0% found this document useful (0 votes)
87 views2 pages

Recommend The Following:: Date: Location: Visit No: 1

Corrective Action Report (CAR): Procedure used in response to a defect. This implies that you are reporting on a detected non-conformance (NCR or NCMR) and have determined root cause to correct this from reoccuring.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
87 views2 pages

Recommend The Following:: Date: Location: Visit No: 1

Corrective Action Report (CAR): Procedure used in response to a defect. This implies that you are reporting on a detected non-conformance (NCR or NCMR) and have determined root cause to correct this from reoccuring.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Document No

Revision No
CORRECTIVE ACTION REPORT
Issue Date
Page No

Organization: Date: Location: Visit No: 1

Title: CAR Ref: Item Ref. Date to be Completed


by:

Part 1 Finding Description (Fault Identified):

Recommendations: Place any recommendations here:


Recommend the following:

Responsible Manager

Finding √ Non-
Observation Finding Category:
Low / Moderate
H
High / Extreme
Type Compliance Risk Risk

Part 2 Tick most appropriate root cause box: (to be completed in consultation with QA)
Task/education √ Inadequate Lack of Discipline Lack of resources/time
checking
Poor instruction/procedure Lack of training Poor work Lack of management
environment support
√ Not following procedures Poor planning Poor Lack of maintenance
communications
Lack of standard operating Design Unsuitable Other
procedures deficiency equipment

Auditors Name & signature: Date: 20 January 2017

Responsible Manager

I acknowledge receipt of this finding and will provide a response

Management/Representative signature:

Date:

Part 3 Responsible Manager to complete Parts 3


Immediate Action Date remedial action to be completed:

Responsible Manager: (Recipient to complete Parts 4and 5 then return to QA/QC Manager on or before response date)
Part 4 Corrective Action Date Corrective action to be completed:
Document No
Revision No
CORRECTIVE ACTION REPORT
Issue Date
Page No

Part 5 Preventative Action Taken:

Responsible Manager
Action Completed by (Name): Title: Date:

....HSSE Manager to complete….

Part 6 Follow-up and close out Proposed follow-up date:

Auditor: Date CAR Closed out:

….GM/Senior Management review to complete….


Part 7 Review of Corrective and Preventative Action:

Corrective action is verified as effective. This CAR is :- Closed

Review Authority Name & Signature: Date CAR reviewed:

 CAR Register updated  Auditee advised


Site/location Manager: Date:

You might also like