NATIONAL COMPANY LAW APPELLATE TRIBUNAL, NEW DELHI
Company Appeal (AT) (Insolvency) No. 582 of 2018
[Arising out of Order dated 26th July, 2018 passed by the Adjudicating
Authority (National Company Law Tribunal), Mumbai Bench in Company
Petition No. CP(IB)-20(MB)/2018]
IN THE MATTER OF:
Overseas Infrastructure Alliance (India) Pvt. Ltd.
Registered address at 501-502,
OIA House, 470, Cardinal Gracious Road,
Andheri East, Mumbai – 400 099.
…Appellant
Vs
Kay Bouvet Engineering Ltd.
Having it’s Registered office at:
BG7/8 Phase 1, Mayfair Eleganza,
NIBM Road, KondhwaKhurd,
Pune-411048, Maharashtra.
….Respondent
Present:
For Appellant: Mr. Amir Arsiwala, Advocate.
For Respondent: Mr. Ajay K. Jain and Mr. Atanu Mukherjee,
Advocates.
J U D G M E N T
BANSI LAL BHAT, J.
This appeal has been preferred by ‘M/s Overseas Infrastructure
Alliance (India) Pvt. Ltd.’, claiming to be an ‘Operational Creditor’ against the
order dated 26th July, 2018 passed by the Adjudicating Authority (National
Company Law Tribunal), Mumbai Bench in Company Petition No. CP(IB)-
20(MB)/2018, by virtue whereof petition filed by the Appellant under Section
-2-
9 of ‘The Insolvency and Bankruptcy Code, 2016’ (hereinafter referred to as
‘I&B Code’) against Respondent - ‘M/s Kay Bouvet Engineering Ltd.’ for
initiation of ‘Corporate Insolvency Resolution Process’ has been dismissed
on the ground that there was existence of a dispute between the two parties
as the Appellant was contesting a specific performance civil suit on one
hand and on the other hand pressing for commencement of insolvency
proceedings in respect of an amount which is the subject matter in both the
proceedings. The Appellant has, through the medium of instant appeal,
assailed the impugned order on various grounds set out in the memo of
appeal.
2. The factual matrix of the case lies within a narrow compass.
Appellant was awarded an EPC Contract by one Mashkour Sugar Mills,
Sudan (hereinafter referred to as ‘Mashkour’) for an amount of
US$.149975000 for commissioning of a sugar plant at its site at White Nile
State, Sudan with capacity of crushing 8750 tons of sugarcane per day
which included all activities right from designing to commissioning. The
said project was proposed to be financed under the Government of India’s
line of credit being operated through Export-Import Bank of India (EXIM
Bank). Respondent was selected as sub-contractor for the said project
through competitive bidding. A Tripartite Agreement dated 18th December,
2010 came to be executed between Mashkour, the Appellant and the
Respondent in this regard. In terms of the agreement Mashkour and the
Appellant agreed to sub-contract the whole of the work as defined in a
Company Appeal (AT) (Insolvency) No. 582 of 2018
-3-
Bilateral Contract between Mashkour and the Appellant. Mashkour
accepted the bid of Respondent sub-contractor for all works relating to
commissioning of the sugar plant right from the stage of its designing till
installation and commissioning and the Respondent agreed to execute the
work for a consideration of US$.106.200 million. The Appellant claimed to
have paid 10% of the contract value to the Respondent as advance payment.
As the project was decided to be financed by EXIM Bank in two tranches of
US$.25 million and US$.124.975 million, two separate tranche based
contracts were signed between the Mashkour and the Appellant respectively
on 14th April, 2010 and 9th February, 2014. Appellant paid an advance
amount of Rs.47,12,10,000 being equivalent value of US$.10.62 million
(10% of the contract value) to the Respondent through Demand Draft dated
30th August, 2011 towards performance of its obligations under the said
contract as the Respondent was unable to provide Advance Bank Guarantee
in US Dollars in terms of the agreement.
