EQUIPMENT
AHU PUMP FCU
SPLIT UNIT
VAV
CHILLIR FANS
N
E
D
S
U
CIO
TN
P
U
M
P
C
H
ILA
R
T
E E
D
W
A
T
M
E
N
TE
R
S
T
A
T
IO
NC
H
TS
Kingdom of Saudi
Arabia
NOTES:-
1. ALL PIPES DIMENSIONINDICATEINSIDECLEARDIMENSION
IN MILLIMETER.
2. ALL DIMENSIONS ARE IN MILLIMETERSANDLEVELSIN
MILLIMETERSUNLESSNOTEDOTHERWISE.
3.ALLDRAINPIPESAREINSULLATEDASPERSPECIFICATION
4.DISTANCEBETWEENSUPPORTSWILLBEACCORDINGTO
CARRIERSTANDARDS.
5.PIPEROUTINGCOULDBEMODIFIED TO SUIT FINAL
EQUIPMENTSELECTIONANDLOCATION.
6. EQUIPMENTSANDFITTING(MODELS&DIMENSIONS)
AREPROPOSEDONLY,FINALSELECTIONWILLBE
ACCORDINGTOAPPROVEDSUBMITTALS.
7.ALLLEVELSARERFFEREDTOF.F.L.,UNLESSOTHERWISE.
8.ALLISOLATINGSWITCHESHEIGHTWILLBECOORDINATED
ANDAPPROVEDBYTHEARCHITECT.
9.ALLLEVELSFROMCENTER OF PIPE.
ABBREVIATIONS:-
S.N SYMBOL ABBREVIATION
1 AHU AIR HANDLING UNIT
2 AS AIR SEPARATION
3 ET EXPANSION TANK
4 CH.V CHECK VALVE
5 CHP CHILLED PUMP
6 CHWS CHILLED WATER SUPPLY
7 CHWR CHILLED WATER RETURN
8 F.C FLEXIBLE CONNECTION
9 FCU FAN COIL UNIT
10 I.V GATE VALVE
11 HEX HEAT EXCHANGER
12 HWP HOT WATER PUMP
13 HWS HOT WATER SUPPLY
14 HWR HOT WATER RETURN
15 I.L INVERT LEVEL
16 S.T STRAINER
17 D.C DRAIN COCK
18 AAV AUTOMATIC AIR VENT
EQUIPMENT
AH
U P U
M P FC
U
S
P
LV
IT
U
A
VN
IT
C
H
ILLIR FA
N
S
REV. DESCRIPTION DRAWN DATE
NO. BY
COORDINATION
Client :
MINISTRY OF FINANCE
CONSULTANT : : hbsjaHvD
]hv hgik]sm ggjwldL ,hbsjaHvhJ hgtkdm
)aHuv
5 ,laHv;, (
DAR AL-HANDASAH
SHAIR AND PARTNERS
CONTRACTOR :
SAUDI BINLADIN GROUP
l[l,uM fK b]K hgsu,]dM
PROJECT :
DESIGN DRAWINGS REFS :
P2-A1-MH-CD-1.8.0.-101
30-09-09
R (01)
P2-A1-AR-CD-1.8.0.-101 30-09-09
R (01)
DOCUMENTS REFS :
SHOP DRAWING TITLE :
ACADEMIC COLLEGES
MISCELLANEOUS DETAILS
FOR DUCT
Dwg.No.: SDF-A1-1.8.0.00-M-AC-BF-009 REV. NO.
SCALE DATE
DRAWN CHECKED
REVIEWED APPROVED
EQUIPMENT
AHU PUM
P FCU
SPLITUNIT
VAV
CHILLIR FANS