EXECUTIVE SUMMARY
T
he preparation of this AMP adheres, as per the agreement, to the ten-step procedure of
the Asset Management manual, which is prepared by the GIZ, and latter elaborated
and contextualized by the Ministry of Urban Development and Construction (which is
now called as Ministry of Urban Development, Housing and Construction).
Thus, the team began its task by detail identification and defining of asset Future classes for
those major assets classified by four strategic activity areas that have been identified and
presented in the Terms of Reference (TOR) by the city administration. Such defined asset
classified by four strategic activity areas and Future classes were defined for the study and these
have been presented for discussion with the focal persons of this Asset Management Plan (AMP)
project. Then, after incorporating all the comments come out from the discussion, strategic
activity areas, Future classes have been identified to be covered in this AMP study, and for
which a precise report was submitted to the city administration in the inception report. It is with
this background that this AMP is prepared.
T
he structure of Dukem Asset Management Plan generally organized following the
requested 10-Steps of Asset Management Plan developing process as it has been
described in the ToR. It is divided into twelve sections, each of which deals with a
specific aspect of the Infrastructure Asset Management Plan of Dukem. These sections are
presented in a summarized as follows:
Introduction This is an introductory part of the plan preparation, which includes a brief review
of Dukem’s General Background, the Terms of Reference (ToR) that has been
prepared for this AMP preparation, Definitions of Related Terms, Objectives the
Project, the Approach and Methodology, and this Structure/Organization of the
Asset Management plan.
Section I: First section which deals about Step 1 of the AMP process that is development
and building of GIS project and the data management structure. It comprises six
sub-sections that describe General Background (including assessment of
requirement) of the Map Option, Use of GIS Application and Environment
(including the proposed systems), Spatial Data Management System and SQL
database system, integrating the Future classes into the GIS Environment, and the
SQL database system.
Section II: This is the Second section which deals about Step 2 of the AMP, Building an
institutional framework for Asset Management Plan and a comprehensive,
integrated, structure for managing the City’s Assets.
Section III: This section deals about Step 3 of the AMP preparation process that is a step in
which the inventoried asset data is compiled. This section consists of three sub-
sections that deal about creation of Unique Identification Number (UIN) for
assets, Structure of the Asset Data and the Inventoried Asset Data.
Section IV: Section 4 presents the asset condition assessment (which is step-4 of the AMP
preparation process) and within which the Overall Condition Assessment
Indicators and the Condition Assessment for all asset categories havebeen
presented
Section V: This section addresses step 5 of the AMP preparation process that refers to
preparation of the asset maintenance budget guide and in which critical issues
like Asset Maintenance Activities are stated, Unit Rates for Maintenance are
created and Overall Budgetary Cost Requirements for Maintenance are estimated
and presented.
Section VI: Section 6 deals with Step-6 of the AMP preparation processes (that discusses
Replacement Cost and Existing Value of Asset Base)in which four sub-titles
(such as List of Unit rates for New Assets, Replacement Cost of city
administration Asset Base, the current Value of Assets and Asset Deficits) are
made and presented.
Section VII: This section is devoted to that of Step-7 and in which Measure of Assets against
Strategic Goals and Objectives is addressed. Thus, it includes discussions on the
Significance of such Measuring, Capital Investment, City Revenue, and Planning
for New Works.
Section III: This section, in another instance, is dealt with detailed plan for on-going
maintenance, together with a plan to address the maintenance deficit
Section IX: This section represents Step-9 of the AMP preparation process and deals about A
set of summary tables that show both the approved new works, and the
maintenance projects, set out as a 3-year rolling program.
Section X: This is a final section of AMP, which looks on Step 10 of the process that deals
about the development of implementation strategy. This has two sub sections and
one ofwhich is General Policy Framework for Implementation Strategy (which
reviews Policy Considerations, Roles and Responsibilities, Staffing Situation,
Use of GIS Environment for AMP, Integrating AMP with Infrastructure
Management, Updating/ Revision of AMP and Decentralization to Kebele).
1. INTRODUCTION
1.1. Background Of Dukem City
T
he world population is increasing at an alarming rate. This growth is both a result of
natural growth and migration, which is mostly pronounced in the developing and under
developed countries. The developing nations are currently urbanizing more rapidly
than the industrialized countries. According to UN-Habitat (2005), some African countries are
experiencing an annual urban population growth rates ranging from 4 to 5%. Ethiopia, as one of
the sub-Saharan African countries, falls under this category. Urbanization level in the country is
low. However, the rate of growth is increasing from time to time both nationwide and regionally.
More specifically, Dukem City, one of the category C of level one cities of Oromia National
Regional State, is experiencing a population growth rate of 7.5% per annum on average.
Dukem is one of the reforming cities of Oromia found in the Special Zone of Oromia National
Regional State, 37 kilometers South East of Addis Ababa along the Addis Ababa –Bishoftu
transport route that connects the East shoa zone. The city was established in 1970 E.C. The main
roads in the city are the Addis Ababa-Djibouti railway and national highway. The city lies
between 8 045`25’’N to 8 050`30’’ N latitude and 38 051`55’’E to 38 056`5’’ E longitude. Its
temperature has an overall Temperate climate. The City lies on a flat land. It also lies 1900m
above sea level. The city’s administration falls into four Kebeles with considerable decision-
making power in local affairs. The Kebeles are the lowest administrative units within the
administrative structure of the city (See Map1.) However, since Dukem Town is Industrialized
Zone, the growth of population increased at fast rate. This creates tremendous pressures to
manage urban infrastructure in an environmentally sustainable way, to meet current development
needs and to ensure the quality of these resource is preserved or enhanced for future generations.
However, there are different demands and problems at the global scales. In the Ethiopia, where
rapid growth combined with inadequate roads, drainage, water supply, sanitation, waste
collection and waste management systems. The same is true in dukem city and also the existing
infrastructural poor conditions overall.Dukem shares boundaries with the two Kebeles and two
cities: Gelan city in the north east, Bishoftu city in the south west and Dibdibe rural kebele in the
southern part of the town.
The total area of the city is about 3586 hectares (RUPI, 2009). The city is expanding rapidly as a
large portion of the surrounding farmland has been changed transformed into urban land and
industrial use. The major land uses of Dukem city comprise housing, business and commercial
and public facilities as well as public and industrial open spaces (See figure below).
From the total area of the city, residence comprises 1308hectares, which is 36.5% of the total
area
The commercial 215 hectares which is 6%, services 63hectare which is 1.75%, Administration
11 hectare which is 0.3%, industrial and storage area 658 hectare which occupies 18.34% of total
area. The rest are occupied by recreation, urban agriculture, forest, buffer etc.
The city is developing rapidly; thanks to its increasing location comparative advantages, as well
as the current government’s economic policy of promoting private investment.
Currently, Dukem is implementing leasehold land delivery system which is directly or indirectly
contributing to the city’s rapid spatial and economic growth. This situation has been
characterized by the migration of people both from the surrounding rural areas and the urban
centers in the country resulting in episodic growth of the small city’s population.
1.2. Population
Many ethnic groups of the country including the Oromo, Amhara, Gurage, SNNP and Tigre as
well as Eastern and some European investors have found home in Dukem.
According to the 2009 structural Plan of study, the population of Dukem Town is 144,027(source
Dukem Finance office). However, since Dukem Town is industrialized zone, the growth of
population increased at fast rate. According to Finance and Economic Development Office of the
town, the population is increasing every year by 7.5%.
The city has also administrative structures of state functions headed by the mayor and municipal
functions separately since 2003 based on Proclamation No.65/2003 of Oromia National Regional
State that provided for the establishment of urban local governments in the region.
The economy of the city is mainly based on small-scale, medium and large scale industries and
micro and small enterprises. There are urban agricultural activities both within and around the
boundary of the city service provision and others. In addition, private sector investment is
receiving paramount attention in the last eight or nine years. As a result of the rapid expansion
and growth of the city, the demand of various types of infrastructure is highly increasing from
time to time. The urban area is an important commercial center for agricultural and industrial
products. Catering activities like bars, hotels, restaurants are very important due to the huge
number of transit vehicles and passengers that visit the city daily on their way.
Despite the city has a long history of foundation for more than 4 decades, the level of
development of public infrastructures is poor. The road sector is mainly dominated by earthen
road. Asphalt roads are only found in very few areas/routes/ mainly along the main routes of the
cities. Since recent years, the city is taking initiations to develop main routes with standardized
asphalt roads and cobblestones for inner roads. The expansion areas and slum areas are mainly
characterized by earthen roads. But, since recent years, the city administration has designed its
strategic development plan to provide with standardized public infrastructures (both physical and
social infrastructures). In addition, the city has special feature in providing public infrastructure
to the residents; is that the administration could work with community in a highly participatory
way that indicates the prevalence of good governance. Every year, many infrastructure projects
were constructed/ executed by local peoples through monetary contribution and labor. Some of
the common projects executed include bridges, public toilets, local red ash and earthen road,
local earthen drains, school facilities, disposal/ clearing of solid wastes. The administration of the
city has been attempting to supply the infrastructure like road, water and electricity to the people
of the city by the municipal revenue and vital participation of the community. However, there is
high gap yet to satisfy the demand to basic infrastructure. This is why the city has planned to
prepare this asset management plan.
The purpose of preparing this AMP document in general is to make the city administration and
the public aware of the city asset location, condition, value, age and to make appropriate decision
for its upgrading, rehabilitation or maintenance.
Spatial Scope:
For both asset management plan and land plot and land use inventory, the spatial scope of the
assignment covers the area covered within built up area of the city. Clearly the assessment covers
proper City administration. The assessment does not cover agricultural land uses included in the
structure plan proposal as future expansion area of the city.
Thematic Scope:
The proposed Asset Management Plan focuses on inventory, collecting, organizing, mapping and
building system software on assets management plan in the entire city administration. It also
covers the major infrastructure categories and sub categories as per the urban asset management
plan manual.
Asset management plan is considered as the appropriate way of identifying and recording the
basic urban social and physical infrastructures, mainly roads, drainages, bridges and culverts,
sanitation, water supply, and street light. As long as asset management plan is concerned,
infrastructure inventory and data collecting approach are very tiresome and time-taking task. In
this infrastructure asset management plan, the data of the infrastructure is gathered through field
survey by assigning engineers and surveyors in of the city. The data regarding water supply and
is obtained from water supply office of the city.
Generally, the public asset data collected through survey using the developed formats were
properly categorized for each item and analyzed in the way it is possible to classify the
infrastructures for maintenance and rehabilitation. So, this Asset management plan is found to be
taken as a document that shows the status.
