Abhinav CSP Safety Permit Record - Daily Update

The document contains details of various permit works carried out from July 1st, 2020 to August 13th, 2020. There are permits for both cold work (non-welding) and hot work (welding). The works involve maintenance activities like pump overhauling, drain cleaning and revamping projects such as the PF1-7 revamping work which included tasks such as manhole cover opening, painting, testing and media filling.

Uploaded by

Abhinav Pradhan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
138 views127 pages

Abhinav CSP Safety Permit Record - Daily Update

The document contains details of various permit works carried out from July 1st, 2020 to August 13th, 2020. There are permits for both cold work (non-welding) and hot work (welding). The works involve maintenance activities like pump overhauling, drain cleaning and revamping projects such as the PF1-7 revamping work which included tasks such as manhole cover opening, painting, testing and media filling.

Uploaded by

Abhinav Pradhan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 127

Permit Type of

Date Work Description


No. Permit

278068 Cold work 01.07.2020 Storm water drain cleaning


278069 Hot Work 01.07.2020 Spare vertical pump maint.
278070 Cold work 01.07.2020 DCP1RE discharge valve gearbox maint.
278071 Cold work 02.07.2020 Spare Air blower gearbox maint.
278072 Cold work 02.07.2020 Spare vertical pump maint.
278073 Cold work 02.07.2020 Storm water drain cleaning
278074 Cold work 02.07.2020 Chemical unloading

278075 Cold work 03.07.2020 PF1-7 side manhole cover opening


278076 Cold work 03.07.2020 Spare vertical pump maint.
278077 Cold work 03.07.2020 P201B coupling spider
278078 Cold work 03.07.2020 Condition monitoring of equipments

278079 Cold work 04.07.2020 PF1-7 side manhole cover opening


278080 Cold work 04.07.2020 Spare vertical pump maint.

278081 Cold work 06.07.2020 PF1-7 side manhole cover opening


278082 Cold work 06.07.2020 Sp-1 Oil Skimmer Tube Fitting Work
278083 Cold work 06.07.2020 Spare vertical pump maint.

278084 Hot Work 07.07.2020 SSPF BWP 1 Pump NRV Maint.Work


100351 Cold work 07.07.2020 PF1-7 Revamping Work
278085 Hot Work 07.07.2020 Coupling Guard Fabrication ICW Pump
475851 Cold work 07.07.2020 CT6 cell 6 & 7 revamping work
475852 Cold work 07.07.2020 ACF Fan 6 oil changeing work
278086 Cold work 07.07.2020 Near SP2 Material Unloading

100352 Cold work 08.07.2020 Sand loading & unloading


100353 Cold work 08.07.2020 Coupling Guard Removing & fitment ICW Pump
100354 Cold work 08.07.2020 Spare vertical pump maint.

100355 Cold work 09.07.2020 Drain cleaning manually


100356 Cold work 09.07.2020 Sand removing work
100357 Hot Work 09.07.2020 MS Bar Cutting
100358 Cold work 09.07.2020 Revamping Work
100359 Cold work 10.07.2020 P.F 1-7 Revamping Work
100360 Cold work 10.07.2020 Spare Blower Shifting SP 1 Store to F/P Blower House
100361 Hot Work 10.07.2020 coupling guard fabrication

100362 Cold work 11.07.2020 P.F 1-7 Revamping Work


1E+07 Cold work 11.07.2020 Spare blower assembly overhouling

278087 Cold work 13.07.2020 P.F 1-7 Revamping Work

278088 Cold work 14.07.2020 P.F 1-7 Revamping Work


278089 Cold work 14.07.2020 ICP 5 A/B/C,ICP 3 A/B/C,ICP 2 A/B/C, Suction strainer cleaning
278090 Cold work 14.07.2020 PF 1-1 Top Man Hole Opening
278091 Hot Work 14.07.2021 DCP-2C Discharge vavle replacement
278092 Cold work 14.07.2022 ICP-5A Suction vavle strainer cleaning and bush cheaking

278093 Cold work 15.07.2020 P.F 1-7 Revamping Work


278094 Cold work 15.07.2020 Material & assembly Shifting at red tag area
278095 Cold work 15.07.2020 ICP5A Stainer cleaning
278096 Hot Work 15.07.2020 ICW,Red tag,Filtration plant area scrab cutting
278097 Cold work 15.07.2020 Vibration Analysis of running Equipments

278098 Hot Work 16.07.2020 P.F 1-7 Revamping Work


278099 Hot Work 16.07.2020 ICP4B Pump NDE Side Bearing Replacement Work
278100 Hot Work 16.07.2020 Material Cutting & Shifting at red tag area
100364 Cold work 17.07.2020 P.F 1-7 Revamping Work (Painting from inside )
100365 Cold work 17.07.2020 House keeping work
100366 Cold work 17.07.2020 Material Shifting at red tag area

100367 Hot Work 18.07.2020 Hand Railing Fitting by welding


100368 Cold work 18.07.2020 PF 1-7 Painting from Inside and Manhole cover bottom fitting
100369 Hot Work 18.07.2020 Scrap Cutting and Shifting
100370 Cold work 19.07.2020 Waste material shifting

100371 Cold work 20.07.2020 PF1-7 air bubble testing and media filling

100373 Cold work 21.07.2020 PF1-7 air bubble testing and media filling
100374 Cold work 21.07.2020 Oil drum shifting Work
100375 Hot Work 21.07.2020 SSPF vent Line Fabrication Wok
100376 Hot Work 21.07.2020 B201B Coupling guard modification work
100377 Cold work 21.07.2020 Spare Vertical pump's TBH Maint. work

100378 Cold work 22.07.2020 PF1-7 air bubble testing and media filling
100379 Cold work 22.07.2020 Sp-1 Oil Skimmer Tube Fitting Work
100380 Cold work 22.07.2020 Spare Vertical pump's TBH Maint. work
100381 Hot Work 22.07.2020 DCP2C Motor's fondation bolts loosening & tightening
T. Redd+E88y+I74:M74
100382 Hot Work 23.07.2020 PF 1-7 revamping work( welding work inside filter)
100383 Hot Work 23.07.2020 DCP2C motor replacdment

100387 Hot Work 24.07.2020 PF 1-7 revamping work(middle manhole fitting and sand filling)
100386 Cold work 24.07.2020 DCP2C Alignment work
100388 Hot Work 24.07.2020 CT-2 staircase hand railing fabrication
100389 Cold work 24.07.2020 Spare vertical pump maint.
100390 Hot Work 24.07.2020 Angle cutting and welding
100391 Cold work 24.07.2020 Oil skimmer dismentling

100393 Cold work 25.07.2020 PF 1-7 revamping work


100394 Hot Work 25.07.2020 CT-2 staircase hand railing fabrication
100395 Hot Work 25.07.2020 Spare DCP1 Rotating Assembly Maint.
100396 Hot Work 25.07.2020 Angle cutting and welding
100397 Cold work 25.07.2020 Spare vertical pump maint.
100398 Hot Work 26.07.2020 CT-2 staircase hand railing fabrication
100399 Hot Work 26.07.2020 PF 1-7 revamping work(sand filling work)
100400 Hot Work 26.07.2020 ICP2D Pump's both DE/NDE side gland replacement work

311251 Hot Work 27.07.2020 CT-2 staircase hand railing fabrication


311252 Cold work 27.07.2020 PF 1-7 top manhole cover boxup
311253 Hot Work 27.07.2020 Angle cutting and welding
311254 Cold work 27.07.2020 Spare Vertiacal pump(SP2) maint. work

311256 Cold work 28.07.2020 PF 1-5 revamping work


311257 Hot Work 28.07.2020 CT-2 staircase hand railing fabrication
311258 Hot Work 28.07.2020 ICP2B Pump's both DE/NDE side gland replacement work
311259 Cold work 28.07.2020 Spare Vertiacal pump(SP2) maint. work
311260 Hot Work 28.07.2020 P301B Pump Pipeline Fabrication work

531262 Cold work 29.07.2020 PF 1-5 revamping work


531263 Hot Work 29.07.2020 CT-2 staircase hand railing fabrication
531264 Cold work 29.07.2020 Chequred plates unloading by farana at SP2 Area
531265 Hot Work 29.07.2020 PF's Foundations strenghtening work
531266 Cold work 29.07.2020 Spare Vertiacal pump(SP2) maint. work

531269 Cold work 30.07.2020 PF 1-5 revamping work


531270 Hot Work 30.07.2020 CT-2 staircase hand railing fabrication
531271 Cold work 30.07.2020 DCP1G Pump' overhauling work
531272 Cold work 30.07.2020 Spare Vertiacal pump(SP1) maint. work
531273 Hot Work 30.07.2020 ICP2B Pump's Coupling guard modification work

531274 Cold work 31.07.2020 PF 1-5 revamping work


531275 Hot Work 31.07.2020 CT-2 staircase hand railing fabrication/ toe gaurd fab.
531278 Hot Work 31.07.2020 DCP-1Dcoupling gaurd modification work
531281 Hot Work 01.08.2020 Road Side Light Pole Dismental
531282 Cold work 01.08.2020 condition monitoring Vibration analysis work
531276 Cold work 01.08.2020 Spare Vertiacal pump(SP1) maint. work
531282 Cold work 03.08.2020 PF 1-5 revamping work
531283 Hot Work 03.08.2020 CT-2 staircase hand railing fabrication/ toe gaurd fab.
531285 Cold work 03.08.2020 Spare Vertiacal pump(SP2) maint. work

531286 Hot Work 04.08.2020 CT-2 staircase hand railing fabrication/ toe gaurd fab.
531287 Cold work 04.08.2020 PF 1-5 revamping work
531284 Hot Work 04.08.2020 DCP-1C coupling gaurd modification work

531288 Cold work 05.08.2020 PF 1-5 revamping work


531289 Hot Work 05.08.2020 CT-2 staircase hand railing fabrication/ toe gaurd fab.

531290 Hot Work 06.08.2020 CT-2 staircase hand railing & Toe Gaurd fabrication
531291 Cold work 06.08.2020 PF 1-5 revamping work
531292 Cold work 06.08.2020 Sp-1 Scrapper Maint. Work

531293 Hot Work 07.08.2020 CT-2 staircase hand railing & Toe Gaurd fabrication
531294 Cold work 07.08.2020 PF 1-5 revamping work
531295 Hot Work 07.08.2020 DCP4RA Motor Replacement Work

531296 Hot Work 08.08.2020 CT-2 staircase hand railing & Toe Gaurd fabrication
531297 Hot Work 08.08.2020 DCP4RA Motor Replacement Work
531298 Cold work 08.08.2020 PF 1-5 revamping work

531299 Hot Work 09.08.2020 Welding of handrailing,toe gaurd and chequard of CT-2 staircase
DCP4RA gland replacement,gland cooling line leakage arresting and discharge flange nut/bolts
531300 Cold work 09.08.2020 tightening

51701 Cold work 10.08.2020 PF 1-5 revamping work


51702 Hot Work 10.08.2020 Welding of handrailing,toe gaurd and chequard plates of CT-2 staircase
51703 Cold work 10.08.2020 CT-1A cold basin strainer cleaning
51704 Hot Work 10.08.2020 FD fan dismentling
51705 Hot Work 10.08.2020 CT-1 backside(F/P side) monkey ladder dismentling

51706 Cold work 11.08.2020 PF 1-5 revamping work( Cleaning from Inside )
51707 Hot Work 11.08.2020 CT-2 staircase handrailing welding work
51708 Cold work 11.08.2020 SP-1 oil skimmer coupling checking
51709 Hot Work 11.08.2020 Plate cutting and shifting
51710 Hot Work 11.08.2020 PSF foundation Angle welding

51713 Hot Work 12.08.2020 At CT-1 common headerPlatform arrangement by welding


51712 Hot Work 12.08.2020 Staircase Handrailing welding
51714 Cold work 12.08.2020 TBH fittment in Red tag Area
51711 Hot Work 12.08.2020 PF 1-5 revamping work( T-bar welding )

51715 Hot Work 13.08.2020 PF 1-5 revamping work( T-bar welding )


51716 Hot Work 13.08.2020 Staircase Handrailing welding
51717 Hot Work 13.08.2020 Hand railing welding for platform
51718 Cold work 13.08.2020 TBH fitting

51719 Cold work 14.08.2020 PF 1-5 revamping work( Painting from inside and bottom manhole fitting )
51720 Hot Work 14.08.2020 CT-1 cold basin top platform old handrailing cutting and new handrailing fabrication
51721 Cold work 14.08.2020 TBH fitting

51724 Cold work 16.08.2020 PF 1-5 revamping work( bottom manhole fitting )
51725 Hot Work 16.08.2020 CT-1 cold basin platform handrailing fabrication
51727 Hot Work 16.08.2020 SLS1 Wheel raplacement work

51726 Hot Work 17.08.2020 CT1 hot basin header leakage arresting work
51728 Cold work 17.08.2020 All Coolng Tower Fan'sinside inspection
51729 Hot Work 17.08.2020 SSPF Top Manhole cover opening work
51730 Cold work 17.08.2020 ICP5A,B&C Pump;s Suction strainers cleaning work
51731 Hot Work 17.08.2020 PF1-1 D Manual Valve replacemnt work
51732 Cold work 17.08.2020 ICP2A,B&C and ICP3A,B&C Pump's Suction strainers cleaning work
51734 Cold work 17.08.2020 PF 1-5 revamping work( Media filling )

51736 Cold work 18.08.2020 PF 1-5 revamping work( Media filling )


51738 Hot Work 19.08.2020 PF 1-5 revamping work( Media filling )
51738 Hot Work 19.08.2020 CT-1 cold basin platform handrailing fabrication
51740 Cold work 19.08.2020 Waste oil barrells lifting & shifting to stores

51741 Hot Work 20.08.2020 PF 1-5 revamping work( Media filling )


51742 Hot Work 20.08.2020 CT-1 cold basin platform handrailing fabrication
51744 Cold work 20.08.2020 Thickner Mechanism Main Drive Motor removing & fitting work
51745 Cold work 20.08.2020 Vibration Analysis of running Equipments

51746 Hot Work 21.08.2020 P301A Impeller chuck nut welding


51747 Hot Work 21.08.2020 CT-1 cold basin platform handrailing fabrication
51748 Cold work 21.08.2020 PF 1-5 revamping work( Media filling )
531351 Cold work 21.08.2020 DCP4RB GLAND & deflector fitting
531352 Cold work 21.08.2020 Thickner Mechanism Main Drive Motor fitting work

531355 Hot Work 23.08.2020 PF 1-5 revamping work( Media filling & Pach welding )

531356 Hot Work 24.08.2020 CT-1 cold basin platform handrailing fabrication
531357 Hot Work 24.08.2020 SP-1 Scrapper maintenance
531358 cold work 24.08.2020 PF 1-5 Top manhole fitttment
531360 Cold work 24.08.2020 PF 1-1 mechanically isolation for revamping work

531362 Cold work 25.08.2020 Scaffolding desmentiling & new installation near P.F1-1
531363 Cold work 25.08.2020 DCP-1C Gland Replacement
531364 Cold work 25.08.2020 Material shifting
531365 Hot Work 25.08.2020 ICP-2A Coupling gaurd fitting
531366 Cold work 25.08.2020 PF 1-1 side manhole Opening Work
531367 Hot Work 25.08.2020 Scrap Material Cutting Work
531368 Cold work 25.08.2020 Vibbration analysis of Cooling Tower

531369 Hot Work 26.08.2020 PF 1-1 Bottom manhole Opening Work


531370 Hot Work 26.08.2020 DCP 1E Coupling gaurd Fabrication Work
531371 Cold work 26.08.2020 Sp-1 Oil Skimmer Tube Fitting Work

531361 Hot Work 27.08.2020 CT-1 stair case handrailing fabrication


531372 Cold work 27.08.2020 FIlter press unloading work
531373 Cold work 27.08.2020 CT2 Hot basin cleaning work
531374 Hot Work 27.08.2020 ICP2C&5C Pump's coupling guards fitting
531375 Cold work 27.08.2020 PF 1-5 revamping work
531376 Cold work 27.08.2020 All Pressure Filter's thickness checking
531377 Cold work 27.08.2020 SP1&SP2 Spare motors fitting on pump's stand piece

531378 Cold work 28.08.2020 PF 1-1 revamping work


531379 Hot Work 28.08.2020 ICP2D&5B Pump's coupling guards fitting Work
531380 Cold work 28.08.2020 CT-1 stair case handrailing fabrication
531381 Cold work 28.08.2020 SP1&SP2 Spare motors Lifting & Shifting Work

531283 Cold work 29.08.2020 PF 1-1 revamping work


531284 Hot Work 29.08.2020 SP-1 handrailing fabrication
531285 Hot Work 29.08.2020 DCP1B NDE Side Bearing Replecment Work
531287 Hot Work 29.08.2020 IC4B,5A,3B&1B Pump's coupling guard fitting work
531288 Cold work 29.08.2020 DCP2&3RB Pump's TBH lub oil replacemen work

531390 cold work 31.08.2020 PF 1-1 Revamping work(Sand Removing)


531391 Hot Work 31.08.2020 Coupling gaurd modification
531392 Hot Work 31.08.2020 ICP3C Coupling gaurd modification
531393 Hot Work 31.08.2020 Scrap cutting at Filteration plant

531398 Hot Work 01.09.2020 DCP2C maint. work


531397 Hot Work 01.09.2020 Chequared plate fabrication for walkway
531394 Hot Work 01.09.2020 Pipe line leakage arresting
531395 cold work 01.09.2020 PF 1-1 Revamping work(Sand Removing)
531389 Hot Work 01.09.2020 CT-1 staircase handrailing fabrication
551396 Hot Work 01.09.2020 Scaffolding Removing Work
531399 cold work 01.09.2020 Vibbration analysis of Cooling Tower

531302 Cold work 02.09.2020 PF 1-1 Revamping work(Sand Removing)


531303 Hot work 02.09.2020 DCP2C rotating assembly replacement
531306 Hot work 02.09.2020 Chequared plate fabrication for walkway
531307 Hot work 02.09.2020 Coupling guard fitting for DCP1B
531301 Cold work 02.09.2020 PF 3-2 Top manhole opening
531305 Cold work 02.09.2020 ICP5A suction strainer cleaning
531305 Cold work 02.09.2020 ICP2B suction strainer cleaning

531309 Cold work 03.09.2020 DCP2C Alignment work


531311 Hot work 03.09.2020 Chequared plate fabrication for walkway
531310 Cold work 03.09.2020 PF 1-1 Revamping work(Sand Removing)
531304 Hot work 03.09.2020 Handrailing Welding work

531312 Hot work 04.09.2020


531318 Cold work 04.09.2020 Thickness measurement of pipeline
531317 Cold work 04.09.2020 Scrap material loading and shifting
531315 Cold work 04.09.2020 DCP2C Alignment work
531314 Cold work 04.09.2020 PF 1-1 Revamping work(Sand Removing)
531313 Hot work 04.09.2020 Handrailing Welding work
531316 Hot work 04.09.2020 Scrap material cutting

531320 Hot work 05.09.2020 Handrailing Welding work


531321 Hot work 05.09.2020 Chequared plate fabrication for walkway
531322 Cold work 05.09.2020 PF 1-1 Revamping work(Sand Removing)
531323 Cold work 05.09.2020 Pipe unloading Work

531323 Cold work 06.09.2020 SP1 Pumphouse shed sheet nut&bolts loosening&tightening work
531326 Cold work 07.09.2020 PF 1-1 Revamping work(Sand Removing)
531327 Hot work 07.09.2020 Chequared plate fabrication for walkway
531328 Hot work 07.09.2020 Handrailing Welding work
531331 Hot work 08.09.2020 DCP2&3RB Pump's TBH Replacement work
531332 Cold work 08.09.2020 PF 1-1 Revamping work(Inside cleaning with water)
531333 Hot work 08.09.2020 Chequared plate fabrication for walkway
531334 Hot work 08.09.2020 Handrailing Welding work
531335 Cold work 08.09.2020 Waste oil barrelles lifting & shifting to stores
531336 Hot work 08.09.2020 Filteration plant hand railing fabrication work
531337 Hot work 08.09.2020 CT1 FD Fan foundation strenthening work

