FSDW-220 KV ATR-BBs (Updated)

This document provides a bar bending schedule for a 500/220/132 KV substation in Faisalabad, Pakistan. It lists 7 items with details on the description, location, bar number, lengths, bends, cuts, spacing, number of bars, weightage, weight, and figure for each. The total weight for one foundation of the ATR pad is 3302 kg and there are 3 foundations for a total of 9906 kg. The total weight for one foundation of the fire wall pad is 2664 kg and there are 2 foundations for a total of 5328 kg. The dowel and distribution bars for the ATR rail beams are also specified.

Uploaded by

noman zafar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views11 pages

FSDW-220 KV ATR-BBs (Updated)

This document provides a bar bending schedule for a 500/220/132 KV substation in Faisalabad, Pakistan. It lists 7 items with details on the description, location, bar number, lengths, bends, cuts, spacing, number of bars, weightage, weight, and figure for each. The total weight for one foundation of the ATR pad is 3302 kg and there are 3 foundations for a total of 9906 kg. The total weight for one foundation of the fire wall pad is 2664 kg and there are 2 foundations for a total of 5328 kg. The dowel and distribution bars for the ATR rail beams are also specified.

Uploaded by

noman zafar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 11

500/220/132 KV FAISALABAD WEST SUBSTATION

220 kV ATR Barbending Schedule


Sr. Description Location Bar no. Length Bend-1 Bend-2 Bend-3 Cut Length Spread Spacing No. of Weightage Weight Figure
No. length Bars
- - # mm mm mm mm mm mm mm no. kg/mm kg -

ATR Pad
300 300
1 Bottom Main Bars ATR Pad 5 7700 300 300 0 8300 9101 150 62 0.001554 799.688
7700
300 300
2 Bottom distribution Bars ATR Pad 5 9102 300 300 0 9702 7700 150 53 0.001554 799.076
9102
300 300
3 Top Main Bars ATR Pad 5 7700 300 300 0 8300 9101 150 62 0.001554 799.688
7700
300 300
4 Top Distribution Bars ATR Pad 5 9101 300 300 0 9701 7700 150 53 0.001554 798.994
9101
0
5 Middle Extra Bars (Longer Side) pad 5 9101 0 0 0 9101 0 0 4 0.001554 56.572
9101
0 0
6 Middle Extra Bars (Shorter Side) pad 5 7700 0 0 0 7700 0 0 4 0.001554 47.863
7700
TOTAL WEIGHT FOR ONE FOUNDATION 3302.000 Kgs

NUMBER OF FOUNDATIONS 3.000

TOTAL WEIGHT 9906.000 Kgs

Fire Wall Pad


300 300
1 Bottom Main Bars Fire Wall Pad 6 5100 300 300 0 5700 9101 150 62 0.002237 790.556
5100
300 300
2 Bottom distribution Bars Fire Wall Pad 6 9101 300 300 0 9701 5100 250 22 0.002237 477.425
9101
300 300
3 Top Main Bars Fire Wall Pad 6 5100 300 300 0 5700 9101 150 62 0.002237 790.556
5100
300 300
4 Top Distribution Bars Fire Wall Pad 6 9101 300 300 0 9701 5100 250 22 0.002237 477.425
9101
0
5 Middle Extra Bars (Longer Side) Fire Wall Pad 6 9101 0 0 0 9101 0 0 4 0.002237 81.436
9101
500/220/132 KV FAISALABAD WEST SUBSTATION
220 kV ATR Barbending Schedule
Sr. Description Location Bar no. Length Bend-1 Bend-2 Bend-3 Cut Length Spread Spacing No. of Weightage Weight Figure
No. length Bars
- - # mm mm mm mm mm mm mm no. kg/mm kg -
0 0
6 Middle Extra Bars (Shorter Side) Fire Wall Pad 6 5100 0 0 0 5100 0 0 4 0.002237 45.635
5100
TOTAL WEIGHT FOR ONE FOUNDATION 2664.000 Kgs

NUMBER OF FOUNDATIONS 2.000

TOTAL WEIGHT 5328.000 Kgs

7 ATR Rail Beams


150

1 Dowel Bars both sides ATR Rail Beam 6 3728 150 300 400 4578 9101 175 106 0.002237 1085.545 3728 300

400
300 300
2 Distribution Bars both sides ATR Rail Beam 5 9101 300 300 0 9701 3160 175 38 0.001554 572.863
9101
0 0
3 Extra Bars under The Rail ATR Rail Beam 8 9101 0 0 0 9101 0 0 6 0.003978 217.223
9101
0 0
4 Extra Bars On Both Sides of Rail ATR Rail Beam 6 9101 0 0 0 9101 0 0 4 0.002237 81.436
9101

