0% found this document useful (0 votes)
190 views5 pages

Kiratpur Tunnel Drawings

The document shows details of benching and rock bolting including section views and technical details. Dimensions and coordinates are provided for various points along the benching and bolting layout.

Uploaded by

Ankush Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
190 views5 pages

Kiratpur Tunnel Drawings

The document shows details of benching and rock bolting including section views and technical details. Dimensions and coordinates are provided for various points along the benching and bolting layout.

Uploaded by

Ankush Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

SECTION B-B

BENCHING DETAIL

C C

SECTION A-A

A
C C

B
A

SECTION B-B

25Ø BOLT.

THICKNESS AS PER
ROCK LINE

SUPPORT CLASS
SHOTCRETE
B
NUT BEARING PLATE
200X200X10THK.
DETAIL - A

SECTION C-C ROCK BOLTS


(SCALE: 1:15)

POINTS X Y
F0 0.00 0.00
F1 0.00 3.33
F2 0.27 2.29
A F3 -0.27 2.29
F4 1.78 2.16
F5 -1.78 2.16
F6 3.34 -0.01
F7 -3.34 -0.01
F8 0.00 19.20

SECTION B-B Ø32

HEADING DETAIL Ø25


Ø8

CLIENT: CONCESSIONAIRE EPC CONTRACTOR : DESIGN CONSULTANT : PROOF CONSULTANT : SAFETY CONSULTANT : PROJECT : DRAWING TITLE :
BALANCE WORK FOR LANING KIRTPUR TO NERCHOWK
SECTION OF NH - 21 (FROM KM 12+750 KM 26+500, KM
126+502 TO KM 158+500 INCLUDING ACC LINK ROAD KM
CROSS SECTION DETAIL-A1 DATE : DECEMBER - 2020 REV: R0
BHARAT CONSTRUCTIONS (INDIA) PVT. LTD.
0+000 TO KM 2+003) GREENFIELD PKG -2 IN THE STATE CHECKED APPROVED
D0 DEC 2020 DRAFT SUBMISSION DESIGNED DRAWN
NATIONAL HIGHWAYS OF HIMACHAL PRADESH HYBIRD ANNUITY MODE(HAM)
REV DATE DESCRIPTION A B C D AUTHORITY OF INDIA SVS KS AK SK
Gawar Construction ltd SCALE : AS SHOWN PAPER SIZE : A3
POINTS X Y
E0 3.00 0.00
E1 3.00 3.33
E2 -1.78 2.16
E3 1.78 2.16
E4 -3.09 1.55
E5 3.09 1.55

CLIENT: CONCESSIONAIRE EPC CONTRACTOR : DESIGN CONSULTANT : PROOF CONSULTANT : SAFETY CONSULTANT : PROJECT : DRAWING TITLE :
BALANCE WORK FOR LANING KIRTPUR TO NERCHOWK
SECTION OF NH - 21 (FROM KM 12+750 KM 26+500, KM
126+502 TO KM 158+500 INCLUDING ACC LINK ROAD KM CROSS SECTION PRIMARY -B2 DATE : DECEMBER - 2020 REV: R0
BHARAT CONSTRUCTIONS (INDIA) PVT. LTD.
0+000 TO KM 2+003) GREENFIELD PKG -2 IN THE STATE CHECKED APPROVED
D0 DEC 2020 DRAFT SUBMISSION DESIGNED DRAWN
NATIONAL HIGHWAYS OF HIMACHAL PRADESH HYBIRD ANNUITY MODE(HAM)
REV DATE DESCRIPTION A B C D AUTHORITY OF INDIA SVS KS AK SK
Gawar Construction ltd SCALE : AS SHOWN PAPER SIZE : A3
B B

C C

B
B

SECTION C-C SECTION A-A

A
C C

SECTION B-B

SECTION D-D POINTS X Y


HEADING DETAIL E0 3.00 0.00
E1 3.00 3.33
E2 -1.78 2.16
E3 1.78 2.16
E4 -3.09 1.55
E5 3.09 1.55
25Ø BOLT.
THICKNESS AS PER

ROCK LINE
SUPPORT CLASS
SHOTCRETE

NUT BEARING PLATE


200X200X10THK.