531338 Cold work 09.09.2020 PF 1-1 Revamping work


531339 Hot work 09.09.2020 Handrailing Welding work
531340 Hot work 09.09.2020 Chequared plate fabrication for walkway
531341 Hot work 09.09.2020 DCP2&3RC Pump's TBH Replacement work
531343 Cold work 09.09.2020 Grass cutting work
531344 Cold work 09.09.2020 Dewatering pump replacement work(Backwash Water Pumphouse)

531342 Cold work 10.09.2020 DCP2C pump's Maint. work


531346 Hot work 10.09.2020 PF 1-1 Revamping work
531347 Hot work 10.09.2020 Handrailing Welding work
531348 Hot work 10.09.2020 Chequared plate fabrication for walkway
531349 Cold work 10.09.2020 Grass cutting work
531350 Hot work 10.09.2020 Road side from SP3 TO SP2 Area scrap cutting and disposal

421251 Hot work 11.09.2020 Hand ralling fabrication work


421252 Hot work 11.09.2020 walkway fabrication work
421254 Hot work 11.09.2020 PF 1-1 Revamping work
421255 Hot work 11.09.2020 thickness testing
421257 Cold Work 11.09.2020 DCP 4RC alignment

421259 Hot work 12.09.2020 Hand ralling fabrication work


421260 Hot work 12.09.2020 DCP-4RC Maintenance
421261 Hot work 12.09.2020 PF 1-1 Revamping work
421263 Hot work 12.09.2020 walkway fabrication work
421265 Hot work 13.09.2020 PF 1-1 Revamping work(Welding Pipes)
421266 Hot work 14.09.2020 Hand ralling fabrication work
421267 Hot work 14.09.2020 walkway fabrication work
421268 Hot work 14.09.2020 PF 1-1 Revamping work
421269 Cold Work 14.09.2020 DCP-4RC Tbh ccoling line hose Replacement
421270 Cold Work 14.09.2020 Thickness measurement
421271 Cold Work 14.09.2020 DCP-1F line NRV Replacement
421272 Cold Work 14.09.2020 P301A suction spool piece removing
421264 Cold Work 14.09.2020 DCP2B motor foundation bolts removing and tightening

421273 Hot work 15.09.2020 walkway fabrication work

421274 Hot work 15.09.2020 Hand ralling fabrication work


421275 Cold Work 15.09.2020 PF 1-1 Revamping work
421276 Hot work 15.09.2020 DCP-2B Motor Replacement
421277 Hot work 15.09.2020 DCP1RC Expanssion Bellow Reeplacement
421278 Hot work 15.09.2020 Dia 350mm pipe line fabrication work
421279 Hot work 15.09.2020 DCP-1RA Pump Replacement

421282 Hot work 16/09/2020 Hand ralling fabrication work


421283 Hot work 16/09/2020 Dia 350mm pipe line fabrication work
421285 Cold Work 16/09/2020 PF 1-1 Revamping work
421286 Hot work 16/09/2020 DCP-2B Alignment

421290 Cold Work 17.09.2020 SP-1 scrapper boom rope fitting


421284 Hot work 18.09.2020 Dai 350 Pipe line fabrication
421287 Cold Work 18.09.2020 PF 1-1 Revamping work
421288 Hot work 18.09.2020 Hand ralling fabrication work
421291 Cold Work 18.09.2020 SP-1 Scrapper Rope Adjustment
421292 Cold Work 18.09.2020 Vibbration analysis of Cooling Tower/SP-1/2/3 Pump,ICW & DCW Pump
421293 Hot work 18.09.2020 SP-2 crane strengthening

421294 Hot work 19.09.2020 PF 1-1 Revamping work


421295 Hot work 19.09.2020 Hand ralling fabrication work
421296 Hot work 19.09.2020 walkway fabrication work
421297 Hot work 19.09.2020 Dai 350 Pipe line fabrication
421299 Hot work 19.09.2020 Sper Vartical Pump Maint. Work
421300 Hot work 19.09.2020 P301A Pump's Maint. work

421303 Hot work 20.09.2020 Hand ralling fabrication work


421301 Cold work 20.09.2020 PF1-1 middle manhole cover fitting
421304 Hot work 20.09.2020 DCP2B discharge valve replacement
421302 Hot work 20.09.2020 Tapping from SP-3 discharge header

421305 Cold work 21.09.2020 PF1-1 sand filling


421306 Hot work 21.09.2020 Hand ralling fabrication work
421309 Hot work 21.09.2020 Drain Chequared plate replacement
421307 Hot work 21.09.2020 DCP1RD pump replacement
421308 Hot work 21.09.2020 SP-2 crane strengthening by fabrication
421310 Cold work 20.09.2020 Thickness Measurement

421311 Cold work 22.09.2020 PF1-1 sand filling


421312 Hot work 22.09.2020 Hand ralling fabrication work
421314 Hot work 22.09.2020 SP-2 crane strengthening by fabrication
421315 Hot work 22.09.2020 Material lifting and shifting
421316 Hot work 22.09.2020 Frame fabrication
421317 Cold work 22.09.2020 125 Dai pipes loading,shifting to SP3 and unloading
421319 Cold work 22.09.2020 Cable tray & fasteners for filter press unloading at sp2 area

421313 Hot work 23.09.2020 Drain Chequared plate replacement


421321 Hot work 23.09.2020 Hand ralling fabrication work
421320 Cold work 23.09.2020 PF1-1 sand filling and leveling
421323 Cold work 23.09.2020 DCP1RD motor lifting and shifting

421326 Cold work 24.09.2020 Pf 1-1 sand leveling , open backwashing,top manhole fitting
421324 Hot work 24.09.2020 Toe guard fitting for handrailing
421328 Hot work 24.08.2020 125 Dia pipe line fabrication
421327 Hot work 24.09.2020 material lifting and shifting

421332 Hot work 25.09.2020 125 Dia pipe line fabrication


421333 Hot work 25.09.2020 CT-1 staircase toe guard welding and material shifting
421334 Hot work 25.09.2020 Plate cutting and shifting
421330 Cold work 25.09.2020 Sand bag and unwanted material shifting
421331 Hot work 25.09.2020 Dia 125 pipe welding

421336 Hot work 26.09.2020 CT-1 staircase toe guard welding and material shifting
421337 Hot work 26.09.2020 Dia 125 pipe welding
421338 Hot work 26.09.2020 walkway fabrication work
421339 Cold work 26.09.2020 Material Lifting & Shifting Work
421340 Cold work 26.09.2020 Sand bag and unwanted material shifting
421341 Hot work 26.09.2020 Dia 200 pipe welding
421342 Hot work 26.09.2020 SP 1 Spear Vartical Pump Maint

421343 Hot work 27.09.2020 CT-1 staircase toe guard welding and material shifting

421344 Cold work 27.09.2020 Thickner Mechanism Motor replacement work

421345 Hot work 28.09.2020 Dia 200 pipe line fabrication work
421346 Hot work 28.09.2020 CT-1 staircase toe guard Fabrication work
421347 Hot work 28.09.2020 walkway Chequrred plates fabrication work
421348 Hot work 28.09.2020 Dia 200 pipe line fabrication work
421349 Hot work 28.09.2020 Meterial lifting and shifting work
421350 Hot work 28.09.2020 Dia 125 pipe line fabrication work
421351 Cold work 28.09.2020 PF 2-1 A'Valve replacment work

421352 Hot work 29.09.2020 Dia 200 pipe line fabrication work

421353 Hot work 29.09.2020 Dia 125 pipe line fabrication work
421354 Hot work 29.09.2020 walkway Chequrred plates fabrication work
421355 Hot work 29.09.2020 Dia 200 pipe line fabrication work
421356 Cold work 29.09.2020 Sand bags filling by Farana
421357 Hot work 29.09.2020 CT-1 staircase toe guard Fabrication work
421358 Cold work 29.09.2020 SP2 Spare Vertical pump's Maint. work

421360 Hot work 30.09.2020 Dia 200 pipe line fabrication work
421361 Hot work 30.09.2020 CT-1 staircase toe guard Fabrication work
421362 Hot work 30.09.2020 walkway Chequrred plates fabrication work
421363 Hot work 30.09.2020 Dia 200 pipe line fabrication work
421364 Hot work 30.09.2020 Sand bags filling by Farana
421365 Hot work 30.09.2020 PF 1-8' B & D Valves replacement work
421366 Hot work 30.09.2020 Dia 125 pipe line fabrication work
421367 Hot work 30.09.2020 DCP1D Pump's Baseframe replacement work

421368 cold work 01.10.2020 Sand bags filling by Farana


421369 Hot work 01.10.2020 Dia 125 pipe line fabrication work
421370 Hot work 01.10.2020 Dia 200 pipe line fabrication work
421371 Hot work 01.10.2020 Dia 200 pipe line fabrication work
421373 Hot work 01.10.2020 walkway Chequrred plates fabrication work
421374 cold work 01.10.2020 DCP1RD Motor lifting and shifting
421375 Hot work 01.10.2020 DCP1D Pump's Baseframe replacement work
421376 Hot work 01.10.2020 PF 1-8' D Valves replacement work

421377 Hot work 02.10.2020 Dia 200 pipe line fabrication work
421378 Hot work 02.10.2020 Dia 200 pipe line fabrication work

421384 Hot work 04.10.2020 walkway Chequrred plates fabrication work


421386 Cold Work 04.10.2020 DCP1RD stand removing
421383 Hot work 04.10.2020 Dia 125 pipeline support fabrication

421385 Hot Work 05.10.2020 P301B Backwash Pump Maintenance

421388 Hot Work 6/10/2020 Lubrication room shed cutting


421389 Hot Work 6/10/2020 walkway Chequrred plates fabrication work
421390 Cold Work 6/10/2020 ICP-2A/B/C-3A/B Suction strainer cleaning
421391 Hot Work 6/10/2020 Dia 200 MM Pipe line fabrication
421393 Cold Work 6/10/2020 SP-1 oil skimmer Removing
421394 Cold Work 6/10/2020 Material shifting & cleaning
421395 Hot Work 6/10/2020 Dia 125 mm pipeline fabrication
421396 Cold Work 6/10/2020 Air blower line flow meter removing and spool piece fittment

421398 Hot Work 7/10/2020 Hand Ralling fabricatiion work


421399 Hot Work 7/10/2020 Dia 125 mm pipeline fabrication
310451 Hot Work 7/10/2020 Lubrication room shed cutting
310452 Hot Work 7/10/2020 Spare vertical pump maintenance

310453
310455 Hot
Hot Work
Work 8/10/2020
8/10/2020 Hand Railing
Dia 125 fabricatiion
mm pipeline work
fabrication

310454
310457 Hot
Hot Work
Work 09.10.2020
09.10.2020 Anhel
Dia 125cutting & shifting
mm pipeline fabrication
310458 Cold Work 09.10.2020 Material Lifting , Shifting
310459 Hot Work 09.10.2020 Hand Railing fabricatiion work
310460 Cold Work 09.10.2020 Material Lifting , Shifting
310461 Cold Work 09.10.2020 Filter/HRF inlet line, CT1/CT1A inlet line thikness checking
310462 Hot Work 09.10.2020 scrap cutting

310463
310464 Hot
Hot Work
Work 10.10.2020
10.10.2020 Hand Railing
Dia 125 fabricatiion
mm pipeline work
fabrication
310465 Cold Work 10.10.2020 Material shifting & Lifting
310466 Cold Work 10.10.2020 Toilet Painting
310467 Cold Work 10.10.2020 Tree Cutting Work CSP Road Side
310468 Cold Work 10.10.2020 Material Lifting & Shifting

310472 Hot Work 11.10.2020 DCP1D foundation breaking with the help of breaker
310473 Hot Work 11.10.2020 Frame fabrication for flow meter display unit
310470 Cold work 11.10.2020 Cooling Tower 2 material shifting from SP2 red tag area

310474 Hot Work 12.10.2020 Hand Railing fabricatiion work


310475 Cold Work 12.10.2020 Material Lifting & Shifting
310476 Hot Work 12.10.2020 Dia 125 mm pipeline fabrication
310477 Cold Work 12.10.2020 DCP1RA bolt tightening work
310478 Hot Work 12.10.2020 EOHT tank & pipe line thikness Checking work
310479 Cold Work 12.10.2020 Toilet Painting work

310485 Hot Work 13.10.2020 Material cutting and shifting


310484 Cold work 13.10.2020 Painting of Toilet
310483 Cold work 13.10.2020 Material shifting and cutting

310469 Hot Work 13.10.2020 Hand railing fabrication


310481 Hot Work 13.10.2020 Dia 125 pipeline fabrication and errection
310480 Hot Work 13.10.2020 DCP4RC TBH replacement work

310487 Hot work 14.10.2020 Dia 125 pipeline fabrication and errection
310489 Cold work 14.10.2020 Material shifting /drilling/grinding
310488 Hot work 14.10.2020 Hand railing fabrication
310492 Cold work 14.10.2020 Material lifting and shifting
310491 Hot work 14.10.2020 Unwanted material cutting
310490 Hot work 14.10.2020 DCP2&3RB pump TBH replacement

310493 Hot work 15.10.2020 Dia 125 pipeline fabrication and errection
310496 Hot work 15.10.2020 Hand railing fabrication
310497 Cold work 15.10.2020 DCP4RC coupling locknut adjustment
310494 Cold work 15.10.2020 PVC material drilling,cutting and shifting
310499 Cold work 15.10.2020 Tree cutting
310500 Cold work 15.10.2020 DC2 header flow meter checking

421403 Hot work 16.10.2020 Dia 125 pipeline fabrication and errection
421404 Hot work 16.10.2020 Hand railing fabrication
421406 Cold work 16.10.2020 PF3-3 Top manhole opening and closing
421407 Cold work 16.10.2020 DCP1A pump freness checking
421408 Cold work 16.10.2020 DCP1RD motor fittment and alignment
421409 Hot work 17.10.2020 Hand railing fabrication
421410 Hot work 17.10.2020 DCP1D Pump's base fabrication
421411 Hot work 17.10.2020 Dia 125 pipeline fabrication and errection

421415 Hot work 18.10.2020 Dia 125 pipeline fabrication and errection
421416 Hot work 18.10.2020 DCP1D Pump's Alignment work

310404 cold work 19.10.2020 Area below Thikner cleaning work


421417 Hot work 19.10.2020 Hand railing fabrication
421418 Hot work 19.10.2020 Scrap Meterial cutting and shifting
421419 Hot work 19.10.2020 DCP1D Foundation Frame stiffening welding work
421420 Hot work 19.10.2020 SP2 Grab Crane Structure Strethning work
310405 Hot work 20.10.2020 Dia 125 pipeline fabrication and errection
421495 Hot work 20.10.2020 SP2 Grab Crane Structure Strethning work
421421 Hot work 20.10.2020 Hand railing fabrication
421416 Hot work 20.10.2020 DCP1D Pump's Alignment work
421422 Hot work 20.10.2020 Eye Shower's fitting work

421424
421425 Hot
Hot work
work 21.10.2020
21.10.2020 Dia
SP2 125
Grabpipeline fabrication
Crane Structure and errection
Strethning work
421426 Hot work 21.10.2020 Hand railing fabrication
421427 Hot work 21.10.2020 Eye Shower's fitting work
421428 Hot work 21.10.2020 DCP1D Pump's Frame hole drilling work
421429 Hot work 21.10.2020 PSF'S Foundation's angles cutting and welding work
421430 Hot work 21.10.2020 DCP1RD Motor removing and shifting
421431 Hot work 21.10.2020 Scrap Cutting

421437 Hot work 22.10.2020 Dia 125 pipeline fabrication and errection
421433 Hot work 22.10.2020 SP2 Grab Crane Structure Strethning work
421434 Hot work 22.10.2020 Hand railing fabrication
421435 Hot work 22.10.2020 Below CT2 Area shed tin sheet cutting and shifting work
421436 Hot work 22.10.2020 DCP1D Pump's Frame hole drilling work
421437 Hot work 22.10.2020 DCP1B Motor Removeing Work

421439 Hot work 23.10.2020 SP-2crane hand ralling & platform fabrication
421441 Hot work 23.10.2020 Hand rallinig fabrication
421442 Hot work 23.10.2020 Dia 125 pipeline fabrication and errection
421444 Hot work 23.10.2020 DCP-4RA Maintenance

310056
310057 Hot
Hot work
work 26.10.2020
26.10.2020 Dia
CT-2125 pipeline fabrication
Revampingwork( and
drilling errection
,grinding,cutting)
3100558 Hot work 26.10.2020 Fabrication work

310060 Hot work 27.10.2020 Fabrication work


310061 Hot work 27.10.2020 Fabrication work
310062 Hot work 27.10.2020 CT-2 Revampingwork( drilling ,grinding,cutting)
310064 Cold Work 27.10.2020 Material lifting and shifting
310063 Cold Work 27.10.2020 PF2-1 & 1-4 air line connection for pneumatic C-valve

310065 Hot Work 28.10.2020 Fabrication work


310067 Hot Work 28.10.2020 CT-2 Revampingwork( drilling ,grinding,cutting)
310068 Cold WOrk 28.10.2020 Material lifting and shifting
310069 Hot Work 28.10.2020 SP-3 Scrapper Hoist rope Replacement
310072 Hot Work 28.10.2020 Shed structure cutting

310066 Hot Work 29.10.2020 Fabrication work


310073 Hot Work 29.10.2020 Fabrication work( CUTTING)
310075 Hot Work 29.10.2020 CT1 FAN-3 Motor Replacement
310077 Cold WOrk 29.10.2020 Sand bag shifting
310076 Cold WOrk 29.10.2020 Material shifting

310078
310079 Hot
Hot Work
Work 30.10.2020
30.10.2020 Fabrication
DCP1D Pump'sworkAlignment work
310080 Cold WOrk 30.10.2020 Material shifting
310081 Cold WOrk 30.10.2020 Sand bag shifting
310082 Hot Work 30.10.2020 Material Cutting & shifting
310083 Hot Work 30.10.2020 CT-2 Revampingwork( drilling ,grinding,cutting)
310083 Hot Work 30.10.2020 P301B maint. work

310084 Hot Work 31.10.2020 Fabrication work


310085 Cold WOrk 31.10.2020 Sand bag shifting
310086 Hot Work 31.10.2020 Material Cutting & shifting
310088 Cold WOrk 31.10.2020 tree Cutting Work
310089 Hot Work 31.10.2020 Scrap pump's dismantelling work

310090 Hot Work 01.11.2020 Mannual valve nut-bolts freeness checking


310091 Hot Work 02.11.2020 Hand railing fbrication and toe guard fitting
310092 Hot Work 02.11.2020 Fibre material cutting and drilling
310093 Cold work 02.11.2020 Sand bag shifting
310094 Hot Work 02.11.2020 Material cutting and shifting
310095 Cold work 02.11.2020 Material shifting

310096 Hot Work 03.11.2020 fabrication Work


310097 Cold work 03.11.2020 Material Lifting & shifting
310098 Hot Work 03.11.2020 Fibre material cutting and drilling
310099 Hot Work 03.11.2020 fabrication Work

310100 Hot Work 04.11.2020 DCP2Edischarge valve replacement


310352 Hot Work 04.11.2020 PF1-4 & 1-8 D-valve Replacement
310351 Cold work 04.11.2020 P201A&P201B discharge valve replacement
310353 Hot Work 04.11.2020 PF1-6,1-7 & 1-3
310354 Hot Work 04.11.2020 CT-1 Make UP valve replacement
310355 Cold work 04.11.2020 ICP5A suction strainer cleaning

310358 Cold work 05.11.2020 Cooling tower -2 fiber material shifting


310357 Cold work 05.11.2020 PF2-4,2-5 C-valve replacement
310362 Hot Work 05.11.2020 PF2-4 D valve replacement
310356 Hot Work 05.11.2020 TBH cooling line connection
310364 Hot Work 05.11.2020 DC3 Pipeline fabrication

310365 Hot Work 06.11.2020 Handrailing and Toe guard fabrication


310366 Hot Work 06.11.2020 Fibre material cutting , drilling and material shifting
310367 Hot Work 06.11.2020 Material shifting
310368 Hot Work 06.11.2020 Chequard plate welding and cutting
310369 Hot Work 07.11.2020 Fibre material cutting , drilling and material shifting
310370 Hot Work 07.11.2020 Handrailing and Toe guard fabrication
310371 Hot Work 07.11.2020 Drinking water line leakage arresting work
310372 Hot Work 07.11.2020 DCP 2E Motor replacement work

