ITP for Acidification Vessel at RDMP

This document provides an inspection and test plan (ITP) for an acidification vessel with tag number A-325-02-01-C3. The ITP lists key inspection steps and holds points to be completed, along with applicable drawings, codes, standards, and procedures. It was issued for approval on March 8, 2021 as Rev 00A for the Refinery Development Master Plan Project in Balikpapan, Indonesia. Detailed ITPs will be issued once a sub-vendor manufacturer is chosen.

Uploaded by

Jeroan Ayam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
353 views8 pages

ITP for Acidification Vessel at RDMP

This document provides an inspection and test plan (ITP) for an acidification vessel with tag number A-325-02-01-C3. The ITP lists key inspection steps and holds points to be completed, along with applicable drawings, codes, standards, and procedures. It was issued for approval on March 8, 2021 as Rev 00A for the Refinery Development Master Plan Project in Balikpapan, Indonesia. Detailed ITPs will be issued once a sub-vendor manufacturer is chosen.

Uploaded by

Jeroan Ayam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Doc. No.

: 26071-203-V1A-MW00-00138

Job No. : 26071 Rev.00A

ITP: ACIDIFICATION VESSEL


Tag: A-325-02-01-C3

PROJECT : Engineering, Procurement and Construction (EPC) Inside


Battery Limits (ISBL) and Outside Battery Limits (OSBL) for
the Refinery Development Master Plan (RDMP) Project
RU V Balikpapan
LOCATION : Refinery Unit V Balikpapan, East Kalimantan,Indonesia
OWNER : PT PERTAMINA (Persero)
PO NO. : 26071-203-POA-MW00-23001

00A 08-Mar-2021 ISSUED FOR APPROVAL N. CAPELLI L. BENSONI L. BENSONI

REV. DATE DESCRIPTION PREPARED CHECKED APPROVED

3V TECH EQUIPMENT & PROCESS SYSTEMS S.p.A

Page 1 of 8
Doc. No. : 26071-203-V1A-MW00-00138

Job No. : 26071 Rev.00A

REVISION LOG

REV. NO. DATE PAGE DESCRIPTION

00A 08-Mar-2021 - ISSUED FOR APPROVAL

Page 2 of 8
Doc. No. : 26071-203-V1A-MW00-00138

Job No. : 26071 Rev.00A

HOLD LIST

NO. PAGE HOLD CONTENT

Page 3 of 8
INSPECTION & TEST PLAN - ACIDIFICATION VESSEL
Doc. No.: 26071-203-V1A-MW00-00138 Sheet: 1 of 5 Rev.: 00A Date: 08/03/2021

** IMPORTANT NOTE **
INSPECTION & TEST PLAN (ITP)

Job: P20268V
THE PRESENT INSPECTION & TEST PLAN IS ISSUED IN
Client: RDMP Balikpapan JO SIMPLIFIED VERSION LISTING THE KEY INSPECTION STEPS.

DETAILED ITP WILL BE ISSUED IN REV.00B ONCE SUB-VENDOR


End User: PT Pertamina HAS BEEN CHOSEN AS MANUFACTURER.

Project: RDMP RU-V Balikpapan Project ITP WILL BE ISSUED ON SUB-VENDOR'S FORMAT.

Tag No.: A-325-02-01-C3

Equipment: Acidification Vessel

Revision Index

Rev. Date Description Prepared by Verified by Approved by

00A 08/03/2021 Issued for approval N. Capelli L. Bensoni L. Bensoni

Page 4 of 8
INSPECTION & TEST PLAN - ACIDIFICATION VESSEL
Document No.: 26071-203-V1A-MW00-00138
Client: RDMP Balikpapan JO P.O.: 26071-203-POA-MW00-23001 Job: P20268V
Project: RDMP RU-V Balikpapan Project TAG No.: A-325-02-01-C3 S.N.: TBA
Code: ASME VIII Div.1 2019 Edition Remarks: ASME U Stamp Required - MIGAS Inspection Required