3. The case set up by the Appellant before the Adjudicating Authority
was that the first tranche contract between Mashkour and the Appellant
was almost completed without involvement of Respondent. However, since
the EXIM Bank did not release the payment under second tranche
agreement dated 9th February, 2014 executed between Mashkour and the
Appellant, Mashkour terminated the contract vide its letter dated 15th June,
2017 citing unwillingness of Government of India and EXIM Bank to
support the project with the Appellant as an EPC Contractor. This
Company Appeal (AT) (Insolvency) No. 582 of 2018
-4-
prompted the Appellant to file suit no. 382 of 2017 before the Hon’ble High
Court of Bombay praying for certain reliefs mentioned therein. In view of
Mashkour appointing the Respondent as its EPC contractor for the said
project in terms of EPC contract dated 5th July, 2017, the earlier Tripartite
Agreement dated 18th April, 2010 became invalid and incapable of being
performed. The Appellant, in view of the aforesaid development, demanded
refund of the advance amount as in terms of the fresh contract Respondent
instead of the Appellant had been appointed as EPC Contractor for
Mashkour. In its reply to the demand notice issued by the Appellant, the
Respondent alleged existence of dispute with respect to the Operational
Debt. This was contested by the Appellant as being spurious. Appellant
claimed that subject matter of the suit was completely different from the
subject matter of the petition under Section 9 of the I&B Code and pendency
of the suit in no manner operated as a bar against the Appellant to claim
payments from Respondent qua the Operational Debt.
4. The Adjudicating Authority found that the Appellants suit for specific
performance and initiation of Corporate Insolvency Proceedings at his
instance could not run side by side. The Adjudicating Authority, while
interpreting the terms of Tripartite Agreement observed as under:-
“7.1. On elaborate analysis of the background of the
case in the light of the Agreements/Tri-partite Agreements
executed it emerges that there was an Agreement for
Company Appeal (AT) (Insolvency) No. 582 of 2018
-5-
Engineering, Procurement and Construction (EPC) to be
executed under the instructions of Mashkour (in the
Agreement referred as “The Employer”). EPC Contractor is
made responsible for all the activities. On completion of
the project had over the same to the Employer. A
contracting party who is actually performing all these jobs
as assigned for execution is, therefore, responsible for
completion of the Agreement. Arrangement of the Funds or
disbursement of Fund on behalf of another party do not
change the intention of such Agreement. Arrangement of
the Funds or disbursement of Fund on behalf of another
party do not change the intention of such Agreement hence
due to this reason such person cannot step into the shoes
of the Contractor who is responsible for completion of EPC
contract.”
5. Having made the aforesaid observations which are self contradictory,
if not absurd, the Adjudicating Authority proceeded to dismiss the petition
holding that there was an existence of a dispute prior to filing of the petition.
The finding has been assailed by the Appellant on the ground that the
factum of receipt of Rs.47,12,10,000/- as ‘Operational Debt’ stands
admitted by the Respondent and the suit filed by the Appellant is on the
basis of a Bilateral Agreement dated 27th March, 2014 executed between the
EXIM Bank and the Appellant wherein the Respondent figures as Defendant
Company Appeal (AT) (Insolvency) No. 582 of 2018
-6-
No. 3 with no substantial relief claimed against it. It is the further case of
Appellant that the liability to pay the ‘Operational Debt’ by the Respondent
to the Appellant arose on or around 5th July, 2017 which was after the filing
of the suit. Hence, the impugned order was liable to be set aside.
6. Learned counsel for the Appellant would submit that in terms of the
Tripartite Agreement the Appellant and Mashkour jointly appointed the
Respondent as sub-contractor to complete the works specified in the
Tripartite Agreement. The total consideration to be paid to the Respondent
for the work to be undertaken was US$.106.2 million and it was in
furtherance of such Tripartite Agreement that the Appellant advanced an
equivalent value of US$.10.62 million in Indian currency and since
Mashkour terminated the bilateral EPC contract with the Appellant on 15th
June, 2017, the Tripartite Agreement itself stood terminated in terms of its
clause no.15.2, due to which the advance amount of US$.10.62 million
became due and payable by the Respondent to the Appellant. Learned
counsel for Appellant would further submit that the debt owed to the
Appellant by the Respondent falls under the definition of ‘Operational Debt’.
He further submits that the suit filed by the Appellant cannot be considered
as proof of existence of dispute between the parties as it relates to a distinct
transaction which is neither the subject matter of demand notice issued by
the Appellant under Section 8(1) of I&B Code nor the petition filed by it
under Section 9 of the said code.