310375 cold work 08.11.2020 Sludge shifting work


310376 Hot Work 08.11.2020 DCP2E Pump Alignment work
310377 Hot Work 08.11.2020 fabrication work

310378 Hot Work 09.11.2020 fabrication Work


310379 cold work 09.11.2020 PF 2-1 A Valve Replacement Work
310380 cold work 09.11.2020 Material Lifting & shifting
310381 cold work 09.11.2020 Fibre material cutting , drilling and material shifting
310382 Hot Work 09.11.2020 Material Cutting & shifting

310383 Hot Work 10.11.2020 fabrication Work


310384 Hot Work 10.11.2020 Fibre material cutting , drilling and material shifting
310385 Hot Work 10.11.2020 DCP1G Pump Bearing Replecment work
310386 cold work 10.11.2020 Material Lifting & shifting
310388 Hot Work 10.11.2020 Pipe Line Fabrication & Cutting Work
310389 cold work 10.11.2020 Grass Cutting Work
310390 cold work 10.11.2020 TBH Maint. Work

310391 Hot Work 11.11.2020 fabrication Work


310392 Hot Work 11.11.2020 fabrication Work
310393 Hot Work 11.11.2020 Fibre material cutting , drilling and material shifting
310394 cold work 11.11.2020 Material Lifting & shifting
310395 cold work 11.11.2020 TBH Maint. Work

310396 Hot Work 12.11.2020 fabrication Work


310397 Hot Work 12.11.2020 Fibre material cutting , drilling and material shifting
310398 cold work 12.11.2020 Material Lifting & shifting
310400 Hot Work 12.11.2020 DCP3B PUMP Both Side Bearing Replecment Work

310406 Hot Work 13.11.2020 fabrication Work


310407 cold work 13.11.2020 Fibre material cutting , drilling and material shifting( CT-2 Rvamping)
310408 cold work 13.11.2020 Grass cutting
310409 cold work 13.11.2020 Hand Ralling Painting
310410 Hot Work 13.11.2020 DCP-1C Pump maintenance
310411 cold work 13.11.2020 Material shifting
310412 Hot Work 13.11.2020 Scrap cutting
310413 Hot Work 13/11/2020 Clit welding for Discharge valve

310415
310414 Hot
coldWork
work 16.11.2020 fabrication
Fibre Work
material cutting , drilling and material shifting( CT-2 Rvamping)
310416 cold work 16.11.2020 Material Cutting & shifting

310417
310418 Hot
Hot Work
Work 17.11.2020
17.11.2020 Fabrication
Fabrication work
work
310419 Hot Work 17.11.2020 Fibre material cutting , drilling and material shifting( CT-2 Rvamping)
310420 Hot Work 17.11.2020 Spare gear bix maintenance
310421 cold work 17.11.2020 PF2-1 "B" Valve Replacement
310422 cold work 17.11.2020 Spare vertical pump TBH maintenance

310423
310424 Hot
Hot Work
Work 18.11.2020
18.11.2020 DCP-4RD PUMP
Fabrication workINSPECTION & ALIGNMENT
310425 Hot Work 18.11.2020 Fabrication work( CUTTING WORK)
310426 Hot Work 18.11.2020 Fibre material cutting , drilling and material shifting( CT-2 Rvamping)
310427 Hot Work 18.11.2020 Material cutting
310428 cold work 18.11.2020 PF2-1 "B" Valve Replacement
310429 Hot Work 18.11.2020 Chequerd plate cutting

310430 Hot Work 19.11.2020 Toe Guards Fabrication work


310431 cold work 19.11.2020 Fibre material shifting( CT-2 Rvamping)
310432 Hot Work 19.11.2020 DCP4RD NRV Maint. work
310433 Hot Work 19.11.2020 Container Shed cutting and shifting work
310434 Hot Work 19.11.2020 Coupling Guards Fabrication work
310435 Hot Work 19.11.2020 Spare Cooling Tower's Gearbox Maint. work
531486 cold work 19.11.2020 ct 6 cell 4,5 revamping work.(column erection)
310436 Hot Work 19.11.2020 Angles cutting work
409578 Hot Work 19.11.2020 Toe board (Fabrication,Cutting work)
409579 Cold work 19.11.2020 Unloading of 1100 mm dia flowmeter

310437 Hot Work 20.11.2020 Toe Guards Fabrication work


310439 Hot Work 20.11.2020 Coupling Guards Fabrication work
310440 Hot Work 20.11.2020 DCP4RC Motor Replacement work
310441 Hot Work 20.11.2020 Fibre material Cutting,Drilling & fitting work
310442 Hot Work 20.11.2020 Dia350 Pipeline errection work
310443 Hot Work 20.11.2020 Handrailing Painting work
310438 cold work 20.11.2020 Container shifting from Alibag gate to ECRW1

310444 Hot Work 21.11.2020 Dia350 Pipeline errection work


310445 Hot Work 21.11.2020 Toe Guards Fabrication work
310447 Hot Work 21.11.2020 Fibre material Cutting,Drilling & fitting work
310448 cold work 21.11.2020 Handrailing Painting work
310449 cold work 21.11.2020 Container shifting from Alibag gate to ECRW1
310450 Hot Work 21.11.2020 ANGLE CUTTING AND WELDING
310451 Hot Work 21.11.2020 Dia350 Pipeline errection work

475902 Cold work 22.11.2020 DCP4RC Alignment work


475903 Hot Work 22.11.2020 Dia 350 pipe line fabrication and errection
475904 Cold work 22.11.2020 Handrailing and Toe board painting
475905 Cold work 22.11.2020 CT-1 outside wall painting

475909 Cold work 23.11.2020 Handrailing and Toe board painting


475911 Cold work 23.11.2020 PF1-7 'B' valve replacement
475912 Hot Work 23.11.2020 Pipe welding
475906 Hot Work 23.11.2020 Dia 350 pipe line fabrication and errection
475908 Cold work 23.11.2020 Painting work
475910 Cold work 23.11.2020 Cutting and drilling of fibre material
475907 Hot Work 23.11.2020 Handrailing and Toe board fabrication

475919 Cold work 24.11.2020 Material lifting and shifting


475915 Hot Work 24.11.2020 Dia 350 Pipe welding
475916 Hot Work 24.11.2020 Dia 350 pipe line fabrication and errection
475918 Cold work 24.11.2020 Fibre material cutting and drilling
475917 Cold work 24.11.2020 Painting work
475921 Cold work 24.11.2020 DCP4RB gland replacement
475920 Hot Work 24.11.2020 PF 1-8 'B' valve replacement

475930 Hot Work 25.11.2020 Scrap cutting


475927 Cold work 25.11.2020 Material lifting and shifting
475923 Hot Work 25.11.2020 Dia 350 pipe line fabrication and errection
475926 Hot Work 25.11.2020 Dia 200 pipeline fabrication
475928 Cold work 25.11.2020 PF 1-3 B valve replacement
475925 Hot Work 25.11.2020 Fibre material cutting and drilling
475924 Cold work 25.11.2020 Painting work
475929 Hot Work 25.11.2020 Dia 350 Pipe welding
475931 Cold work 25.11.2020 Cooling tower fan spare gearbox maint

475932 Hot Work 26.11.2020 DCP1C motor replacement


475933 Hot Work 26.11.2020 Dia 350 pipe line fabrication and errection
475936 Hot Work 26.11.2020 Pipeline fabrication and errection
475937 Hot Work 26.11.2020 Scrapper structure strengthening
475938 Cold work 26.11.2020 Painting work
475935 Hot Work 26.11.2020 Dia 350 Pipe welding
475939 Cold work 26.11.2020 Chequerd plate unloading
475934 Cold work 26.11.2020 PF 1-9 A& B ,PF 2-4 B valve replacement

475941 Hot Work 27.11.2020 Dia 350 pipe line fabrication and errection
475942 Hot Work 27.11.2020 Pipeline fabrication and errection
475944 Cold work 27.11.2020 Handrailing and toe board painting
475945 Hot Work 27.11.2020 Dia 350 Pipe welding and pipe shifting
475946 Hot Work 27.11.2020 P301B maint. work
475947 Cold work 27.11.2020 Wall painting
475943 Hot Work 27.11.2020 Shed cutting

475948 Cold work 28.11.2020 Wall painting


475949 Cold work 28.11.2020 Handrailing and toe board painting
475950 Cold work 28.11.2020 Spare Vartical Pump Maint.
413451 Hot Work 28.11.2020 Dia 350 pipe line fabrication and errection
413452 Hot Work 28.11.2020 Dia 350 pipe line fabrication Work
413453 Hot Work 28.11.2020 Pipeline fabrication and errection
413454 Hot Work 28.11.2020 DCP1A Motor Replecment Work
413456 Hot Work 28.11.2020 Pipeline Removing Work(Thickner Area)

413455
413457 Cold work
Hot Work 29.11.2020
29.11.2020 Wall painting
Fabrication Work

413458 Hot Work 30.11.2020 Dia 350 pipe line fabrication and errection
413459 Hot Work 30.11.2020 Handrailing fabrication work
413461 Hot Work 30.11.2020 Handrailing and platform fabrication work
413462 Cold work 30.11.2020 Wall painting
413463 Cold work 30.11.2020 Waste oil barrella lifting and shifting
413464 Hot Work 30.11.2020 Spare vertical pump's Maint. work

413465 Hot Work 1.12.2020 Dia 350 pipe line fabrication and errection
413466 Hot Work 1.12.2020 Platform fabrication work
413467 Hot Work 1.12.2020 Handrailing fabrication work
413468 Cold work 1.12.2020 Wall painting
413469 Cold work 1.12.2020 PF 1-5 B valve replacement
413470 Hot Work 1.12.2020 F/P B201A Gaurd Fabrication

413472 Hot Work 2.12.2020 Dia 350 pipe line fabrication and errection
413473 Hot Work 2.12.2020 Handrailing fabrication work
413474 Hot Work 2.12.2020 Base Frame Fabrication Work
413475 Cold work 2.12.2020 Wall painting
413476 Hot Work 2.12.2020 Spare vertical pump's Maint. work
413477 Hot Work 2.12.2020 Fabrication Work

413478 Hot Work 3.12.2020 Dia 350 pipe line fabrication and errection
413479 Hot Work 3.12.2020 Base Frame Fabrication Work
413480 Hot Work 3.12.2020 Shed fabrication
413481 Hot Work 3.12.2020 Backwash Pump 301B Maint. Work
413482 Cold work 3.12.2020 PF 1-2 Top Man Hole Opening work
413483 Cold work 3.12.2020 Handrailing and toe board painting
413484 Cold work 3.12.2020 Wall painting
413485 Cold work 3.12.2020 Spare vertical pump's Maint. work

413489 Cold Work 4.12.2020 Wall painting working


413486 Hot Work 4.12.2020 350 Dia pipeline Fabrication and erection
413487 Cold Work 4.12.2020 Hand Railing painting
413492 Cold work 4.12.2020 Spare vertical Pump maintenance
413488 Cold work 4.12.2020 PF 1-8 top manhole Cover Opening
413491 Hot Work 4.12.2020 SSPF leakage welding
413493 Cold work 4.12.2020 Pump's Vibration checking purpose
Hot Work 4.12.2020 P301A Pump's Maint work

413495 Hot Work 5.12.2020 Dia 350 pipe line fabrication and errection
413496 Hot Work 5.12.2020 Fabrication work& errection
413498 Cold work 5.12.2020 Wall painting working
413499 Cold work 5.12.2020 Hand Railing painting
413500 Hot Work 5.12.2020 CT-1 Fan-2 maintenance
310001 Hot Work 5.12.2020 CT-2 Revamping( prepareness)cutting/welding
310002 Hot Work 5.12.2021 Fabrication work& errection

310004 Cold work 06.12.2020 CT-1 Fan-2 maintenance


310005 Cold work 06.12.2020 Wall painting working
310006 Hot Work 06.12.2020 CT-2 Revamping( prepareness)cutting/Driling

310007 Hot Work 07.12.2020 Dia 350 pipe line fabrication and errection
310008 Hot Work 07.12.2020 SP3 Pumphouse Old Shed Dismantelling work
310009 Cold work 07.12.2020 Hand Railing painting
310010 Hot Work 07.12.2020 CT-2 Revamping( prepareness)cutting/Driling of FRP Meterial
310011 Cold work 07.12.2020 CT1 Wall painting work
310012 Cold work 07.12.2020 Structural piller Errection work
310013 Hot Work 07.12.2020 Rod cutting at Filteration area
310014 Cold work 07.12.2020 LBSS Area Wall painting work
310015 Hot Work 07.12.2020 New Pump's foundation fabrication work
310016 Cold work 07.12.2020 Sand bag unloading
310018 Hot Work 08.12.2020 Fabrication work
310019 Hot Work 08.12.2020 Dia 350 pipe line fabrication and errection
310020 Cold Work 08.12.2020 Wall painting work
310021 Cold Work 08.12.2020 Wall painting work
310022 Cold Work 08.12.2020 PF 2-5 B valve , 3-1 A Valve replacement
310023 Hot Work 08.12.2020 SP-3 Shed Cutting Work
310024 Hot Work 08.12.2020 Below ThicknerPump & Pipeline Fabrication

310033
310031 Hot
ColdWork
Work 09.12.2020
09.12.2020 Drilling and grinding
DCP1D Alignment work
work
310025 Hot Work 09.12.2020 Dia 350 pipe line fabrication
310026 Hot Work 09.12.2020 Shed cutting work
310027 Cold Work 09.12.2020 Wall Painting
310028 Cold Work 09.12.2020 Hand Railing painting
310029 Hot Work 09.12.2020 Pump errection and fabrication
310030 Hot Work 09.12.2020 Errection of structural piller
310032 Hot Work 09.12.2020 Piller Angle welding/cutting

310034 Hot Work 10.12.2020 Errection of structural piller


310035 Hot Work 10.12.2020 Dia 350 pipe line fabrication
310036 Hot Work 10.12.2020 Pump errection and fabrication
310037 Cold Work 10.12.2020 Structurs and Hand Railing painting
310038 Cold Work 10.12.2020 Wall Painting
310039 Hot Work 10.12.2020 FRP Meterial Drilling and grinding work
310040 Hot Work 10.12.2020 Air Blower B201A Lub oil checking and Alignment work
310041 Hot Work 10.12.2020 SP3 Pumphouse Old Shed dismantelling work
310042 Hot Work 10.12.2020 Cutting and Welding work
310043 Hot Work 10.12.2020 PF 1-10 Pipeline leakage arresting work
310044 Hot Work 10.12.2020 PF 1-6 D- valve replacement
310045 Cold Work 10.12.2020 PF 1-6 & 3-2 C valve replacement

310046 Cold Work 11.12.2020 SP1 Scale Scrapper's Structur Painting work
310047 Hot Work 11.12.2020 Pump errection and Pipeline fabrication
310049 Hot Work 11.12.2020 ICP2B Pump's Maint. Work
310050 Hot Work 11.12.2020 Dia 350 pipe line fabrication
413751 Cold Work 11.12.2020 Civil Eection work
413752 Cold Work 11.12.2020 ICP3A,B,C Pump' Suction Strainers cleaning work
415535 Cold Work 11.12.2020 ct 6 cell 3,4 revamping work(SH#3 dismelting,)

310048 Cold Work 12.12.2020 FRP Meterial Drilling and grinding work
413754 Cold Work 12.12.2020 Errection work of Tank and Agitator Fitment
413755 Hot Work 12.12.2020 Dia 350 pipe line fabrication
413756 Cold Work 12.12.2020 SP1 Scale Scrapper's Structur Painting work
413757 Cold Work 12.12.2020 DCP1D Pump's foundation concrete graveting work

413758 Hot Work 13.12.2020 Dia 350 pipe line fabrication


413759 Hot Work 13.12.2020 DCP1D pump alignment

413760 Hot Work 14.12.2020 Dia 350 pipe line fabrication


413761 Hot Work 14.12.2020 Near Thickner Pump Errection& Fabrication Work
413762 Hot Work 14.12.2020 Errection& Fabrication Work
413763 Cold Work 14.12.2020 Material Lifting & Shifting
413764 Hot Work 14.12.2020 FRP Meterial Drilling,Grinding,Materil Shifting work

413765 Cold work 15.12.2020 Errection of CT-1 online cleaning system


413766 Hot Work 15.12.2020 Dia 350 pipe line fabrication and errection
413768 Cold work 15.12.2020 SP-3 scrapper structure painting
413769 Hot Work 15.12.2020 FRP Meterial Drilling,Grinding,Materil Shifting work
413770 Cold work 15.12.2020 DCP1RC ARV maint.
413771 Hot Work 15.10.2020 Fabrication work
413773 Hot Work 15.10.2020 Fabrication work
413772 Cold work 15.12.2020 Backwash pit Darling pump discharge pipe support fabrication
413774 Cold work 15.12.2020 PF1-1 B-valve replacement

413775 Cold work 16.12.2020 Cable termination at Panel and motor side
413777 Hot Work 16.12.2020 FRP Meterial Drilling,Grinding,Materil Shifting work
413778 Hot Work 16.12.2020 Dia 350 pipe line fabrication and errection
413779 Cold work 16.12.2020 SP-3 scrapper structure painting
413780 Hot Work 16.12.2020 Fabrication work
413781 Hot Work 16.12.2020 Grinding and welding work
Man
Location Applicant Holder Authoriser
power

In front of ICW pump house Vinod Sudam Pawar 8 Kamble


Near SP-1 Vinod Mahesh 4 Kamble
SP-3 Pump House Vinod Shirke 5 Mokal
Near SP-1 Stores Vinod Shirke 3 Mokal
Near SP-1 Vinod Mahesh 3 Kamble
In front of ICW pump house Vinod Sudam Pawar 3 Kamble
Near F/P and Near CT-2 Vinod SanjayKumar 4 Kamble

F/P ( Near PF1-7 ) Vinod Shamsher Ali 5 Kamble


Near SP-1 Vinod Mahesh 3 Kamble
F/P Vinod Shirke 3 Kamble
ICW/DCW/SP-1,2,3 & F/P Vinod Satish 5 Kamble

F/P ( Near PF1-7 ) Harinarayana Shamsher Ali 5 Kamble


Near SP-1 Harinarayana 3 Kamble

F/P ( Near PF1-7 ) Sachin Shamsher Ali 5 Kamble


SP-1 Sachin S D Rajam 2 Kamble
Near SP-1 Sachin Tushar 4 Kamble

SSPF Sachin S D Rajam 4 Kamble


F/P Sachin Shamsher Ali 6 Kamble
Near SP-1 Stores Sachin Reddy 3 Kamble
ph-2 Hemant ashok dubey 7 wagh
PH#1 Aakash Bhandari 3 Vaibhav
SP 2 Ashirwad Chottu 3 Kamble

F/P Ashirwad Shamsher Ali 6 Kamble


Near SP-1 Stores & ICW Area Ashirwad Reddy 3 Kamble
Near SP-1 Ashirwad Tushar 4 Kamble

Filtration Plant/ICW Rajam S D Prittam 3 Kamble


Filtration Plant Rajam S D Shamsher Kamble
IN front control Room Rajam S D Kamble
Filtration Rajam S D Kamble
Filtration Atish Shamsher Ali 5 Kamble
Near SP-1 to F/P Atish Shirke 2 Kamble
Near SP-1 Stores & ICW Area Sachin Rajam 3 Kamble

Filtration Atish Shamsher Ali 5 Kamble


SP-1 Atish Shirke 3 Kamble

Filtration Ashirwad Shamsher Ali 5 Kamble

Filtration Plant Ashirwad Shamsher Ali 5 Kamble


ICW AREA Ashirwad Sameer 4 Kamble
Filtration Plant Ashirwad Mane 4 Kamble
DCP Pump House Ashirwad Shirke 6 Kamble
ICW AREA Ashirwad Sameer 4 Kamble

Filtration Plant Atish Shamsher Ali 5 Kamble


Read tag area Rajam Jagdish 5 Kamble
ICW Area Rajam Jagdish 3 Kamble
ICW,Red tag,Filtration plant areAshirwad Reddy 2 Kamble
ICw/DCW/SP-1,2,3 Vinod Satish 4 Kamble

