FSDW-220 KV ATR-BBs (Updated)
FSDW-220 KV ATR-BBs (Updated)
ATR Pad
300 300
1 Bottom Main Bars ATR Pad 5 7700 300 300 0 8300 9101 150 62 0.001554 799.688
7700
300 300
2 Bottom distribution Bars ATR Pad 5 9102 300 300 0 9702 7700 150 53 0.001554 799.076
9102
300 300
3 Top Main Bars ATR Pad 5 7700 300 300 0 8300 9101 150 62 0.001554 799.688
7700
300 300
4 Top Distribution Bars ATR Pad 5 9101 300 300 0 9701 7700 150 53 0.001554 798.994
9101
0
5 Middle Extra Bars (Longer Side) pad 5 9101 0 0 0 9101 0 0 4 0.001554 56.572
9101
0 0
6 Middle Extra Bars (Shorter Side) pad 5 7700 0 0 0 7700 0 0 4 0.001554 47.863
7700
TOTAL WEIGHT FOR ONE FOUNDATION 3302.000 Kgs
1 Dowel Bars both sides ATR Rail Beam 6 3728 150 300 400 4578 9101 175 106 0.002237 1085.545 3728 300
400
300 300
2 Distribution Bars both sides ATR Rail Beam 5 9101 300 300 0 9701 3160 175 38 0.001554 572.863
9101
0 0
3 Extra Bars under The Rail ATR Rail Beam 8 9101 0 0 0 9101 0 0 6 0.003978 217.223
9101
0 0
4 Extra Bars On Both Sides of Rail ATR Rail Beam 6 9101 0 0 0 9101 0 0 4 0.002237 81.436
9101
5 Wall Spacer Under The Rail ATR Rail Beam 6 424 250 250 0 924 9101 150 62 0.002237 128.153 250 424 250
450
9101 for
H/D H C/C 900
6 Wall Spacer Horizantal and Vertical in the wall ATR Rail Beam 3 424 450 450 0 1324 V C/C 88 0.000559 65.130 424
2960 for 450
V/D
450
0 0
7 Extra Bars In the bottom of rail BEAM in Pad pad 8 9101 0 0 0 9101 0 0 4 0.003978 144.815
9101
500/220/132 KV FAISALABAD WEST SUBSTATION
220 kV ATR Barbending Schedule
Sr. Description Location Bar no. Length Bend-1 Bend-2 Bend-3 Cut Length Spread Spacing No. of Weightage Weight Figure
No. length Bars
- - # mm mm mm mm mm mm mm no. kg/mm kg -
TIE BEAM
250 250
1 Bottom Longitudnal Bars Tie Beam 6 5673 250 250 0 6173 0 0 3 0.002237 41.427
5673
250 250
2 Top Longitudnal Bars Tie Beam 6 5673 250 250 0 6173 0 0 3 0.002237 41.427
5673
0 0
3 Extra Bars In The Middle Tie Beam 6 5673 0 0 0 5673 0 0 2 0.002237 25.381
5673
300
4 Ties Tie Beam 3 300 300 75 0 1350 3123 200 19 0.000559 14.338 300 75
8 Oil pit Sump crank bars B/D Oil Pit Slab 4 800 200 150 650 1800 800 175 12 0.000994 21.470 650 150
800
0
9 Extra Bars in SUMP B/D Oil Pit Slab 4 800 0 0 0 800 0 0 4 0.000994 3.181
800
TOTAL WEIGHT FOR ONE OIL PIT 955.000 Kgs
1 Vertical Bars Wall 4 1650 300 100 0 2050 7500 175 48 0.000994 97.810 1650
300
2 Distribution Bars Wall 3 8700 100 100 0 8900 1400 175 9 0.000559 44.776 100 100
8700
3 Crank Bar Pad to Wall 4 250 200 200 0 650 7500 175 48 0.000994 31.013 250 200
200
TOTAL WEIGHT FOR ONE WALL 174.000 Kgs
1 Vertical Bars Wall 4 1850 300 100 0 2250 6800 175 44 0.000994 98.406 1850
300
100
1 Vertical Bars (Oil sump) Wall 4 2350 300 100 0 2750 650 175 5 0.000994 13.668 2350
300
2 Distribution Bars Wall 3 8000 100 100 0 8200 1600 175 11 0.000559 50.422 100 100
8000
3 Distribution Bars (oil sump) Wall 3 650 100 100 0 850 2100 175 13 0.000559 6.177 100 100
650
3 Crank Bar Pad to Wall 4 250 200 200 0 650 7500 175 48 0.000994 31.013 250 200
200
TOTAL WEIGHT FOR ONE WALL 200.000 Kgs
1 Vertical Bars Left side Wall 4 1750 300 100 0 2150 9100 175 53 0.000994 113.266 1750
300
100
1 Vertical Bars Right side Wall 4 1750 300 100 0 2150 8400 175 49 0.000994 104.718 1750
300
100
1 Vertical Bars (oil sump) Wall 4 2350 300 100 0 2750 650 175 5 0.000994 13.668 2350
300
### Horizontal Bars ( Left ) Wall 3 9100 100 100 0 9300 1500 175 10 0.000559 51.987 100 100
9100
### Horizontal Bars ( Right ) Wall 3 8400 100 100 0 8600 1500 175 10 0.000559 48.074 100 100
8400
### Crank Bar Pad to Wall 4 250 200 200 0 650 9100 175 106 0.000994 68.487 250 200
200
### Horizontal Bars ( oil sump ) Wall 3 650 100 100 0 850 2100 175 13 0.000559 6.177 100 100
650
TOTAL WEIGHT FOR ONE WALL 406.4 Kgs