DOCUMENT REVISION NOT REQUIRES ITP REVISION


INSPECTIONS POINTS DRAWINGS / CALCULATIONS
0 Date & signature 1 Date & signature 2 Date & signature 3 Date & signature 4 Date & signature 5 Date & signature
H Hold Point - Presenza richiesta 26071-203-V1A-MW00-00066
D1
W Witness Point - Presenza facoltativa (General Assembly Drawing)
S Surveillance - Monitoraggio 26071-203-V1A-MW00-00082
D2
P Perform - Esecuzione (Mechanical Calculations)
R Review of Record/Certificate - Controllo rapporti/certificati
CODES & STANDARDS Edition CODES & STANDARDS Edition
X Record Required - Certificato richiesto
C1 ASME II/A/B/C/D 2019 C5 NACE MR0103 2015
C2 ASME VIII DIV.1 2019 C6 NACE MR0175 2015
INSPECTIONS ACTIVITIES
C3 ASME IX 2019
AT Air Test - Prova ad aria C4 ASME V 2019
PMI Alloy Verification - Verifica leghe DOCUMENT REVISION NOT REQUIRES ITP REVISION
3V TECH APPLICABLE PROCEDURES (Project Document No.)
DC Dimensional Check - Controllo dimensionale R Date & signature R Date & signature R Date & signature
EP Edge Preparation - Preparazione lembi P1 WELDING BOOK (26071-203-V1A-MW00-00165)
FU Fit Up - Assiematura P2 NDE PROCEDURES (26071-203-V1A-MW00-00235)
HRD Hardness Check - Controllo durezze P3 INSPECTION & TEST PLAN (26071-203-V1A-MW00-00138)
HYT Hydrostatic Test - Prova idraulica P4 PMI PROCEDURE (26071-203-V1A-MW00-00194)
MC Marking Check - Controllo marcature P5 HYDROSTATIC TEST PROCEDURE (26071-203-V1A-MW00-00177)
MI Material Identification - Identificazione materiali P6 PAINTING PROCEDURE (26071-203-V1A-MW00-00217)
MT Magnetic Particle Test - Esame Magnetoscopico P7 MANUFACTURING / QUALITY PROCEDURES
PT Dye Penetrant Test - Controllo con liquidi penetranti
PWHT Post Weld Heat Treatment - Trattamento termico dopo saldatura
APPLICABLE PROJECT SPECIFICATIONS
RT Radiographic Test - Esame radiografico
TM Mechanical Test - Prove meccaniche P8 Shop Inspection & Test Procedure (26071-100-GQI-GAQ-00013 Rev.002)
UT Ultrasonic Test - Controllo ultrasonoro P9 Guideline of shop inspection point (26071-100-GQI-GAQ-00020 Rev.000)
VE Visual Examination - Controllo visivo P10 Basic engineering design data (26071-100-3BD-G04-00001 Rev.001)
HLT Helium Leak Test - Prova ad Elio P11 Design criteria for mechanical equipment (Amendment) (26071-100-3DR-M40-00001 Rev.000)
WM Weld Monitoring - Monitoraggo saldatura P12 Design criteria for packaged equipment (Amendment) (26071-100-3DR-M40-00002 Rev.000)
THK Thickness Check - Controllo spessore P13 Design criteria for static equipment (Amendment) (26071-100-3DR-M40-00004 Rev.000)
P14 Project specification for general pressure vessel (Amendment) (26071-100-3PS-MV00-00001 Rev.001)
P15 Standard drawing for mechanical stationary equipment (Amendment) (26071-100-M0-M000-00100-002 Rev.002)
P16 Engineering specification for traceability (26070-100-3SS-N000-J0030 Rev.B01)
P17 Engineering specification for positive material identification (PMI) (26070-100-3SS-NE00-J0001 Rev.B01)
P18 Engineering specification for hydrotesting water quality and drying (26070-100-3SS-NF00-J0003 Rev.B01)
LOCATION LEGENDA
P19 Engineering specification for general welding and NDE requirement for pressurized equipment (26070-100-3SS-NW00-J0001 Rev.B02)
D Dalmine Via Friuli, 19 P20 Standard engineering specification for shop and field painting (Amendment) (26071-100-3SS-NX00-00100-005 Rev.005)
SUB Sub-Vendor's workshop (To be assigned ) P21 Certifying authority’s inspection (26071-100-GQI-GAQ-00008 Rev.001)
P22 Positive material identification procedure (26071-100-GQI-GCQ-00003 Rev.000)
P23 Material requisition for spent caustic treatment package (A-325-02) (26071-203-MRA-MW00-23001 Rev.000)
P24 Engineering specification for tank lining (Amendment) (26071-100-3SS-NLLG-00008 Rev.000)