Company Appeal (AT) (Insolvency) No. 582 of 2018
-7-
7. Per contra it is contended by learned counsel for Respondent that the
Appellant is not an Operational Creditor of the Respondent as there is no
existence of Operational Debt. Learned counsel would further submit that
the Appellant has neither provided any goods nor services to the Respondent
so as to raise a claim against the Respondent as an ‘Operational Creditor’.
It is further contended that no amount is due and payable to the Appellant
under the Tripartite Agreement as in terms of the said agreement
commissioning of the sugar plant was to be executed by the Respondent
which was funded by EXIM Bank and the Respondent has received interest
free advance of US$.10.62 millions equivalent to Rs.47.12 crores from EXIM
Bank on instructions from Mashkour. It is further contended that no
amount is due and payable to the Appellant under the Memorandum of
Understanding dated 18th December, 2010 executed between Mashkour,
Appellant and the Respondent, which supersedes the Tripartite Agreement.
It is further submitted by learned counsel for the Respondent that the suit
filed by the Appellant before the Hon’ble High Court of Bombay shows
existence of dispute in relation to contracts dated 11th October, 2009, 14th
April, 2010 and 9th February, 2014 executed in relation to Mashkour sugar
project. Therefore, the Appellant was not entitled to raise the same dispute
under the garb of petition under Section 9 of I&B Code. The suit filed by
Appellant on 22nd June, 2017 was prior in point of time as the demand
notice under Section 8(1) of I&B Code was issued by the Appellant on 23rd
November, 2017. Further pleas have been raised in the written submissions
Company Appeal (AT) (Insolvency) No. 582 of 2018
-8-
regarding the jurisdiction of this Appellate Tribunal and the issue of
limitation though the same were not pressed during oral hearing.
8. Heard learned counsel for the parties and considered their
submissions in the light of material on record. The first and foremost
question for consideration is whether the transaction in question is an
‘Operational Debt’ and the Appellant qualifies as an ‘Operational Creditor’.
Under Section 3(11) of the I&B Code ‘debt’ means a liability or obligation n
respect of a claim which is due from any person. It includes an ‘Operational
Debt’ which is defined under Section 5 (21) of the I&B Code as follows:
“5(21) “operational debt” means a claim in respect of the
provision of goods or services including employment or a
debt in respect of the repayment of dues arising under any
law for the time being in force and payable to the Central
Government, any State Government or any local
authority;”
Section 5(20) of the I&B Code defines ‘Operational Creditor’ as under:-
“5(20) “operational creditor” means a person to whom
an operational debt is owed and includes any person to
whom such debt has been legally assigned or
transferred;”
Company Appeal (AT) (Insolvency) No. 582 of 2018
-9-
On plain reading of the aforesaid definitions, it comes to fore that the
person seeking triggering of Corporate Insolvency Resolution Process under
Section 9 of I&B Code must be a person to whom a claim in respect of the
provision of goods or services including employment or a debt in respect of
the repayment of dues arising under any law and payable to the Central
Government, State Government or local authority is owed. Whether, in a
given case, the claim is in respect of the provision of goods or services has to
be ascertained from the agreement governing contractual relation between
such person and the Corporate Debtor in regard to a transaction which may
have been executed under the agreement. Thus, reference to the Tripartite
Agreement executed inter-se ‘Mashkour’, Appellant and the Respondent
becomes inevitable. A bare look at the aforesaid Tripartite Agreement dated
18th December, 2010 would reveal that the Appellant, who was appointed as
EPC Contractor by ‘Mashkour’ in terms of agreement dated 11th October,
2009, and ‘Mashkour’ jointly appointed Respondent as sub-contractor to
complete the works specified in the Tripartite Agreement against total
consideration of US$.106.2 Million. It was in adherence to the aforesaid
Tripartite Agreement that the Appellant made an advance payment of
US$.10.62 Million in Indian currency to Respondent. This represented 10%
of the sub-contract price as reflected in sub-clause 14.1 of the Tripartite
Agreement. Subsequently on 15th June, 2017, ‘Mashkour’ terminated the
EPC Contract dated 11th October, 2009 with the Appellant. Such an
Company Appeal (AT) (Insolvency) No. 582 of 2018
-10-
eventuality was contemplated in Tripartite Agreement in sub-clause 15.2
which provided in unambiguous terms that:
“xxx… In the event of the Mashkour –OIA contract between
the employer and the EPC contractor is terminated, this
sub-contract agreement shall be deemed to be terminated
and any compensation required to be paid for the same
will be paid in proportion upon receipt of such amounts
from the employer.”