500/220/132 KV FAISALABAD WEST SUBSTATION
220 kV ATR Barbending Schedule
Sr. Description Location Bar no. Length Bend-1 Bend-2 Bend-3 Cut Length Spread Spacing No. of Weightage Weight Figure
No. length Bars
- - # mm mm mm mm mm mm mm no. kg/mm kg -
1 Bottom Vertical Bars both sides Fire Wall 5 4450 300 0 0 4750 9121 150 124 0.001554 915.306 4450
300
2 Middle vertical Bars both sides Fire Wall 5 4675 0 0 0 4675 9121 150 124 0.001554 900.854 4675
200
3 Top vertical Bars both sides Fire Wall 4 4635 200 0 0 4835 9121 150 124 0.000994 595.943 4635
4 Distribution Bars both sides Fire Wall 4 9121 200 200 0 9521 11560 200 118 0.000994 1116.737 200 200
9121
450
9121 for H C/C 900
4 Wall Spacer Horizantal and Vertical in the wall Fire Wall 3 238 450 450 0 1138 H/D 297 0.000559 188.934 238
11560 for V C/C 450
V/D
450
5 Opening in firewall for N2 Cylender Cabinet Fire Wall 4 800 0 0 0 800 0 0 12 0.000994 9.542 0 0
800
500/220/132 KV FAISALABAD WEST SUBSTATION
220 kV ATR Barbending Schedule
Sr. Description Location Bar no. Length Bend-1 Bend-2 Bend-3 Cut Length Spread Spacing No. of Weightage Weight Figure
No. length Bars
- - # mm mm mm mm mm mm mm no. kg/mm kg -
5 Opening in firewall for N2 Cylender Cabinet Fire Wall 4 1100 0 0 0 1100 0 0 12 0.000994 13.121 0 0
(location will finalize later)
1100
TOTAL WEIGHT FOR ONE FIRE WALL 3741.000 Kgs
1 Bottom Vertical Bars both sides Fire Wall 5 4450 300 0 0 4750 9121 150 124 0.001554 915.306 4450
300
2 Middle vertical Bars both sides Fire Wall 5 4675 0 0 0 4675 9121 150 124 0.001554 900.854 4675
0
200
3 Top vertical Bars both sides Fire Wall 4 4635 200 0 0 4835 9121 150 124 0.000994 595.943 4635
4 Distribution Bars both sides Fire Wall 4 9121 200 200 0 9521 11560 200 118 0.000994 1116.737 200 200
9121
450
9121 for H C/C 900
H/D
4 Wall Spacer Horizantal and Vertical in the wall Fire Wall 3 238 450 450 0 1138 11560 for 297 0.000559 188.934 238
V/D V C/C 450
450
500/220/132 KV FAISALABAD WEST SUBSTATION
220 kV ATR Barbending Schedule
Sr. Description Location Bar no. Length Bend-1 Bend-2 Bend-3 Cut Length Spread Spacing No. of Weightage Weight Figure
No. length Bars
- - # mm mm mm mm mm mm mm no. kg/mm kg -
5 Opening in firewall for N2 Cylender Cabinet Fire Wall 4 800 0 0 0 800 0 0 6 0.000994 4.771 0 0
800
5 Opening in firewall for N2 Cylender Cabinet Fire Wall 4 1100 0 0 0 1100 0 0 6 0.000994 6.560 0 0
1100
TOTAL WEIGHT FOR ONE FIRE WALL 3730.000 Kgs
N2 Cylender Cabinet
1 Bottom Main Bars Pad to Wall 4 850 1350 1350 80 3710 950 150 8 0.000994 29.502 1350 80 1350
80
850
2 Bottom Distribution Bars Pad to Wall 4 950 1350 1350 80 3810 850 150 7 0.000994 26.510 1350 80 1350
80
950
3 Top Main Bars Pad 4 850 450 450 0 1750 950 175 7 0.000994 12.177 450 850 450
4 Top Distribution Bars Pad 4 950 450 450 0 1850 850 175 6 0.000994 11.033 450 950 450
5 Distribution Bars in longer direction in both walls wall 4 950 0 0 0 950 750 150 12 0.000994 11.332 0 0
950
500/220/132 KV FAISALABAD WEST SUBSTATION
220 kV ATR Barbending Schedule
Sr. Description Location Bar no. Length Bend-1 Bend-2 Bend-3 Cut Length Spread Spacing No. of Weightage Weight Figure
No. length Bars
- - # mm mm mm mm mm mm mm no. kg/mm kg -
6 Distribution Bars in shorter direction in both walls wall 4 850 0 0 0 850 750 150 12 0.000994 10.139 0 0
850
TOTAL WEIGHT FOR ONE N2 CABINET PAD 101.000 Kgs
Cable Pit
1 Bottom Main Bars Both Way Pad to Wall 3 550 425 425 80 1560 550 150 10 0.000559 8.720 425 80 425
80
550
2 Bottom Distribution Bars Both Way Pad 3 550 0 0 0 550 550 150 10 0.000559 3.075 0 0
550
3 Distribution Bars Both Way Wall 3 550 0 0 0 550 300 150 12 0.000559 3.689 0 550 0
will finalize later TOTAL WEIGHT FOR ONE N2 CABINET PAD 0.000 Kgs