Filtration Plant Sachin Shamsher Ali 5 Kamble


ICW Sachin Shirke 3 Kamble
Sp 2 (Read tag area) Sachin Reddy 3 Kamble
Filtration Plant Vinod Samsher Ali Kamble
maintenace shop ner ,sp-1 Vinod shirke 3 Kamble
Red tag area Vinod madhu 2 Kamble

CT-2 Rajam Abdul(SRK Engg) 6 Kamble


Filtration plant Rajam Samsher 5 Kamble
Sp-2 Red tag Area Rajam madhu 5 Kamble
Backside of F/P Vinod Samsher Ali 6 Chetan

Filtration plant(1-7) Vinod Samsher Ali 6 Kamble

Filtration plant(1-7) Sachin Samsher Ali 4 Kamble


ECRW 1 Sachin Ramchandra 4 Kamble
SSPF Rajam Reddy 4 Kamble
Filtration plant Harinarayana Reddy 4 Kamble
SP1 Area Harinarayana Mahesh 2 Kamble

Filtration plant(1-7) Sachin Samsher Ali 4 Ajit Mokal


SP-1 Sachin Sandesh 5 Ajit Mokal
SP2 Area Sachin Madhu 4 Ajit Mokal
DCW Pumphouse Harinarayana Shirke 2 Ajit Mokal

Filtration plant(1-7) Vinod Samsher Ali 6 Ajit Mokal


DCW pump House Vinod Shirke 6 Ajit Mokal

Filteration plant(PF1-7) Vinod Samsher Ali 6 Ajit Mokal


DCW pump house Vinod Shirke 3 Ajit Mokal
CT-2 staircase Vinod SRK 5 Ajit Mokal
SP-2 Vinod Mahesh 5 Ajit Mokal
F/P(in front of Blower house) Vinod S.Reddy 3 Abhijeet
SP-3 Rajam 3

Filteration plant(PF1-7) Sachin Samsher Ali 6 Ajit Mokal


CT-2 staircase Sachin SRK 5 Ajit Mokal
Near SP-1 Stores Sachin Shirke 3 Ajit Mokal
F/P(in front of Blower house) Sachin Madhu 4 Ajit Mokal
SP-2 Sachin Mahesh 4 Ajit Mokal
CT-2 staircase Harinarayana Ajit(M/s.SRK Engg 4 Vaibhav
Filteration plant(PF1-7) Harinarayana Samsher Ali 5 Vaibhav
ICW pump house Harinarayana Shirke 3 Vaibhav

CT-2 staircase Harinarayana Ajit(M/s.SRK Engg 3 Kamble


Filteration plant(PF1-7) Harinarayana Samsher Ali 5 Kamble
sp1 area Harinarayana as.reddy 2 Kamble
sp2 area Harinarayana Mahesh 2 Kamble

Filteration plant(PF1-5) Harinarayana Samsher Ali 5 Kamble


CT-2 staircase Harinarayana Ajit(M/s.SRK Engg 4 Kamble
ICW pump house Harinarayana Shirke 3 Kamble
SP-2 Harinarayana Mahesh 4 Kamble
F/P Sachin Reddy 4 Kamble

Filteration plant(PF1-5) Harinarayana Samsher Ali 4 Kamble


CT-2 staircase Harinarayana Ajit(M/s.SRK Engg 4 Kamble
SP2 area Harinarayana Roshan 4 Kamble
Filteration plant Harinarayana Reddy 2 Kamble
SP2 area Harinarayana Mahesh 2 Kamble

Filteration plant(PF1-5) Harinarayana Samsher Ali 5 Kamble


CT-2 staircase Harinarayana Ajit(M/s.SRK Engg 4 Kamble
CT-1A Area Harinarayana Shirke 3 Kamble
SP1area Harinarayana Chotu 4 Kamble
ICW pump house Harinarayana Reddy 2 Kamble

Filteration plant(PF1-5) ATISH Samsher Ali 5 Kamble


CT-2 staircase ASHIRWAD Ajit(M/s.SRK Engg 4 Kamble
DCW ASHIRWAD REDDY 4 Kamble
ECRW 1 Ashirwad S D Rajam 3 Pingale
ECRW 1 Sachin Ritesh Mhatre 2 Vaibhav
SP1area Ashirwad Mahesh 4 pingale
Filteration plant(PF1-5) ATISH Samsher Ali 5 Kamble
CT-2 staircase ASHIRWAD Ajit(M/s.SRK Engg 4 Kamble
SP2area Atish Mahesh 4 Kamble

CT-2 staircase ASHIRWAD Ajit(M/s.SRK Engg 4 Kamble


Filteration plant(PF1-5) Sachin Samsher Ali 5 Kamble
DCW ASHIRWAD Reddy 4 Kamble

Filteration plant(PF1-5) Atish Samsher Ali 5 Kamble


CT-2 staircase ASHIRWAD Ajit(M/s.SRK Engg 4 Kamble

CT-2 staircase Ashirwad Ajit(M/s.SRK Engg 4 Kamble


Filteration plant(PF1-5) Sachin Samsher Ali 5 Kamble
Sp-1 Sachin Shirke 3 Kamble

CT-2 staircase Ashirwad Ajit(M/s.SRK Engg 4 Kamble


Filteration plant(PF1-5) Sachin Samsher Ali 5 Kamble
SP-2 Ashirwad Mahesh 4 Kamble

CT-2 staircase Ashirwad Ajit(M/s.SRK Engg 4 Kamble


SP-2 Ashirwad Mahesh 4 Kamble
Filteration plant(PF1-5) Sachin Samsher Ali 5 Kamble

CT-2 staircase Vinod Ajit Kr. Dubey 4 Chetan

SP-2 pump house Vinod Shirke 2 Chetan

Filteration plant(PF1-5) Vinod Samsher Ali 5 Kamble


CT-2 Staircase Vinod Ajit Kumar Dubey 4 Kamble
CT-1A Vinod Sachin 5 Kamble
CT-1(DCW Pump House) Vinod T.Reddy 4 Kamble
CT-1 Backside(F/P side) Vinod S.Reddy Kamble

Filteration plant(PF1-5) Vinod Samsher Ali 5 Kamble


CT-2 staircase Vinod Ajit Kr. Dubey 4 Kamble
SP-1 oil skimmer area Vinod Shirke 4 Kamble
CT-1A(Near DCP1G) Vinod Madhu PP 2 Kamble
Filteration plant Vinod T.Reddy 4 Kamble

CT-1 Top platform Vinod T.Reddy 6 Chetan


CT-2 staircase Vinod Abadulha 3 Kamble
Red tag Area near SP-2 Vinod Mahesh 6 Kamble
Filteration plant(PF1-5) Vinod Samsher 5 Kamble

Filteration plant(PF1-5) Vinod Samsher Ali 5 Kamble


CT-2 staircase Vinod Ajit Kr. Dubey 4 Kamble
CT-1 top platform Vinod Surendra Reddy 2 Kamble
Red tag Area near SP-2 Vinod Tushar 2 Kamble

Filteration plant(PF1-5) Vinod samsher Ali 5 Kamble


CT-1 cold basin top platform Vinod Ajit Kr. Dubey 4 Kamble
SP-2 Vinod Tushar 3 Kamble

Filteration plant(PF1-5) Harinarayana samsher Ali 5 Vaibhav


CT-1 cold basin top platform Harinarayana Ajit Kr. Dubey 4 Vaibhav
SP-1 Harinarayana Shirke Shirke Vaibhav

CT1 S.D.Rajam Uma Reddy 7 Kamble


CT2&CT2 S.D.Rajam Mahesh Kamble
SSPF Area S.D.Rajam Mahesh 3 Kamble
ICW Pumphouse S.D.Rajam Sameer 3 Kamble
Filteration plant Harinarayana Sachin 6 Kamble
ICW Pumphouse Harinarayana Roshan 3 Kamble
Filteration plant(PF1-5) Harinarayana samsher Ali 5 Kamble

Filteration plant(PF1-5) Harinarayana samsher Ali 5 Ajit Mokal


Filteration plant(PF1-5) Harinarayana samsher Ali 5 Kamble
CT-1 cold basin top platform Harinarayana Ajit Kr. Dubey 4 Kamble
SP1 Harinarayana shamid 3 Kamble

Filteration plant(PF1-5) Harinarayana samsher Ali 5 Kamble


CT-1 cold basin top platform Harinarayana Ajit Kr. Dubey 4 Kamble
Filteration plant Harinarayana Shirke 3 Kamble
ICW/DCW/SP-1,2,3 Sachin Digambar Tamboli 3 vaibhav

F/P ATISH REDDY 4 KAMBLE


CT-1 cold basin top platform ATISH Ajit Kr. Dubey 4 Kamble
Filteration plant(PF1-5) ATISH samsher Ali 5 Kamble
SP-2 ATISH Tushar 2 Kamble
Thickner Sachin Shirke 2 Chetan Mhatre

Filteration plant(PF1-5) ATISH samsher Ali 4 PINGLE

CT-1 cold basin top platform ATISH Ajit Kr. Dubey 4 abhijeet
SP-1 ATISH REDDY 4 abhijeet
Filteration plant(PF1-5) ATISH samsher Ali 4 abhijeet
PF1-1 in Filteration plant Vinod samsher Ali 4 Kamble

Filteration plant(PF1-1) ATISH samsher Ali 4 K.J KAMBLE


DCW ATISH SHIRKE 3 K.J KAMBLE
ecrw-1 area ATISH Rajam 3 K.J KAMBLE
ICW ATISH REDDY 4 K.J KAMBLE
Filteration plant(PF1-1) Ashirwad samsher Ali 4 Kamble
Near Sp-1 Sachin Reddy 4 Kamble
CT-1/1A,CT-2 Ashirwad Ritesh 3 Kamble

Filteration plant(PF1-1) Ashirwad samsher Ali 4 Kamble


DCW Ashirwad Reddy 3 Kamble
SP-1 Sachin Jayprakash 3 Kamble

CT-1 Harinarayana Ajit Kr. Dubey 3 Kamble


SP2 Harinarayana Mahithi(M/s.Rohit 9 Kamble
CT-2 Harinarayana Sameer 3 Kamble
ICW Harinarayana Reddy 3 Kamble
Filteration plant(PF1-5) Harinarayana samsher Ali 6 Kamble
Filteration plant Harinarayana Himansh(M/s.Sigma 2 Kamble
SP1&SP2 Roshan Jagdish 3 Kamble

Filteration plant(PF1-1) Sachin samsher Ali 6 Kamble


ICW Ashirwad Reddy 3 Kamble
CT-1 Ashirwad Ajit Kr. Dubey 3 Kamble
SP-1 & SP-2 Sachin Shirke 4 Kamble

Filteration plant(PF1-1) Sachin samsher Ali 6 Kamble


SP-1 Ashirwad Ajit Kr. Dubey 3 Kamble
DCW Ashirwad Shirke 3 Kamble
ICW Pumphouse Harinarayana J.D.Chuahan 4 Kamble
SP-1 Harinarayana Mahesh 3 Kamble

Filteration plant(PF1-1) Vinod Samsher Ali 6 Kamble


ICW pump house Vinod T.Reddy 3 Kamble
ICW pump house Vinod J.D.Chuahan 4 Kamble
Filteration plant Harinarayana T.Reddy 3 Kamble

DCW pump house Vinod Shirke 3 kamble


Near wash water tank(F/P) Vinod J.P.Sharma 3 kamble
Storm water drain in F/P Vinod Uma Reddy 4 Kamble
Filteration plant(PF1-1) Vinod Samsher Ali 6 Kamble
CT-1 staircase Vinod Ajit Kr. Dubey 4 Kamble
CT-1 Top Header Vinod Reddy 4 Kamble
ECRW-1 Sachin Satish 2 Mokal

Filteration plant(PF1-1) Vinod Samsher Ali 5 Kamble


DCW pump house Rajam Shirke 5 Mokal
Near wash water tank(F/P) Vinod pratik Patil 4 Kamble
DCW pump house Vinod S.Reddy 3 Kamble
Filteration plant(PF3-2) Rajam Sameer 3 Kamble
ICW Pump house Vinod Prashant 3 Kamble
ICW Pump house Harinarayana Roshan 3 Kamble

DCW pump house Vinod Shirke 3 Abhijeet


Inside F/P Vinod Pratik 5 Kamble
Filteration plant(PF1-1) Vinod Samsher Ali 5 Kamble
CT-1 Staircase Vinod Abdulha 2 Kamble

Inside F/P Vinod Pratik 5 Kamble


SP-1/2/3 Vinod Krishna Koli 3 Chequared plate f
Near SP-1 Vinod prashant 3 Kamble
DCW pump house Vinod Shirke 3 Kamble
Filteration plant(PF1-1) Vinod Samsher Ali 5 Kamble
CT-1 Staircase Vinod Ajit kr. Dubey 5 Kamble
Filteration plant(PF1-1) Vinod S.Reddy 2 Kamble

CT-1 Staircase RAJAM Ajit kr. Dubey 5 Kamble


F/P RAJAM Maithi 4 Kamble
Filteration plant(PF1-1) RAJAM Samsher Ali 5 Kamble
SP-1 RAJAM Ramesh Gaud 3 Kamble

SP-1 Harinarayana M.M.Shirke 5 chetan


Filteration plant(PF1-1) Harinarayana Samsher Ali 5 Kamble
F/P Harinarayana Pratik(M/s.Rohit) 4 Kamble
CT-1 Staircase Harinarayana Ajit kr. Dubey 5 Kamble
SP-1 Harinarayana M.M.Shirke 8 Ajit Mokal
Filteration plant(PF1-1) Harinarayana Samsher Ali 5 Kamble
F/P Harinarayana Pratik(M/s.Rohit) 4 Kamble
CT1 Harinarayana Abdulla 3 Kamble
SP-1 area Harinarayana Abhay(Stores) 4 Kamble
Filteration plant RAJAM Umareddy 3 Kamble
CT1 Sachin J.P.Sharma Kamble

Filteration plant(PF1-1) Roshan Samsher Ali 5 Kiran wagh


CT1 Harinarayana Abdulla 3 Kiran wagh
F/P Harinarayana Pratik(M/s.Rohit) 6 Kiran wagh
SP-1 Harinarayana M.M.Shirke 5 Ajit Mokal
SP-2 Harinarayana Sudanad patil 10 Ajit Mokal
F/P Rajam S.Reddy 3 Ajit Mokal

DCW Pumphouse Harinarayana M.M.Shirke 3 Ajit Mokal


Filteration plant(PF1-1) Harinarayana Samsher Ali 5 Ajit Mokal
CT1 Harinarayana Abdulla 3 Ajit Mokal
F/P Harinarayana Pratik(M/s.Rohit) 6 Ajit Mokal
SP-3,CT2 Area Harinarayana Akesh 10 Kamble
ECRW1 Harinarayana S.Reddy 3 Kamble

CT1 atish Abdulla 4 Kamble


Filteration plant atish pratik patil 7 Kamble
Filteration plant(PF1-1) atish Samsher Ali 4 Kamble
DCW to filtration plant atish krishna 5 ajit
SP-2 sachin mahesh 4 Kamble

CT1 ATISH AJIT 4 Kamble


SP-2 ATISH REDDY 7 Kamble
Filteration plant(PF1-1) ATISH Samsher Ali 4 Kamble
Filteration plant ATISH pratik patil 5 Kamble
Filteration plant(PF1-1) Rajam Samsher Ali 4 Ajit Mokal
CT1 ATISH Abudulla 3 Kamble
Filteration plant ATISH pratik patil 5 Kamble
Filteration plant(PF1-1) ATISH Samsher Ali 4 Kamble
SP-2 ATISH Tushar 2 Kamble
F/P ATISH Koli 2 Kamble
F/P ASHIRWAD SACHIN 2 Kamble
Backwash pump pit Vinod Sachin 4 Kamble
DCW pump house Rajam Tushar 2 Kamble

Filteration plant ATISH pratik patil 5 Kamble

CT1 ATISH Abudulla 3 PINGLE


Filteration plant(PF1-1) ATISH Samsher Ali 4 PINGLE
DCW ATISH JAGDISH 3 PINGLE
SP-3 ATISH REDDY 6 Kamble
CT-1A ASHIRWAD M/S. ROHIT 5 Kamble
SP-3 ASHIRWAD TUSHAR 4 Kamble

CT1 ATISH Abudulla 3 PINGLE


CT-1A ATISH M/S. ROHIT 7 PINGLE
Filteration plant(PF1-1) ATISH Samsher Ali 4 PINGLE
DCW ATISH Shirke 3 kamble

SP-1 Rajam Shirke 6 Mokal


CT-1A Sachin M/S. ROHIT 4 Kamble
Filteration plant(PF1-1) Sachin Samsher Ali 4 Kamble
CT1 Sachin Abudulla 3 Kamble
SP-1 Sachin Shirke 6 ajit Mokal
ECRW-1 Sachin Satish 4 Kamble
SP-2 Crane Rajam Babu Errector Kamble

Filteration plant(PF1-1) Sachin Samsher Ali 4 Kamble


CT1 Sachin Abudulla 3 Kamble
Filteration plant Sachin pratik patil 5 Kamble
CT-1A Sachin M/S. ROHIT 4 Kamble
SP-1 Sachin Shirke 5 Ajit Mokal
Filteration plant Harinarayana Jagdish 5 Ajit Mokal

CT-1 Hot basin Vinod Abdulha 4 Mokal


Filteration plant(PF1-1) Vinod Samsher Ali 4 Mokal
DCW pump house Vinod T.Reddy 5 Mokal
SP-3 Vinod Naresh 3 Mokal

Filteration plant(PF1-1) Vinod Samsher Ali 5 Chetan


CT-1 Hot basin Vinod Ajit Kr. Dubey 4 Chetan
Filteration plant Vinod Sashank 4 Kamble
SP-3 Pump House Vinod Uma Reddy 6 Kamble
SP-2 crane Rajam Jogendra Gupta 7 Kamble
Filteration plant Vinod Krishna Koli 2 Kamble

Filteration plant(PF1-1) Vinod Samsher Ali 5 Kamble


CT-1 Hot basin Vinod Ajit kr. Dubey 4 Kamble
SP-2 crane Rajam Yogendra Yadav 7 Kamble
SP-2 red tag area Rajam Sameer Patil 3 Mokal
Near SP-1 Stores Vinod Reddy 3 Mokal
SP3 Area Harinarayana Thale 5 Kamble
SP2 Area Harinarayana Kelkar(M/s.BWI) 5 Kamble

Filteration plant Vinod Sashank 4 Kamble


CT-1 Hot basin Vinod Ajit kr. Dubey 4 Kamble
Filteration plant (PF1_1) Vinod Samsher Ali 4 Kamble
SP-3 pump house Vinod Jagadish 5 Mokal

PF1-1 in F/P Vinod Samsher Ali 3 Kamble


CT-1 staircase Vinod Ajit Kr. Dubey 3 Kamble
Sp-3 pump house Vinod Sushant Kr 4 Kamble
SP2 red tag area Rajam Uma Reddy 8 Mokal

Near SP-3 pump house Rajam Sushant Kr 4 Kamble


CT-1 Staircase Rajam Ajit Kr Dubey 4 Kamble
Near DCP1G pump Vinod Uma Reddy 5 Mokal
Behind F/P Rajam Samsher Ali 4 Kamble
Near Chuna gate Rajam Vijay(Hyteck) 5 Kamble

CT-1 Staircase Sachin Ajit Kr Dubey 4 Kamble


Near Chuna gate(SP-3) Sachin Vijay(Hyteck) 5 Kamble
F/P Sachin Sushant Kr 4 Kamble
SP-2 Red tag Area Sachin Abhinav 4 Kamble
F/P Sachin Samsher Ali 4 Kamble
SP-3 Sachin M/s Techno 5 Kamble
SP-1 Shirke Mahesh 5 Mokal

CT-1 Staircase Sachin Ajit Kr Dubey 4 Mokal

F/P(Thickner area) Sachin Jagdish 3 Mokal

SP-3 Harinarayana M/s Techno 5 Kamble


CT-1 Staircase Harinarayana Ajit Kr Dubey 4 Kamble
F/P Harinarayana Sushant Kr 4 Kamble
SP-3 Area Harinarayana Murari(M/s.Hitech) 5 Kamble
SP2 Red Tag Area Rajam Sameer 5 Kamble
Near Chuna gate(SP-3) Rajam Vijay(Hyteck) 5 Kamble
SP-2 Rajam Sachin 3 Kamble