Thus, the termination of EPC contract with the Appellant by
‘Mashkour’ had the consequential effect of termination of the Tripartite
Agreement executed inter-se ‘Mashkour’, Appellant and the Respondent,
which rendered the Respondent liable to refund the advance amount of
US$.10.62 Million to the Appellant which had become due and payable. It
emerges from the Tripartite Agreement that the Respondent was engaged as
sub-contractor for design, engineering, supply, installation, erection, testing
and completion of factory plant for ‘Mashkour Sugar Co. Ltd.’ in Sudan while
Appellant was made responsible for all activities relating to engineering,
procurement and construction as EPC contractor and required to handover
the project to ‘Mashkour’ upon its completion. The responsibility for
completion of the project lay on the shoulders of the Appellant. The works
were to be completed within thirty months from the time the contract
became effective. Viewed thus it is manifestly clear that the Appellant, who
jointly with ‘Mashkour’ engaged the Respondent as sub-contractor for
Company Appeal (AT) (Insolvency) No. 582 of 2018
-11-
execution of the works specified in Tripartite Agreement was to render
services to ‘Mashkour’ while the Respondent in his capacity as sub-
contractor was required to render services to Appellant as also ‘Mashkour’ in
terms of the Tripartite Agreement. Having glanced through the terms of
Tripartite Agreement, we have no doubt in mind that the same made
provision for rendering of services in the nature of execution of works related
to construction, installation and commissioning of the ‘Sugar Plant’ with
clear stipulation for supply of goods including equipment towards execution
of work. It is expressly stipulated in the Tripartite Agreement that the
Appellant has paid 10% of the contract value to the sub-contractor
(Respondent) as advance payment. Therefore, there should be no difficulty
in holding that the Tripartite Agreement provided for supply for goods and
rendering of services and the Appellants claim was in respect of such
provision of goods and services. Viewed in this perspective, it can be stated
without any hesitation that the Appellant having advanced 10% of the
contract value to Respondent – sub-contractor as advance payment had a
claim in respect of provision of goods or services bringing him within the
definition of ‘Operational Creditor’, to whom an ‘Operational Debt’ was owed
by the Respondent – ‘Corporate Debtor’. The plea raised by the Respondent
that he had received the advance money from EXIM Bank on the
instructions of ‘Mashkour’ cannot be said to be supported by record as such
Advance money was admittedly paid under the Tripartite Agreement dated
18th December, 2010 well before the Tripartite Agreement got superseded.
Company Appeal (AT) (Insolvency) No. 582 of 2018
-12-
The Adjudicating Authority declined to address this issue on the ground that
the matter was sub-judice before the Hon’ble High Court ignoring its own
observation that the suit filed by the Appellant sought the relief of specific
performance of contract. The reluctance on the part of Adjudicating
Authority to address the issue whether non-refund of the amount paid by
the Appellant to Respondent, as advance amount, in terms of the Tripartite
Agreement gave rise to a claim in respect of provisions of goods and services
cannot be appreciated as the nature of relief claimed in the suit was distinct
and same could not operate as bar for seeking remedy in the nature of
triggering of Corporate Insolvency Resolution Process within the ambit of
I&B Code. Admittedly, the issue whether the debt in question qualifies as an
‘Operational Debt’ and the Appellant was covered by definition of
‘Operational Creditor’ was not sub-judice before the Hon’ble High Court. It
further emerges from record that in the Civil Suit filed before the Hon’ble
High Court, EXIM Bank figures as Defendant No. 1 against whom inter-alia,
declaration in regard to specific performance of agreement dated 27th March,
2014 has been sought as the primary relief while no primary relief is sought
against the Respondent who figures as Defendant No. 3 in the Suit. Whether
pendency of the aforesaid Suit on the date of filing of petition under Section
9 of I&B Code would amount to existence of a dispute operating as bar to
initiation of Corporate Insolvency Resolution Process has to be examined in
the light of observations of the Hon’ble Apex Court in “Innoventive
Company Appeal (AT) (Insolvency) No. 582 of 2018
-13-
Industries Ltd. v. ICICI Bank, (2018) 1 SCC 407”. Para 28 and 29 of the
aforesaid judgment are reproduced hereunder:
“28. When it comes to a financial creditor triggering the
process, Section 7 becomes relevant. Under the
Explanation to Section 7(1), a default is in respect of a