D
ukem is one of the reform cities of Oromia, in the fast development truck. It is
among the grade 1 cities of Oromia Regional State. It is striving hard to improve its
status. Although the city has been expanded highly in the last five years, the
provision of basic infrastructures is not as rapid as the expansion of housing, investment and
social sectors. The town has proposed road networks of 356 km according to structural Plan of
the town in 2008 and the road sector is mainly dominated by Gravel road. In the last, few years’
earthen roads have been changed to gravel roads. Cobblestone roads are being constructed about
71.6 km in the town. Asphalt road is about 9.145km in the city that had been constructed by
Ethiopian Roads Authority (ERA) and CCCC (China Community Construction Company)
expressway wich is under Ethiopian Toll Roads Entreprise.Two Additional concrete Asphalt
Road is under construction by the city administration each 2.5km in length.41.245kmof the Red
ash road had been constructed in the city.
There has been substantial participation of the community and private sectors during the work.
This situation has enabled to change the status of infrastructure of the city.
From the existing condition of infrastructure, density, intensity, and the demand for these
infrastructures, the city need to supply all types of basic utilities (infrastructure) in terms of item
and size and quality. The road items and their distribution are mainly dominated by earthen and
gravel road, which needs closer consideration from all stakeholders of the city.
Yet there is no adequate sanitation and solid waste infrastructure disposal site and service
provision; it requires Careful attention and sound resources allocation.
Drainage problem has persisted for years as big risk to the city dwellers and development. The
distribution of this infrastructure (drainage) is not proportional to all areas.
Clean and reliable drinking water is essential for good health. The source of water supply for
Dukem city is 9 (Nine) boreholes functional now. The town is access to tap water that has a
capacity of producing an average about 4914m3 per day at boreholesThe existing average daily
water production (2914 m3 per day) and that of average water available for consumption is 2586
m3 per day. Based on the combined yield of Boreholes, the minimum average total annual
production capacity of the Dukem scheme is estimated to be 1,793,610 m3 and coverage of the
city is about 88.41%.
An electric light is a device that produces light by the flow of electric current. It is the most
common form of artificial lighting and essential to modern society, providing interior lighting for
buildings and exterior light for evening and nighttime activities. For mentioned services, the city
has solarstreetlight, LED Streeetlight,high length voltage line and Transformers.
A
s stipulated in Urban Infrastructure Asset Management Plan manual, asset
management is expensive to construct and maintain the strategic solutions of a city at
one time. The merit of GIS based database is the provision of ample, seamless
integration, dynamically updateable tabular and spatial data, easy query/analysis facilities and
versatile for generating report for project planning, budgeting and maintenance schedule.
Besides, based on the information generated, one can produce effective capital investment
planning and strategies for long-term operation and maintenance of infrastructure asset. The
Infrastructure Asset inventory asset management plan of Dukem City has been prepared
following the basic steps that is:
This revised Asset Management Plan manual which was released in June, 2016; uses a
Geographical Information System as the platform for managing the city`s assets after
conducting detailed inventory. There is a very good reason for making this choice, which is
summed up by the following explanation, namely that: “The use of spatial relational terms
requires the selection of a reference frame and the construction of a spatial template”; What this
statement means is that, to build relationships between spatial data, two shared components are
required.
The first component (the reference frame) is a common (shared) spatial referencing system, so
that when a junction in a road (for example) is given a coordinate, that coordinate is common to,
and understood by all users of the system. In Geographic Information System, there are two
major coordinate systems: that is; Geographic Coordinate System and Projected Coordinate
System. To describe it briefly the former (Geographic Coordinate System) is based on three-
dimension coordinate system (x, y and z) or Latitude, Longitude and Elevation that is modelled
in mathematical geometry which define the shape of the Earth in a circle and more specifically
modelling the Earth is a sphere. However, the limitation with the Geographic Coordinate System
is not suitable for area and distance calculation since it is based in degree, therefore, Geodesist`s
have defined a datum based on a perfect ellipsoid for countries to have different spatial reference
system by projecting the three-dimensional coordinate in to two dimension as done by
Transverse Mercator who is an American Mathematician and Geographer who developed the
Universal Transverse Mercator(UTM) projection by putting the Earth in a cylinder. Accordingly,
Ethiopia uses Adindan datum for a spatial reference for horizontal measurement which fall in
three Universal Transverse Mercator (UTM) projection consists of (36, 37 and 38 UTM zones)
with Clarke 1880 modified spheroid. The coordinate system used for the preparation of Dukem
AMP is Universal Mercator Projection Zone 37 with Clarke 1880 modified spheroid and the
horizontal reference point(datum) is Adindan, minute and second or degree, grad and radian.
The term ‘data’ refers to raw facts. So, collecting facts about the road network, such as the start
and end points, length, width, material of surface finish and so on, is described as data collection.
In Asset Management, data is generally synonymous with numbers or values that describe
characteristics of the different elements that make up the various asset categories (described in
Step 2).
Information, on the other hand, is generally used to describe processed facts, i.e.; the answer
that comes out of queries made about the data, and which results in a useful or meaningful
output. Thus, a table that sums up how many kilometres of road the city has for each surface
finish is information. This example provides another way of looking at the difference between
the two terms, where it can be seen that the data provides simple facts, while the information is
actually transmitting a message about those facts.
In short spatial data in Infrastructure Asset Inventory and Management Plan is the road centre
line, drainage line, pedestrian walkway and road median which are represented in polyline in
feature geometry in GIS while the attribute data is the route id, node id, width of the road,
surface material, deterioration type, condition assessment and year of construction that will be
collected from the field survey in a city.
The backdrop image is an important component of the Infrastructure Asset Inventory and
Management Plan in which the vector layers, spatial templates, or feature classes are digitized
from this georeferenced Orthophoto or Satellite Imagery. Contemporarily high-resolution
Satellite Imagery Acquisition companies in the World are Geo EYE, Digital Globe, SKYSAT
and SPOT PLEIADES. The first three belong to the United States of America while the last one
belong to France.
The other important option for a backdrop image for the AMP is high resolution Ortho Photo in
which high resolution Photo Camera will be mounted on an Air Plane and takes Aerial View
Shots of a place. These Snap shots of aerial picture of a place will be processed in
photogrammetry software with a super computer or workstation. Currently, the Information
Network Security Agency (INSA) is mandated to perform this task in Ethiopia. Accordingly, the
Ministry of Urban Development and Housing (MUDH) in collaboration with INSA and the
Ethiopian Mapping Agency have captured Ortho Photo of 23 major cities in Ethiopia, which was
flown in June 2012 G.C. by INSA.
ArcGIS geodatabase is a collection of geographic datasets of various types held in a common file
system folder, or a multiuser relational DBMS (such as Oracle, Microsoft SQL Server,
PostgreSQL, Informix, or IBM DB2). Geodatabases come in many sizes, have varying numbers
of users and can scale from small; single-user databases built on files up to larger workgroup,
department, and enterprise geodatabases accessed by many users (ESRI, 2015).There are three
types of geodatabase in ArcGIS. Namely
i. Personal Geo-database
The Dukem AMP geodatabase is designed in File Geo-database, which has a Terabyte memory,
which allows various Raster and Vector data to be stored within it.
The Dukem AMP File Geo-database is structured in feature dataset, Raster Dataset, feature
class and geodatabase table. This helps the user to have a quick view of the data in Arc Catalog
of ArcGIS and allow automatic calculation of length and area while you work in ArcGIS Geo-
database. Moreover, the geodatabase is structured using attribute domain and subtype. The logic
behind organizing data in attribute domain is to set the permissible value of a field type or to
constrain the value allowed for any particular attribute for a table, feature class or sub-type. This
is quite useful to constrain the allowable value of a field type in a situation where the same
feature class data entry is handled by different person. For instance, road material attribute is
constrained to the following values:
Culvert (9)
Besides, a person can easily manage data entry by choosing from the look up table instead of
consuming time for entering value just by writing; which obviously is different from one person
to another. For instance, if the data is not organized according to the aforementioned approach of
geo-database in uncontrolled manner, one person may write mistakenly “concrete road” as
‘concrt road’, the others ‘concret’ and so on, which makes difficult the integrity of data for
generating refined report on asset management plan. In conclusion, the organization of data as
mentioned above makes data entry to be simple as one can easily choose the values from the
already set look up table; even without having user interface system.
The other advantage of attribute domain is sharing of the same attribute by different feature
class. For instance, the general condition assessment of all asset categories is modeled (coded)
as:1(Very Good), 2(Good), 3(Moderate),4(Poor) and 5(Severe) that is shared from the geo-
database by all feature class of Road, Walkways, Drainage, Land Sliding Retaining and Flood
Controlling Wall to describe the condition of the given infrastructure asset.
Therefore, the attribute domain enforces data integrity by maintaining common values to share
same information that can be performed by different persons and different attributes of different
feature class to share the same attribute to realize consistency, validity and integrity of data.
Similarly, for water distribution line, the main subset of the distribution line is categorized in to
DCI, GS, HDPE and PVC by material type. The same is true for point data like Street light
where the left and right side point data is captured including attributes of street light type
(Incandescent, Florescent, High Pressure Magnesium Light, High Pressure Sodium Light and
Light Emitting Diode) using hand held GPS.
A similar situation would apply to the linear elements of the water supply category. So, for
example, using the sub-category of water, steel distribution mains, and a similar set of variations
would apply, defining different elements (segments) of the sub-category by length, class and
diameter. For further elaboration of the approach for tabular database template pursuant to
operational manual, two examples are provided. The first one let us take a linear element of
Road, its category is Road and Movement Network, its sub-category is Cobble or Small Block
Paved Road, element is described by defining two node points (Node from, Node to), one
defining the start while the other defining the end respectively. The route is uniquely identified
by Route id. In the same manner, let us take a point element of pump, its category is Water
Supply Network, its sub-category is pump, its specific geographic location is identified by x, y
coordinates and described according to pipe material, dimension, discharge amount, year
installed and so on. Unique number identifies the element. The spatial and non-spatial databases
are linked with unique id, which makes the integration versatile to accommodate data within the
same geo-database system. More indicators are developed for infrastructure asset management
plan based on the operational manual and tailoring variables to the context of Dukem city. The
following table depicted below shows sample road network and drainage tabular database
templates used for Dukem City Asset Inventory and management plan.
