Inspected By:: Plantroom Inspection Checklist

This document is a plantroom inspection checklist used to evaluate safety conditions in plantrooms. It contains sections to check layout and organization, environment, emergency procedures, general plantroom conditions, and the plant and equipment. Inspectors evaluate each item as adequate, below standard, or not applicable and note any required actions or hazards. The goal is to identify and address safety issues to maintain a tidy, well-lit, well-ventilated plantroom with clear emergency exits and properly maintained equipment.

Uploaded by

saad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views3 pages

Inspected By:: Plantroom Inspection Checklist

This document is a plantroom inspection checklist used to evaluate safety conditions in plantrooms. It contains sections to check layout and organization, environment, emergency procedures, general plantroom conditions, and the plant and equipment. Inspectors evaluate each item as adequate, below standard, or not applicable and note any required actions or hazards. The goal is to identify and address safety issues to maintain a tidy, well-lit, well-ventilated plantroom with clear emergency exits and properly maintained equipment.

Uploaded by

saad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

Plantroom Inspection Checklist Page 1

FACULTY / OTHER AREA (FOA) INFORMATION Date: __________

Building: FOA: Location:

INSPECTED BY:
Supervisor: (name and signature) OHS Management Rep: (name and Employee HSR: (name and signature)
signature)

ELEMENT Y/N/N COMMENTS / HAZARDS


A
Y = Up to standard (adequate), N = Below standard (action required), NA = Not Applicable
1 LAYOUT
1.1 Room is tidy
1.2 Adequate storage area provided
1.3 Floor is free of obstructions and not-slippery
1.4 The room can be safely accessed (doors, ladders
etc)
1.5 Any opening in the floor are guarded or covered
1.6 Aisles are sufficiently wide for easy movement
1.7 Walkways clearly marked and guarded if
necessary
Actions: (include person responsible and target completion date)

2 ENVIRONMENT
2.1 Lighting is adequate
2.2 Lighting covers and fittings are secure
2.3 Noise level is adequately controlled or hearing
protection provided
2.4 Ventilation is adequate
Actions: (include person responsible and target completion date)

3 EMERGENCY PROCEDURES
3.1 Extinguisher of appropriate type easily accessible
3.2 Tag on extinguisher has been checked in the last
6 months
3.3 Alarm can be heard in the area (if applicable)
3.4 Escape routes are clear
3.5 Emergency and hazard signage is clearly visible
3.6 Access to the room is controlled (by permit)
3.7 Communication can occur in an emergency
Actions: (include person responsible and target completion date)
Plantroom Inspection Checklist Page 2

ELEMENT Y/N/N COMMENTS / HAZARDS


A
Y = Up to standard (adequate), N = Below standard (action required), NA = Not Applicable
4 GENERAL PLANTROOM
4.1 Warning and safety signage in good condition
4.2 Procedure, plant and equipment manuals are
current and available
4.3 Plantroom free of food and drink
4.3 Plantroom is secure and kept locked
Actions: (include person responsible and target completion date)

5 PLANT AND EQUIPMENT


5.1 Area around plant clean
5.2 Access to plant is clear
5.3 Safe working instructions available and used
5.4 Plant and equipment maintained and in good
condition
5.5 Emergency stops are working
5.6 Plant guarding in place
5.7 No sharp edges protruding into aisles or
walkways
5.8 Excessive force is not required to operate the
plant or controls
5.8 Work postures for maintenance staff are not
constrained or awkward.
5.9 Do maintenance staff need to over-reach,
stretch, lift, carry or bend in such a way that it
may cause body strain?
5.10 Risks associated with the plant when it is not in
use or when undergoing maintenance have been
addressed.
5.11 Controls are suitably identified and conveniently
located.
Actions: (include person responsible and target completion date)

Other Comments:
Plantroom Inspection Checklist Page 3

General Recommendations: