as well as over-
current conditions due to faults by closing the bypass switch and removing the device from service
temporarily. When the condition has passed, the device should automatically restart and resume
normal operation. This operation will not have critical time constraints and outages lasting several
minutes will be acceptable. The bypass system should not operate in case of normal inrush current of
the motors starting at the load side. This may require special sensing and protection circuits.
f) Sufficient diagnostics should be made available so that the source of a failure of a major electronic
component or subassembly can be accurately and quickly identified by maintenance personnel. The
diagnostic data available from the modem or other communication device should include, but is not
limited to, the following:
1) Three line voltages at both source and line side (magnitude and phase)
2) Three line currents (magnitude and phase)
3) Three inverter voltage magnitudes and phase, if applicable
4) Three inverter current magnitudes and phase, if applicable
5) Ambient temperature
6) DC bus voltage
As an option, a Remote Terminal Unit (RTU) for connection to a Supervisory Control and Data Acquisition
(SCADA) System should be made available at additional cost to the customer.
12. Protection
a) The control of the device should monitor its operation and the operation of various components. Two
levels of protection should provide: warning and shutdown where appropriate. A warning indicates a
developing problem that exists, but the equipment or its proper operation is not in immediate danger.
A shutdown indicates fault that prevents operation or that may cause damage if left uncorrected.
b) The device protection should be properly coordinated to prevent incorrect operation. Fail-safe
principles should be applied. The protection system should be equipped with voltage and current
transformers, which are either part of the device package or supplied by the user. Redundant protec-
tive functions should be demonstrated and recorded.
c) The device should withstand an external phase-phase or phase-ground fault cleared by backup pro-
tection without the failure of a major subassembly.
d) The device should withstand internal fault on the ac side of the inverter bridges cleared by backup
protection from the distribution system without failure of the inverter components and without dam-
age to the dc bus or energy storage system.
e) The protection should remove the device from the service with appropriate diagnostic message in
case of:
1) High impedance faults
2) Faults that short the secondary winding of the series insertion transformer
f) The device should detect overvoltage and overcurrent conditions within the inverter circuits, the dc
bus circuit, and the energy storage circuits, and initiate a shutdown rapidly enough to prevent conse-
quential failure of components. It shall provide diagnostic information that shows the reason for
each shutdown.
a) Switches should be provided to bypass the device series transformer leads both at the source and
load sides.
b) The device system should be equipped with switches (circuit breakers or disconnect switches as
appropriate) to permit isolation from the primary system voltage. The transformer basic impulse
insulation level (BIL) should be in accordance with appropriate IEEE standards. The insulation level
of the inverter side of the transformer should be coordinated with that of the inverter. Surge protec-
tive equipment should be used as required.
c) The switches and links should be adequately sized to carry the maximum steady state and transient
fault currents.
a) Equipment should be furnished with permanent conspicuous signs stating “Danger—High Voltage
—Keep Out” in accordance with the National Electrical Code® (NEC®) (NFPA 70-1999), and cus-
tomers should be apprised of the need to provide clear working space during maintenance in accor-
dance with Table 110-34(a) of the National Electrical Code® (NEC®) (NFPA 70-1999).
b) Suitable interlocks should be placed in service to insure that the equipment cannot be operated with
personnel inside an inverter or energy storage module.
a) Delivery to the installation site should be within __________ months [typical delivery time is nine
(9) months] after the contract award.
b) The installation time is __________ months and the commissioning requires __________ months.
a) The user-provided wiring installation and handling should be in accordance with the manufacturer’s
recommendations.
b) The user should provide adequate storage space for the equipment supplied by the device manufac-
turer. Prior to installation and during construction at the job site, the device should be protected
against damage at all times. The device should be stored in a clean, dry environment with tempera-
ture and humidity within the range as specified by the device manufacturer. Space heaters should be
energized during storage, as recommended by the manufacturer.
c) The manufacturer should provide the necessary spare parts for the first year of operation. The manu-
facturer should prepare a spare part list that assures trouble-free operation.
d) The manufacturer should provide a maintenance recommendation that includes the description of
the maintenance procedures and schedules.
The device should be fully tested at the manufacturing location. The tests should include the following:
a) Type test performed on selected components. The manufacturer should maintain a certified copy of
the test reports.
b) Production tests performed on the components/assemblies manufactured for this installation. The
manufacturer should maintain a certified copy of the test reports. The owner may send a representa-
tive to witness the tests.
c) The manufacturer and the owner should perform joint checkout and start-up test of the solid-state
electronic device equipment under the technical direction of the manufacturer’s service engineer.
d) The manufacturer and the owner should perform joint functional test to prove the overall integrated
system performance and design.
A copy of all tests and checks performed in the field, complete with meter readings and recordings, where
applicable, should be submitted to the owner for his or her record.
a) The manufacturer should provide to the owner a start-up service for the device provided. This ser-
vice should include the following:
1) Inspection, final adjustments, operational checks of the provided device
2) Functional checks of spare parts
3) Final report for record purposes
b) The manufacturer should include __________ parts warranty from date of completion of commis-
sioning for the device provided.
c) The manufacturer should provide a training course for the owner’s personnel. It should be completed
within one week after the completed installation. Representatives of the manufacturer should present
the course at the job site or other location selected by the owner.