Excavation Checklist

This document is a checklist for excavation operations for an education city project in Qatar. It contains 14 items to check to ensure excavation works are being done safely and within specifications. Some of the key points checked include establishing temporary benchmarks, confirming the setting out matches approved drawings, allowing sufficient work space, having an approved job hazard analysis, marking out excavation levels accurately, storing excavated materials properly, meeting plate bearing test requirements to confirm the excavated bed is within tolerance, and getting approval to proceed to blinding after inspection.

Uploaded by

Budoy Smith
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
973 views1 page

Excavation Checklist

This document is a checklist for excavation operations for an education city project in Qatar. It contains 14 items to check to ensure excavation works are being done safely and within specifications. Some of the key points checked include establishing temporary benchmarks, confirming the setting out matches approved drawings, allowing sufficient work space, having an approved job hazard analysis, marking out excavation levels accurately, storing excavated materials properly, meeting plate bearing test requirements to confirm the excavated bed is within tolerance, and getting approval to proceed to blinding after inspection.

Uploaded by

Budoy Smith
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

EDUCATION CITY - QATAR Contract No. Document No.

Title: Page Rev No.


0
CHECKLIST FOR EARTHWORK - Excavation Operations 1 of 1

CHECKLIST FOR EARTHWORKS - Excavation Operations


Date: JV Form #

Reference to RFIT # (Only if applicable) Checklist #

Location: Sub Contractor (If app.)

COMPLIANCE
S.NO. DESCRIPTION/ TOPIC REMARKS
Yes No N/A
1 Are the temporary bench marks established and approved by KEO/ QP?
2 Temporary bench mark referenced for this setting out:
3 Is the setting out in accordance to approved shop drawings?
Shop dwg. # and Rev
4 Is sufficient working space allowed around the construction area?
5 Safety:is the JHA or AHA approved by KEO/ QP?
6 Are the excavation levels marked out at site?
7 Equipments used:

8 Ensure excavated material is not stacked beside excavation.


9 Is the excavated bed withing tolerance: + 2 cm allowed
10 Is the ITL approved by KEO/ QP to carry out plate bearing tests/
11 Carry out plate bearing tests at designated/ agreed locations After proof rolling. Raise RFIT
12 Are the plate bearing test reults compliant and acceptable? Lab Report #
13 Plate bearing test details
Location Northing Easting RL
i
ii
iii
iv
14 Is the area released for Blinding?

NOTES/ REMARKS:

OHL-CL JV SECTION
AGENCY >>> OHL-CL JV SURVEYOR OHL-CL JV QC KEO
MANAGER
NAME
DATE
SIGNATURE

C:\Users\rborja\Documents\CHECKLIST\290194000-Check-List-for-Site-construction-works/EW - EXC-3 Page 1 of 1