Tech - Note (X-Smart - Installation - Check - List)
Tech - Note (X-Smart - Installation - Check - List)
Technical Notes
1. Unpacking
a. Follow the document “How to Unpack X-Smart.pdf”
b. Note on the Step4 of the document: check to ensure that the agitation
central cam is not broken. A spare is usually packed with a machine if
required replacement
c. Note on the Step6 of the document: check below on each pump/canister
BEFORE fitting onto the dispenser:
d. Valve position is correct (horizontal)
e. Piston is pushed in completely
f. Take a note of the serial number of the dispenser
5. Calibration (optional)
a. Start Calibration Workshop
b. Check that each pump is assigned with correct profile
c. Check each profile to ensure that tolerance, number of repeats, and number
of turn table turns are all set as desired value
d. Run “Measure Density” command 2 -3 times to ensure that the density is not
varying. If varying, perform further air elimination. We recommend using the
measured density for calibration.
e. Calibrate each pump
IDEX CORPORATION
15/05/2014 - Tech_Note (X-Smart_installation_Check_List).doc
2 of 3
6. Check accuracy and fine tune (optional)
a. On the Calibration Workshop, conduct “Report” function using the same
profile as calibration on each pump
b. Import the reporting result into the dedicated Excel program
c. For the points requiring adjustments, change the step size from within
Calibration Workshop (to do so, go to “Maintenance” > “Configuration” >
“Settings” > “Canisters & Pumps” > “Advanced”, then right click on a channel
and choose to edit calibration point
d. Repeat a – c till satisfied
7. Conduct “real” dispenses. If possible, select formulas from the customer standard
database, dispense into customer bases and check the resulting colour making sure
the customer is satisfied with the result and that the dispenser operates correctly
and accurately.
9. License PrismaPro
IDEX CORPORATION
15/05/2014 - Tech_Note (X-Smart_installation_Check_List).doc
3 of 3