The document contains a table with 29 rows showing site IDs, planned and actual completion dates for work done by Clean IT. Most sites had their work completed on the planned date, though a few saw delays of 1-3 days. The pre and post reports and engineer name are the same for all entries, still pending finalization.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
33 views2 pages
S/N Site Id Pre DT Plan End Actual
The document contains a table with 29 rows showing site IDs, planned and actual completion dates for work done by Clean IT. Most sites had their work completed on the planned date, though a few saw delays of 1-3 days. The pre and post reports and engineer name are the same for all entries, still pending finalization.