Table 1: Example of Tabular Database for Road Network Category and Sub-Category
Field Name Data Type Description of the Field Name
Route ID Text Route Identification Number
Node From Text Node From
Node To Text Node To
Length From Double Length From
Length To Double Length To
RoadMat Text Road Material
Length Double Actual Length in Metre
Deterioration Type Text Type of Deterioration
Deterioration Area Double Deterioration Area in m2
Condition Text Condition Assessment
Carriageway Width Double Carriage Width
CarraiageWayType Text Carriage Way Type
Kerbing Material Left Text Kerbing Material Left
Kerbing Left Width Double Kerbing Left Width in Centimetre
Kerbing Material Right Text Kerbing Material Right
Kerbing Right Width Double Kerbing Left Right in Centimetre
Construction Year Long Integer Date/Year Construction
Maintenance Year Long Integer Maintenance Year
Ownership Text Ownership of Road
The overall database structure of this AMP is established in the following form (adopted from
the manual). Thus, the spatial dataset (as a whole) holds the central place connected with all the
required Tabular Data Sets (TDS) of assets.
TDS1: is dataset that provides data on the physical condition of all assets;
TDS 2: is data set that provides data on the assets cost and value;
TDS 4: is data set that provides data on the condition and maintenance requirements;
Figure 4: Relational diagram of the attribute databases used for the AMP
The other important technology selection for this project is the selection of the appropriate
software. The World Bank Infrastructure Asset Inventory and Management Plan as an ideal
software for the preparation of Dukem AMP have selected Arc Info ArcGIS 10.4.1. This
software is the product of Environmental Systems Research Institute (ESRI, 2015 Redlands
California USA) which are the most powerful GIS software for entertaining large database,
which are compatible in any database soft wares like SQL Server or Oracle, and programming
languages like C#, VB.Net, Python, and Java.
Desktop ArcGIS 10.4.1 has a number of extensions for instance Linear Referencing, Spatial
Analyst, Network Analyst, 3D Analyst, etc…from the available extensions, Linear Referencing,
Network Analyst and Spatial Analysis will be chosen to perform the Asset Management Plan
study of the city. The details of these extensions are discussed in the following sections.
D
ukem has a council elected by its residents that assumes the Legislative power and
the city Mayor in whom executive leadership is vested to exercise executive
authority. The city manager is in charge of municipal services and is appointed by
the mayor. The city administration of Dukem has a ULGDP Coordination unit which is under the
City`s Manager Office and have five major experts namely: Infrastructure Target Expert,
Procurement Expert, AMP Unit, Revenue Enhancement Plan Expert and Environmental and
Social Safeguard Expert under Core Process of Infrastructure Development office.
The responsible body for asset management and planning is that of the Housing and
Infrastructure process. It is situated as a line process office under Urban Development, Housing
and Construction Service Office. Thus, it is with this process that the AMP staffs are positioned.
While the responsibility of Urban Development, Housing and Construction Service Office rely
on coordinating the planning, management and development of the asset infrastructure. The
Housing and Infrastructure Process is responsible for the asset management plan as well as an
infrastructure management system in the city administration.
The responsibilities of the AMP focal person, together with one for each additional member of
the AMP unit have the following responsibilities:
The annual preparation of the AMP report for the City.The following list is
specific activities that contribute to the AMP.
Establishing and managing the AMP GIS project.
Establishing and managing all the attribute databases associated with the GIS
project,
Carrying out and maintaining the inventory of the City’s assets, updating this
annually.
Carrying out a condition analysis of all assets annually
Maintaining a record of unit rates for all assets included in the asset management
plan.
Building and maintaining a list of normal maintenance activities for all feature
classes of assets included in the City’s AMP.
Building a list of assets that have a maintenance deficit, and assembling this list
into a total maintenance deficit that includes all of the City’s assets.
Building a list of assets that require rehabilitation or decommissioning.
Working with the CIP team to develop a list of new works projects and managing
the new works projects database.
Developing and prioritizing a list of maintenance activities for implementation.
Managing the tracking process for new works projects from approval through
construction, and their transfer to the existing database
Managing the tracking process for maintenance activities from approval through
construction, and their transfer to a change in the condition indicator
Managing the recording of progress of projects and maintenance activities against
target and providing a report on performance.
The term ‘category’, as it applies to asset management that can be defined as a specific group of
assets that share a common purpose, and as such are managed together as a group. A water
supply network is more than just the water pipes in the ground. There are valves, reservoirs,
pumps, standpipes and many other components. It is all of those components together that make
up the category of assets termed ‘The Water Supply Network’. Similarly, a school can be more
than just a building; it can include a boundary wall or fence; a paved area; a toilet block; a
playing field, etc. So, the category ‘school’ has to include all of these components.
In the new version of the AMP manual; it is clearly stated that the AMP that will be prepared in
any urban centre should incorporate all of the city’s physical assets. The list of Categories and
Sub Categories that belongs to the city Asset should been defined first before full deployment of
field survey launched. Accordingly, the list of infrastructure asset Categories has been defined in
to four strategic activity areas except municipal administration buildings. The allocation of asset
categories to the four strategic activity areas is shown in table 3 below.
Table 2: Allocation of Categories of Physical Assets to the Four Strategic Activity Areas
The Movement The Water Supply Environmental Social and
Network Network Services Economic Services
Road Network Water Supply Urban drainage Abattoirs
Cycle Paths Water resources Liquid waste Fire service
Walkways Reservoir Sanitation Municipal markets
Street Lighting Valves Solid waste MSE facilities
Pedestrian Chambers Urban Greenery Schools
Walkways
Borehole Parks and play areas Health clinics
Hydrant Rivers Youth centers
Pump Wetlands Other
Natural areas
The other important step that should be done after categorizing the infrastructure asset into four
strategic areas is defining the responsible organ (body) who manages the asset categories in the
city administration. Accordingly, the infrastructure asset categories have been categorized in to
four strategic activity areas as depicted in the table below.
Table 3: Category of Infrastructure Asset and Responsible Body in the City`s Organogram
No Categories of Responsible Body Responsible Remarks
Assets Person/Group
1 Roads Infrastructure Team Members Infrastructure Development Main
Development Main Of the process Business Process is responsible
Business Process to open new roads based on the
City’s Structure Plan; While
Design, Construction, &
Contract Administration
&Infrastructure Process is
responsible for construction,
Maintenance and Management
of the Road
2 Urban Infrastructure Team Members Responsible for construction,
Drainage Systems. Development Main of the process maintenance and management
Business Process of
the City`s
Administration
3 Street Light Infrastructure Team Members Responsible for the Installation
Development Main of the process of Streel Light
Business Process of
the City`s
4 Water Supply Administration
Bishoftu Water Team Members Both municipality and Dukem
Systems Supply Service Of the Water Supply Service Office are
Office Enterprise responsible for provision /supply
of water for the people of
Bishoftu City Administration
5 Solid and Liquid Beautification and Team Members Beautification and Green
Waste Green Development of the process Development Office
Management Office
System, Urban
6 Greenery and
Abattoir, Fire City Service and Team Members City Service and Supply Office
Fighting, and Supply Office of the process
Municipal
7 Buildings
Education Education Bureau Team Members Responsible for maintenance &
Buildings Supervision of each facilities
and buildings in their respective
sectors
8 Health Service Health Bureau of the process Responsible for maintenance &
Buildings Supervision of each facilities
and buildings in their respective
9 MSEs and Market Each Sectorial Each Sectorial sectors
Responsible for maintenance &
Facilities Department of the Department of Supervision of each facilities
City`s the City`s and buildings in their respective
Administration Administration sectors
10 Machineries, Contract Contract Responsible for maintenance, &
Vehicles administration and administration supervision
Infrastructure and
Department Infrastructure
Department
Once the list of asset categories that are included in the city’s AMP has been defined, the next
step is to link these to the GIS system. Each feature class should be tested against the GIS
Protocol to ensure that it comprises only one of the three defined features. Thus on the wider
road a culvert might be defined as a line feature, since it is of sufficient length to give it a start
point and an end point, while on a narrow access road a culvert might be defined simply as a
point feature, since its short length does not warrant defining both a start and an end point. In this
situation, there are two options available. In this Dukem AMP; culverts have been defined as a
line or polygon feature.
Having completed the list of feature classes and tested them against the GIS Protocol, the AMP
focal person can create a summary table of feature classes, listed according to their spatial
feature, and incorporate this into the City’s AMP. An example of such a summary is shown in
the table below
Table 4: The List of Feature Classes associated with their respective GIS feature type
Point Feature Line Feature Polygon Feature
Road furniture Asphalt road Paved area
Manhole Cobblestone road Round about
Pump Gravel/ red ash road Reservoir
Valve Compacted earth road Retention and detention ponds
Access box Cycle path Landfill site
Water meter Walkway Administrative boundary
Hydrant Retaining wall External site boundary
Public and communal toilet Drainage channel Internal boundary
Bucket collection point Pipe drainage Building and facility
Solid waste container Water pipeline network Bridge
Lighting pole and mast River channel center line Culvert
Construction plant Tunnel
Machinery Fence and boundary wall
Vehicle
Table 5: The relationship between the operational sub-classes and their associated asset feature
class for the category road network
Operational Sub-Category Associated Feature Class
Asphalt Road Asphalt Road
Cobblestone Road Cobblestone Road
Gravel Road Gravel Road
Red Ash Road Red Ash Road
Compacted Earth Road Compacted Earth Road
Asphalt Walkway Walkway
Walkways – Other Surfaces Walkway
Roundabout at Grade Roundabout
Roundabout Elevated Roundabout
Bridge Bridge
Retaining Wall Retaining wall
Culvert Culvert
Overpass (Flyover) Overpass flyover
Pedestrian Footbridge Bridge
Traffic Signals Road furniture
All road signs Road furniture
Offices Building and facility
Workshops Building and facility
Fence Fence and boundary wall
Land External boundary
Road reserve External boundary
All construction plant Construction plant and machinery
All types of machinery Construction plant and machinery
All trucks Vehicles
All other vehicles Vehicles
4.7. Details of the Unique Identifier System used for the City’s AMP
An identifier (ID) is an alphanumeric string (a short list of characters that can include both letters
and numbers) that is attached to a single element of a feature class of asset and refers only to that
element. Because of this it is unique within a data set; hence it is termed a unique identifier.
The identifier does not contain all of the attribute data for an element; that is provided in the
database. The objective of the identifier is to be able to locate the element in both the spatial and
the tabular databases. It is also important to be able to distinguish the category and feature class
to which the element belongs. This is particularly important for linear elements, where different
services are provided in the same vicinity (e.g. a road, a water main and an electrical cable for
example).