SP-3 Harinarayana M/s Techno 5 Kamble

Near Chuna gate(SP-3) Harinarayana Vijay(Hyteck) 5 Kamble


F/P Harinarayana Sushant Kr 4 Kamble
SP-3 Area Harinarayana Murari(M/s.Hitech) 5 Kamble
F/P Rajam Chandan 6 Kamble
CT-1 Staircase Rajam Ajit Kr Dubey 4 Kamble
SP-2 Harinarayana Tushar 2 Mokal

SP-3 Rajam M/s Techno 5 Kamble


CT-1 Staircase Harinarayana Ajit Kr Dubey 4 Kamble
F/P Harinarayana Sushant Kr 4 Kamble
Tunnel Furnace side Area Rajam Murari(M/s.Hitech) 5 Kamble
F/P Area Rajam Dilip 6 Kamble
F/P Harinarayana Jagdish 3 Mokal
Near Chuna gate(SP-3) Rajam M.D.Altaf(Hyteck) 5 Mokal
DCW Pumphouse Harinarayana Umareddy 4 Mokal

F/P Area Rajam Sameer 6 Kamble


Near Chuna gate(SP-3) Rajam Murari(M/s.Hitech) 5 Kamble
Tunnel Furnace side Area Rajam M/s Techno 11 Kamble
SP-3 Rajam M/s Techno 8 Kamble
F/P Harinarayana Sushant Kr 5 Mokal
SP-3 Harinarayana M.M.Shirke 3 Mokal
DCW Pumphouse Harinarayana Umareddy 4 Mokal
F/P Harinarayana Chotu 5 Mokal

Tunnel Furnace side Area Sachin M/s Techno 9 Pingale


SP-3 Sachin M/s Techno 7 Pingale

NearSP-1 HT MCC room Rajam Sushant Kr 6 Mokal


SP-3 Pump house Rajam Jagadish 2 Mokal
Chuna gate to SMS Rajam Techno 6 Mokal

Filtration Plant Rajam Uma Reddy 6 Kamble

SP-1 RAJAM REDDY 5 Mokal


F/P ATISH M/S ROHIT 5 KAMBLE.K.J
ICW ATISH Sameer patil 2 Mokal
Billet caster ATISH Nandu 5 KAMBLE.K.J
SP-1 ATISH Jagdish 4 AJIT MOKAL
CT-1A ATISH Abhinav 4 Mokal
SP-3 ATISH NAGAR 5 KAMBLE.K.J
F/P Vinod Um Reddy 4 KAMBLE.K.J

F/P ATISH M/S ROHIT 5 KAMBLE.K.J


SP-3 ATISH Nandu 5 KAMBLE.K.J
SP-1 Sachin REDDY 5 Mokal
SP-1 ATISH TUSHAR 2 PINGLE

F/P
SP-3 Ashirwad
Rajam M/S ROHIT
Nandu 5
5 KAMBLE.K.J
KAMBLE.K.J

SP-2
SP-3 Ashirwad
Rajam Reddy
Nandu 3
5 KAMBLE.K.J
KAMBLE.K.J
CT 2 Rajam Subhash 6 KAMBLE.K.J
F/P Ashirwad M/S ROHIT 5 KAMBLE.K.J
ECRW1 Sachin Dilip 3 KAMBLE.K.J
ECRW1 Sachin Krishna 2 Ajit
Near SP1 stores Vinod Madhu 3 KAMBLE.K.J

F/P
SP-3 Ashirwad
Ashirwad M/S
Nandu ROHIT 5
5 KAMBLE.K.J
KAMBLE.K.J
CT 1A Sachin Dilip 6 KAMBLE.K.J
Near Sp-1 Sachin Jayesh 3 KAMBLE.K.J
CSP Sachin Tukaram 4 KAMBLE.K.J
CT-2 Sachin Subhash 6 Ajit Mokal

Near DCP1E pump Vinod Jagadish 3 Mokal


SP-3 pump house Vinod Reddy 2 Mokal
SP2 red tag area to CT-2 Vinod Subhash 6 Mokal

F/P Ashirwad M/S ROHIT 5 KAMBLE.K.J


CT-2 Ashirwad M/S Wet bulb 6 KAMBLE.K.J
SP-3 S.D.Rajam Nandu 5 KAMBLE.K.J
SP-3 Ashirwad Tushar 2 Chetan
EOHT Ashirwad Krishna 2 Chetan
Near Sp-1 Ashirwad Jayesh 2 Chetan

SP-2 Vinod Uma Reddy 3 Kamble


Near SP-1 Vinod Ravindra 4 Kamble
SP-2 Red Tag Area & CT-2 cold
Vinod Dharmendra 6 Kamble
basin platform
F/P Vinod Sushant Kr. 10 Kamble
SMS to SIP Area Rajam Nandu 6 Kamble
SP-2 pump house Vinod Mahesh 6 Mokal

SMS to SIP Area Rajam Nandu 6 Kamble


CT-2 Rajam Dharmendra 6 Kamble
F/P Vinod Sushant 10 Kamble
SP1&SP3 Vinod Chandan 4 Kamble
CSP utility area Vinod Madhu 3 Ajit
SP1 pumphouse Vinod Shirke 6 Ajit

SMS to SIP Area Rajam Nandu 6 Ajit


F/P Vinod Mayur Gharat 6 Ajit
SP-2 Vinod Shirke 6 Kamble
SP-2/DG pump Rajam Ajit 6 Ajit
SP2 East side Vinod Tukaram 4 Kamble
Near DCP2A Vinod Mahesh 2 Kamble

SMS to SIP Area Rajam Nandu 6 Kamble


F/P Vinod J.P.Sharma 5 Kamble
F/P Rajam Sameer 3 Ajit
DCW pump house Vinod Jagadish 3 Ajit
SP-3 pump house Vinod Mahesh 2 Ajit
F/P Harinarayana Sushant(M/s.Rohit) 5 Ajit
DCW pump house Harinarayana Umareddy 7 Ajit
SMS to SIP Area Harinarayana Nandu 6 Ajit

Near Chunagate Road Harinarayana Nandu 5 Ajit


DCW pump house Harinarayana Shirke 3 Ajit

Filteration Plant Rajam Avinash 6 Kamble


F/P Harinarayana Sushant(M/s.Rohit) 5 Kamble
SP1 Area Harinarayana Tushar 3 Kamble
DCW pump house Harinarayana S.Reddy 3 Kamble
SP2 Area Harinarayana Kashi(M/s.Babu Errc. 6 Kamble
SMS to SIP Area Rajam M/s.Techno Eng. 6 Kamble
SP2 Area Harinarayana Kashi(M/s.Babu Errc. 6 Kamble
F/P Harinarayana Sushant(M/s.Rohit) 5 Kamble
DCW pump house Harinarayana Shirke 3 Ajit
ICW&DCW pump house Harinarayana Tushar 2 Kamble

SMS to SIP Area


SP2 Area Rajam
Rajam M/s.Techno Eng.Errc.
Kashi(M/s.Babu 6
6 Kamble
Kamble
F/P Harinarayana Sushant(M/s.Rohit) 5 Kamble
ICW pump house Harinarayana chotu 2 Kamble
DCW pump house Harinarayana Shirke 3 Ajit
F/P Harinarayana S.Reddy 2 Kamble
SP3 Harinarayana Jagdish 2 Ajit
ECRW 1 Sachin Sameer 3 Kamble

SMS to SIP Area Rajam M/s.Techno Eng. 6 Kamble


SP2 Area Rajam Kashi(M/s.Babu Errc. 6 Kamble
F/P Harinarayana Sushant(M/s.Rohit) 5 Kamble
Below CT2 Area Harinarayana Chotu 7 Kamble
DCW pump house Harinarayana Shirke 3 Ajit
DCW pump house Ashirwad Tushar 6 Ajit Mokal

SP-2 RAJAM Kashi(M/s.Babu Errc. 6 KAMBLE.K.J


CT-1 ATISH Sushant(M/s.Rohit) 5 KAMBLE.K.J
SMS to SIP Area ATISH M/s.Techno Eng. 6 KAMBLE.K.J
SP-2 ATISH SHIRKE 5 KAMBLE.K.J

SP-3
DG ATISH
ATISH M/s.Techno
Wet bulb.co Eng. 6
3 KAMBLE.K.J
KAMBLE.K.J
F/P ATISH Rohit Engg 4 KAMBLE.K.J

F/P ATISH Rohit Engg 4 KAMBLE.K.J


ECRW-1 area ATISH Tushar 4 pingle
DG ATISH Wet bulb.co 3 KAMBLE.K.J
SP-1/F/P,Near Descaler Vinod Dilip 3 KAMBLE.K.J
F/P Vinod Jagadish 3 Ajit

F/P ATISH Rohit Engg 4 KAMBLE.K.J


DG ATISH Wet bulb.co 3 KAMBLE.K.J
ECRW-1 area ATISH Sameer 4 KAMBLE.K.J
SP-3 ATISH Mahesh 5 KAMBLE.K.J
Near SP-1 Vinod T.Reddy 4 KAMBLE.K.J

F/P ATISH Rohit Engg 4 KAMBLE.K.J


SP-1 STORE ATISH CHOTU 4 KAMBLE.K.J
CT-1 ATISH SHIRKE 4 AJIT MOKAL
F/P RAJAM SANMEER 5 KAMBLE.K.J
Beside HRF ATISH Dilip 4 KAMBLE.K.J

SP-1
DCW Ashirwad
Ashirwad Rohit
ShirkeEngg 4
4 Kamble
Ajit Mokal
ECRW 1 Sachin Sameer 4 Kamble
F/P Sachin Dilip 4 Kamble
ECRW 1 Ashirwad Chottu 4 Kamble
CT-2 Ashirwad Wet-bulb 3 Kamble
Backwash pump pit Vinod T.Reddy 4 Ajit Mokal

SP-1 Ashirwad Rohit Engg 4 Kamble


F/P Sachin Dilip 4 Kamble
ECRW 1 Ashirwad Chottu 4 Kamble
SP-2 Sachin Mahesh 4 Kamble
SP-2(Red tag area) Harinarayana Shirke 3 Ajit Mokal

F/P Vinod Jagadish 3 Ajit


SP_1 pump house Vinod Sushant Kr. 6 Kamble
Near container cabin Vinod Subhash 2 Kamble
HRF to F/P Vinod Dilip 4 Kamble
Near EOHT Vinod Chhottu 3 Kamble
Near SP-1 Vinod Sameer 4 Kamble

Filtration plant Ashirwad Sushant Kr. 6 Kamble


Near SP-1 Ashirwad Sameer 4 Kamble
Near container cabin Ashirwad Subhash 2 Kamble
Filtration plant Ashirwad Madhu 2 Kamble

DCW Pump House Vinod Shirke 5 Ajit Mokal


F/P Ashirwad Sushant Kr. 5 Kamble
F/P Harinarayan Roshan 4 Kamble
F/P Sachin Sujeet 4 Kamble
CT-1 Vinod Sunil 5 Kamble
ICW Vinod Hemant 4 Ajit Mokal

Near CT-2 Vinod Subhash 4 Kamble


F/P Ashirwad Sachin 6 Ajit Mokal
F/P Rajam Manohar 6 Kamble
SP-2 Vinod Tushar 4 Kamble
SP-1 Rajam Sunil 4 Kamble

SP-1 Vinod Sushant Kr. 6 Ajit Mokal


Near container cabin Vinod Subhash 7 Ajit Mokal
SP-1;SP-2 &CT-1A Rajam Sameer 4 Ajit Mokal
Near container cabin Rajam Madhu 2 Ajit Mokal
Near container cabin Harinarayana Subhash 7 Ajit Mokal
SP-Area Harinarayana Sushant Kr. 6 Ajit Mokal
SP-Area Harinarayana Madhu 3 Ajit Mokal
DCW Pumphouse Harinarayana Shirke 6 Ajit Mokal

F/P Ashirwad Rajam 3 Ajit Mokal


DCW Sachin Shirke 4 Ajit Mokal
ECRW 1 Sachin T Reddy 3 Ajit Mokal

SP-3 Ashirwad Sushant Kr. 6 Kamble


F/P Sachin Sujeet 3 Kamble
ECRW 1 Sachin Tushar 3 Kamble
CT-2 Ashirwad Subhash 8 Kamble
SP-3 Ashirwad Chottu 4 Kamble

SP-3 Ashirwad Sushant Kr. 6 Kamble


CT-2 Ashirwad Subhash 8 Kamble
DCW(CT1A) Ashirwad Shirke 4 Ajit Mokal
ECRW 1 Sachin Naresh 3 Kamble
ECRW 1 Ashirwad T Reddy 3 Kamble
ECRW 2 Sachin Hiraman 5 Kamble
Near DG Pump House Sachin Mahesh 3 Kamble

SP-3 Ashirwad Sushant Kr. 6 Kamble


ECRW 1 Ashirwad Reddy 4 Kamble
CT-2 Ashirwad Subhash 8 Kamble
ECRW 1 Sachin Naresh 3 Kamble
Near DG Pump House Sachin Shirke 3 Kamble

SP-3 Ashirwad Sushant Kr. 6 Kamble


CT-2 Ashirwad Subhash 8 Kamble
ECRW 1 Sachin Sameer 3 Kamble
DCW Ashirwad Shirke 5 Ajit Mokal

SP-3 ATISH SATISH 6 Kamble


CT-2 ATISH M/S.Wet Bulb 8 Kamble
F/P SP-2 ATISH Pandurang 4 Kamble
sp-1 ATISH Santosh 4 Kamble
DCW PUMP HOUSE ATISH SHIRKE 4 AJIT
sp-2 ATISH Naresh 3 Kamble
F/P SP-2 ATISH CHOTU 3 Kamble
DCW PUMP HOUSE ABHINAV REDDY 2 AJIT

SP-1
CT-2 Harinarayana SATISH
M/S.Wet Bulb 6
7 Kamble
SP-2(Red Tag Area) Harinarayana Naresh 3 Kamble

SP-3
ECRW-1 ATISH
ATISH Satish
Suryakant 4
4 K.J.KAMBLE
K.J.KAMBLE
CT-2 ATISH M/S.Wet Bulb 7 Kamble
DG ATISH SHIRKE 4 AJIT
F/P ATISH HARI 4 Kamble
DG ATISH Tushar 3 AJIT

SP-2
SP-3 ATISH
ATISH SHIRKE
Satish 4
4 AJIT
K.J.KAMBLE
CT2 ATISH Suryakant 4 K.J.KAMBLE
CT-2 ATISH M/S.Wet Bulb 7 Kamble
RAJAM 4 Kamble
F/P ATISH Harinarayana 4 Kamble
SP-2 Vinod Uma Reddy 5 Kamble

SP-2 Harinarayana Satish 4 K.J.KAMBLE


CT-2 Harinarayana Ashok (M/S.Wet Bulb) 7 K.J.KAMBLE
SP-2 Harinarayana Mahesh 4 AJIT
near Alibaug gate area Harinarayana M/s.Rohit Engg. 4 K.J.KAMBLE
ECRW-1 Abhinav M/s.Techno Engg. 4 AJIT
ECRW-2 Harinarayana Jagdish 2 AJIT
phase 2 tilak tejbahadur 15+2 vaibhav
SP-2 Roshan Madhu 2 K.J.KAMBLE
Drinking Water Plant H.Naik T S Reddy 5 Abhijeet
Central Utility H.Naik Kali 3 Jitendra

SP-2 Harinarayana Vimlesh(M/s.Rohit) 5 K.J.KAMBLE


ECRW-1 Harinarayana M/s.Techno Engg. 4 K.J.KAMBLE
SP-2 Harinarayana Tushar 6 AJIT
CT-2 Harinarayana Ashok (M/S.Wet Bulb) 7 K.J.KAMBLE
SP-1 Area Roshan Satish(M/s.Rohit) 6 K.J.KAMBLE
SP-1 & Filteration plant Area Rajam M/s.Naroloc Paints K.J.KAMBLE
ECRW-1 Harinarayana Rajam 8 K.J.KAMBLE

SP-1 Area Harinarayana Satish(M/s.Rohit) 4 K.J.KAMBLE


SP-1 Area Harinarayana Vimlesh(M/s.Rohit) 5 K.J.KAMBLE
CT-2 Harinarayana Ashok (M/S.Wet Bulb) 7 K.J.KAMBLE
SP-1 & Filteration plant Area Harinarayana M/s.Naroloc Paints 4 K.J.KAMBLE
ECRW-1 Roshan RAJAM K.J.KAMBLE
Filteration plant Area Roshan MADHU K.J.KAMBLE
SP-1 Area Harinarayana Satish(M/s.Rohit) 5.5 K.J.KAMBLE

SP-2 pump house Vinod Shirke 3 Ajit


Near SP-1 Vinod Satish 5 Ajit
SP-1 pump house Vinod Sandip Kr. 5 Ajit
CT-1 Vinod Vikas 4 Ajit

SP-3 pump house Vinod Sandip 5 Kamble


F/P Hari Roshan 4 Kamble
Near CT-1A Vinod Ibran 3 Kamble
Near DCW pump house Vinod Satish 5 Kamble
F/P Vinod Milind 5 Kamble
Near container cabin Vinod Ashok 5 Kamble
SP-2 pump house Vinod Vimlesh 5 Kamble

Alibag gate Rajam Vimlesh 5 Kamble


Near CT-1A Vinod Ibrar 2 Kamble
Near SP-3 Vinod Satish 5 Kamble
Behind CT-2 Vinod Ashok 6 Kamble
ECRw-1,SP-1.2.3 & F/P Vinod Milind 5 Kamble
SP-2 pump House Vinod Tushar 2 Ajit
F/P Hari Roshan 4 Ajit

ecrw1 area Abhinav Mahesh 3 Ajit


SP-2 to F/P Rajam Vishwas Kamble
SP-1 to chuna gate Vinod Satish 6 Kamble
Near ICP1B & toilet Vinod Vimlesh 4 Kamble
F/P Hari Roshan 4 Ajit
Behind CT-2 Vinod Ashok 5 Kamble
F/P & SP-1 Vinod Milind 5 Kamble
Near CT-1A Vinod Ibrar 2 Ajit
Near DG pump Rajam Shirke 3 Ajit

DCW pump house Vinod Shirke 6 Ajit


Near SP-1 Rajam Satish 6 Kamble
Near CT-2 Vinod Vimlesh 5 Kamble
SP-1 Scrapper Vinod Tushar 3 Kamble
SSPF area Abhinav Ganesh 4 Kamble
Near CT-1A Vinod Ibrar 2 Kamble
SP-2 Vinod Maiti 4 Kamble
F/P Sachin Ashirwad 3 Ajit

SP_1 to Chuna gate Vinod Satish 5 Kamble


Near CT-2 Vinod Shravan 5 Kamble
F/P Vinod Sandeep 4 Kamble
Near CT-1A Vinod Ibrar 2 Kamble
Backwash pump pit Vinod T.Reddy 5 Ajit
SP-1 & CT-1 Vinod Milind 4 Kamble
Near SP-3 Rajam Vimlesh 4 Kamble

ECRW-1 Sachin Milind 4 Kamble


F/P Sachin Sandeep 5 Kamble
SP-2(Red tag Area) Sachin Mahesh 2 Ajit
SP_1 to Chuna gate Ashirwad Satish 5 Kamble
Near CT-1A Ashirwad Ibrar 5 Kamble
Near CT-2 Ashirwad Yadav 3 Kamble
DCW Ashirwad Shirke 3 Ajit
F/P Ashirwad Vishwas 2 Ajit

ECRW-1
Near DG Sachin
Ashirwad Sandip
Reddy 4
2 K Wagh
Ajit

SP_1 to Chuna gate Harinarayana Satish (M/s.Rohit Engg. 6 Ajit


F/P Harinarayana Shasank (M/s.Rohit Engg. 2 Ajit
below CT2'D' Cell area Harinarayana Yadav(M/s.Rohit Engg. 5 Ajit
ECRW-1 Harinarayana Milind(M/s.Vikas Arts 3 Ajit
SP1 Abhinav Abhay Patil(Stores) 2 Ajit
SP1 Area Abhinav Mahesh 2 Ajit

