03.NTPCs Renewable Energy Plan

1) NTPC has 360 MW of installed solar capacity currently through projects set up under EPC mode at existing thermal stations and standalone locations. An additional 510 MW of solar projects are expected to commission in 2016-17. 2) NTPC has plans to set up 3,495 MW of new solar projects between 2018-2020 and is in discussion for additional projects post 2020 in various states. 3) NTPC is also developing solar projects of 3,000 MW under the National Solar Mission Phase II Batch II as the nodal agency, with 2,770 MW of projects already awarded. Solar tariffs in India have fallen significantly in the last year.

Uploaded by

Nagaraj Naik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views42 pages

03.NTPCs Renewable Energy Plan

1) NTPC has 360 MW of installed solar capacity currently through projects set up under EPC mode at existing thermal stations and standalone locations. An additional 510 MW of solar projects are expected to commission in 2016-17. 2) NTPC has plans to set up 3,495 MW of new solar projects between 2018-2020 and is in discussion for additional projects post 2020 in various states. 3) NTPC is also developing solar projects of 3,000 MW under the National Solar Mission Phase II Batch II as the nodal agency, with 2,770 MW of projects already awarded. Solar tariffs in India have fallen significantly in the last year.

Uploaded by

Nagaraj Naik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 42

13.02.

17 SURINDER RAINA GM-I/C(RE & Nuclear)


11
Outline
• Renewable Energy in India
• Solar Projects in NTPC
• -EPC Mode
• -Developer Mode
• Wind Projects in NTPC
• New Initiatives

2
Renewable Energy in India
Installed capacity (Renewables)-50 GW (31.12.16)
SMALL HYDRO – 9 %
SOLAR- 18% (4.3 GW) WIND – 57%
(9.0 GW) (28.7 GW)

BIOMASS - 16 %
(7.9 GW)

Small Hydro : Capacity up to 25 MW Source: MNRE


3
Renewable Energy in India
Massive Capacity Addition Program by 2022

4
Renewable Energy in India
Policy Initiatives by MNRE-Solar Projects

1. Solar Park Scheme

2. CPSU Scheme

3. VGF Scheme

4. Canal Bank/Canal Top Scheme

5. Roof Top Scheme

5
Renewable Energy in India
Policy Initiatives-Solar Park
• Concentrated Development zones
for solar projects
• Solar Power Park Developer(SPPD)
makes available the following to
Solar project developer(SPD)
 Land with Clearances
 Approach Roads to each block
 Transmission System
 Basic Drainage
 Water Supply

MNRE has accorded approval to 33 Solar Parks of aggregate


capacity of 20,000 MW to be set up in 21 States.
6
Renewable Energy in India
CPSU scheme

• 1000 MW of Solar projects to be set up by CPSUs


• Domestically manufactured Cells and Modules to be used
• VGF shall be paid through SECI
1. Rs 1 Cr/MW --- Where both domestic cells and modules are
used
2. Rs 50 Lakh/MW – Where only domestic modules are used.

7
NTPC Ltd
Present Installed Capacity – 48 GW
NO. OF CAPACITY (MW)
PLANTS
NTPC Owned
Coal 19 35,885
Gas/Liquid Fuel 7 4,017
Hydro 1 800
Solar Power projects 9 360
Total 36 41,062
Owned By JVs/Subsidiaries
Coal & Gas 9 6,966
Total 45 48,028

8
NTPC Ltd
Business plan of NTPC ---Diversified Growth
In GW By % Mix
2032
Coal 85 65.4
Gas 6 4.6
Hydro 5 3.8
Renewable 32 24.7
Nuclear 2 1.5
Total 130 100

9
Solar Projects in
NTPC under EPC
Mode

10
NTPC Ltd
Present Solar Installed Capacity - 360 MW
SLN NAME OF PROJECT CAPACITY (MW)
Solar Projects at existing Thermal Stations
1 DADRI SOLAR(UP) 5
2 RAMAGUNDAM SOLAR(TELENGANA) 10
3 UNCHAHAR SOLAR(UP) 10
4 TALCHER KANIHA SOLAR(ODISHA) 10
5 FARIDABAD SOLAR(HARYANA) 5
6 SINGRAULI SOLAR(UP) 15
Standalone Solar Projects
7 ANDAMAN SOLAR (PORT BLAIR) 5
8 RAJGARH SOLAR(MADHYA PRADESH) 50
9 ANANTAPURAMU SOLAR (AP) 250
TOTAL 360
11
NTPC Ltd
Present Solar Installed Capacity
Dadri – 5 MW
Ramagundam – 10 MW

Talcher– 10 MW Unchahar– 10 MW

Faridabad -5 MW
Singrauli– 15 MW

12
NTPC Ltd
Present Solar Installed Capacity

Port Blair – 5 MW

Rajgarh(MP)– 50 MW Anantapur(AP)– 250 MW

13
NTPC Ltd
Solar Power Projects–Commissoning in 2016-17

Year Solar Project Capacity(MW)


