Relay Coordination - PSM and TMS calculator
Inputs
1 Feeder Load Current 35 Amps
2 CT installed on feeder - Primary 60 Amps
3 CT secondary current 1 Amps
4 Minimum fault current 8000 Amps
5 Maximum fault current 12000 Amps
6 Relay error 0.075
7 CT error 0.1
8 CT over shoot 0.05
9 CT interrupting time 0.17
10 Safety factor 0.33
Low Current setting - I >
1 Times current setting 0.58
2 Over Load Current 34.8 Amps
3 Over load current setting 0.58
4 Plug setting of Relay (PMS) 0.58
5 Plug setting multiplier ( PSM) 229.89
1.114885
6 Operating time of Relay for Normal Inverse 1.22
7 Time delay of relay(TMS) 0.10 Sec
8 Actual operating Time of Relay (t>) 0.12 Sec
9 Grading time of Relay 0.55 Sec 0.025
10 Operating time of upstream relay 0.70 Sec
High Current setting - I>>
1 Plug setting of Relay 1.4
Pick up setting of over current relay 1.4
Plug setting multiplier ( PSM) 95.24
2 Time Delay (TMS) 0.1
3 Curve is selected NI
Operating time for normal inverse curve 1.47 1.095409
Actual operating time of delay 0.15 Sec
Grading time of relay 0.575
Operating time of upstream relay 0.72 Sec
Conditions
1 PMS (I >) 0.58 Must be greater than equal to 0.8
2 0.125< 133.3333
0.114885
0.575
0.095409