0% found this document useful (0 votes)
38 views2 pages

Weekly Working Report (Week 9)

- The weekly report summarized 6 tasks related to improving export production and operations in various sections from November 23-28, 2020. - It discussed analyzing export line capacity, compiling work instructions to display, introducing new KPIs for production monitoring, and exploring ways to increase fin dressing comb length and add drains to chemical application tanks. - The status of each task was provided, such as carrying out discussions, completing a report, or needing more data collection.

Uploaded by

SaAhRa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views2 pages

Weekly Working Report (Week 9)

- The weekly report summarized 6 tasks related to improving export production and operations in various sections from November 23-28, 2020. - It discussed analyzing export line capacity, compiling work instructions to display, introducing new KPIs for production monitoring, and exploring ways to increase fin dressing comb length and add drains to chemical application tanks. - The status of each task was provided, such as carrying out discussions, completing a report, or needing more data collection.

Uploaded by

SaAhRa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Weekly Working Report

Assigned Section: Overall


Date: 23/11/2020 to 28/11/2020
Prepared by: Shayan Ahmed Raghib

Sr.
Task Description Details Section Status
#
Discussions were carried out.
Further working on (i) Press Shop
Various ideas and targets
capacity (ii) Export Line Station
Analysis of Export were discussed with Rustam
Export wise capacity (iii) Human
Production with Sb. to increase and
1. Assembly + Resources reqd. for production
respect to Prior and streamline export
Press Shop increase.
Subsequent Sections production. Press Shop
Will conduct meeting to evaluate
output will be analyzed.
options with relevant depts. and
top management.
Fin Machine and Tube Machine
Work Instructions of all instructions were compiled BUT
Compilation and
process on the production they are already on display in
2. Display of Work Overall
floor are to be written and feeding section so moved on to
Instructions
displayed. next processes. Will add them to
ISO QMS.

Report Completed and Shared


Monitoring and recording
Introduction of OEE with respective personnel.
system of KPIs that highlight
3. based KPIs for Overall Currently monitoring to gather
runtime, performance and
production more data. Will update report
quality.
weekly.

Time can be saved if fin


dressing comb length is Sample provided to operator.
Increasing size of fin
4. increased. Samples of this Process Hall Time study report to highlight
dressing combs
are to be made. To perform results.
trials and test.

Feasibility of adding a drain


Adding drain hole/pipe Discussed with maintenance, will
valve or hole to the
5. to the chemical Process Hall be applied when FPR (repair) will
chemical application was
application tanks be done next time
investigated.
New quality reports for
Press Shop Report being used.
6. Quality Reports rework, scrap and press Overall
Press Shop scrap report provided.
shop.