Anantapuramu-I(AP) 250(*)
2016-17
Bhadla(Rajasthan) 260 (**)
Mandsaur(MP) 250(**)
510

(*) Already Commissioned


(**) Expected by Mar’17

14
NTPC Ltd
Anantapuramu Solar Project -I 250 MW(5 x 50 MW)
DOMESTICALLY MANUFACTURED CELLS AND MODULES ARE USED

April 2015 April 2016

EPC AGENCIES – TATA(100 MW), LANCO(50 MW), BHEL(50 MW), S&W(50 MW)
Max. Peak load – 225.70 MW (21.11.16)
Max. Generation of 1.5058 MU (10.02.17)-CUF of 25.10%
15
NTPC Ltd
Anantapuramu Solar Project -I 250 MW(5 x 50 MW)

Sunrise on day of Solar PV array Control Room


Synchronisation

Inverter Room 33/220 kv Switchyard 220/400 kv Switchyard


16
NTPC Ltd
Bhadla Solar Power Project-260 MW( 4 x 65 MW)
DOMESTICALLY MANUFACTURED CELLS AND MODULES ARE USED

April 2016 Jan 2017

AWARDED : 31.03.16, COMMISSIONING BY MAR-17


EPC AGENCIES – VIKRAM SOLAR (2 X 65 MW),
JAKSON(65 MW), TATA(65 MW)

17
NTPC Ltd
Bhadla Solar Power Project-260 MW( 4 x 65 MW)
Solar PV array Control Room Inverter Room

33/132 kv Switchyard Power Transforrmer

18
NTPC Ltd
Mandsaur Solar Project-250 MW( 5 x 50 MW)
DOMESTICALLY MANUFACTURED CELLS AND MODULES ARE USED

DOMESTICALLY MANUFACTURED CELLS AND


April 2016 MODULES USED Jan 2017

AWARDED : 31.03.16, COMMISSIONING BY MAR-17


EPC AGENCIES – LANCO(2 X 50 MW), VIKRAM SOLAR ( 50 MW),
BHEL(50 MW), TATA(65 MW)
19
NTPC Ltd
Mandsaur Solar Project-250 MW( 5 x 50 MW)

MMS foundation Control Room Inverter Room

Control Room Approach Road


Solar array

20
NTPC Ltd
Solar Power Projects- Planned in 2018-20
Solar Project Capacity(MW)
Anantapuramu-II (AP) 750
Pavagada (Karnataka) 1000
Andaman and Nicobar 25
Banaskantha(Gujarat) 500
Bilhaur(UP) 250
Morena(MP) 250
Chattarpur(MP) 500
Existing Gas projects 220
Total 3495

21
NTPC Ltd
Solar Power Projects- Planned in 2020-22
Discussions are on with the following states
for development of Solar Projects
• Rajasthan
• MP
• Tamil Nadu
• Orissa
• Haryana
• UP
• Maharastra

(Capacities to be worked out separately)

22
NTPC Ltd
Solar Power Projects with BESS in A&N
Chidiya Tapu(8MW) Manglutan(17 MW)

NIT done on 08.10.16 NIT done on 20.10.16

BESS : Battery Energy Storage System


23
Solar Projects
under
Developer Mode

24
NTPC Ltd
Solar Projects under Developer Mode
National Solar Mission Phase II Batch II
NTPC - Nodal agency for implementation

15000 MW

Tranche-1(*) Tranche-2(**) Tranche-3(**)


3000 MW 5000 MW 7000 MW
2014-17 2015-18 2016-19

• (*) Under State Specific Bundling Scheme


• (**) Implementation Guidelines yet to be issued by MNRE

25
NTPC Ltd
Solar Projects under Developer Mode
National Solar Mission Phase II Batch II
TRANCHE-1 : 3000 MW
Break up Non Solar
Solar Park Total
of Projects Park
Open 2020 MW 580 MW 2600 MW
DCR 250 MW 150 MW 400 MW
Total 2270 MW 730 MW 3000 MW

NIT ISSUED 3000 MW


PPA SIGNED 2750 MW
Balance 250 MW (KADAPA)
Under tendering.
26
NTPC Ltd
Solar Projects – Falling Tariff in India

MONTH AGENCY SOLAR Levellised Tariff


PROJECT IN INR/Kwh
JUL-15 SKY POWER MP Rs 5.05
NOV-15 SUNEDISON AP Rs 4.63
FEB-16 FORTRUM MP Rs 4.34
JAN-17 MAHINDRA MP Rs 2.97 for First
/ACME year with 5 paise
/SOLENERGI increase every
year