financial debt owed to any financial creditor of the
corporate debtor — it need not be a debt owed to the
applicant financial creditor. Under Section 7(2), an
application is to be made under sub-section (1) in such
form and manner as is prescribed, which takes us to the
Insolvency and Bankruptcy (Application to Adjudicating
Authority) Rules, 2016. Under Rule 4, the application is
made by a financial creditor in Form 1 accompanied by
documents and records required therein. Form 1 is a
detailed form in 5 parts, which requires particulars of the
applicant in Part I, particulars of the corporate debtor in
Part II, particulars of the proposed interim resolution
professional in Part III, particulars of the financial debt in
Part IV and documents, records and evidence of default in
Part V. Under Rule 4(3), the applicant is to dispatch a copy
of the application filed with the adjudicating authority by
registered post or speed post to the registered office of the
corporate debtor. The speed, within which the adjudicating
Company Appeal (AT) (Insolvency) No. 582 of 2018
-14-
authority is to ascertain the existence of a default from the
records of the information utility or on the basis of
evidence furnished by the financial creditor, is important.
This it must do within 14 days of the receipt of the
application. It is at the stage of Section 7(5), where the
adjudicating authority is to be satisfied that a default has
occurred, that the corporate debtor is entitled to point out
that a default has not occurred in the sense that the
“debt”, which may also include a disputed claim, is not
due. A debt may not be due if it is not payable in law or in
fact. The moment the adjudicating authority is satisfied
that a default has occurred, the application must be
admitted unless it is incomplete, in which case it may give
notice to the applicant to rectify the defect within 7 days of
receipt of a notice from the adjudicating authority. Under
sub-section (7), the adjudicating authority shall then
communicate the order passed to the financial creditor and
corporate debtor within 7 days of admission or rejection of
such application, as the case may be.
29. The scheme of Section 7 stands in contrast with the
scheme under Section 8 where an operational creditor is,
on the occurrence of a default, to first deliver a demand
Company Appeal (AT) (Insolvency) No. 582 of 2018
-15-
notice of the unpaid debt to the operational debtor in the
manner provided in Section 8(1) of the Code. Under Section
8(2), the corporate debtor can, within a period of 10 days
of receipt of the demand notice or copy of the invoice
mentioned in sub-section (1), bring to the notice of the
operational creditor the existence of a dispute or the record
of the pendency of a suit or arbitration proceedings, which
is pre-existing—i.e. before such notice or invoice was
received by the corporate debtor. The moment there is
existence of such a dispute, the operational creditor gets
out of the clutches of the Code.”
The dictum of law is loud and clear that when the Operational Creditor
delivers the demand notice of the unpaid debt to the Corporate Debtor in
prescribed manner, the Corporate Debtor can bring to the notice of the
Operational Creditor, within ten days of receipt of demand notice, the
existence of a pre-existing dispute or pendency of a suit or arbitration
proceeding. Existence of dispute contemplated under this provision is in
regard to a pre-existing dispute. The Hon’ble Apex Court, while dealing with
the expression ‘existence of a dispute’ as contemplated under Section 8(2)(a)
of the I&B Code in “Mobilox Innovations (P) Ltd. v. Kirusa Software (P)
Ltd., (2018) 1 SCC 353”, held as under:-
Company Appeal (AT) (Insolvency) No. 582 of 2018
-16-
51. It is clear, therefore, that once the operational creditor
has filed an application, which is otherwise complete, the
adjudicating authority must reject the application under
Section 9(5)(2)(d) if notice of dispute has been received by
the operational creditor or there is a record of dispute in
the information utility. It is clear that such notice must
bring to the notice of the operational creditor the
“existence” of a dispute or the fact that a suit or arbitration
proceeding relating to a dispute is pending between the
parties. Therefore, all that the adjudicating authority is to
see at this stage is whether there is a plausible contention
which requires further investigation and that the “dispute”
is not a patently feeble legal argument or an assertion of
fact unsupported by evidence. It is important to separate
the grain from the chaff and to reject a spurious defence
which is mere bluster. However, in doing so, the Court
does not need to be satisfied that the defence is likely to
succeed. The Court does not at this stage examine the
merits of the dispute except to the extent indicated above.