SP_1 to Chuna gate Ashirwad Satish (M/s.Rohit Engg. 6 Kamble


below CT2'D' Cell area Ashirwad Vimlesh(M/s.Rohit Engg. 5 Kamble
F/P Ashirwad Shasank (M/s.Rohit Engg. 2 Kamble
ECRW-1 Sachin Milind(M/s.Vikas Arts 3 Kamble
F/P Harinarayana Roshan 3 Kamble
F/P Ashirwad 3 Kamble

SP_1 to Chuna gate Ashirwad Satish (M/s.Rohit Engg.) 6 Kamble


F/P Ashirwad Shasank (M/s.Rohit Engg.) 5 Kamble
SP-2 Ashirwad Malik Akram(M/s.Rohit Engg.) 4 Ajit
ECRW-1 Sachin Milind(M/s.Vikas Arts 4 Kamble
SP-2(Red Tag Area) Ashirwad Mahesh 3 Ajit
NearCT-2 , Contener Area Rajam Madhu 3 Kamble

SP_1 to Chuna gate Ashirwad Satish (M/s.Rohit Engg.) 6 Kamble


SP-2 Ashirwad Malik Akram(M/s.Rohit Engg.) 4 Ajit
SP-2 Ashirwad Vimlesh(M/s.Rohit Engg.) 5 Kamble
F/P Ashirwad Jagdish 4 Ajit
F/P Sachin Sameer 4 Kamble
F/P Sachin Sheidesh Kumar 4 Kamble
ECRW-1 Sachin Vijay(M/s.Vikas Arts) 4 Kamble
SP-2(Red Tag Area) Sachin Tushar 2 Ajit

LBSS/CT-1 Rajam Vijay(M/s.Vikas Arts) 4 Kamble


CT-1A Rajam Vimlesh(M/s.Rohit Engg.) 4 Kamble
Sp-3 Rajam Shailesh 6 Kamble
DG Pump House Rajam Tushar 2 Ajit
Filtration Plant Rajam Sameer 3 Kamble
SSPF Rajam S.Reddy 2 Kamble
ECRW1 Area Harinarayana Satish(conditon&Monetering) Kamble
F/P Harinarayana M.M.Shirke 5 Ajit

SP_1 to Chuna gate ATISH Satish (M/s.Rohit Engg.) 6 Kamble


F/P ATISH M/S Rohit 4 Kamble
CT-1/CT-2 ATISH Vijay(M/s.Vikas Arts) 4 Kamble
Sp-3 ATISH Shailesh 6 Kamble
CT-1/CT-2 ATISH SHIRKE 5 Kamble
CT-2 RAJAM M/S.Wet bulb 2 Kamble
f/p ABHINAV Kothekar 4 AJIT

DCW Sachin Shirke 3 Pingale


ECRW-1 Sachin Vijay(M/s.Vikas Arts) 3 Pingale
CT-2 Sachin Ashok Kumar 2 Ajit

CT-1A Harinarayana Satish (M/s.Rohit Engg.) 5 Kamble


SP3 Harinarayana Prathik (M/s.Rohit Engg.) 5 Kamble
ECRW-1 Harinarayana Shailesh 8 Kamble
CT-2 Harinarayana Ashok yadav 3 Kamble
ECRW-1 Harinarayana Vijay(M/s.Vikas Arts) 3 Kamble
F/P S.D.Rajam Solunke Kamble
F/P S.D.Rajam T.S.Reddy 3 Kamble
LBSS Area S.D.Rajam Nitin 3 Kamble
Below Thichner area S.D.Rajam (M/s.Rohit Engg.) 4 Kamble
F/P S.D.Rajam Sameer 5 Kamble
F/P Atish Reddy 4 Ajit
SP-1 Atish Satish 5 Kamble
F/P Atish Vijay 4 Kamble
LBSS-1 Atish A N Patil 4 Kamble
F/P Harinarayana Sujit 4 Ajit
SP-3 Atish Pratik Patil 4 Kamble
F/P Atish Premanand 4 Kamble

Near ECRW1house
DCw Pump Rajam
Rajam Ashok
Shirke 5
3 Kamble
Kamble
Near CT-1A Rajam Satish 5 Kamble
SP-3 Rajam Pratik 5 Kamble
F/P Rajam Vijay 5 Kamble
SP-2 Rajam Shailesh kr. 5 Kamble
F/P Rajam Vishwas Katkar 5 Kamble
F/P Rajam Gavendra singh 7 Kamble
F/P Rajam T.Reddy 3 Kamble

F/P Rajam Gavendra singh 7 Kamble


Near CT-1A Rajam Satish 5 Kamble
F/P Harinarayana RamchandPrathik (M/s.Rohit Engg4 Ajit
DG Pumphouse Harinarayana Shailesh kr. 8 Kamble
F/P Harinarayana Vijay 35 Kamble
Near ECRW1 Harinarayana Ashok 3 Kamble
F/P Harinarayana Shirke 3 Ajit
SP3 Rajam Prathik (M/s.Rohit Engg.) 5 Ajit
Near ECRW1 Rajam Tushar 3 Ajit
F/P Rajam S.Reddy 3 Kamble
F/P Vinod Shirke 4 Ajit
F/P Ashirwad Sachin 3 Kiran Wagh

SP1 Harinarayana Shailesh kr. 3 Kamble


F/P Harinarayana Vishwas Katkar 5 Ajit
ICW Harinarayana Shirke 5 Ajit
Near CT-1A Harinarayana Satish 4 Kamble
F/P Rajam Gavendra singh 6 Kamble
ICW Rajam Sameer 3 Kamble
PH# 2 Hemant tejbahadur 16+2 pingale

Near ECRW1 Harinarayana Ashok 3 Kamble


Beside DCP3 Pumphouse Rajam Someswar(M/s. Sureflow) 4 Kamble
Near CT-1A Harinarayana Satish 6 Kamble
SP1 Harinarayana Shailesh kr. 6 Kamble
DCW Harinarayana Pankaj(M/s.N.S.Landge 6 Ajit

Near CT-1A Vinod Pratik 5 Chetan


DCW Pump house Vinod Shirke 3 Ajit

Near CT-1A Ashirwad Satish 6 Kamble


F/P Ashirwad Adesh 4 Kamble
DCW Sachin Ramesh 5 Kamble
SP-2 Ashirwad Rajam 3 Ajit
Near ECRW1 Ashirwad Ashok 3 Kamble

Near CT-1 Rajam Sureflow 5 Kamble


CT-1A/ SP-1 to Chuna gate Vinod Satish 5 Kamble
SP-3 Vinod Shailesh Kr. 5 Kamble
Near CT-2 Vinod Wet bulb 3 Kamble
SP-3 pump house Vinod Shirke 3 Ajit
Near Thickner Vinod Prem Chand 4 Kamble
F/P Harinarayana Tushar 2 Ajit
Backwash pit Harinarayana Uma Reddy 5 Ajit
F/P Harinarayana Roshan 3 Ajit

Near CT-1 & F/P Rajam Rameshwar 5 Kamble


Near CT-2 Vinod Ashok 4 Kamble
SP-1 to Chuna gate Vinod Satish 5 Kamble
SP-3 Vinod Shailesh 5 Kamble
Near Thickner Vinod Premchand 5 Kamble
Near DG pump Vinod Tushar 5 Kamble
R/A ,WAH,LOTO,SCAFF,HYDRA,HEAVY LIFT,EXCAVATION etc

RA-317032
RA-317036
RA-317037,LOTO-321883,Tag-7028
RA-317038
RA-317039,Hydra-
RA-317040
RA-317041

RA-313042, 313043 Mech.LOTO-321884,C-v/vTag-7407,D-v/v-Tag-6506


RA-317044
RA-317045,LOTO-321885,Tag-6061
RA-317046

RA-317047, Mech.LOTO-321884,C-v/vTag-7407,D-v/v-Tag-6506
RA-317048/Farana-301103

RA-317047, Mech.LOTO-321884,C-v/vTag-7407,D-v/v-Tag-6506
RA-317048/Loto-321886/Tag-6054
RA-317048/Farana-301103

RA-303302/Loto-321887/Tag-6043
RA-303301/Mech.LOTO-321884,C-v/vTag-7407,D-v/v-Tag-6506/Frana-301105/CSE49281
R.A-303302
RA-329547 LOTO-130878\343013 WAH-334177 scaffolding-302124
RA 475852 LOTO 336015
RA-303304

RA-303605/Farana-301107
R.A-303606/LOTO-321888/89/90/91/Tag-6064/39/7035/6073
RA-317048

RA-303609
R-303608/Farana-301108
RA 303610
RA-303601/Farana-301108/CSE 49282/Loto-6504/7404
RA-3036011/Farana-301109/CSE 49283
RA-303612/Farana-30110
RA-303613

RA-3036014/Farana-301111/CSE 49284
R.A-3036015

RA-3036016/17/Farana-301112/CSE 49285

RA-3036018/19//CSE 49286
RA-3036020
RA-3036022
RA-303621,303623/ LOTO-321889
RA-303624

RA-303625/26/Hydra-1113/CSE 49287
RA-303627/Hydra-1114
RA 303628/LOTO -321895/Tag-6352
RA-303629
RA-303630

RA-303631/32/Hydra-1114/CSE 49288
RA-303633/Tag-7114/Loto-81599
RA-303634
RA-303635/ CSE49289,Mech. LOTO-321884,TAG-7407,6506
RA-303636
RA-303637/Hydra-301116

RA-303640
RA-303638/39/CSE-49290/LOTO-327881/Tag-6506
RA-303641
RA-303642

RA-303643,Mech LOTO-321884,Tag-7407 &6506,Farana-301118

RA-303645,Mech LOTO-321884,Tag-7407 &6506,Farana-301119,CSE-49292


RA-303646,Farana-301120
RA-303647,Mech Tag-7178,
RA-303648,LOTO-321899,Ele.Tag-6069
RA-303649

RA-303650,Mech LOTO-321884,Tag-7407 &6506,Farana-301121,CSE-49293


R.A-303501,Loto-321900,Tag-7182
R.A-303502
RA-303503/LOTO-49294/Ele. Tag no:7034

RA-303506,Mech LOTO-321884,Tag-7407&6506,CSE-49295
RA-303504,303507,303508,LOTO-321502,Tag-7104,Hydra-301122

RA-303509/303510,mech.LOTO-321884,Tag-7407/6505,Farana-301123
RA-303511,LOTO-321503,Tag-7110
RA-303512
RA-303513
RA-303514
RA-303515,LOTo-321504,Tag-7036

RA-303517/303510,mech.LOTO-321884,Tag-7407/6505,Farana-301124
RA-303518
RA-303519/Farana-301125
RA-303520
RA-303521/Farana-301125
RA-303522
RA-303523/Farana-301127
RA-303524,LOTO-321506,Tag-9386/9415

RA-303525
RA-303526,mech.LOTO-321884,Tag-7407/6505,Farana-301127/CSE-49297
RA-303527
RA-303528

RA-303529,30/Loto-321507/TAg-8616,9398,9370/Farana-301829
RA-303531
RA-303532/Tag-8527,8550/Loto-321508
RA-303533
RA-303534/Tag-8418,9885/Loto-321509

RA-303536/Loto-321507/TAg-8616,9398,9370/CSE-49299
RA-303537
RA-303538/Farana301130
RA-303539
RA-303540/Farana301130

RA-303543/Loto-321507/Tag(Mech.)-8616,9398,9370/CSE-49298/Farana-301131
RA-303544
RA-303546/Tag-9881,8413/Loto-321510
RA-303546/Farana301131
RA-303547/Tag-8411/Loto-321511

RA-303548/Loto-321507/Tag(Mech.)-8616,9398,9370/CSE-49300/Farana-301131
RA-303549
R.A-303551/LOTO-321512/TAG-7876
R.A-303555/farana-301134
RA-303556
RA-303554
RA-303552/Loto-321507/Tag(Mech.)-8616,9398,9370/CSE-49300/Farana-301135
RA-303553
RA-303559

RA-303560
RA-303561/Loto-321507/Tag(Mech.)-8616,9398,9370/CSE-49300/Farana-301136
RA-303558

RA-303562/Loto-321507/Tag(Mech.)-8616,9398,9370/CSE-49300/Farana-301137
RA-303563

RA-303564
RA-303565/Loto-321507/Tag(Mech.)-8616,9398,9370/CSE-53604/Farana-301138
RA-303566/Loto-321515/Tag-5329

RA-303567
RA-303568/Loto-321507/Tag(Mech.)-8616,9398,9370/CSE-53605/Farana-301139
RA-303569/70/71/72/LOTO-321515/Elec.Tag-7815/Mech.Tag-5818/WAH-216231/Farana-301140

RA-303573
RA-303574/75/76/77/LOTO-321515/Elec.Tag-7815/Mech.Tag-5818/WAH-216232/Farana-301141/H. LIFT-20691
RA-303578/Loto-321507/Tag(Mech.)-8616,9398,9370/CSE-53605/Farana-301142

RA-303579

RA-303580,LOTO-321516,Tag-7153

RA-303581/CSE-53607/Mech.LOTO-321507/Tag-8616,9398,9370
RA-303582
RA-303584
RA-303585,LOTO-120555,Tag-6302,Heavy lift-329301
RA-303586

RA-303587/CSE-53607/Mech.LOTO-321507/Tag-8616,9398,9370
RA-303588
RA-303589,LOTO-321518,Tag-6303
RA-303590
RA-303591

RA-303594,WAH-216234
RA-303593
RA-303595
RA-303592/CSE-53609/Mech.LOTO-321507/Tag-8616,9398,9370

RA-303596/CSE-53610/Mech.LOTO-321507/Tag-8616,9398,9370
RA-303597
RA-303598,WAH-216235
RA-303599

RA-303600/CSE-53611/Mech.LOTO-321507/Tag-8616,9398,9370
RA-302982
RA-302983

RA-313002
RA-313003
RA- 313004/LOTO-

RA-313005,6,7/CSE-53612/WAH-216236/Mech.LOTO-321522/Tag-5111,5048,5048
RA-313009/Mech.LOTO-321521/Tag-5110
RA-313012,13/Mech.LOTO-321523/Tag-5113,5050
RA-313014/Mech.LOTO-321524/Tag-5112,5114
RA-302985
RA-313010
RA-3130132/CSE-53613/Mech.LOTO-321507/Tag-8616,9398,9370/Farana-301144

RA-313017/CSE-53614/Mech.LOTO-321507/Tag-8616,9398,9370/Farana-301145
RA-313019,21/CSE-53615/Mech.LOTO-321507/Tag-8616,9398,9370/Farana-301146
RA-313011
RA-313022

RA-313023,24/CSE-53616/Mech.LOTO-321507/Tag-8616,9398,9370/Farana-301147
RA-313025
RA-313027/LOTO-321526/Tag-5271
RA-313028

R.A-313029/LOTO-321528/TAG-15082
R.A-313030
R.A-313031
R.A-313032/LOTO-321529/TAG-5345
R.A-313033

R.A-313026/LOTO-321507//Tag-8616,9398,9370/CSE-8616/9398/9370

R.A-313037
R.A-313039/40 LOTO-321530/TAG-5059/WAH-216239
R.A-313038
RA-313041,Mech. LOTO-321531,Tag-7112,7162,7829

R.A-313044/WAH-216240
R.A-313045/LOTO-321532/TAG-7113
R.A-313042/FARANA-301150
R.A-313046/LOTO-321533/TAG-5844
R.A-313048
R.A-313049
R.A-313050

RA-313047,Mech. LOTO-321531,Tag-7112,7162,7829
RA-317146,Mech. LOTO-321534,Tag-5632
RA-317147,Mech. LOTO-321527,Tag-5629

R.A-303952
R.A-317150/Heavylift-206912/Farana-301052
R.A-317149
RA-317148,303953/Mech. LOTO-321536,321537/Tag-2856,7900
RA-317117/CSE-53617/Mech.LOTO-321531/Tag-7112,7162,7829
R.A-317149
R.A-317155

R.A-303956/CSE-53618/ LOTO-321531/Mech.Tag-7112,7162,7829
R.A-303957/LOTO-321538,321539/Mech.Tag-7916,7956/Elect.Tag-7647,12520
R.A-303958
R.A-303959

R.A-303961/CSE-53619/ LOTO-321531/Mech.Tag-7112,7162,7829
R.A-303962
R.A-303963/Loto-321532/Mech.Tag-7159/Elect.Tag7955
R.A-317115,/Loto-321543,46.47/Mech.Tag-7954,7160,7156/Elect.Tag-7443,5125,7158
R.A-317114/Loto-321545/Mech.Tag-5133/Elect.Tag1234

RA-303964,CSE-53620 ,Mech-LOTO-321531
RA-303965,Mech-LOTO-321548/Tag-5056(Mech.),7100(Ele.)
RA-303966/Mech-LOTO-321549/Tag-5628(Mech.),5841(Ele.)
R.A-303967

RA-303972,LOTO-321550,Tag-5134,5135
RA-303971
RA-303968
RA-303968,CSE-53621,Mech.LOTO-321531
RA-303963
RA-303970/WHA-216244
RA-303973

RA-303976,CSE-53622,Mech.LOTO-321531
RA-303978,303980,303981,LOTO-321550,Tag-5134,5135
RA-303983
RA-303984,LOTO-145302,Tag-5488,5132
RA-303975,LOTO-145303
RA-303982,LOTO-145301,Tag-5249,5136
RA-303982,LOTO-145301,Tag-5249,5136

RA-303986,LOTO-321550,Mech. Tag-5134,5135
RA-303987
RA-303987,CSE-53623,Mech.LOTO-321531
RA-303979

RA-303989
RA-303995
RA-303993,Hydra-301208
RA-303992,LOTO-145306,7618/7616
RA-303991,CSE-53624,Mech.LOTO-321531
RA-303990
RA-303994

R.A-303997
R.A-303998
RA-303999;CSE-53625,Mech.LOTO-321531
R.A-304000,Farana-301211

RA 329201/WAH -216241
RA-329202/CSE-53626/Mech.LOTO-321531/Mech.Tag-7112,7162,7829
R.A-329203
R.A-329204
RA-329207,8,12,13/LOTO-145307/Mech.Tag-7443,7483/WAH-216242/Heavy-206914/Farana-301214
RA-329209/CSE-53627/Mech.LOTO-321531/Mech.Tag-7112,7162,7830
R.A-329210
R.A-329211
R.A-329214
R.A-329205
R.A-329215/LOTO-120555/Ele.Tag-7462

RA-329216/CSE-53628/Mech.LOTO-321531/Mech.Tag-7112,7162,7830
R.A-329217
R.A-329218
RA-329219,20,21,22/LOTO-145308/Mech.Tag-6318,7485/WAH-216245/Heavy-206915/Farana-301216
R.A-329223
R.A-329224

R.A-329229,329231/LOTO-145309/Ele.Tag-7416/Mech.Tag-7481,7484
RA-329226/CSE-53629/Mech.LOTO-321531/Mech.Tag-7112,7162,7830
R.A-329227
R.A-329228
R.A-329230
R.A-329232

RA 329233
RA 329234
RA-329236/CSE-53630/Mech.LOTO-321531/Mech.Tag-7112,7162,7830
RA-329239
RA-329241 LOTO-145311 / electrical tag-7479 mech tag-7482

R.A-329243
R.A-329245/46/47,LOTO-145312/TA-7471/7472/HEAVY LIFT-206717/WAH-216246
RA-329244/CSE-53631/Mech.LOTO-321531/Mech.Tag-7112,7162,7830
R.A-329244
RA-329248/CSE-53632/Mech.LOTO-321531/Mech.Tag-7112,7162,7830
R.A-329249
R.A-329250
RA-329151/CSE-53633/Mech.LOTO-321531/Mech.Tag-7112,7162,7830
R.A-329152/LOTO-145313/TAG-7918/Mech tag-7919
R.A-329153
R.A-329154
RA-329155,LOTO-145314,Tag-5130
RA-329156,LOTO-145315,Tag-7322