Rs 4.34 remained the lowest quoted tariff for almost 1 year


27
Wind Projects in
NTPC

28
NTPC Ltd
50 MW Wind Energy Project- Rojmal Site(Gujarat)
NTPC’s Award placed
first in 19 days from
Wind techno-
Energy commercial bid
Project opening

• PPA has been


• 50 MW Rosigned with GUVNL
• Awarded to M/s INOX wind Noida on 05.12.16
• Commissioning Schedule : 19 weeks from Award
• Project site is located approx. 70 Km from Rajkot city
O&M for 11 years is also in the Scope of INOX

NTPC plans : 2000 MW wind capacity in next two years


29
NTPC Ltd
50 MW Wind Energy Project- Rojmal Site(Gujarat)
Salient Details

48.8 m
100 m 16.5 m Dia
WTG foundation
2.5 m Depth

Weight/ Height of
250 MT/92 M
Tower(in 4 parts)
Weight of Nacelle 70 MT
36 MT
92 m Weight of Rotor (Hub: 11MT,
Blades: 25.5MT).

30
NTPC Ltd
50 MW Wind Energy Project- Rojmal Site(Gujarat)
Progress Photographs

Tower Foundation Tower & Blade Erection in progress

31
NTPC Ltd
50 MW Wind Energy Project- Rojmal Site(Gujarat)
33/220 Kv Switchyard View of Rojmal Wind farm

Telescopic Trailor used for transporting wind turbine blades

32
New Initiatives

33
NTPC Ltd
New R&D Initiatives- Floating Solar(Kayamkulam)

Salient Details:
 Indigenous floaters developed in collaboration with (CIPET, Chennai)
 5 kW Floating solar PV installed at Kayamkulam
 100 kW Floating PV being installed at Kayamkulam : Completion Feb ’17
 Project cost with indigenous floater : Rs 6 Cr/MW

NTPC plans for MW scale floating solar in 2017


34
NTPC Ltd
New R&D Initiatives- Module Degradation Study
Salient Details:
 Identification of mode of degradation and
performance reduction for Indian Climate
 Studying various losses due to soiling,
shading etc.
 Settling of Solar PV Test Lab with Indoor
and Outdoor Test equipments
Deliverables:
 Preparation of base line degradation data,
Guidelines for PV plants
 Prediction of Online performance degradation

Studies in collaboration with IIT Mumbai


35
NTPC Ltd
New R&D Initiatives- Dry Cleaning System
Salient Details:
 Dry cleaning of Solar PV panel
using robotic units
 Self Powered
 Self auto Cleaning
 Remotely operated
Benefits :
 No use of water
 Improved generation as soiling loss are minimized because of
daily cleaning
Installed in NTPC Dadri Solar plant(5MW)-under commissioning
– 4 MW with Dry Cleaning System
– 1 MW with Wet Cleaning System

36
NTPC Ltd
New R&D Initiatives- Solar Wind Hybrid at Kudgi
2 MW Wind + 1.3 MW High Efficiency (>19%) Solar PV
Objective
1. Maximization of Generation from a piece of
land ( 200 x 150 M)
2. Development of Control for Solar and Wind
Curtailment
3. Optimum Size storage Integration for
Smoothening (To be taken up in next phase)
4. First Such Plant In India, will help Policy
framework

Award is expected by Feb’17


37
NTPC Ltd
New R&D Initiatives- CW Channel at Mouda
Objective
• Design of Low Cost replicable
optimized solar structures.
• Identifying most suitable stretch of canal
for economic Power
• Comparison study rooftop & Canal top
Configuration of Mouda
•CW Channel Length: 280 meters
•PV Plant size : 150 KW
•The Side wall of Channel will act as load bearing members for
Solar Structure
Under Implementation. Completion by Mar’17
38
NTPC Ltd
New R&D Initiatives- Solar Thermal Hybrid at Dadri

Salient Details:
 Solar Field : 15 MW thermal
 Solar Conversion efficiency : 24.39%
 Additional output : 3.66 MW electrical
 Coal Saving : 3250 MT/year
Under Implementation. Completion by Jul’17
39
NTPC Ltd
New R&D Initiatives- Solar Power forecasting
1. Centralized Day-Ahead Generation
forecasting solution for 9 Solar PV Plants
2. Based on NWP (Numerical Weather
Prediction) and Artificial Intelligence
Techniques
3. Model optimization by using SCADA and
Weather Monitoring Station data
4. Approx. 96 % cases in +-10% band
5. Study on impact of local weather
conditions on solar generation

40
NTPC Ltd
New R&D Initiatives- Geothermal Project

Tattapani Geothermal
Project in Chhattisgarh:

• MoU Signed with Govt.


of Chhattisgarh.
• Feasibility studies in
association with the
Geological Survey of
India are in progress.

Hot Springs on the river bed at Tattapani

41
THANK YOU
NTPC Limited
( A Government of India Enterprise) 42
www.ntpc.co.in