Inspection & Test Plan Grand Egyptian Museum (III) : Wall/Roof Cladding EWS (19&15)
Inspection & Test Plan Grand Egyptian Museum (III) : Wall/Roof Cladding EWS (19&15)
1.0 Submissions
H31.1201
H31.1202
H31.1103
Approval of concept & 1082-CN-GN-CT-TEN-
Complying with Project
Working Drawings 114820-0206 Shop drawing transmittal
1.1 Specifications and tender PMC acceptance Prior to work H R R -
,Technical Notes & 1082-CN-GN-CT-TEN- (SDF)
drawings
interfaces design 114880-0546
1082-CN-GN-CT-SDF-
13883
A.4013
Approval of method -PMC Acceptance Method statement
1.2 Documents Review 1082-CN-GN-CT-MST- Prior to work H R R -
statements -Compliance with project specifications (MST)
104111
A.4013
Approval of Material 1082-CN-GN-CT-MAR- Material specification/Manufacturer Material submittal
1.3 Material Review Prior to work H R R -
submittal 116291-1186 recommendations (MAR)
H31.2200
Mock up installation to
confirm general visual Prior to
Mock Up installation Sample Tag manufacturing
2.1 intent including color , size H31.1304 PMC Acceptance H H H -
(visual inspection) Mockup drawings
and coordination
INSPECTION & TEST PLAN
Grand Egyptian Museum (III)
JVBO NO GEMIII-XX-AR-XX-AL-ITP-XX-106124
Wall/Roof Cladding
EWS(19&15) PMC NO 1082-CN-GN-CT-ITP-106124- 0141
Working drawing of
prototype/Test Report by
2.2 Prior to
System Performance A.4008 Specification performance requirements (loads, independent testing
Prototype manufacturing H H H H
Requirements H31.1305 climatic conditions and structural movements) agency(1082-CN-GN-
of works
DSF-01517& 1082-CN-
GN-DSF-01518)
First completed
-Compliance with Approved Working drawings and full height
Installation of Quality Visual ,Dimensional, and A.4009 Inspection Request Form
2.3 Project’s specifications. structural bay H H H -
Benchmark alignment H31.1306 (CIR)
--non commutative tolerance of each type of
system
- All proceeding works (Thermal Check for all proceeding works in Approved Shop compliance with approved working drawings Contractor Inspection
4.3 insulation, Acoustic insulation the façade area drawings Request (CIR) Prior to M H H
...etc.) if required to be completed and approved Installation
A.6101.a
A.6103,A.6501
Surveying of the structure , H31.3000
checking line, level and fixing Book 10, Section
points, to be compliant with MC 03100, CONCRETE
survey work, Verify actual FORMWORK Specifications tolerances Prior to
4.4 Surveying the structure QC Check list H W R
location and dimension and other Book 10, Section (Tolerances shall not be cumulative) installation
conditions to compliance with 05150,
requirements for installation STRUCTURAL
tolerance STEEL - Tolerances
Approved Working
drawings
INSPECTION & TEST PLAN
Grand Egyptian Museum (III)
JVBO NO GEMIII-XX-AR-XX-AL-ITP-XX-106124
Wall/Roof Cladding
EWS(19&15) PMC NO 1082-CN-GN-CT-ITP-106124- 0141
H31.3000
Architecture (Steel Visual and Dimensional -Approved working drawings
Approved Working
5.2 Brackets & Aluminum drawings
-Specifications tolerances Complying with Inspection request form Each façade/ H H H -
profiles) Tightness of brackets bolts Approved Technical note Torque values in TEN and supplier catalog Part of
and supplier catalog
(CIR) façade
H31.3000
6.0 Testing
R - Review: Are stages at which BOJV shall be required to present inspection and test documents for review and endorsement – (Lab test report and DSF
to be submitted to consultant/PMC)
M – Monitor: Are stages at which BOJV shall conduct its own surveillance of construction activities, with no Owner’s Representative participation nor
notice provided.
W - Witness Points: require notification of the Engineer by the Contractor. Upon proper written notification by the Contractor to the Engineer, work may
proceed beyond a Witness Point with or without action by the Engineer. The Engineer may at
any time request the Contractor not to proceed once the Engineer has been notified of a Witness Point.
H - Hold Points : are mandatory verification points identified by the Engineer beyond which work may not proceed until the Contractor notifies the
Engineer and the Engineer performs mandatory verification and gives notice to the Contractor to proceed.
Form No. :
Rev. No. :
9. Check the male and female assembly as per approved shop drawing
10. check that the stainless steel screw is fixed as per approved shop drawing
13- check that Cladding panel shall be free from any visible damage
Rev. No. :
15.Check fixation fasteners and screws as per approved material and shop drawings
COMMENTS / OUTSTANDINGS:-
Site Engineer
QC Engineer
Supervision Consultant
Form No. :
Rev. No. :
Site QC Engineer
ACTIVITIES /ITEMS TO BE INSPECTED Eng.
Sign. Yes No
Document Review
1. Check that the required and related shop drawings are approved by PMC Engineer.
2-Check that the material submittal for the above activity is approved by PMC Engineer.
3. Check that the method statement for this installation is approved by PMC Engineer
Bracket installation
6. Check bracket size, type, location and dimension as per approved shop.
Frame installation
14. Check final alignment , leveling , plumping of frames within the allowable tolerances as per
project specifications
Form No. :
Rev. No. :
Site QC Engineer
ACTIVITIES /ITEMS TO BE INSPECTED Eng.
Sign. Yes No
COMMENTS / OUTSTANDINGS:-
Site Engineer
QC Engineer
Supervision Consultant