Quality Conformance Awareness Training
Door Frame
Installation
Prepared By : Eddy Ong
Quality Conformance Awareness Training
Content
Safety Issue
Organization Chart
Method Of working
Q & A
Prepared By : Eddy Ong
Quality Conformance Awareness Training
Quality Objectives
To achieve Zero Reworks hence Zero Customer
Complaints on tiling works by:
creating awareness of the correct work
methodology & best practices so as the tiling
work is executed right the first time & every time;
implementing modular coordination & 3 S
principles (simplicity, standardization & single
integrated element) to enhance workability &
build-ability, and to
continuously re-examine and re-engineer tiling
process to improve work productivity & product
quality with minimum wastage
To improve customer satisfaction for repeat order &
to improve the bottom line for Contractor
Prepared By : Eddy Ong
Quality Conformance Awareness Training
Safety Issue
PPE
Housekeeping
Incoming and Out Going Material
Storage
Machinery
Prepared By : Eddy Ong
Quality Conformance Awareness Training
Organization Chart
Project Manager
Supervisor
Skill Workers
Prepared By : Eddy Ong
Quality Conformance Awareness Training
Method Of Working
Prepared By : Eddy Ong
Quality Conformance Awareness Training
Installation of Anchor Block
Prepared By : Eddy Ong
Quality Conformance Awareness Training
Method Of laying of anchor block as brick ‘s
Prepared By : Eddy Ong
Quality Conformance Awareness Training
Once layer the anchor block than cover with cement
mortar
Prepared By : Eddy Ong
Quality Conformance Awareness Training
The alignment of anchor block is
followed the string ( Benang ) as shown.
Prepared By : Eddy Ong
Quality Conformance Awareness Training
Once complete layer the anchor block as photo show above
Vertically layer 4nos each side Lintel layer 2nos
Each door frame minimum of 10nos anchor block required
Prepared By : Eddy Ong
Quality Conformance Awareness Training
Assembling of Door sub frame
Prepared By : Eddy Ong
Quality Conformance Awareness Training
Installing works carried out
Prepared By : Eddy Ong
Quality Conformance Awareness Training
Workers using laser to check the vertical and
horizontal alignment and height of FFL
Prepared By : Eddy Ong
Quality Conformance Awareness Training
Workers fastening the door sub frame toward the
anchor block .
Prepared By : Eddy Ong
Quality Conformance Awareness Training
Workers infill cement mortar in
between the gaps
Prepared By : Eddy Ong
Quality Conformance Awareness Training
Prepared By : Eddy Ong
Quality Conformance Awareness Training
Completed works
Prepared By : Eddy Ong
Quality Conformance Awareness Training
Q&A
Prepared By : Eddy Ong