5 Wall Spacer Under The Rail ATR Rail Beam 6 424 250 250 0 924 9101 150 62 0.002237 128.153 250 424 250

450
9101 for
H/D H C/C 900
6 Wall Spacer Horizantal and Vertical in the wall ATR Rail Beam 3 424 450 450 0 1324 V C/C 88 0.000559 65.130 424
2960 for 450
V/D
450
0 0
7 Extra Bars In the bottom of rail BEAM in Pad pad 8 9101 0 0 0 9101 0 0 4 0.003978 144.815
9101
500/220/132 KV FAISALABAD WEST SUBSTATION
220 kV ATR Barbending Schedule
Sr. Description Location Bar no. Length Bend-1 Bend-2 Bend-3 Cut Length Spread Spacing No. of Weightage Weight Figure
No. length Bars
- - # mm mm mm mm mm mm mm no. kg/mm kg -

TOTAL WEIGHT FOR ONE RAIL BEAM 2296.000 Kgs

NUMBER OF RAIL BEMAS 12.000

TOTAL WEIGHT 27552.000 Kgs

TIE BEAM
250 250
1 Bottom Longitudnal Bars Tie Beam 6 5673 250 250 0 6173 0 0 3 0.002237 41.427
5673
250 250
2 Top Longitudnal Bars Tie Beam 6 5673 250 250 0 6173 0 0 3 0.002237 41.427
5673
0 0
3 Extra Bars In The Middle Tie Beam 6 5673 0 0 0 5673 0 0 2 0.002237 25.381
5673
300

4 Ties Tie Beam 3 300 300 75 0 1350 3123 200 19 0.000559 14.338 300 75

TOTAL WEIGHT FOR ONE TIE BEAM 123.000 Kgs

NUMBER OF TIE BEAMS 15.000

TOTAL WEIGHT 1845.000 Kgs

SLAB FOR OIL PIT


150 150
5 Bottom Main Bars Left side Oil Pit Slab 4 2188.5 150 150 0 2489 9101 175 53 0.000994 131.099
2189
150 150
6 Bottom Main Bars Oil Pit Slab 4 1041 150 150 0 1341 9101 175 159 0.000994 211.940
1041
150 150
1 Bottom Main Bars Right side Oil Pit Slab 4 2188.5 150 150 0 2489 8401 175 49 0.000994 121.205
2189
150
1 Bottom Main Bars Right side At Sump opening Oil Pit Slab 4 1488.5 150 250 0 1889 800 175 6 0.000994 11.263 250
1489
150 150
7 Distribution Bars Oil Pit Slab 4 9102 150 150 0 9402 2189 175 14 0.000994 130.838
9102
150 150
2 Distribution Bars Oil Pit Slab 4 9102 150 150 0 9402 1041 175 21 0.000994 196.257
9102
150 150
2 Distribution Bars Oil Pit Slab 4 9102 150 150 0 9402 1289 175 8 0.000994 74.765
9102
500/220/132 KV FAISALABAD WEST SUBSTATION
220 kV ATR Barbending Schedule
Sr. Description Location Bar no. Length Bend-1 Bend-2 Bend-3 Cut Length Spread Spacing No. of Weightage Weight Figure
No. length Bars
- - # mm mm mm mm mm mm mm no. kg/mm kg -
150 250
8 Distribution Bars on Right side At Sump Opening Oil Pit Slab 4 8402 150 250 0 8802 800 175 6 0.000994 52.495
8402
500/220/132 KV FAISALABAD WEST SUBSTATION
220 kV ATR Barbending Schedule
Sr. Description Location Bar no. Length Bend-1 Bend-2 Bend-3 Cut Length Spread Spacing No. of Weightage Weight Figure
No. length Bars
- - # mm mm mm mm mm mm mm no. kg/mm kg -
200

8 Oil pit Sump crank bars B/D Oil Pit Slab 4 800 200 150 650 1800 800 175 12 0.000994 21.470 650 150

800
0
9 Extra Bars in SUMP B/D Oil Pit Slab 4 800 0 0 0 800 0 0 4 0.000994 3.181
800
TOTAL WEIGHT FOR ONE OIL PIT 955.000 Kgs

NUMBER OF OIL PITS 3.000

TOTAL WEIGHT 2865.000 Kgs

OUTER WALLS OF ATR (lower wall)