Both the spatial and the tabular databases will have a unique identifier automatically each time a
new record is created. This is termed an auto-ID. While this auto-ID could be used internally by
the GIS software as the main identifier for an element, using it more widely is not recommended,
since this would have a number of serious disadvantages. Firstly, the auto-ID is simply a number,
making it difficult to link, mentally, with a specific element of infrastructure. Secondly each new
database will generate a new auto-ID table, so there is an immediate duplication, i.e.; the same
element will have different auto-IDs in different databases. To overcome these constraints, it is
necessary to create a unique identifier system that is tailored specifically to meet the needs of the
asset management plan.
As a result, the manual has produced a different identifier system, designed specifically for the
Asset Management Plan. This unique identifier, which is described below, has been tested in a
number of cities and has shown itself to be robust and versatile. At the same time some minor
changes have been made to the individual components of the identifier in response to user
feedback. The unique identifier is made up of four parts and, while it has been created
specifically for asset management, it has also been designed to provide an interface with other
users of the asset infrastructure and services that are likely to use the information generated by
the asset database system. The unique identifier is made up of four parts.
Identifier Component 1: This is a 4 character, alphabetic, code that is linked to the asset
category (with the first two letters) and the feature class (with the second two letters). This
provides a quick internal referencing system for the AMP itself. A list of codes for all categories
and feature classes included in the manual is listed in table 8 below.
Identifier Component 2: This is a 3-4 character, alphanumeric, code indicating the major
characteristic of the asset. This links the asset to its primary user, and it is for the primary user to
define this specific component of the identifier. This is something that can be done at any time.
In the interim period this component has been given the code “xxxx”.
Where:
4.9. The List of Codes Used for the First Block of the Identifiers
The list of codes is shown in the table in the next page, which represent the details of feature
classes with their associated codes. For instance, “RN” represent Road Network while “AS”
represent Asphalt Road. Likewise, the rest of the Asset Categories given their own specific codes
management, updating, and analysis; and besides for water assets; the company used Network
Analyst extension of ArcGIS 10.4.1.
Linear Referencing: is the method of storing geographic locations by using relative positions
along a measured linear feature. Distance measures are used to locate events along the line. In
most data models, linear features split at intersections where they connect with two or more line
features and frequently also split where key attribute values change, such as a change in the road
name. However, users often want to record many additional attributes about the roads. This
could require that roads may split into many tiny segments at each location where attribute
values change. As an alternative, these situations can be handled as linear referencing events
along the roads as illustrated in the concept figure below:
Figure 6: Storing Multiple Sets of Attributes for a Feature performed using Linear
Referencing
Why We Use Linear Referencing?
Linear referencing is used for many reasons. The following are the two primary reasons:
Many locations are recorded as events along linear features—for example,
locations of traffic accidents are recorded using a convention such as "27 meters
east of reference mile marker 35 along State Highway 287." Many sensors record
conditions along linear features using measures of distance or time along the lines
—along pipelines, along roads, along streams, and so forth.
Linear referencing is also used to associate multiple sets of attributes to portions
of linear features without requiring that underlying lines be segmented (split) each
time that attribute values change. For example, most road centerline feature
classes are segmented where three or more road segments intersect and where the
road names change
Dynamic segmentation is the process of computing the map locations of events stored and
managed in an event table using a linear referencing measurement system and displaying them
on a map. The term dynamic segmentation is derived from the concept that line features need not
be split (in other words, "segmented") each time an attribute value changes; you can
"dynamically" locate the segment.
Using dynamic segmentation, multiple sets of attributes can be associated with any portion of an
existing linear feature independently of where it begins or ends. These attributes can be
displayed, queried, edited, and analyzed without affecting the underlying linear feature's
geometry.
A route feature class is a line feature class that has a defined measurement system. These
measurement values can be used to locate events, assets, and conditions along its set of linear
features. In ArcGIS, the term route refers to any linear feature, such as a city street, highway,
river, or pipe that has a unique identifier and a common measurement system along each linear
feature. There are two primary data types that are used to implement linear referencing in
ArcGIS:
Using dynamic segmentation, events from event tables are located on line features in a route
feature class.
T
he Infrastructure Inventory of Dukem has been done using conducting detailed
inventory of the Assets. On the other hand, the Water Supply Network data had been
collected by printing the existing map, and updating the gap using GPS and key
informant person from water supply bureau/office. The attribute data consists of information
associated with the asset as well as key information useful for operation and maintenance. The
summary report of the infrastructure assets presented in the coming sections according to their
strategic areas in which the details are available in the annex table and further details can be
referred from the Dukem AMP Geo-database.
According to the infrastructure asset inventory result; there is a total length of about 328.64
kilometers(This number includes the road network owned by the Ethiopian Road Authority and
Ethiopian toll roads enterprise) of road in Dukem urban boundary belongs to the city
administration,9.415kmbelongs to the Ethiopian Road Authority.12.63km belongs to Ethiopian
Toll Road Enterprise. The inventory result further revealed that Earth Surface and Asphalt Road
cover a total length of 257.04Kilometer (78.21%) followed by Cobble Road 71.6 Kilometer
(21.79%) and The total area according the structure plan boundary of the city had an area of
35.86kilometer square; of which the total area reserved for road network from the structural
plan was 2.30kilometer square with a total percentage of 6.42.see table below.
the infrastructure asset inventory of dukem city owned assets are further revealed that graveland
earthen Road has the maximum coverage which accounted 193.75kilometers (58.95%) followed
by Cobblestone Road which has a total length of 71.6 (21.79%) kilometers and while Asphalt
(including ERA owned) and Red Ash has a total length of 41.245kilometer (6.71%) and
41.245Kilometers (12.55%) respectively.
Road Structures that include Bridge and Culvert are inventoried in Dukem City Infrastructure
Asset Inventory and Management Plan Project. The road crossing (Slab) structures which are
found at the junction of roads and which has a short span with no defined structural components
are also inventoried. A total of 257 road structures including ERA owned are found within the
city boundary. The city administration has a total of 255 road structures of which, 11 are culverts
with box and pipe and the remaining 244 are concrete slab crossing. The locations of this road
structures with respects to road hierarchy and the total inventory owned by the city
administration is summarized in the table below.
Sodium lamp
Florescent lamp
Transmission of electric power line.
Transformer of electric power.
The field survey conducted on street light revealed that there are about96 solarstreetlights in
Dukem city boundary.
Solar Street 96 - - 96
light
Total 96 96
A total of 35traffic sign post and 17 Zebra Crossing are inventoried in Dukem City for various
traffic signals like allowed for Carts, Bus Stop, Campus Area, Cross Road, End, Heavy Load,
School Area, Slow Speed, Turn Right and others.
In the category of movement network about 1.3km length of road median are inventoried with in
the city boundary. In the inventory of road median, the number and type of the trees found within
the median are also inventoried.
The information for water supply is obtained from Dukem City Water Supply and sewerage
Authority. The authority is semi-autonomous managed by mayor of the City administration. The
office has its own record and data base, which categorize components of the water supply
according to its specific nature.
Accordingly; the inventory result revealed that, the water Supply Network Asset inventory of
Dukem City revealed that the city has 86.3 kilo meter length of Distriburionineand 8 Kilo meter
Transmission line. Besides, the Water Supply office of Dukem city has a point location asset
which includes public tap (Bono) with a total count of 12, Reservoir (4), Borehole (10), Borehole
Pumps (9), Valves (4).
13. Reservoir No 4
14. Office No 1
15. Vehicles(Toyota Pickup) No 1
16. Machinery No 0
17. Tri cycle(three wheel vehicle) No 2
The Water Supply Network Asset of Dukem City has been with detailed description of each
feature classes like pipe material, pipe diameter, reservoir material and other detailed attributes
as presented in table to follow.
J-55
D: 80.0 mm
L: 575.79 m
P-81
J-56
J-57 J-54
To Finfinne P-84
D: 1 50.0 mmm
L: 1,315. 6 2
L: 337.93 mm
m
P-78
D: 200.0
J-53
D: 100.0 mm
L: 854.66 m
P-85
J-69
New Road To Bushoftu
P-9 8
D: 80.0 J-60 P- 83 mm
L: 813.65mm
m D: 1 00.0 3 m
L: 1,843.8
J-63 P-75
L: 355.97mm
J-51
m
P-93
D: 100.0
P-75
D: 2 50.0 mm
J-59 L: 59 7. 11 m
J-67
J-58
L: 1,550.2
D: 50.0 0 m
J-61
P-76
J-65 0
P-9 mm
mm
m
D: 50.0.48
L: 449
J-46
L: 2,045.60 m
D: 80.0 mm
J-38
L: 666.01mm
m
P-66
P-94
D: 50.0
J-66
J-68
J-52
J-47
P- 71 mm
D: 8 0.0 m
L: 882.55
J-39
J-49
Zone 1 Reservoir
J-48 J-37
J-45
J-50 J-36
J-26
J-44
P-61
D: 1 00 .0 mm J-40 P-64
D: 80.0
L: 887. 47 m L: 462.6 mm
J-25
0m
J-41
P-63
D: 150.0
L: 482.2 mm
P-55
0 mm
J-27
8m
J-35 D: 2 00. 49 m
L: 5 2.
J-34
J-24
J-42
J-23
J-43
J-28
J-33 J-29
J-12
J-22
J-30 J-21
J-11
D: 100.0 mm
L: 987.53 m
P-49
J-13
L: 1,833.99 m
D: 100.0 mm
L: 2,150.59
P-48
D: 50.0
J-14
P-47
J-20
mm
J-1
m
J-31 J-10
J-9
J-15
J-2
J-19
J-8 J-3
J-32
J-16
J-4
J-18
J-7
J-17 J-5
J-6
Description of drains
Masonry drain
Cobblestone drain
Earth drains
Concrete/steel pipe drain
Drains are only provided adjacent to roads. Those adjacent to asphalt road & cobble stone roads
are mainly open masonry channels. They are found either on one or on both sides of the road,
depending on the width of roads and the discharge of the area. Most of Drains adjacent to gravel,
red ash and earthen roads are earthen. They are to be found normally on two sides and some
other on one side of the road only. Dukem is currently converting double roads to cobble stone
road and these will have new drains in future.
The asset inventory result revealed that there is 86.96 kilometers of drainage line along roads.
The survey result further revealed that about 45.99 Kilometer of the total drainage line is Open
Masonry Drain and the rest was covered with Earth drain and the remaining drainage types are
depicted in table below.
There are three major flood structures in Dukem City which are found at the Boundary of the
city that are made of Earth terracing(Natural Gorge).