So long as a dispute truly exists in fact and is not
spurious, hypothetical or illusory, the adjudicating
authority has to reject the application.”
Company Appeal (AT) (Insolvency) No. 582 of 2018
-17-
On perusal of record, we find that the Appellant – Operational Creditor
has in his demand notice dated 23rd November, 2017 at page 253 of the
paper book specifically stated that the Respondent-Corporate Debtor has
replaced Appellant as EPC Contractor for the project in terms of EPC
contract dated 5th July, 2017 and thereby the Tripartite Agreement dated
18th April, 2010 stands superseded and in view of the same Respondent,
being unable to perform under the Tripartite Agreement was liable to refund
the advance amount of Rs.47,12,10,000/- being equivalent of US$.10.62
Million. Responding thereto the Respondent, while admitting that it had
received equivalent of US$.10.62 Million as advance money, claimed that it
had received the advance money on behalf of ‘Mashkour’ in terms of the
Tripartite Agreement, which stood terminated as ‘Mashkour’ had entered
into fresh contract with the Respondent. Respondent further stated that it
was under no legal or contractual obligation to refund the advance money to
the Appellant. The Respondent raised the dispute by denying the status of
Appellant as ‘Operational Creditor’ and further stated that the Appellant had
filed suit seeking release of amount of US$10745000. It has been noted
elsewhere in this judgment that the suit filed by the Appellant primarily
sought a declaration with relief of specific performance based on the contract
which stood terminated/ superseded after Mashkour executed fresh contract
with the Respondent eliminating the Appellant from the project. No primary
or substantial relief was sought against the Respondent. It is also relevant to
notice that the Hon’ble High Court of Bombay declined the interim relief on
Company Appeal (AT) (Insolvency) No. 582 of 2018
-18-
the ground that the original contract for which the line of credit was to be
made available by the EXIM Bank, no more subsisted and no effective final
relief prima facie could be granted in the suit for specific performance of the
contract. In view of this finding of the Hon’ble High Court recorded on 27th
June, 2017, which is exactly six months before the filing of Section 9 petition
and having regard for the fact that no substantive relief in the nature of
declaration or specific performance of contract was sought against the
Respondent in the lis filed at the instance of Appellant (who was virtually
non-suited by the Hon’ble High Court), it can be said without hesitation that
the dispute raised in regard to existence of dispute was a spurious defence
not supported by evidence. Given the frame of the suit and the nature of
relief claimed therein coupled with the fact that no relief with regard to the
subject matter of petition under Section 9 of I&B Code was claimed therein
against the Respondent, we are of the considered view that the contention
raised by the Respondent does not require further investigation and the
dispute raised in reply to the demand notice is a mere bluster.
9. For the foregoing reasons, the impugned order passed by the
Adjudicating Authority on 26th July, 2018 cannot be supported. The
impugned order suffers from grave legal infirmity. The Adjudicating
Authority seriously erred in declining to recognize Appellant as an
‘Operational Creditor’ and in arriving at the conclusion that there was an
existence of dispute prior to filing of the petition. Having regard to the
Company Appeal (AT) (Insolvency) No. 582 of 2018
-19-
findings recorded hereinabove the impugned order cannot be sustained and
the same is set aside. The appeal is allowed. The matter is remitted back to
the Adjudicating Authority to admit the petition filed by the Appellant under
Section 9 of the I&B Code after giving limited notice to the Respondent –
Corporate Debtor so as to enable it to settle the claim before its admission.
It shall not be open to the Adjudicating Authority to consider the issues
considered and settled in this appeal. The appeal is accordingly allowed.
There shall be no orders as to costs.
[Justice S. J. Mukhopadhaya] [Justice Bansi Lal Bhat]
Chairperson Member (Judicial)
NEW DELHI
21st December, 2018
AM
Company Appeal (AT) (Insolvency) No. 582 of 2018