100

1 Vertical Bars Wall 4 1650 300 100 0 2050 7500 175 48 0.000994 97.810 1650

300

2 Distribution Bars Wall 3 8700 100 100 0 8900 1400 175 9 0.000559 44.776 100 100
8700

3 Crank Bar Pad to Wall 4 250 200 200 0 650 7500 175 48 0.000994 31.013 250 200

200
TOTAL WEIGHT FOR ONE WALL 174.000 Kgs

NUMBER OF FIRE WALLS 3.000

TOTAL WEIGHT 522.000 Kgs

OUTER WALLS OF ATR (Higher wall)


500/220/132 KV FAISALABAD WEST SUBSTATION
220 kV ATR Barbending Schedule
Sr. Description Location Bar no. Length Bend-1 Bend-2 Bend-3 Cut Length Spread Spacing No. of Weightage Weight Figure
No. length Bars
- - # mm mm mm mm mm mm mm no. kg/mm kg -
100

1 Vertical Bars Wall 4 1850 300 100 0 2250 6800 175 44 0.000994 98.406 1850

300
100

1 Vertical Bars (Oil sump) Wall 4 2350 300 100 0 2750 650 175 5 0.000994 13.668 2350

300

2 Distribution Bars Wall 3 8000 100 100 0 8200 1600 175 11 0.000559 50.422 100 100
8000

3 Distribution Bars (oil sump) Wall 3 650 100 100 0 850 2100 175 13 0.000559 6.177 100 100
650

3 Crank Bar Pad to Wall 4 250 200 200 0 650 7500 175 48 0.000994 31.013 250 200

200
TOTAL WEIGHT FOR ONE WALL 200.000 Kgs

NUMBER OF FIRE WALLS 3.000

TOTAL WEIGHT 600.000 Kgs

OUTER WALLS OF ATR (On Slope Slab)


500/220/132 KV FAISALABAD WEST SUBSTATION
220 kV ATR Barbending Schedule
Sr. Description Location Bar no. Length Bend-1 Bend-2 Bend-3 Cut Length Spread Spacing No. of Weightage Weight Figure
No. length Bars
- - # mm mm mm mm mm mm mm no. kg/mm kg -
100

1 Vertical Bars Left side Wall 4 1750 300 100 0 2150 9100 175 53 0.000994 113.266 1750

300
100

1 Vertical Bars Right side Wall 4 1750 300 100 0 2150 8400 175 49 0.000994 104.718 1750

300
100

1 Vertical Bars (oil sump) Wall 4 2350 300 100 0 2750 650 175 5 0.000994 13.668 2350

300

### Horizontal Bars ( Left ) Wall 3 9100 100 100 0 9300 1500 175 10 0.000559 51.987 100 100
9100

### Horizontal Bars ( Right ) Wall 3 8400 100 100 0 8600 1500 175 10 0.000559 48.074 100 100
8400

### Crank Bar Pad to Wall 4 250 200 200 0 650 9100 175 106 0.000994 68.487 250 200

200

### Horizontal Bars ( oil sump ) Wall 3 650 100 100 0 850 2100 175 13 0.000559 6.177 100 100
650
TOTAL WEIGHT FOR ONE WALL 406.4 Kgs
500/220/132 KV FAISALABAD WEST SUBSTATION
220 kV ATR Barbending Schedule
Sr. Description Location Bar no. Length Bend-1 Bend-2 Bend-3 Cut Length Spread Spacing No. of Weightage Weight Figure
No. length Bars
- - # mm mm mm mm mm mm mm no. kg/mm kg -

NUMBER OF FIRE WALLS 3.000

TOTAL WEIGHT 1219.13 Kgs

Fire Wall Dowels Of FW-01

1 Bottom Vertical Bars both sides Fire Wall 5 4450 300 0 0 4750 9121 150 124 0.001554 915.306 4450

300

2 Middle vertical Bars both sides Fire Wall 5 4675 0 0 0 4675 9121 150 124 0.001554 900.854 4675

200

3 Top vertical Bars both sides Fire Wall 4 4635 200 0 0 4835 9121 150 124 0.000994 595.943 4635

4 Distribution Bars both sides Fire Wall 4 9121 200 200 0 9521 11560 200 118 0.000994 1116.737 200 200
9121
450
9121 for H C/C 900
4 Wall Spacer Horizantal and Vertical in the wall Fire Wall 3 238 450 450 0 1138 H/D 297 0.000559 188.934 238
11560 for V C/C 450
V/D
450