5.3.3. Sanitation
Assets Information was provided that there were 10 public toilets, the waste from septic tanks is
disposed at the solid and liquid waste disposal site which is located at about 3.5 km away from
the City administration. According to head of the waste sector of the municipality, there was a
plan to construct the liquid treatment plant when the land fill was designed but not implemented
that would be the basic factor for the existing poor liquid dumping system. Lack of machineries
such as Dozer and Excavator to serve the land fill site is the other factor for the existing poorly
managed waste disposal.
The waste management system of the City is poor. The municipality doesn’t have area-based
storage containers, including the transporting of the containers directly to the landfill site. There
is only 1 tractor to collect and transport solid waste which generated daily and currentlt it is
unfunctional. The waste disposal system of the City is open dump system which creates serious
Environmental problems to the surrounding community.
TOTAL 63,582.192
Even so the importance of urban greening has given considerable recognitions in many towns
and cities, including Dukem, the inventory show that the road side median greenery and road
islands that is growing at some good rate and inventoried and assessed along with the
infrastructure assets in the former section, there are few community green areas in different parts
of the city, that are insignificant number for the city. The Municipality will strive to do more in
this regard as the inventory indicates that the development of greenery assets in Dukem is not yet
as suitable as demanded.
5.3.7. Monuments
Two Statues were inventoried with a detail of their construction materials. One found Infront of
Mechot Hotel Inside michot greenery, the Second is Monument found in front of Gebriel church
on the road to Addis Ababa.
The administration offices and related service buildings included in the inventory comprises of
the city administration office, sectoral offices and Kebele administration offices with their inter-
related services within the above-mentioned compounds such as stores, cafeterias and toilets.
A total of 8 administrative institutes were inventoried that are currently providing services for
Dukem City with their 41 buildings that are located at a total area of 31,989.14square meter of
built up space.
4 Administration Office Dukem City Water & Sanitation Office DU_AD_04 5 4,971.78
Total 41 31,989.14
The details of each educational institute is listed under the table below and specific data about
any building within the boundary of the city can be found on the Excel spread sheet and GIS
geodatabase supplied in attachment with the report.
Two health centers and 1 Health post are inventoried and registered that are currently in the
service having 20 buildings and covering 32,718.26 m2 area.
1 Health Institute Dukem main Health Center Health Center DU_H_01 15 15,772.92
2 Health Institute Dukem Tedecha Health Center Health Center DU_H_02 4 14,660.50
3 Health Institute Dukem Tedecha Health post Health Post DU_H_03 1 2,284.84
TOTAL 20 32,718.26
In the category of Youth center, Dukem City Administration has 1 Youth center in Dukem
tedecha and Dukem Koticha Youth Center Is Under Construction. Collectively the youth centers
have 1 G+1 buildingand 1,604.39 m2 area coverage. The corresponding fence data is also
registered and mapped in the GIS Database.
Name ID Area
Dukem Old Cattle Market DU_MK_01 3,960.84
Dukem New Cattle Market DU_MK_02 8,400.00
Kebele 01 Gulit Market DU_MK_03 274.30
Dukem New Market DU_MK_03 25,319.64
Dukem Old Market DU_MK_04 1,518.18
TOTAL 39,472.96
The details of MSE premises organized in Kebele and service type is listed in the table below, as
can be seen three main concentrations of MSE facilities located in Market area.On the other hand
from MSE facilities scattered in different locations of the city, Kebele 01 has the largest number
of buildings with 260buildings and a total area of 19,074.22 m2 of plinth area.
S/N
Asset_Catagory Name Id No Area
The inventory result shows that there are 563housing buildings covering 33,780.00 square meters
of built up space, this number is composed of housing buildings and their ancillary services i.e.
service quarters and toilet facilities.
Since the construction nature of the blocks, the number 563does not implies the corresponding
household in possession, rather it is the building blocks that are inventoried in this category.
Number of households’ especially in municipal housing group can share one block and in
contrast, one household can have number of buildings in its premise.
One abattoir facility is inventoried; itdoes not belongs to the city administration.is under private
owners.
Machineries and vehicles composed of different types and operations (construction machines, freight services, waste transporting,
abattoir related services, heavy public transport bus and light office vehicles) are inventoried and their capacity and operational status
are recorded. A total of 69vehicles were inventoried and the details of it are clearly depicted in table below.
Status
Name of Machinery Specific brand / Year of
(Functional/nonfunctional/under Purpose Plate Number
(Engineering Equipment) Mark Purchased
maintenance
EXCAVATOR KOMATSU - Functional Construction SE-370C
LOADER XGMI - Under maintenance Construction SG-853111
GRADER Functional Construction PP-16G-VI
ROLLER - - Functional Construction -
DUMPTRUCK SINO Functional Construction 4-02981
DUMP TRUCK SINO Functional Construction 4-03652
DUMP TRUCK POWER PLUS Functional Construction 4-20512
DUMP TRUCK POWER PLUS Functional Construction 4-20513
PRADO TOYOTA 2009 Functional mayor service
AUTUMOBILE NISSAN 2009 Functional Mun.service
AUTOMOBILE NISSAN 2009 Functional ODP offfice ser.
AUTOMOBILE GELLY Functional Office service 4-06078
AUTOMOBILE GELLY Functional Office service 4-06079
AUTOMOBILE GELLY Non Functional Office service 4-06076
AUTOMOBILE GELLY Functional Office service 4-06077
AUTOMOBILE GELLY Functional Office service 4-04125
PICKUP TOTOTA Functional Office service 4-02702
PICKUP TOYOTA 2010 Functional Office service
PICKUP NISSAN Functional Office service 4-04287
Status
Name of Machinery Specific brand / Year of
(Functional/nonfunctional/under Purpose Plate Number
(Engineering Equipment) Mark Purchased
maintenance
PICKUP HIGER Functional Office service 4-04122
PICKUP MAHINDRA Functional Office service
PICKUP TOYOTA Functional Office service 4-01395
PICKUP MAHINDRA Functional Office service
PICKUP JINBEI Functional Office service
LAND CRUISER TOYOTA Functional Office service 4-04121
AMBULANCE TOYOTA Functional Ambulance 4-04123
BISHOFTU BUS Functional Office service
TRUCKTOR Non Functional Solid waste
CITY BUS BISHOFTU 2011 Functional Public service
MOTORBICYCLE TIGER Functional
MOTORBICYCLE TIGER Functional
MOTORBICYCLE TIGER Functional
MOTORBICYCLE TIGER Functional
MOTORBICYCLE TIGER Functional
MOTORBICYCLE TIGER Functional
MOTORBICYCLE TIGER Functional
MOTORBICYCLE TIGER 2011 Functional
MOTORBICYCLE TIGER 2011 Functional
MOTORBICYCLE TIGERS 2011 Functional
MOTORBICYCLE TIGER 2011 Functional
MOTORBICYCLE PULSAR 2011 Functional
MOTORBICYCLE PULSAR 2011 Functional
MOTORBICYCLE APACHE 2011 Functional
MOTORBICYCLE TIGERS 2011 Functional
MOTORBICYCLE APACHE 2011 Functional
MOTORBICYCLE PULSAR 2011 Functional
BAJAJ TAGROW 2009 Functional
BAJAJ TAGROW 2009 Functional
Status
Name of Machinery Specific brand / Year of
(Functional/nonfunctional/under Purpose Plate Number
(Engineering Equipment) Mark Purchased
maintenance
BAJAJ TAGROW 2010 Functional
MOTORBICYCLE TIGERS 2011 Functional
MOTORBICYCLE TIGERS 2011 Functional
MOTORBICYCLE PULSAR 2012 Functional
MOTORBICYCLE PULSAR 2012 Functional
MOTORBICYCLE PULSAR 2012 Functional
MOTORBICYCLE PULSAR 2012 Functional
MOTORBICYCLE PULSAR 2012 Functional
MOTORBICYCLE PULSAR 2012 Functional
MOTORBICYCLE PULSAR 2012 Functional
MOTORBICYCLE PULSAR 2012 Functional
MOTORBICYCLE PULSAR 2012 Functional
MOTORBICYCLE PULSAR 2012 Functional
PICKUP BISHOFTU 2012 Functional
PICKUP BISHOFTU 2012 Functional
PICKUP BISHOFTU 2012 Functional
PICKUP BISHOFTU 2012 Functional
PICKUP BISHOFTU 2012 Functional
AMBULANCE TOYOTA 2012 Functional
TRACTOR 2012 Functional
TRACTOR 2012 Functional
A
ssessing asset condition may require benchmarking, i.e.; the development of
quality/standards profiles against which the assets can be measured. With above
ground assets, this will generally take the form of visual inspection, although in some
cases it may also involve mechanical testing. A road for example needs to have some definition
of the types of deterioration that occurs and a quantitative description of what constitutes the
different levels of deterioration. Therefore, the consultant used a five-point scale for condition
assessment.
For instance, for asphalt road, the following indicators of deteriorations are investigated on the
ground: pot holes, cracking, surface wear out, sliding and differential settlement. Accordingly, a
five-point scale can be used as one of the recommended scale as per the Asset Management
Manual prepared by the Ministry of Urban Development and Housing.
In doing so, detailed quality indicators for condition assessment of each asset infrastructure were
developed and data collection is made accordingly. Simple condition assessments for road,
drainage, walk ways, street light, traffic sign post, bridges, and culverts and over passes asset
infrastructure are described as indicated in the table below.
Table 31: Condition Indicator Table for All Roads (Asphalt, Cobble, Red Ash and Gravel Surface)
Leve Descriptio Detailed Description Type of Deterioration Indicativ
l n
e RUL
1 Very Good Sound Structure or New None 71-100%
Road on the original status of
construction
2 Good Serves but minor deterioration None 46-70%
(<5%).
Minor maintenance required.
3 Moderate Marginal, evident deterioration If there is minor Crack, 26-45%
(6-20%). Peeling and/or Siltation
Significant maintenance (Alluvial Formation)
required.
4 Poor Significant deterioration of If there is Crack, Peeling, 11-25%
structure, and/or appearance; Pot Hole, Siltation (Alluvial
Significant impairment of Formation) and Channeling
Table 33: Condition Indicator Table for Drainage Channels and Pipes
Leve Rating Scale Condition Indicator Deterioration
l
1 Very Good Shape of drain still in original design None
condition
2 Good Less than 5% of the channel length None
suffers deterioration, either on the walls
or the floor
3 Moderate Drainage effective but slightly impaired Minor Joint Damage, Minor
Between 6% and 20% of the channel Siltation Problem
length suffers deterioration, either on
the walls or the floor
4 Poor Design function impeded due to Major Joint Damage, Major
siltation, vegetation or scour Siltation Problem
Between 21% and 50% of the channel
length suffers deterioration, either on
the walls or the floor
5 Severe Drainage not functional Masonry Collapse, fully
Greater than 50% of the channel length filled with silt
suffers deterioration, either on the
walls or the floor
2 Good Good quality, and working well, only minor maintenance like
painting
3 Fair Some kind of pothole on the surface or cracking on the wall but can
be maintained easily
2 Good Good quality, and only some of the greeneries needs changing or
insignificant maintenance on fence like painting
3 Fair No real damage on the structural part and minor correction on the
greenery
Condition Assessment for Pedestrian walkways has also been done for Dukem City and the
inventory condition assessment shows that from the total 0.15Km walkways; all 0.15kilometer
length are in a goodcondition . The rest of the condition assessment for pedestrian walkways are
depicted in table below.