SECTION E-E DETAIL - A Ø26


BENCHING DETAIL ROCK BOLTS
Ø20
(SCALE: 1:15)
Ø8

CLIENT: CONCESSIONAIRE EPC CONTRACTOR : DESIGN CONSULTANT : PROOF CONSULTANT : SAFETY CONSULTANT : PROJECT : DRAWING TITLE :
BALANCE WORK FOR LANING KIRTPUR TO NERCHOWK
SECTION OF NH - 21 (FROM KM 12+750 KM 26+500, KM
126+502 TO KM 158+500 INCLUDING ACC LINK ROAD KM CROSS SECTION PRIMARY -B2 DATE : DECEMBER - 2020 REV: R0
BHARAT CONSTRUCTIONS (INDIA) PVT. LTD. 0+000 TO KM 2+003) GREENFIELD PKG -2 IN THE STATE
D0 DEC 2020 DESIGNED DRAWN CHECKED APPROVED
DRAFT SUBMISSION OF HIMACHAL PRADESH HYBIRD ANNUITY MODE(HAM)
NATIONAL HIGHWAYS
REV DATE DESCRIPTION A B C D AUTHORITY OF INDIA SVS KS AK SK
Gawar Construction ltd SCALE : AS SHOWN PAPER SIZE : A3
A

POINTS X Y
E0 0.00 0.00
E1 0.00 3.33
E2 -1.78 2.16
E3 1.78 2.16
E4 -3.09 1.55
E5 3.09 1.55
E6 -5.10 2.89
E7 5.10 2.89
E8 0.00 18.79
E9 -4.24 -0.46
E10 4.24 -0.46

B B

C C C C

A
B B
SECTION B-B
SECTION A-A
SECTION C-C

Ø32

Ø25

Ø8

CLIENT: CONCESSIONAIRE EPC CONTRACTOR : DESIGN CONSULTANT : PROOF CONSULTANT : SAFETY CONSULTANT : PROJECT : DRAWING TITLE :
BALANCE WORK FOR LANING KIRTPUR TO NERCHOWK
SECTION OF NH - 21 (FROM KM 12+750 KM 26+500, KM
126+502 TO KM 158+500 INCLUDING ACC LINK ROAD KM CROSS SECTION PRIMARY -C1A DATE : DECEMBER - 2020 REV: R0
BHARAT CONSTRUCTIONS (INDIA) PVT. LTD. 0+000 TO KM 2+003) GREENFIELD PKG -2 IN THE STATE
D0 DEC 2020 DESIGNED DRAWN CHECKED APPROVED
DRAFT SUBMISSION OF HIMACHAL PRADESH HYBIRD ANNUITY MODE(HAM)
NATIONAL HIGHWAYS
REV DATE DESCRIPTION A B C D AUTHORITY OF INDIA SVS KS AK SK
Gawar Construction ltd SCALE : AS SHOWN PAPER SIZE : A3
BOLT PLATE FOR SN BOLTS
(GROUTED)
(SCALE: 1:10)

25Ø BOLT.

THICKNESS AS PER
ROCK LINE

SUPPORT CLASS
SHOTCRETE
SECTION B-B NUT BEARING PLATE
BENCHING DETAIL 200X200X10THK.
DETAIL - A
ROCK BOLTS

SECTION E-E
HEADING DETAIL

CLIENT: CONCESSIONAIRE EPC CONTRACTOR : DESIGN CONSULTANT : PROOF CONSULTANT : SAFETY CONSULTANT : PROJECT : DRAWING TITLE :
BALANCE WORK FOR LANING KIRTPUR TO NERCHOWK
SECTION OF NH - 21 (FROM KM 12+750 KM 26+500, KM
126+502 TO KM 158+500 INCLUDING ACC LINK ROAD KM
DATE : DECEMBER - 2020 REV: R0
BHARAT CONSTRUCTIONS (INDIA) PVT. LTD. 0+000 TO KM 2+003) GREENFIELD PKG -2 IN THE STATE
D0 DEC 2020 DESIGNED DRAWN CHECKED APPROVED
DRAFT SUBMISSION OF HIMACHAL PRADESH HYBIRD ANNUITY MODE(HAM)
NATIONAL HIGHWAYS
REV DATE DESCRIPTION A B C D AUTHORITY OF INDIA SVS KS AK SK
Gawar Construction ltd SCALE : AS SHOWN PAPER SIZE : A3