5 Opening in firewall for N2 Cylender Cabinet Fire Wall 4 800 0 0 0 800 0 0 12 0.000994 9.542 0 0
800
500/220/132 KV FAISALABAD WEST SUBSTATION
220 kV ATR Barbending Schedule
Sr. Description Location Bar no. Length Bend-1 Bend-2 Bend-3 Cut Length Spread Spacing No. of Weightage Weight Figure
No. length Bars
- - # mm mm mm mm mm mm mm no. kg/mm kg -

5 Opening in firewall for N2 Cylender Cabinet Fire Wall 4 1100 0 0 0 1100 0 0 12 0.000994 13.121 0 0
(location will finalize later)
1100
TOTAL WEIGHT FOR ONE FIRE WALL 3741.000 Kgs

NUMBER OF FIRE WALLS 1.000

TOTAL WEIGHT 3741.000 Kgs

Fire Wall Dowels Of FW-02

1 Bottom Vertical Bars both sides Fire Wall 5 4450 300 0 0 4750 9121 150 124 0.001554 915.306 4450

300

2 Middle vertical Bars both sides Fire Wall 5 4675 0 0 0 4675 9121 150 124 0.001554 900.854 4675

0
200

3 Top vertical Bars both sides Fire Wall 4 4635 200 0 0 4835 9121 150 124 0.000994 595.943 4635

4 Distribution Bars both sides Fire Wall 4 9121 200 200 0 9521 11560 200 118 0.000994 1116.737 200 200
9121
450
9121 for H C/C 900
H/D
4 Wall Spacer Horizantal and Vertical in the wall Fire Wall 3 238 450 450 0 1138 11560 for 297 0.000559 188.934 238
V/D V C/C 450
450
500/220/132 KV FAISALABAD WEST SUBSTATION
220 kV ATR Barbending Schedule
Sr. Description Location Bar no. Length Bend-1 Bend-2 Bend-3 Cut Length Spread Spacing No. of Weightage Weight Figure
No. length Bars
- - # mm mm mm mm mm mm mm no. kg/mm kg -

5 Opening in firewall for N2 Cylender Cabinet Fire Wall 4 800 0 0 0 800 0 0 6 0.000994 4.771 0 0
800

5 Opening in firewall for N2 Cylender Cabinet Fire Wall 4 1100 0 0 0 1100 0 0 6 0.000994 6.560 0 0
1100
TOTAL WEIGHT FOR ONE FIRE WALL 3730.000 Kgs

NUMBER OF FIRE WALLS 1.000

TOTAL WEIGHT 3730.000 Kgs

N2 Cylender Cabinet

1 Bottom Main Bars Pad to Wall 4 850 1350 1350 80 3710 950 150 8 0.000994 29.502 1350 80 1350
80

850

2 Bottom Distribution Bars Pad to Wall 4 950 1350 1350 80 3810 850 150 7 0.000994 26.510 1350 80 1350
80

950

3 Top Main Bars Pad 4 850 450 450 0 1750 950 175 7 0.000994 12.177 450 850 450

4 Top Distribution Bars Pad 4 950 450 450 0 1850 850 175 6 0.000994 11.033 450 950 450

5 Distribution Bars in longer direction in both walls wall 4 950 0 0 0 950 750 150 12 0.000994 11.332 0 0
950
500/220/132 KV FAISALABAD WEST SUBSTATION
220 kV ATR Barbending Schedule
Sr. Description Location Bar no. Length Bend-1 Bend-2 Bend-3 Cut Length Spread Spacing No. of Weightage Weight Figure
No. length Bars
- - # mm mm mm mm mm mm mm no. kg/mm kg -

6 Distribution Bars in shorter direction in both walls wall 4 850 0 0 0 850 750 150 12 0.000994 10.139 0 0
850
TOTAL WEIGHT FOR ONE N2 CABINET PAD 101.000 Kgs

NUMBER OF N2 CABINET PAD 3.000

TOTAL WEIGHT 303.000 Kgs

Cable Pit

1 Bottom Main Bars Both Way Pad to Wall 3 550 425 425 80 1560 550 150 10 0.000559 8.720 425 80 425
80

550

2 Bottom Distribution Bars Both Way Pad 3 550 0 0 0 550 550 150 10 0.000559 3.075 0 0
550

3 Distribution Bars Both Way Wall 3 550 0 0 0 550 300 150 12 0.000559 3.689 0 550 0

will finalize later TOTAL WEIGHT FOR ONE N2 CABINET PAD 0.000 Kgs

NUMBER OF N2 CABINET PAD 2.000

TOTAL WEIGHT 0.000 Kgs

TOTAL WEIGHT OF ALL 57611.129 Kgs