140
120
100
80
60
40 Culvert
20 Concrete Slab
Crossing
0
Very Good Moderate Poor Very Poor
Condition Indicators
Feature Class
Very Very
(Street Light) Total Number Good Moderate Poor
Good Poor
Steel Pole 96 81 15 - - -
Total 96 81 15 - - -
Condition Indicators
Feature Class
Total Very Very
(Road Median) Good Moderate Poor
Length(KM) Good Poor
Road Median 1.30 0.00 0.5 0.8 0.00 0.00
6.2. Condition Assessment for Water Supply
Condition Assessment for Water Supply Network was also done though it is very difficult since
the water supply pipes (water supply transmission and distribution line) are buried below the
surface of the earth. Therefore, condition assessment for water supply network was done in
consultation with the professionals from water supply office of the city by considering the age of
installation and other important parameters. Accordingly, from the total 8kilometer transmission
pipe line about 6.54 kilometer are in Good condition followed by Moderate condition with a total
length of 1.46 kilometer. This condition assessment indicates that the pipelines are laid almost at
similar time. On the hand from the total Distribution line of 86.3 kilometer, about 6.3 kilometer
are in Very Good Condition followed by 71.69 kilometer in Good condition. The condition
assessment of the pipeline with different material type and the rest of Water Supply Network
Assets inventoried are depicted in the table below.
Condition Indicator
Sr.
Water Supply Uni Diameter Very Very
No Type Quantity Good Moderate Poor
Sub Category t (mm) Good Poor
. (km) (KM) (KM)
(KM) (KM)
Steel(GSP) Km 6”-3”
Condition Indicator
Sr.
Water Supply Uni Diameter Very Very
No Type Quantity Good Moderate Poor
Sub Category t (mm) Good Poor
. (km) (KM) (KM)
(KM) (KM)
500m3
700m3-
Pioneer No. 2 1 1
1000m3
As part of the liquid waste management system, among the existing public and communal toilet
facilities majority lies in poorcondition, owing to the recent construction date. However, those
serving for long period of time are deteriorated and unsanitary to serve the community.
It is examined from physical observation that there are still wastes piled up and scattered in the
surrounding. According to the head of the Waste sector of the Municipality, the inadequate level
of the operation of the dumping site is associated with absence of proper management and lack
of necessary machineries. Coupled with absence of appropriate liquid waste disposal site that
will pose potential threat and risk of polluting the surrounding, the existing function of the waste
disposal system, in general, should be improved to standard level that would be suitable for
Dukem.
A parks found in the city are found in very good condition credited to their recent year of
construction. Whereas the case of playgrounds is different in which majority lies in good
condition.
As can be seen from the table of condition assessment of Monuments below, both monuments
found in the city are found in Very good condition due to their recent construction datae and
maintenance carried out.
Among the inventoried administrative buildings in the city 1 Blockis in poor condition where as4
are in the moderate condition,10 blocksfor very good and 25 blocks are in good condition
collectively in their 40 structures. No buildings giving administrative service to the city are in
very poor state, since this institutes are providing service with limited no of buildings their
rehabilitation is crucial.
In summary from the total of 50 education service giving buildings 20 buildings which is 40%
are found in moderate condition, 9 buildings 18% share is taken by structures in Very good and
40% are in a good conditions collectively. The remaining buildings are in poor state. The Status
of buildings in this category listed in detail in the table below, which shows building conditions
under each educational institutes.
Machineries and vehicles composed of different types and operations are inventoried and their
capacity and operational status are recorded. A total of 51 vehicles and construction materials
were inventoried and their conditions were also assessed and depicted in the table below.
Capacity in
Name of Machinery Specific brand / Year of Plate
Status Quintal/ Horse Sector Condition
(Engineering Equipment) Mark Purchased Number
Power
EXCAVATOR KOMATSU - Functional Construction SE-370C Dukem Municipality Good
LOADER XGMI - Functional Construction SG-853111 Dukem Municipality Good
GRADER Functional Construction PP-16G-VI Dukem Municipality Good
ROLLER - - Functional Construction - Dukem Municipality Good
DUMPTRUCK SINO Functional Construction 4-02981 Dukem Municipality Good
DUMP TRUCK SINO Functional Construction 4-03652 Dukem Municipality Good
DUMP TRUCK POWER PLUS Functional Construction 4-20512 Dukem Municipality Good
DUMP TRUCK POWER PLUS Non Functional Construction 4-20513 Dukem Municipality Good
PRADO TOYOTA 2009 Functional mayor service Dukem Municipality Good
AUTUMOBILE NISSAN 2009 Functional Mun.service Dukem Municipality Good
AUTOMOBILE NISSAN 2009 Functional ODP offfice ser. Dukem Municipality Good
AUTOMOBILE GELLY Functional Office service 4-06078 Dukem Municipality Good
AUTOMOBILE GELLY Functional Office service 4-06079 Dukem Municipality Good
AUTOMOBILE GELLY Functional Office service 4-06076 Dukem Municipality Good
AUTOMOBILE GELLY Functional Office service 4-06077 Dukem Municipality Good
AUTOMOBILE GELLY Functional Office service 4-04125 Dukem Municipality Good
PICKUP TOTOTA Functional Office service 4-02702 Dukem Municipality Good
PICKUP TOYOTA 2010 Functional Office service Dukem Municipality Good
PICKUP NISSAN Functional Office service 4-04287 Dukem Municipality Good
PICKUP HIGER Functional Office service 4-04122 Dukem Municipality Moderate
PICKUP MAHINDRA Functional Office service Dukem Municipality Good
PICKUP TOYOTA Functional Office service 4-01395 Dukem Municipality Good
PICKUP MAHINDRA Functional Office service Dukem Municipality Moderate
PICKUP JINBEI Functional Office service Dukem Municipality Moderate
LAND CRUISER BISHOFTU Functional Office service 4-04121 Dukem Municipality Good
AMBULANCE TOYOTA Functional Ambulance 4-04123 Dukem Municipality Good
BISHOFTU BUS Functional Office service Dukem Municipality Good
Capacity in
Name of Machinery Specific brand / Year of Plate
Status Quintal/ Horse Sector Condition
(Engineering Equipment) Mark Purchased Number
Power
TRUCKTOR Non-Functional Solid waste Dukem Municipality poor
CITY BUS BISHOFTU 2011 Functional Public service Dukem Municipality Good
MOTORBICYCLE TIGER Functional Office service Dukem Municipality Good
MOTORBICYCLE TIGER Functional Office service Dukem Municipality Good
MOTORBICYCLE TIGER Functional Office service Dukem Municipality Good
MOTORBICYCLE TIGER Functional Office service Dukem Municipality Good
MOTORBICYCLE TIGER Functional Office service Dukem Municipality Good
MOTORBICYCLE TIGER Functional Office service Dukem Municipality Good
MOTORBICYCLE TIGER Functional Office service Dukem Municipality Good
MOTORBICYCLE TIGER 2011 Functional Office service Dukem Municipality Very Good
MOTORBICYCLE TIGER 2011 Functional Office service Dukem Municipality Very Good
MOTORBICYCLE TIGERS 2011 Functional Office service Dukem Municipality Very Good
MOTORBICYCLE TIGER 2011 Functional Office service Dukem Municipality Very Good
MOTORBICYCLE PULSAR 2011 Functional Office service Dukem Municipality Very Good
MOTORBICYCLE PULSAR 2011 Functional Office service Dukem Municipality Very Good
MOTORBICYCLE APACHE 2011 Functional Office service Dukem Municipality Very Good
MOTORBICYCLE TIGERS 2011 Functional Office service Dukem Municipality Very Good
MOTORBICYCLE APACHE 2011 Functional Office service Dukem Municipality Very Good
MOTORBICYCLE PULSAR 2011 Functional Office service Dukem Municipality Very Good
BAJAJ TAGROW 2009 Functional Office service Dukem Municipality Good
BAJAJ TAGROW 2009 Functional Office service Dukem Municipality Good
BAJAJ TAGROW 2010 Functional Office service Dukem Municipality Good
MOTORBICYCLE TIGERS 2011 Functional Office service Dukem Municipality Very Good
MOTORBICYCLE TIGERS 2011 Functional Office service Dukem Municipality Very Good
MOTORBICYCLE PULSAR 2012 Functional Office service Dukem Municipality Very Good
MOTORBICYCLE PULSAR 2012 Functional Office service Dukem Municipality Very Good
MOTORBICYCLE PULSAR 2012 Functional Office service Dukem Municipality Very Good
MOTORBICYCLE PULSAR 2012 Functional Office service Dukem Municipality Very Good
MOTORBICYCLE PULSAR 2012 Functional Office service Dukem Municipality Very Good
Capacity in
Name of Machinery Specific brand / Year of Plate
Status Quintal/ Horse Sector Condition
(Engineering Equipment) Mark Purchased Number
Power
MOTORBICYCLE PULSAR 2012 Functional Office service Dukem Municipality Very Good
MOTORBICYCLE PULSAR 2012 Functional Office service Dukem Municipality Very Good
MOTORBICYCLE PULSAR 2012 Functional Office service Dukem Municipality Very Good
MOTORBICYCLE PULSAR 2012 Functional Office service Dukem Municipality Very Good
MOTORBICYCLE PULSAR 2012 Functional Office service Dukem Municipality Very Good
PICK UP BISHOFTU 2012 Functional Office service Dukem Municipality Very Good
PICK UP BISHOFTU 2012 Functional Office service Dukem Municipality Very Good
PICK UP BISHOFTU 2012 Functional Office service Dukem Municipality Very Good
PICK UP BISHOFTU 2012 Functional Office service Dukem Municipality Very Good
PICK UP BISHOFTU 2012 Functional Office service Dukem Municipality Very Good
AMBULANCE TOTOTA 2012 Functional Ambulance Dukem Municipality Very Good
TRACTOR METEC 2012 Functional Sanitation Dukem Municipality Very Good
TRACTOR METEC 2012 Functional Sanitation Dukem Municipality Very Good
E
stablishing modern and sustainable maintenance management program will enable the
city to use its core infrastructure assets and other facilities sustainably; while providing
improved service and widening economic opportunities at the same time.