R.A-329159

R.A-329160
RA-329158/CSE-53634/Mech.LOTO-321531/Mech.Tag-7112,7162,7830
R.A-329161/62/LOTO-145317/TAG- FARANA-421276
R.A-329163/LOTO-145318/TAG-7487/7821
R.A-329164
R.A-329165-66/loto-145319/WAH-215256/TAG-6255

R.A-329171
R.A329170
RA-329172/CSE-53635/Mech.LOTO-321531/Mech.Tag-7112,7162,7830
R.A-329173/LOTO-145316/TAG- 6397/7323

RA-329175,LOTO-145320,Tag-7680,WAH-216248
RA-329178
RA-329174,76/CSE-53636/Mech.LOTO-321531/Mech.Tag-7112,7162,7830/Farana-301226
RA-329169
RA-329177/Loto-145321/Mech.Tag-7343,Elec.Tag-6294
RA-329179
RA-329180/81,LOTO-145322,Tag-7478,WAH-216257,Farana-301227

RA-329186/CSE-53637/Mech.LOTO-321531/Mech.Tag-7112,7162,7830
RA-329183
RA-329185
RA-329184
RA-329189/Farana-301230
RA-329190,91/Mech.Tag-7625,7624/Ele.Tag-6123/LOTO-145523

RA-329194
RA-329192,Hydra-301232,Mech. LOTO-321531
RA-329195,LOTO-145324,Tag-6239
RA-329193

RA-329196,Farana-306233,Mech.LOTO-321531
RA-329197
RA-322402
RA-329200,322401,WAH-216260,LOTO-145325,Tag7147,HYDRA-301236
RA-329198,329199,Hydra-301234(Cherry picker),Hydra-301235, WAH-216259
RA-322403

RA-322404,Farana-301237,Mech.LOTO-321531
RA-322405
RA-322407/322408,Hydra-301238/30301239,WAH-216261
RA-322409
RA-322410
RA-322411/Farana-301241
RA-322412

RA-322406
RA-322414
RA-322413,CSE-53638,Mech LOTO-321531,Hydra-301244
RA-322417,WAH-216263,Hydra-301246,LOTO-120504,Tag-5654

RA-322421,CSE-53639,Mech-LOTO-321531
RA-322419
RA-322423/Farana-301248,WAH-216264
RA-322422,24

RA-322428
RA-322429
RA-322430
RA-322426,Hydra-301250
RA-322427

RA-322433
RA-322434
RA-322435
RA-322436/Frana-349452
RA-322437/Frana-349453
RA-322438/Frana-349451
RA-322432

RA-322439
RA 322440/Loto -145327/Ele. Tag-0209

RA-322441
RA-322444
RA-322443
RA-322442/Farana-319445
RA-322445
RA-322446
RA-322447

RA-322451/WAH-216265

RA-322449/Farana-319456
RA-322454
RA-322450/Farana-319456
RA-322448
RA-322453
RA-322455

RA-322463,322464/WAH-216267
RA-322466
RA-322467/Farana-319460
RA-322452,322465/Farana-319458
322461/Farna-319461
RA-322468/LOTO-145329/Ele. Tag-7651.Mech.Tag-7649,7658
RA-322462/Farana-319453/WAH-216268
RA-322469,322470/LOTO-145330/Ele. Tag-7651,Mech.Tag-5234

322475/Farna-319464
RA-322476
RA-322471,322472/Farana-319462
RA-322473/WAH-216269
RA-322478
RA-322480/LOTO-120507/Ele. Tag-0219/WAH-216269
RA-322481,322483/LOTO-145330/Ele. Tag-7651,Mech.Tag-5234
RA-322474,322482/LOTO-145331

RA-322484,322485/Farana-319466
RA-322486

RA-322492
RA-322496,LOTO-45330,Tag-0210
RA-322494,95,WAH-216271,Hydra-319468

RA-322500/Loto-145332/Tag Elec-0214/Tag Mech-7277/7278

R.A-338752
R.A-338759
R.A-338760
R.A-338754/55FARANA-319469
R.A-338757/LOTO-
R.A-338756

RA-338761,WAH-216272

R.A-338762
R.A-332497/98 FARANA-319474WAH-216273
R.A-338765
R.A-338766

RA-338753
R.A-322459,60/Farana-319475/WAH-216274

R.A-338767
R.A-338769,70/Farana-319477/WAH-216275
R.A-338771
RA-338773
R.A-338774/Farana-319478
R.A-338775
RA-338772

RA-338785
RA-338783-84/WAH-216277/Farana-319479-80
RA-338786
RA-338787
RA-338788
RA-338789

RA-338794
RA-338795
RA-338791

RA-338796
RA-338797
RA-338776-77/WAH-216278/Farana-319482-83
RA-338798
RA-338799
RA-339000

RA-303856
RA-303855
RA-303853

RA-338790
RA-338792/338793,Hydra-319485/319484,WAH-216249
RA-303852,WAH-216279,LOTO-145335,Tag-723, Mech-Tag-001

RA-303857,303858/WAH-216280
RA-303859
RA-303861
RA-303867,HYDRA-319490
RA-303868
RA_303864,306866/WAH-216281/Heavy lift-206919,LOTO-145336,TAG-7651

RA-303870/71,WAH-216282,Hydra-319491,92
RA-303872
RA-303873,LOTO-145337,Tag-508
RA-303862
RA-303875,Man lifter-319494
RA-307876,Manlifter-319494

RA-303878,79/WAH-216283,Hydra-319495,96
RA-303882
RA-303863,Mech. LOTO-145339
RA-303884,LOTO-145338,Tag-0628
RA-303885,LOTO-120507,Tag-0219,WAH-216284,Hydra-319497
RA-303886
RA-303887,LOTO-145338,Tag-0628
RA-303878,79/WAH-216285,Hydra-319498,99

RA-303897,98/WAH-216290/Hydra-319500,301059
RA-303899,LOTO-145338,Tag-0628

RA-303896
RA-303900
RA-317151
RA-303869/LOTO-145338,Tag-0711
RA-322415,16/WAH-216291/Hydra-301061,62
RA-317153,54/WAH-216292/Hydra-301063,301064
RA-317155,56/WAH-216293/Hydra-301065,66/LOTO-145322/Tag-7458
RA-317157
RA-317158,59/LOTO-145338/Tag-0211
RA 317160

RA-317161,62/WAH-216295/Hydra-301067,301068
RA-317163,64/WAH-216294/Hydra-301069,70/LOTO-145322/Tag-7458
RA-317167
RA 317168
RA-317169
RA-317170
RA-317171/LOTO-120594/Tag-1599/WAH-216296
RA-317172

RA-317173,74/WAH-216299/Hydra-301076,301077
RA-317175,76/WAH-216297/Hydra-301072,73/LOTO-145322/Tag-7458
RA-317177
RA-317178
RA-317179/LOTO-145338/Tag-0211
RA-317179/LOTO-342002/MECH.Tag-6672,1891/ELEC. tag-1467/Farana-301078

R.A-317182/83/WAH-216300/FARANA-301080
R.A-317185
R.A-317186/87 WAH-216301/FARANA-301081
R.A-317189/90LOTO-342003TAG-6710MECH-1075/WAH-216302/FARANA-301082

R.A-313100WAH-216360
R.A-313100WAH-216360
R.A-313100

R.A303659
R.A-303660
R.A-303661
RA-303663,FARANA-301088
RA-303662

R.A.303664
R.A-303666
R.A-303667
R.A-303668/69/LOTO-145340/WAH-216307
RA-303672,WAH-216308,Hydra-301090

R.A.303665
R.A-303678
R.A-303676/77/LOTO-342007/CRANE-206921
R.A-303674, Hydra-301092
RA-303674,Hydra-301091

R.A-303679
R.A-303680/LOTO-145338/Tag-0211
R.A-303681
R.A-303682
R.A-303683
R.A-303677
RA-303684,LOTO-342008,TAG-0163

R.A-303685
R.A-303686/Farana-301096
R.A-303687/Farana-301094
R.A-303689/Farana-301096/WAH-216310
R.A-303690

RA-303691
RA-303692
RA-303693
RA-303694,Hydra-301097
RA-303695,Hydra-301097
RA-303696,Hydra-301097

RA-303697
RA-303698,Hydra-301098
RA-303699
RA-303700

RA-338807/08,LOTO-342009,Tag-983,Hydra-301099
RA-338810/11,Mech.LOTO-342011
RA-338809,
RA-338812,13
RA-338814,
RA-338815,LOTO-342013,Tag-981

RA-338818
RA-338817
RA-338820, Mech. LOTO-342015,Tag-814
RA-338816
RA-338819,21/WHA-216311/Farana-301100

RA-338822
RA-338823
RA-338824
RA-338825
RA-338826
RA-338827
RA-338828/WAH-216312
RA-338829,30,LOTO-342016,Tag Ele-648,Mech-3915,3961

RA-338832
RA-338833,LOTO-342016,Tag Ele-648,Mech-3915,3961
RA-338834

RA-338835/37
RA-338836/Mech.Loto-342017
RA-338839/Farana-301003
RA-338838
RA-338840

RA-338841
RA-338842
RA-338843,44/Loto-342018/Mech.Tag-3345/3263/Loto-342018
RA-338845/Farana-301005
RA-338847/WAH-216313/Frana-301004
RA-338848
RA-338849

RA-338850
RA-327017
RA-327019
RA-327018/Frana-301004
RA-327016

RA-332579
RA-332580
RA-332581/Farana-301007
RA-332583/Loto-342020/Elec.Tag-0342/Mech.Tag-3264,65/Farana-301007

R.A-322586
R.A-322585
R.A-322582
R.A-322587
R.A-322588/89/LOTO-342022/TAG-3267/3286
R.A-322591
R.A-322590
R.A-322592/LOTO-342023/TAG-3266/920

R.A-322594
R.A-322593

R.A-332597
R.A-332598
R.A-332599
R.A-332600
R.A-338546/LOTO-342023
R.A-388547

R.A-343501/02
R.A-338548 LOTO-342024
R.A-338549
R.A-338550
R.A-343503
R.A-345104/LOTO-34202MECH TAG-3606/3662
RA-343505

R.A-343506
R.A-343507/Farana-301012
R.A-343508/LOTO-342026,Mech Tag-3063,Ele.Tag-
R.A-343507/Farana-301012
R.A-343512
R.A-343510
RA-332663/LOTO-306021/145015/145019/ SCAFF-315566/WAH-307279
R.A-343511
RA-303746
RA-303747,Hydra-319255

R.A-343513
R.A-343515
R.A-343516/LOTO-342028,Mech Tag-3599,Ele.Tag-303/Farana-301014/WAH-216316/Heavy lift-112453
R.A-343517
R.A-343519,20
R.A-343521
RA-343514,Heavy lift-112453,Hydra-301012

RA-343522/23 WAH-216318 FARANA-301016


R.A-343524
R.A-343526
RA-343521
RA-343528,Heavy lift-127720, EXCAVATION-217720 WAH-216319
RA-343539
RA-343522/23 WAH-216318 FARANA-301017

RA-313533,LOTO-342029,Tag-783
RA-343532,WAH-216320,Hydra-301017
RA-343534
RA-343535

RA-343538
RA-343540,Mech LOTO-342038,Tag-3610
RA-343542
RA-343531,343541,Hydra-301018,WAH-216321
RA-343537
RA-343539
RA-343536

RA-343549
RA-343545
RA-343546,WAH-216323,Hydra-301020
RA-343548
RA-343547
RA-343951,LOTO-342032,Tag-1551
RA-343551,Mech.LOTO-342031,WAH-216324

RA-343959
RA-343957
RA-343953,WAH-16325,Hydra-301022
RA-343956
RA-343958,Mech.LOTO-342033
RA-343955
RA-343954
RA-343960
RA-343961

RA-343962/65,LOTO-342034,Tag-1688,Hydra-301026
RA-343964/66,WAH-216326,Man lifter-301024,Hydra-301025
RA-343968
RA-343969,LOTO-342037,WAH-216327
RA-343970
RA-343967
RA-343971,Hydra-301026
RA-343963/Loto-342035/Mech Tag-3929,3948

RA-343975/76,WAH-216328,HYDRA-301027.301028
RA-343977
RA-343978
RA-343979
RA-343980,LOTO-342039,Tag-1672
RA-343973
RA-317191,WAH-216303,HYDRA-301083.301084

RA-343985
RA-343986
RA-343990
RA-343981,82/WAH-216329/Farana-301229
RA-343983/Farana-301230
RA-343984
RA-343987/Loto-342040/Farana-301030/Mech.Tag-3933,34/Elec. Tag-1663
RA-343988

RA-343972
RA-343991

RA-343992,93/WAH-216330/Farana-301031
RA-343994
RA-343996
RA-343997
RA-343999/Farana-301032
RA-343998

RA-343552/WAH-216331/Farana-301033
RA-343553
RA-343554
RA-343555
RA-343556
RA-343557/Loto-342043/Elect.Loto-3436

RA-343559/WAH-216332/Farana-301035
RA-343560
RA-343561
RA-343562
RA-343563/Farana-301035
RA-343564

RA-343565/WAH-216333/Farana-301036
RA-343566
RA-343567/WAH-216334/Farana-301036
RA-343568/Loto-342045,Mech. Tag-4202,03/Elect. Tag-204
RA-343569/Mech. Tag-4199/4200/Loto-342045
RA-344000
RA-343570
RA-343571

RA-343578/WAH-216335
RA-343574/Farana-301038
RA-343577
RA-343576
RA-343572/Mech.Loto-342047,Mech. Tag-3917,3918
RA-343573/Mech.Loto-342048,Mech. Tag-3531,3521
RA-343579
RA-343580,81/Loto-342049,Mech. Tag-3531,3919/Elect. Tag-8608

R.A-343582/WAH-216338/FARANA-301040/MANLIFT-301041
R.A-343583
R.A-343586
R.A-843587
R.A-343588/LOTO-322050TAG-266WAH-216336
R.A-343590
R.A-343591

R.A-343593/Loto-42752/Tag-3115
R.A-343594
R.A-343595

R.A-343593/WAH-216339/FARANA-301044/MANLIFT-301045
RA-343596/WAH-216341
R.A-343600
R.A-343585
R.A-343597
R.A-343151/WAH-216340/FARANA-301046,301047
R.A-343599
R.A-343152
R.A-343153
RA-343154,Hydra-301048
R.A-343159
R.A-343160,62/WAH-216344/Farana-32053,54
R.A-343164
R.A-343158
R.A-327020,Loto-42753,MechTag-4209,10
R.A-343163,WAH-216345
R.A-343157

RA-343171
RA-343174,LOTO-42754,Tag-960,Mech. Tag-3113,3114
RA-343267
RA-343144,WAH-216347
RA-343170
RA-343169
RA-343173
RA-343156,68/WAH-216346/Hydra-328051,52
RA-343172

RA-343175,76/WAH-216349/Hydra-328057,58
RA-343267
RA-343178
RA-343179
RA-343180
RA-343181
RA-343182,LOTO-42756,Ele.Tag-1644,Mech.Tag-3001
RA-338782/WAH-216288
RA-317166
RA-303881,LOTO-42757,Mech.Tag-3002,3841
RA-343183,Mech.LOTO-42758 Tag-3061
RA-310045,Loto-42760,Mech. Tag-3150,3747

RA-343185/LOTO-42760,Mech.Tag-957
RA-343187
RA-343191,92/LOTO-42761,Mech.Tag-3092,3699/Ele.Tag-956
RA-343189
RA-343190/Faran-301056,301057/Excavation-216289
RA-343195/LOTO-42762,Mech.Tag-3534,3384/Ele.Tag-3605
RA-303846/WAH-307454/LOTO-145019-145059/SCAFF-315581

RA-343188
RA-343198/Excavation-34450/Farana-328036,328064
RA-313902
RA-313904/LOTO-42764/Tag-3537
RA-343200/LOTO-42765/Tag-1645

RA-332578
RA-343177,LOTO-42763,Elec.Tag-1645

RA-343102
RA-343103
RA-343104,05/WAH-216348/Farana328066/67
RA-343107/Farana328066
RA-343106

RA-343108,09/WAH-308401,Farana-328068/Manlifter-328069
RA-343110/11
RA-343112,LOTO-42766,Tag-
RA-343113
RA-343114,LOTO-42767,Tag-1538
RA-343115
RA-343117
RA-343116
RA-343118

RA-322223,343199/WAH-308403
RA-313906
RA-313907,08/WAH-308402/Farana-328070,Manlifter-328071
RA-338780
RA-338781
RA-313909,10
Remarks Applicant Completed

permit Closed Properly Harinarayana


permit Closed Properly Harinarayana
permit Closed Properly Harinarayana
permit Closed Properly Harinarayana
permit Closed Properly Harinarayana
permit Closed Properly Harinarayana
Permit closed properly Vinod

Permit closed properly Vinod


Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod

Permit closed properly Atish


Permit closed properly Atish

Permit closed properly Atish


Permit closed properly Sachin
Permit closed properly Atish

Permit closed properly Ahirwad


Permit closed properly Ahirwad
Permit closed properly Ahirwad
Permit closed properly Raut
Permit closed properly Aakash
Permit closed properly Ahirwad

Permit closed properly Atish


Permit closed properly Atish
Permit closed properly Atish

Permit Closed Properly Sachin


Permit closed properly Sachin
Permit Closed Properly Sachin
Permit Closed Properly Rajam
Permit Closed Properly Sachin
Permit closed properly Sachin
Permit closed properly Sachin

Permit closed properly Sachin


Permit closed properly Sachin

Permit closed properly Vinod

Permit closed properly Vinod


Permit closed properly ashirwad
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod

Permit closed properly Vinod


Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod

Permit closed properly Rajam


Permit closed properly Sachin
Permit closed properly Rajam
Permit closed properly Vinod
Permit closed properly Vinod
Permit Closed Properly Vinod

Permit Closed Properly Harinarayana


Permit Closed Properly Harinarayana
Permit Closed Properly Harinarayana
Permit closed properly Vinod

Permit Closed Properly Harinarayana

Permit Closed Properly Harinarayana


Permit Closed Properly Harinarayana
Permit Closed Properly Harinarayana
Permit Closed Properly Harinarayana
Permit Closed Properly Harinarayana

Permit Closed Properly Harinarayana


Permit Closed Properly Sachin
Permit Closed Properly Harinarayana
Permit Closed Properly Harinarayana

Permit Closed Properly Harinarayana


Permit Closed Properly Harinarayana

Permit Closed Properly ATISH


Permit Closed Properly ATISH
Permit Closed Properly ATISH
Permit Closed Properly ATISH
Permit Closed Properly ATISH
Permit Closed Properly ATISH

Permit Closed Properly ATISH


Permit Closed Properly ATISH
Permit Closed Properly ATISH
Permit Closed Properly ATISH
Permit Closed Properly ATISH
Permit Closed Properly ATISH
Permit Closed Properly ATISH
Permit Closed Properly ATISH

Permit Closed Properly Ashirwad


Permit Closed Properly Ashirwad
Permit Closed Properly Ashirwad
Permit Closed Properly Ashirwad

Permit Closed Properly ATISH


Permit Closed Properly ATISH
Permit Closed Properly ATISH
Permit Closed Properly ATISH
Permit Closed Properly Harinarayana

Permit Closed Properly ATISH


Permit Closed Properly ATISH
Permit Closed Properly Harinarayana
Permit Closed Properly ATISH
Permit Closed Properly ATISH

Permit Closed properly Sachin


Permit Closed properly Sachin
Permit Closed properly Sachin
Permit Closed properly Sachin
Permit Closed properly Sachin

Permit Closed properly Sachin


Permit Closed properly Sachin
Permit Closed properly Sachin
Permit Closed properly Sachin
Permit Closed properly Sachin
Permit Closed properly Sachin
Permit closed properly Vinod
Permit closed properly Vinod
Permit Closed properly Atish

Permit closed properly Vinod


Permit closed properly Vinod
Only Tool Box Talk copy received Vinod

Permit closed properly Vinod


Permit closed properly Vinod

Permit closed properly Vinod


Permit closed properly Vinod
Permit closed properly Vinod

Permit closed properly Vinod


Permit closed properly Vinod
Permit closed properly Vinod

Permit closed properly Harinarayana


Permit closed properly Harinarayana
Permit closed properly Harinarayana

Permit closed properly Harinarayana

Permit closed Properly Vinod

Permit closed properly Harinarayana


Permit closed properly Harinarayana
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Harinarayana