00A Issued for approval 08/03/2021 QCI - N. Capelli QA/QC Mgr. - L. Bensoni QA/QC Mgr. - L. Bensoni
Rev. Description-Descrizione Date-Data Prepared by-Preparato da Checked by-Controllato da Approved by-Approvato da
Page 5 of 8
INSPECTION & TEST PLAN - ACIDIFICATION VESSEL
Document No.: 26071-203-V1A-MW00-00138
Client: RDMP Balikpapan JO P.O.: 26071-203-POA-MW00-23001 Job: P20268V
Project: RDMP RU-V Balikpapan Project TAG No.: A-325-02-01-C3 S.N.: TBA
Reference Procedure /

Extension
Location

Required
Record
Acceptance Criteria SUB-VENDOR VENDOR CLIENT OWNER ASME A.I. GOVERN. INSP.
Step Stage Description NOTES
Project SPC. Ref. (To be assigned ) (3V Tech) (RDMP-JO) (PMC) (To be assigned ) (Migas)

A DOCUMENTS CONTROL

Pre-Inspection Meeting (PIM) PIM Agenda


A5 D Before fabrication - X - H H H - Record required: PIM Minutes of meeting
P23

General Assembly Drawing (GAD) D1 - C2


SUB

A10 Before fabrication - - H R R R R


P10 - P11 - P12 - P13 - P14 - P15

Mechanical Calculations D2 - C2
SUB

A15 Before fabrication - - H R R R R


P10 - P11 - P12 - P13 - P14 - P15

Welding Book (WPS / PQR / Weld Map) P1 - C3


SUB

A20 Before fabrication - - H R R R R


P14 - P19

NDE Procedures (with NDE Map) P2 - C4


SUB

A25 Before fabrication - - H R R R R


P14 - P19

Inspection and Test Plan (ITP) P3


SUB

A30 Before fabrication - - H R R R R


P8 - P9

This column shall be filled by Sub-Vendor's ASME A.I.


Manufacturing / Quality procedures P7
SUB

A35 Before fabrication - - H R R R -


P23

WPQ & NDE Personnel qualifications C3 - C4


SUB

A40 Before fabrication - X H R R R R


P14 - P19

Page 6 of 8
INSPECTION & TEST PLAN - ACIDIFICATION VESSEL
Document No.: 26071-203-V1A-MW00-00138
Client: RDMP Balikpapan JO P.O.: 26071-203-POA-MW00-23001 Job: P20268V
Project: RDMP RU-V Balikpapan Project TAG No.: A-325-02-01-C3 S.N.: TBA
Reference Procedure /

Extension
Location

Required
Record
Acceptance Criteria SUB-VENDOR VENDOR CLIENT OWNER ASME A.I. GOVERN. INSP.
Step Stage Description NOTES
Project SPC. Ref. (To be assigned ) (3V Tech) (RDMP-JO) (PMC) (To be assigned ) (Migas)

B CHECK DURING FABRICATION

During fabrication Materials P7


SUB

B5 100% - H S S S -
(Before PWHT) INCOMING QC CHECK P14 - P16 - P17 - P22
During fabrication Materials C5 - C6 - D1 EN 10204 3.1 (Pressure parts and
SUB

B10 100% X H R R R R
(Before PWHT) MATERIAL TEST CERTIFICATES CHECK P16 materials welded to pressure parts)
During fabrication Welding P1
SUB

B15 100% - H S S S -
(Before PWHT) EP - FU P14 - P19
During fabrication Welding P1
SUB

B20 100% - H S S S -
(Before PWHT) WM P14 - P19
During fabrication Welding P2 - P4 X-Ray films shall be checked by 3V
SUB

B25 (*) X H H/R S S R


(Before PWHT) NDE EXAMINATIONS (VT,PT,MT,RT) P14 - P17 - P19 - P22 Tech before PWHT
During fabrication All reinforcing pads with telltale holes (if any) P7 Soapy water solution at a pressure of 1
SUB

B30 100% X H S S S R
Kg/cm2 for 15 minutes holding time

This column shall be filled by Sub-Vendor's ASME A.I.