Thus, preparation of maintenance budget guide based on the condition of existing asset base will
enable the city to allocate adequate fund to meet the deferred maintenance needs that have been
pushed off from the past years. It also helps to retain assets that are found in status of good
condition. Eventually, the maintenance budget guide is expected to be a maintenance Type and
Maintenance Activities
Overview of the existing maintenance approach of the municipality revealed that maintenance
practice of the municipality has been challenged by inadequate funding and inconsistence. The
basic factors for such challenges would be associated with absence of frequent or/and seasonal
condition inspection, limited resource availability, poor attitude to maintenance and the absence
of maintenance data management system. These in turn make it difficult to identify and
determine what is actually needed.
Obviously, inadequate maintenance of assets would eventually result in falling of assets below
acceptable standards or service levels that progressively shorten lifespan of core infrastructure
assets that are too costly to replace. More harshly, as maintenance is delayed, the cost for repairs,
rehabilitation etc. increases exponentially and will need relatively big investment in
maintenance.
In this regard, the maintenance need of all the city assets including the movement network assets,
the water supply network, the environmental strategic area, social and economic service
buildings and facilities as well as supporting services are identified on the basis of condition
assessments. Accordingly, maintenance types and condition based specific maintenance
activities are identified. In addition, the baseline maintenance rates have also been established to
estimate and allocate maintenance budget need to address the maintenance demand. The
maintenance activities are developed by reviewing several relevant sources including the
recently revised AMP Manual, the experience of ERA particularly ERCC, AACRA and Rural
Road Construction Enterprises, the city itself and peer cities and recognized international
literatures prepared for developing countries.
On the other hand, in the absence of recent actual maintenance data in the municipality and
recent standard road maintenance unit costs at country or regional level by relevant institutions,
(for example ERA and Road fund) as baseline and/or lack of parameters to set new rate,
establishing maintenance unit rate is indeed remaining the challenging task.
Within all the challenges to estimate reasonable maintenance rate, for it is one of fundamental
issue in maintenance planning and funding, much has been done to collect supporting
documentation, including maintenance reports of various peer cities, cognizing the variations of
labor and material costs and other factors among the cities. Eventually reasonable maintenance
rate has developed as a base line based on the aforementioned sources.
The maintenance to be implemented in this case, as per the AMP manual is categorized mainly
in two types. The first is normal maintenance that can be preventive, routine and periodic and
should be execute with the goal to retain and preserve ‘good’ performing assets or assets found
to be in state of good conditions. It would be noted that the condition level to be maintained by
routine and periodic maintenance will also include the assets found in state of very good
condition in the case of water supply networks. The ultimate goal of normal maintenance
activities to be implemented through routine and periodic maintenance is eventually to prevent
failure and deterioration. The second type of maintenance that is the main concern of the study
and the preparation of this budget guide is to restore assets found in state of different
deterioration level to bring back to the desired and targeted good condition level. This form of
maintenance is basically targeted to eliminate the deferred maintenance, backlog and deficit
accumulated over the years.
Most of the proposed maintenance activities are directly adapted from the recently revised AMP
manual (as JUNE 2016, FINAL VERSION). In addition to the manual as explained above, for it
is compressive and indicative, attempt has made to assess and include a range of maintenance
activities, as referred below, from various sources. The relevancy of additional maintenance
measures recommended from other sources has been reviewed against the overall frameworks of
maintenance measures provided in the AMP manual, local practices and institutional and the
maintenance industry capacity. It is to mean that for the case of adopted maintenance
experiences from international literatures consideration has been given to ensure the relevancy
and applicability against the implementation capacity of the city and other local factors, such as
the need for materials, machineries, professionals and labor, affordability and socioeconomic
benefits, such as creating labor-based maintenance strategy.
The second type of maintenance that is the center of the preparation of this maintenance budget
guide is to address the accumulated maintenance gap and restore the deteriorated assets to bring
to the desired good condition level. It is entirely targeted to eliminate the maintenance backlog
and deficits accumulated over the years.
Correspondingly Maintenance expenditure is therefore estimated for both routine and periodic
maintenance and to eliminate accumulated maintenance backlogs.
In addition, attempt, has made to identify and address rehabilitation, renewal and replacement
requirement of the assets, which are reported severely deteriorated to return their service
potential to condition level it had originally had. Along with estimating the maintenance budget
need, the possible maintenance activities are identified almost for all of the assets included in the
inventory and condition assessments. Most of the proposed maintenance activities are directly
adapted from the revised AMP manual. In addition, because the manual is not expected to be
exhaustive to provide the entire possible maintenance activities attempt has made to review other
relevant sources including local experiences and literatures.
On the other hand, there is no recent and updated standard maintenance base line rate at national
or regional level to accustomed and adjust to local condition. The road maintenance base unit
rate prepared by ERA as baseline has not been revised in the last decade.
Cognizing the current challenges and the need to set at least initial base rate supposing the
municipality can adjust and fine-tune through its own practical experiences, various efforts have
been made to gather information from different sources, including the ERCC projects.
Finally the initial maintenance base rate is established and applied in the study based on the
following different sources.
3. Maintenance rate employed by ERCC for Asphalt roads, gravel roads and culvert
employed in 2007 E.C is reviewed,
4. The existing gravel road maintenance rates utilized by Rural Road Authority is
reviewed,
5. Maintenance unit rate applied for some of road infrastructures by Road Authority
of Addis Ababa City (AACRA) that has been employed in the preparation of
AMP of Addis Ababa (2014 E.C.) is reviewed,
6. Maintenance rate of water supply network assets is set by fixed percentage of the
investment and replacement cost based on age and remaining useful life of the
water assets. This is a common practice by Addis Ababa Water Supply and
Sewerage Authority (WASSA) and recommended by AMP manual.
The table below presents maintenance rates of some of road network assets applied by ERRC in
2007 E.C for quick reference and comparison. Threshold to lay down a ground to embark on
sustainable maintenance management system.Finally, maintenance unit rates are proposed based
on the above sources considering local condition, such as material availability and the relative
cost of local labor. The rate are utilized to estimate the maintenance budget in this study and the
municipality should apply the proposed maintenance rate as base rate and, eventually should
fine-tune based on recording the actual maintenance cost from ongoing and future maintenance
projects.some items do not listed in the table is taken from nearby cities rate.
Table 59: Maintenance and Rehabilitation Rate (Br/m2) for Movement and Environmental
Network
roads
6 Pedestrian side m2 4.50 42.06 96 179
walk terrazzo
7 Pedestrian Red Ash m2 16 32 40 100
8 Culverts No 2000 8000 30000 60000
9 Open masonry Ml 61 138 215 1,380
drainage
10 Earthen Drain Ml 10 25 50 120
Table 60: Maintenance and Rehabilitation Rate for the Water Supply Network-(above ground
assets)
Table 61: Maintenance and Rehabilitation Rate for Water Supply Network-(below ground assets)
RC of RC of RC
4RC
4 Bono Laterals 0.1 % of 2 % 5 % of 10 % 100 % RC
RC of RC of RC
RC
Table 62: Maintenance Rate for Environmental and other Strategic Activity Area
No Feature Class Good (as % of Moderate (as % of Poor (as % of RC)
RC) RC)
1 Public and 0.5 % 2% 3%
communal toilet
2 Landfill site 0.5 % 2% 3%
3 Urban Greenery 0.5 % 2% 3%
4 Parks and 0.5 % 2% 3%
Playground areas
5 Sport Fields 0.5 % 2% 3%
Table 63 : Maintenance Rate for Social and Economic Strategic Activity Area and Supporting
Services
No Feature Class Good (as % Moderate (as % of Poor (as % of
of RC) RC) RC)
1 Buildings and 0.5 % 2% 3%
Facilities
2 Fence 0.5 % 2% 3%
3 Machineries 0.5 % 2% 3%
4 Vehicles 0.5 % 2% 3%
Normal maintenance measures of routine and periodic maintenance should carry out for road and
related infrastructure network assets found in state of good condition. The ultimate target of
normal maintenance measures is to preserve the existing good performing assets at that desired
condition level to ensure their optimal functionality over the life cycle. Cognizing that most of
the maintenance activities at this condition level are routine and periodic, the following are the
proposed generic normal maintenance measures for most of the movement network assets.
Pavement preservation is the primary maintenance function of paved roads. Preventing water
from penetrating the base material is so a major objective as longevity of the pavement structure
is dependent on this. Thus routine and periodic cleaning of the road free of rubbish and debris
and ensuring water can flow freely off the road surface will be the basic normal maintenance
activities for asphalt and cobble stone paved roads.
Spot repair by selected materials and ensuring that water can flow freely off the road surface and
brushing and ditching will be the major normal maintenance activities to retain the gravel and
red ash road found in good condition. Similarly keeping the earth pressed road from over flow of
water and routine and periodic minor grading and compaction will be in place to preserve the
good condition of earthen road.
The existing road surfacing, excluding earthen road needs an estimated Birr 36.4 Million for
routine and periodic maintenance. As mentioned earlier there is no any provision how to estimate
the maintenance requirement for good performing road infrastructure assets in the revised
manual. Thus estimate of maintenance requirement for routine and periodic maintenance of
movement network assets and drainage networks is therefore computed based on the previous
manual that is taking into consideration two percent of the road that is in good condition. The
need for routine and periodic maintenance of each movement network assets is presented in the
table below.
Table 64: Routine and Periodic Maintenance Budget for the Road Surfacing
Chart Title
Red Ash
1%
Gravel Road
44%
Cobblestone Road
55%
Walkways that are found in state of good condition can be retained with similar maintenance
activities of the same road surfaces. Based on the condition assessment, the existing good
performing pedestrian sidewalk roads are can be retained by an estimated Birr 12,618.00.
Table 65: Routine and Periodic Maintenance Budget for the Pedestrian sidewalk
The intention of routine and periodic maintenance of culverts is to maintain the structures in
sound condition and safe for traffic. Thus, culverts in good condition can be preserved by minor
maintenance activities such as clearing, cleaning, and erosion control measures. In order to
function properly, a culvert must retain the full opening over its complete length. In addition, the
upstream approaches and the downstream area must be free of any obstructions. And also the
maintenance of road slab crossing is aiming to facilitate the traffic and drainage system too.