Permit closed properly Harinarayana


Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana

Permit closed properly Vinod


Permit closed properly Harinarayana
Permit closed properly Vinod
Permit closed properly Harinarayana

Permit closed properly Harinarayana


Permit closed properly Harinarayana
Permit closed properly Vinod
Permit closed properly Harinarayana

Permit closed properly ATISH


Permit closed properly ATISH
Permit closed properly ATISH

Permit closed properly Harinarayana


Permit closed properly ATISH
Permit closed properly ATISH

Permit closed properly Vinod


Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana

Permit closed properly Harinarayana


Permit closed properly Harinarayana

Permit closed properly ATISH


Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly Harinarayana

Permit closed properly Sachin


Permit closed properly Sachin
Permit closed properly Harinarayana
Permit closed properly Sachin

Permit closed properly Sachin


Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Atish
Permit closed properly Sachin

Permit closed properly Vinod

Permit closed properly Vinod


Permit closed properly Atish
Permit closed properly Vinod
Permit closed properly Vinod

Permit closed properly Ashirwad


Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Ashirwad

Permit Closed Properly Rajam


Permit Closed Properly Rajam
Permit Closed Properly Rajam

Permit Closed Properly Rajam


Permit Closed Properly Harinarayana
Permit Closed Properly Harinarayana
Permit Closed Properly Rajam
Permit Closed Properly Rajam
Permit Closed Properly Rajam
Permit Closed Properly Rajam

Permit Closed Properly Rajam


Permit Closed Properly Rajam
Permit Closed Properly Rajam
Permit Closed Properly Rajam

Permit Closed Properly Harinarayana


Permit Closed Properly Harinarayana
Permit Closed Properly Harinarayana
Permit Closed Properly Harinarayana
Permit Closed Properly Harinarayana

Permit Closed Properly Harinarayana


Permit Closed Properly Harinarayana
Permit Closed Properly Harinarayana
Permit Closed Properly Harinarayana

Permit closed properly Sachin


Permit closed properly Sachin
Permit closed properly Vinod
Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Sachin

Permit Closed Properly Harinarayana


Permit Closed Properly Harinarayana
Permit Closed Properly Harinarayana
Permit Closed Properly Harinarayana
Permit Closed Properly Harinarayana
Permit closed properly Vinod
Permit Closed Properly Harinarayana

Permit closed properly Vinod


Permit Closed Properly Harinarayana
Permit Closed Properly Harinarayana
Permit Closed Properly Harinarayana

Permit closed properly ATISH


Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH

Permit closed properly ATISH


Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH

permit cancelled Harinarayana


Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly Harinarayana
Permit closed properly ATISH
Permit closed properly ATISH

Permit closed properly ATISH


Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH

Permit closed properly Sachin


Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Sachin

Permit closed properly Atish


Permit closed properly Atish
Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Atish

Permit closed properly Sachin


Permit closed properly Ashirwad
Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Rajam
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Atish
Permit closed properly Ashirwad
Permit closed properly Vinod
Permit closed properly Vinod

Permit closed properly Vinod

Permit closed properly Vinod


Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Harinarayana
Permit closed properly Vinod
Permit closed properly Harinarayana

Permit closed properly Vinod


Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod

Permit Closed Properly Vinod


Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod

Permit closed properly Harinarayana


Permit closed properly Harinarayana
Permit closed properly Sachin
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana

Permit closed properly Harinarayana


Permit closed properly Vinod
Permit closed properly Harinarayana
Permit closed properly Harinarayana

Permit closed properly Harinarayana


Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Vinod

Permit closed properly Harinarayana


Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana

Permit closed properly Harinarayana


Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Vinod

Permit closed properly Harinarayana


Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana

Permit closed properly ATISH


Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH

Permit closed properly ATISH


Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH

Permit closed properly Harinarayana

Permit closed properly Harinarayana

Permit closed properly ATISH


Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH

Permit closed properly ATISH

Permit closed properly ATISH


Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH

Permit closed properly Sachin


Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Sachin

Permit closed properly Sachin


Permit closed properly Sachin

Permit closed properly Sachin


Permit closed properly Sachin
Permit closed properly Harinarayana
Permit closed properly Sachin

Permit closed properly Sachin


Permit closed properly Sachin

Permit closed properly Rajam


Permit closed properly Rajam
Permit closed properly Rajam

Permit Closed properly Vinod

Permit closed properly Vinod


Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod

Permit closed properly Vinod


Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod

Permit
Permit closed
closed properly
properly Vinod
Vinod

Permit
Permit closed
closed properly
properly Vinod
Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod

Permit
Permit closed
closed properly
properly Harinarayana
Harinarayana
Permit closed properly Harinarayana

Permit closed properly Harinarayana

Permit closed properly Harinarayana


Permit closed properly Shirke
Permit closed properly Vinod

Permit closed properly Harinarayana


Permit closed properly Harinarayana
Permit closed properly Harinarayana

Permit closed properly Vinod

Permit closed properly Harinarayana

Permit closed properly Harinarayana


Permit closed properly Harinarayana
Permit closed properly Harinarayana

Permit closed properly Harinarayana


Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana

Permit closed properly Harinarayana


Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit Closed Properly Atish
Permit Closed Properly Sachin
Permit Closed Properly Atish

Permit closed properly Harinarayana


Permit closed properly Harinarayana

Permit Closed Properly Sachin


Permit Closed Properly Sachin
Permit Closed Properly Sachin
Permit Closed Properly Sachin
Permit Closed Properly Sachin
Permit Closed Properly Sachin
Permit Closed Properly Sachin
Permit Closed Properly Sachin
Permit Closed Properly Sachin

Permit
Permit Closed
Closed Properly
Properly Sachin
Sachin
Permit Closed Properly Sachin
Permit Closed Properly Sachin
Permit Closed Properly Sachin
Permit Closed Properly Sachin
Permit Closed Properly Harinarayana
Permit Closed Properly Sachin

Permit Closed Properly Sachin


Permit Closed Properly Sachin
Permit Closed Properly Sachin
Permit Closed Properly Sachin
Permit Closed Properly Vinod

Permit Closed Properly Ashirwad


Permit Closed Properly Ashirwad
Permit Closed Properly Vinod

Permit
Permit closed
closed properly
properly Atish
Vinod
Permit closed properly Vinod

Permit closed properly Vinod


Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod

Permit closed properly Vinod


Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod

Permit closed poperly Vinod


Permit closed poperly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod

Permit
Permit closed
closed properly
properly Vinod
Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod

Permit closed properly Harinarayana


Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana

Permit closed properly Harinarayana


Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana

Permit closed properly Harinarayana


Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana

Permit closed properly ATISH


Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana

Permit closed properly Sachin


Permit closed properly Ashirwad
Permit closed properly Sachin
Permit closed properly Vinod
Permit closed properly Sachin

Permit closed properly ATISH


Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH

Permit closed properly ATISH


Permit closed properly SACHIN
Permit closed properly ATISH

Permit closed properly ATISH


Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH

Permit closed properly Harinarayana


Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana

Permit closed properly ATISH


Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH

Permit closed properly Harinarayana


Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana

Permit closed properly Harinarayana


Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana

Permit closed properly Harinarayana


Permit closed properly Harinarayana

Permit
Permit closed
closed properly
properly Vinod
Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod

Permit
Permit closed
closed properly
properly Vinod
Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod

Permit closed properly Vinod


Permit closed properly Vinod
permit closed properly Vinod
permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Sagar Betkar
permit closed properly Vinod
Permit closed properly H.Naik
Permit closed properly H.Naik

Permit closed properly Vinod


Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Vinod

Permit closed properly Sachin


Permit closed properly Sachin
Permit closed properly Ashirwad
Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Sachin

Permit closed properly Ashirwad


Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Ashirwad

Permit closed properly Sachin


Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Sachin

Permit closed properly Sachin


Permit closed properly Ashirwad
Permit closed properly Sachin
Permit closed properly Ashirwad
Permit closed properly Ashirwad
Permit closed properly Ashirwad
Permit closed properly Ashirwad

Permit closed properly Ashirwad


Permit closed properly Ashirwad
Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Harinarayana
Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Ashirwad
Permit closed properly Sachin

Permit closed properly Harinarayana


Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Sachin

Permit closed properly ATISH


Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH

Permit closed properly ATISH


Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH

Permit
Permit closed
closed properly
properly Sachin
Ashirwad

Permit closed properly ATISH


Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH
Permit closed properly ATISH

Permit closed properly Harinarayana


Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana

Permit closed properly Harinarayana


Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana

Permit closed properly Harinarayana


Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana

Permit closed properly Harinarayana


Permit closed properly Harinarayana
Permit closed properly Rajam
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Rajam
Permit closed properly Harinarayana
Permit closed properly Harinarayana

Permit closed properly Harinarayana


Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana
Permit closed properly Harinarayana

Permit closed properly Sachin


Permit closed properly Sachin
Permit closed properly Sachin

Permit closed properly Vinod


Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod

Permit closed properly Vinod


Permit closed properly Vinod

Permit closed properly Vinod


Permit closed properly Atish
Permit closed properly Sachin
Permit closed properly Atish
Permit closed properly Atish
Permit closed properly Harinarayana
Permit closed properly Atish
Permit closed properly Atish

Permit
Permit closed
closed properly
properly Vinod
Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod

Permit closed properly Vinod


Permit closed properly Vinod
Permit closed properly vinod
Permit closed properly vinod
Permit closed properly vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Ashirwad

Permit closed properly Vinod


Permit cancelled(Cutting set problem) Vinod
Permit closed properly Vinod
Permit closed properly Vinod
Permit closed properly Rajam
Permit closed properly Vinod

Permit closed properly Sachin


Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Sachin

Permit closed properly Vinod


Permit closed properly Vinod

Permit closed properly Sachin


Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Sachin
Permit closed properly Sachin

Permit closed properly Sachin


Permit closed properly Ashirwad
Permit closed properly Sachin
Permit closed properly Ashirwad
Permit closed properly Ashirwad
Permit closed properly Ashirwad
Permit closed properly Sachin
Permit closed properly Ashirwad
Permit closed properly Sachin

Permit closed properly Sachin


Permit closed properly Sachin
Permit closed properly Ashirwad
Permit closed properly Ashirwad
Permit closed properly Sachin
Permit closed properly Sachin
RISK ASSESSMENT FORMAT

EQUIPMENT BASIC JOB STEPS

Painting Cleaning with scrapper, wire brush

Painting Cleaning with scrapper, wire brush

Painting Cleaning with scrapper, wire brush


Cleaning gas line with scrapper, wire
Painting brush, buffing
Painting Painting

Painting Painting
Painting Painting
Painting Painting
Painting Painting

Gas cutting Gas cutting

Gas cutting Gas cutting

Gas cutting Gas cutting

Gas cutting Gas cutting


Gas cutting Gas cutting
Gas cutting Gas cutting

Gas cutting Gas cutting

Gas cutting Gas cutting


Gas cutting Gas cutting

Gas cutting Gas cutting

Gas cutting Gas cutting


Gas cutting Gas cutting
Gas cutting Gas cutting

Gas cutting Gas cutting

Gas cutting Gas cutting

Gas cutting Gas cutting

Gas cutting Gas cutting

Gas cutting Gas cutting

Gas cutting Gas cutting

Gas cutting Gas cutting

Gas cutting Gas cutting

Gas cutting Gas cutting

Gas cutting Shfting of Gas cylinder

Welding Welding

Welding Welding

Welding Welding
Welding Welding

Welding Welding

Welding Welding

Welding Welding

Welding Welding

Welding Welding

Welding Welding

Welding Welding
Welding Welding

Welding

Welding
PHE PHE backflushing Climbing on ladder
PHE PHE backflushing Valve closing
PHE PHE backflushing venting
PHE PHE backflushing PHE flange opening
PHE PHE backflushing Nut bolts loosening/ tightening

PHE backflushing Flange removing / Fitting


PHE

PHE backflushing Flange removing / Fitting


PHE

Drilling/Grinding Drilling/Grinding

Grinding Grinding

Grinding Grinding
Grinding Grinding

Grinding Grinding
A hazard is something that can cause harm, e.g. electricity, chemicals, working up a ladder
A risk is the chance, high or low, that any hazard will actually cause somebody harm.
POTENTIAL HAZARDS CONSEQUENCES

Loose flakes, rust, dust, fine particles Eye irritation, eye injury

Loose flakes, rust, dust, fine particles Body injury

Loose flakes, rust, dust, fine particles Respiration problem

Sparking Fire
Paint handling Spillage of paint on body parts

Chemical fumes Dizziness / headache


Chemical fumes Eye irritation
Chemical fumes Respiration problem
Flammable liquid Fire

Compressed flammable gas Fire due to damage to cylinder valve


Fire due to gas leakage from attached
Compressed flammable gas equipment

Compressed flammable gas Fire due to slipped, damaged hoses

Compressed flammable gas Explosion due to flash back


Compressed flammable gas Explosion due to flash back
Compressed flammable gas Explosion due to excess pressure

Compressed flammable gas Explosion due to inappropriate pressure


Sudden escape of gas causing cylinder to
Compressed gas move with high velocity
Flammable gas Hand Burn

Flammable gas Fire

Flammable gas Fire


Compressed gas
Flammable gas Burn injury due to flash back

Hot surface burns

Hazardous fumes and gases Eye irritation / Respiratory problems

Heat rays ( Infrared radiation ) Eye injury / skin burns

Spatters ( sparks and hot metal ) Eye / skin burns

Spatters ( sparks and hot metal ) Fire

Flammable material Fire

Explosive material Explosion / fire

Hollow container Explosion / fire


Metal fume fever, commonly called 'zinc
Zinc chills' or 'galo'

Explosive gases Explosion /Cylinder damage

Spatters ( sparks and hot metal ) Eye / skin burns

Spatters ( sparks and hot metal ) Fire

Hazardous fumes and gases Eye irritation / Respiratory problems


Heat rays ( Infrared radiation ) Eye injury / skin burns

Hot surface burns

Flammable material Fire

Explosive material Explosion / fire

Hollow container Explosion / fire

Hot welding rod stub ends Fire/ Slip and fall

Electric shock Loss of consciousness

Electric shock Tingling


Inhalation of toxic gases Breathing problem

Fire Property damage

Burn Body part injury


Working at Height Fall from height
Sharp edges on handle Cuts to hands
pressurised water eye injury
Working at Height Fall from height
Slip of spanner / hammer finger injury/ body part injury

Heavy load fall of flange

Finger trapping and pinching between


Heavy flange
flange and PHE body

Particles spalsh in eyes/shock Eye injury

Rotating equipment Cut injury

Sparks Hot burn,fire


Damage grinding disc
ectricity, chemicals, working up a ladder, noise, stress, etc.
l actually cause somebody harm.
CURRENT CONTROL MEASURES Contributor

Use safety goggle. Wash eyes frequently Navin

Use hand gloves, jeans jacket, keep away from loose flakes, rust Navin

Use mask. Keep away from flying dust, rust, loose flakes Navin
Do not perform cleaning with sharp edged objects. Do not perform
these activities on pressurised gas line. Navin
Use hand gloves, jeans jacket, safety goggles, mask Navin
Use mask. Take perioding break if ventilation is not proper. Stay in
upwind direction Navin
Use safety goggle. Wash eyes frequently Navin
Use mask. Stay in upwind direction Navin
Do not perform hot work in vicinity of painting job. No smoking. Abhijeet
Check that protective valve cap is firmly fixed on the cylinder and it
is not damaged Navin
Check that there is no leakage from any equipment connected to
DA and Oxygen cylinders Navin
Check that the hoses are tightly crimped with jubilee clamp and are
not having any cuts or cracks Navin
Check flash back arrester is fitted on DA and Oxygen side at the
cylinder end Navin
Check NRV is fitted on DA and Oxygen sides of torch Navin
Check pressure of DA and Oxygen cylinders is in safe range Navin
Check that working pressure of Oxygen and DA cylinder is properly
set Navin

Check that the cylinders are properly secured with chain on trolley Navin
Use industrial friction type gas lighter for lighting the torch Navin

Keep regulators, hoses, torches and other oxy-fuel gas equipment


free of grease, oil, and other combustibles. Never use lubricants on
Oxy fuel equipment Navin

Do not open the aceteylene gas cylinder valve more than 1.5 turns.
Open /close only with T-wrench or key. Leave the T-wrench on
position for readily closing the valve in case of emergency. Navin
Keep the cylinder in upright position Navin
If the flame goes out and burns back within the torch, producing a
pronounced hissing or squealing noise, IMMEDIATELY shut off the
torch. After a flashback, allow the torch to cool and recheck the
operating pressures. Before relighting, allow oxygen (NOT fuel gas)
to flow through the torch for several seconds to clear out soot that
may have accumulated in the torch. If another flashback occurs or
the torch repetitively backfires, remove torch from service Navin
Cool down the cutting edge and surrounding surface before
handling. Use leather gloves for handling Navin

Do not breathe the fumes. Keep head out of the fumes. Use proper
ventilation. Do not heat / cut the plate covered with unknown
material Navin
Wear safety goggles / helmets made for gas welding and cutting
purpose with proper shade. Navin
Use face shield while cutting. Use leg guards and jeans clothing. Do
not use clothing stained with grease and oil Navin

Use fire blanket / sheet to limit flying spatters. Keep suitable fire
extinguisher ready. Cover holes cracks and crevices Navin

Do not perform gas cutting near flammable material. Clean


flamable material from working area. If possible move the material
to be cut to safe location. Inspect the area after completing the
work Navin

Never cut the containers or piping which previously held flammable


liquid or an unknown material unless they are first properly
cleaned. Never cut the closed vessels /cylinders Navin
Jacketed containers or other hollow parts should be vented before
gas cutting Navin
Do not inhale fumes from welding or cutting galvanized sheet,
brass, or other zinc alloys Navin
Always Use cutting set trollry to shift Gas cylinders. Do not roll the
cylinders over ground Vaibhav

Use welding helmet with proper shade. Use leg guards and jeans
clothing. Do not use clothing stained with grease and oil Navin

Use fire blanket / sheet to limit flying spatters. Keep suitable fire
extinguisher ready. Cover holes cracks and crevices Navin

Do not breathe the fumes. Keep head out of the fumes. Use proper
ventilation. Do not heat / cut the plate covered with unknown
material Navin
Wear safety goggles / helmets made for gas welding and cutting
purpose with proper shade. Navin
Cool down the welding edge and surrounding surface before
handling. Use leather gloves for handling Navin

Do not perform gas cutting near flammable material. Clean


flamable material from working area. If possible move the material
to be cut to safe location. Inspect the area after completing the
work Navin

Never weld the containers or piping which previously held


flammable liquid or an unknown material unless they are first
properly cleaned. Never weld the closed vessels /cylinders Navin
Jacketed containers or other hollow parts should be vented before
welding Navin
Use container partly filled with water to store the hot welding rod
stub ends Navin

Do not touch welding machine without wearing rubber handgloves Vinod Patil

Do not touch welding machine without wearing rubber handgloves Vinod Patil
Use face shield and dust mask Vinod Patil
Ensure area is free from flamable material and keep fire
extinguisher near workplace Vinod Patil

welder must wear leather handgloves, face shield and leg guard Vinod Patil
Use 3 point contact while climbing ladder Vaibhav
Use hand gloves Vaibhav
Use safety goggle Vaibhav
Use proper platform. Tie it properly from both ends Vaibhav
Use proper sized spanner. Use proper hammer. Vaibhav

Use proper nylon rope for lifting falnge. properly tie knot to the
flange. Use sufficient manpower to lift flange. Do not stand below
lifted load Vaibhav

Place the flange properly from all the sides, the gap should be
equal on all the sides. Use wedges if required. Use sufficient
manpower to fit and remove the flange. Navin

Use face shield . Take connection via 30 mA ELCB only. Do not use
cut wire. Chetan

1.Ensure machine and wheel RPM 2. Make sure guard are fitted to
all rotating part 3.Correct installation of grinding wheel Aakash

1.make sure area is free from flammable material or use Fire


blanket if its not possible to clear the area. 2.Worker must wear
jeans jacket and face shield 3.Keep fire extinguisher at site Aakash
1.Make sure that disc is compatible with grinding machine
2.Inspect the grinding disc prior to starting work Aakash