WI-NG-6460-002-089 Work Instruction For Bus Bar Prot Panel Scheme Check & FT Rev00

This document provides responsibilities and procedures for testing the scheme and function of a bus bar protection panel. It outlines that project staff must follow safety requirements and test equipment must have valid calibration certificates. The work instruction details general mechanical checks, electrical tests of the protection scheme including zone logic, and references related documents. Records of the test results must be signed by both contractor and utility staff.

Uploaded by

Mohamed Nasr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
106 views6 pages

WI-NG-6460-002-089 Work Instruction For Bus Bar Prot Panel Scheme Check & FT Rev00

This document provides responsibilities and procedures for testing the scheme and function of a bus bar protection panel. It outlines that project staff must follow safety requirements and test equipment must have valid calibration certificates. The work instruction details general mechanical checks, electrical tests of the protection scheme including zone logic, and references related documents. Records of the test results must be signed by both contractor and utility staff.

Uploaded by

Mohamed Nasr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

NATIONAL GRID

Title: Index Number:


WI-NG-6460-002-089
Bus Bar Protection Panel Scheme Check Page Number:
2 of 4
and Function Test

2.0 RESPONSIBLITIES

- Anyone working in testing location during commission stage must follow the
safety requirements as per SEC rules and CSD employees are responsible for
applying safety rules in all places which they working in.
- Project site engineer is responsible for committing the contractor to prepare
testing and commissioning places to be done in proper climate conditions as per
Company policies, procedures and accepted temperatures the relays, devices and
test equipment can be tested or operated within it.
- Any of CSD staff is responsible for testing activities according to approved
specification and design and he shall not start any test for any Bus Bar Protection
Panel Scheme and Function check until providing the following:

o Approved test forms.


o Signed test formats of all activities which must be completed before Bus Bar
Protection Panel Scheme and Function check
o Factory Tests certificates.
o Updated Approved final settings.
o All relays must be configured.
o Relay manual.
o Approved schematic drawings.
o Protection requirement.
o Test equipment valid calibration certificates.
o Approved Contractor organization chart.
o Contractor staff approved qualification certificates.

- Its responsibility of the commissioning contractors to provide all testing Bus Bar
Protection Panel Scheme and Function check with its valid calibration certificates
that will maybe require applying the testing / commissioning procedure in proper
manner.
- Its responsibility of the CSD Engineer/Technician to check and witness all
activities required for Bus Bar Protection Panel Scheme and Function check
following all of this work instruction.
- CSD Engineer/Technician is responsible for recording status of any test for Bus
Bar Protection Panel Scheme and Function check in its check list and test form as
per the following work instruction.
- Each check list and test form shall be signed by CSD engineer/technician and
testing contractor engineer.

Archiving System Website: http://AMAS TP-NG-6250-001-007


NATIONAL GRID

Title: Index Number:


WI-NG-6460-002-089
Bus Bar Protection Panel Scheme Check Page Number:
3 of 4
and Function Test

3.0 Work Instruction of Bus Bar Protection Panel Scheme Check and Function
Test

3.1 General Mechanical checks and visual inspection

Item Description Remarks


1 General Visual Inspection WI-NG-6460-002-056

3.2 Electrical tests

Item Description Remarks


WI-NG-6460-002-083
1. General Function Tests
WI-NG-6460-002-085
Verify the CT switching scheme and proper zone selection
if hardwired.
2. For digital protection schemes, verify the relay’s internal
bus-bar replica and zone selection is correct including bus
merge / load transfer conditions.
Check Bus-bar trip logic / conditions from the relay up to
3.
the circuit breakers
Test In / Out operation for each check zone &
4.
discrimination zone
Test trip logic for each zone out:
Discrimination zone out = 1 out of 1 tripping based on
check zone operation.
5.
Check zone out = 1 out of 1 tripping based on
discrimination zone operation.
Both CZ and DZ out = no tripping for that bus zone.
CBF supply and supply supervision if supplied through the
6.
Bus-bar panels.
Check CBF relay tripping through bus-bar panel bus replica
7.
scheme.

Archiving System Website: http://AMAS TP-NG-6250-001-007


NATIONAL GRID

Title: Index Number:


WI-NG-6460-002-089
Bus Bar Protection Panel Scheme Check Page Number:
4 of 4
and Function Test

4.0 REFERENCES

Index Number /
Title
Reference Number
PR-NG-6460-002 Project Commissioning Procedure
WI-NG-6460-002-056 Work Instructions of Protection relays general mechanical checks
& visual inspection
WI-NG-6460-002-083 Work Instructions of General Panel Scheme and Function Check
WI-NG-6460-002-085 Work Instructions of Relay and Control Panels Scheme and
Function Check
CL-NG-6460-002-089 Checklist for Bus Bar Prot Panel Scheme Check & FT

5.0 REVISION HISTORY

Version Date Brief Description of Change / Annual Review


00 2015-07-01 First issue.

This document shall comply in accordance with the existing Company’s Rules and Regulations.
Any modifications therein found not conformance with the document shall be declared invalid.
For clarification and verification on this document, contact the following:

Engr. Tarek Mohammad Ahmad


Technical Support and Coordination Division
Commissioning Services Department
Technical Services Business Unit
Extension No. 77469 Email: [email protected]

Archiving System Website: http://AMAS TP-NG-6250-001-007


NATIONAL GRID

Title: Index Number:


CL-NG-6460-002-089
Check List of Bus Bar Protection Panel Scheme Check and Function Page Number:
Test 1 of 2

1.0 Equipment General Data and Information

Substation
Bay/Panel
Equipment Serial No

2.0 General Mechanical checks and visual inspection

Item Description Done Remarks

1. General Visual Inspection as per WI-NG-6460-002-056

3.0 Electrical tests

Item Description Done Remarks


General Function Tests as per WI-NG-6460-002-083 and
1.
WI-NG-6460-002-085
Verify the CT switching scheme and proper zone selection if
hardwired.
2. For digital protection schemes, verify the relay’s internal
bus-bar replica and zone selection is correct including bus
merge / load transfer conditions.
Check Bus-bar trip logic / conditions from the relay up to the
3.
circuit breakers
Test In / Out operation for each check zone & discrimination
4. zone
Test trip logic for each zone out:
Discrimination zone out = 1 out of 1 tripping based on check
zone operation.
5.
Check zone out = 1 out of 1 tripping based on discrimination
zone operation.
Both CZ and DZ out = no tripping for that bus zone.
CBF supply and supply supervision if supplied through the
6. Bus-bar panels.
Archiving System Website: http://AMAS
NATIONAL GRID

Title: Index Number:


CL-NG-6460-002-089
Check List of Bus Bar Protection Panel Scheme Check and Function Page Number:
Test 2 of 2

Check CBF relay tripping through bus-bar panel bus replica


7. scheme.

CSD Contractor T&C Contractor


Name
Sign.