(Before PWHT) AT P14 - P19
During fabrication Vessel complete: Internal visit D1
SUB

B35 100% X H H S S R
(Before PWHT) VE - DC P14 - P15 - P19
During fabrication Vessel complete D1
SUB

B40 100% X H H S S R
(Before PWHT) VE - DC - THK P14 - P15 - P19
Vessel complete P7
SUB

B45 PWHT 100% X H S S S R


PWHT P14 - P19
During fabrication Welding P2 - P4 X-Ray films shall be checked by 3V
SUB

B50 (*) X H W S S R
(After PWHT) NDE EXAMINATIONS (VT,PT,MT,RT) P14 - P17 - P19 - P22 Tech before hydrostatic test
During fabrication Welding P7
SUB

B55 (*) X H W S S R
(After PWHT) HARDNESS CHECK P14 - P19
During fabrication All reinforcing pads with telltale holes (if any) P7 Soapy water solution at a pressure of 1
SUB

B60 100% X H W S S R
(After PWHT) AT P14 - P19 Kg/cm2 for 15 minutes holding time
During fabrication Vessel complete: Internal visit D1
SUB

B65 100% X H H W W R
(After PWHT) VE - DC P14 - P15 - P19
During fabrication Vessel complete D1
SUB

B70 100% X H H W W R
(After PWHT) VE - DC - THK P14 - P15 - P19
During fabrication Vessel complete D1 Pressure parts and materials welded to
SUB

B75 100% X H W S S R
(After PWHT) MC P16 pressure parts
During fabrication Vessel complete P5 Pressure indicated on GAD - Holding
SUB

B80 100% X H H W W W
(After PWHT) HYT P14 - P18 - P19 time: 2 hours
During fabrication Vessel complete P5
SUB

B85 100% X H S S S R
(After PWHT) DRAINING & DRYING P14 - P18 - P19

(*) = Extension of examination will be detailed in the next revision

Page 7 of 8
INSPECTION & TEST PLAN - ACIDIFICATION VESSEL
Document No.: 26071-203-V1A-MW00-00138
Client: RDMP Balikpapan JO P.O.: 26071-203-POA-MW00-23001 Job: P20268V
Project: RDMP RU-V Balikpapan Project TAG No.: A-325-02-01-C3 S.N.: TBA
Reference Procedure /

Extension
Location

Required
Record
Acceptance Criteria SUB-VENDOR VENDOR CLIENT OWNER ASME A.I. GOVERN. INSP.
Step Stage Description NOTES
Project SPC. Ref. (To be assigned ) (3V Tech) (RDMP-JO) (PMC) (To be assigned ) (Migas)

C FINAL TESTS & CHECKS

During fabrication Vessel complete P7


SUB

C5 100% X H W S S R
(After hydrotest) PFA LINING CHECK P24
During fabrication Vessel complete P6 Final visual examination, DFT Check,
SUB

C10 100% X H W W W R
(After hydrotest) SURFACE PREP. & PAINTING CHECK P20 RAL check.
During fabrication Vessel complete D1
SUB

C15 100% X H W S S R ASME U-Stamp required


(After hydrotest) NAMEPLATE CHECK P14
During fabrication Vessel complete P7 Closure of all opening connections,
SUB

C20 100% X H W W W R painting touch-up, rust prevention,


(Before shipment) PREPARATION FOR SHIPMENT P23 preservation.
During fabrication Vessel complete P7 Closure of wooden box, shipping mark
SUB

C25 100% X H W W W R
(Before shipment) PACKING CHECK P23 check, etc.
During fabrication Vessel complete MDB Index
SUB

C30 100% - H H R R R
(Before shipment) MANUFACTURER DATA BOOK REVIEW P23
Upon inspection activities are

This column shall be filled by Sub-Vendor's ASME A.I.


During fabrication Vessel complete
SUB

C35 100% - X - - H R - completed, Client shall issue IRN and


(Before shipment) IRN & SRN SRN for shipment authorization.

Page 8 of 8