The overall objective of bridge maintenance is to keep the structures in sound condition and safe
for traffic. In this respect where a bridge spans a watercourse, the water must flow freely at all
flood levels without damaging the bridge or the waterway. In addition, repair of loose/missing
connectors and fixings and painting are the basic normal and minor maintenance measures to be
carried out for bridges rated as state of good conditions. In total, 4 culverts and 85 road slab
crossing that are found in good condition could be prevented at minimum annual outlays of Birr
91,000.00.See the table below.
Table 66: Routine and Periodic Maintenance Budget for road structure
Street lighting maintenance should be carried out using an approach whereby there are programs
at two levels: Preventative and Corrective and forced. Preventative maintenance of street lighting
comprises scheduled inspection and maintenance activity of road patrol, bulk lamp replacement
and pole inspection. The maintenance budget has been estimated by considering the replacement
cost of the bulb, the salary of the at least two people, rental of cherry picker and rental of truck.
The city Solar street light networks constituted by 96 street light poles have been inspected.
Taking the preventive maintenance activities; road patrol, bulk lamp replacement and pole
inspection of different types, it is proposed that a minimum of Birr 37,500.00will be needed to
make them functional.
Table 67: Routine and Periodic Maintenance Budget for Street light
Sub-Total 37,500.00
The condition assessment result exhibited that some of the Movement Network assets found in
different deterioration condition in addition to small size of severely deteriorated assets. Below is
the brief description of the proposed maintenance activities to eliminate the different deteriorated
conditions of the Movement Network assets to restore and bring back to the target and desired
condition level. As mentioned in the overview of exiting maintenance approaches the
municipality as of other cities, lacked effective and sustainable maintenance approach that would
be correlated and emanated from inefficient infrastructure management system and contributed
to the deteriorated state of some size of movement network assets. Below are the proposed
maintenance activities to eliminate the different deteriorated state of the Movement Network
assets.
Surface depression Lift out the cobblestone in demarcated area. Clean the bed. Add sub-
base material and compact. Lay sand bed and compact. Lay new
cobblestones.
Failure of Lift out the cobblestone in demarcated area. Clean the bed. Add sub-
Cobblestone base material if required and compact. Lay sand bed and compact. Lay
edging new cobblestones.
Table 70: Proposed Maintenance Activities for Deteriorated Red Ash and gravelRoads
Deterioration type Maintenance measures and methods
Channelling For channels, less than 20cm wide clean out channel, fill with graded
material and compact by hand
Potholes Clean out depression, fill with graded material and compact by machine
Wash-away For channels, greater than 30cm wide clean out channel, fill with graded
material and compact by machine
The total maintenance backlog for all road surfaces is estimated to be about Birr 61.96 Million.
The detailed analysis is presented in the GIS and alternatively in Microsoft Excel. The highest
deficit is observed in gravel road asset, which constitutes about 89.42% of the total maintenance
deficit in road surfacing sub-category.
6.026.195,00
Total 4
Maintenance 0,087,145.00
Maintenance activities for deteriorated road structures should vary based on the types and
materials of the structures itself and deterioration and damages identified. Maintenance of
deteriorated bridges should vary based on the types and materials of the bridge and the extent
and types of defects and damages. Most commonly, the bridge maintenance comprises the
following:
Replacing wearing surface, crack seal surface, pave full width, seal joint
between edge of paving and face of wall,
Pointing masonry, repair barriers, safety features, slab maintenance, replace
walls, saw cut around deterioration, patch with concrete,
Patch delaminating replaces deck and floor beam/ column, etc.
Feature Class Maintenance Activity Level of Uni Quantity Unit Rate Estimated
deterioration t to be (Br) Maintenance
Maintaine Budget (Br)
d
Concrete Slab Failure
Slab Siltation
Crossing Cracking Moderate No 10 8,000.00 80,000.00
Surface Peeling
Depression
10 80,000.00
Concrete Slab Failure
Slab Siltation
Crossing Cracking Poor No 15 30,000.0 450,000.00
Surface Peeling 0
Depression
15 450,000.00
Total 25 530,000.00
Maintenance
Earth
Pressed Channeling
Depression Very Poor m2 35,210.00 40.00 1,408,400.00
Wash Away
Non Compaction
Gravel
Depression
Channeling Very Poor m2 15,470.00 250.00 3,867,500.00
Wash Away
64,120.00 11,995,900.00
Road structures are the main important structures in dealing with transport system and drainage
facilitation. Hence, these structures should be maintained and preserved in good condition. Those
bridges and culverts, which are deteriorated severely, are identified and needs an estimated
rehabilitation or replacement cost of Birr 60,000.00.
The table below presents the rehabiltation summary of the movement network
Chart Title
14000000
12000000
10000000
8000000
6000000
4000000
2000000
0
Road Network Pedestrian Walk ways Road Structures Others (Street Light +
Whereas, below ground water supply network assets, that are water pipe lines need relatively
larger fund to retain the very good and good condition and maintain and repair moderate and
poor condition assets. The determination of the condition level of the water line is challenging
because they are below ground. But the accepted and widely employed method is to predict the
condition of pipelines based on their age against the pre-determined physical and economical
useful life. The budget estimate needed to repair and replacements for these water lines is
therefore associated with the indicative remaining useful life of the pipe lines. The indicative
remaining useful life is thus the base to assign maintenance rate that is the fixed percentage of
the replacement cost of the assets under consideration.
Deep wheels
Clean, well head maintenance, draws down monitoring (and rehabilitation if old enough to serve
properly and significant damages are inspected),
Pumps
Customer connections
Regular inspection to maintain and repair and leakage detection, (and replacement and upgrade)
Cleaning, leakage detection, inlet & outlet maintenance, painting water proof material and level
monitoring, (and replacement and upgrade),
Water Meters
Valves
Strip, clean, repack, check wear, manhole installation, replace and upgrade,
Water Lines
Regular inspection, repair damages and leakages, maintain from any risks that may causes
breakage, (and replace and upgrade)
As provided in the tables below, the city shall allocate a minimum of Birr 34,691,400.00 for
assets to be needed to keep the water supply network functional and operating without risk of
significant supply cut-off.
All drain lines or drainpipes should be maintained in good working edict without defects. All
such lines or pipes should be inspected regularly and where leakage, blockage or defects are
detected, they should be rectified immediately.
Blockage of drains by solid dusts or items, commonly siltation, can be cleared by high-pressure
water jet or rodding, which is easily applicable and implemented. For this manholes should be
readily accessible for regular maintenance. Access to them should not be obstructed. And or the
best alternative option of clearing and cleaning of drain systems especially for open drainage
systems is using human power. So that, desilting drains and sewers is one of the best ways to
ensure drainage system to fully operational and greatly reduces the risk of flooding from wet
weather.
The main routine and periodic maintenance activities as described above to preserve good
performing drainage networks needs an estimated budget of Birr 2,759,790.00.
Table79: Routine and Periodic Maintenance Budget Estimate for Drainage Network
Feature Class Maintenance Level of Uni Quantity Unit Estimated
Activity Deterioratio t to be Rate Maintenanc
n Maintaine (Br) e Budget
d (Br)
Open Masonry Siltation & Good ml 29,590.00 61
1,804,990.00
Drain Deposition
Cobble Stone Lined Siltation & Good ml 12,400.00 77
954,800.00
Drain Deposition
Earth Drain Siltation & Good ml 0.00 10 0.00
Deposition
2,759,790.00
7.8.2. Routine and Periodic Maintenance Activities for Parks, Greenery, Road
Median and Street Greenery .
The other sub categories of environmental activity area assets that are found under good
condition level are trees on the street (on the median), communal green (located infront of
michael church along the road to Addis Ababa), and Stadium. The total estimated routine and
periodic maintenance need for these assets are Birr 23,807.56. From this maintenance need
30.66% is goes to flood control channel maintenance.
Table 80: Routine and Periodic Maintenance Budget Estimate for Parks, Greenery, Road
Median, Furniture and Street-Side Greenery
Feature Class Conditio Uni Total Area Unit RC Maintenance
(Park & Playground) n t Rate as Budget (Br)
% of
RC
Dukem Stadium Good m2 31,804.39 0.50% 3,301,512.0 16,507.56
0
Total 31,804.39 3,301,512.0 16,507.56
0
Feature Class Conditio Uni Total Area Unit Maintenance
(Urban Greenery) n t Rate as Budget (Br)
% of
RC
Communnal green Good m2 1446.242m 0.50% 580,000.00 2,900.00
2
Trees on Road Median Good No 1050 0.50% 880,000.00 4,400.00
1,460,000.0 7,300.00
0
Total 4,761,512.0 23,807.56
0
Some of the drainage line found to be in deteriorated condition and need significant maintenance
and it would be among the top maintenance priority to minimize the spillover negative effects of
the poorly functioning drainage line. The following are some of the proposed maintenance
activities recommended for deteriorated drainage networks.
Clean out the damaged area and refill the affected joints with new mortar.
Remove all damaged block back to the solid wall. Clean the joints and lay
new blocks.
Replace manhole cover or grating, pointing joints, Maintaining weep holes
Maintain headwall, replacing stone, provide new meter (turnout) drain,
reline drain, reshaping, are the main maintenance activities.
To address the accumulated maintenance deficit of the drainage network the study proposes an
estimated about of Birr 1,500,620.00.
Chart Title
Open Masonry Drain
11%
Earth Drain
42%
The Cobble lined drain constitutes the largest share (42.1%) of the rehabilitation work which
would be better to replace with structured drainage system. The rest percentage of the drainage
rehabilitation work with siltation and deposition removal work is goes to earthen drainage
system.
Buildings rated as good condition will be prevented by routine and periodic maintenance actions.
Since most of the service buildings are found in good conditions the municipality should allocate
adequate budget for preventive maintenance to extend the useful life of the buildings and
declining the future big maintenance cost.
About 40 administrative buildings with different storey level are inventoried in the assessment.
Thus, 25 buildings are found in good condition with an estimation budget of Birr 90,911.20to
keep them in current good condition.
s % of (Br)
RC
Stadium Good 1 m2 6.54 0.50% 204,16 1,020.83
6.00
Total 1 3504.0 1,020.83
0
Machineries and vehicles found in good condition will need frequent services whereas these
rated as moderate and poor condition level would get major maintenance and replacement of
parts. In addition, it is supposed that machineries and vehicles rated under sever condition
apparently requires replacing damaged parts and components if not decommissioned. As
mentioned in maintenance unit rate section, the estimation of maintenance and repair cost of
machineries and vehicles is computed based on the fixed rate as percentage of the replacement
cost. It is worth mentioning here that the forecasted maintenance would only serve as indicative
annual maintenance budget need. The condition assessment is done based on the percentage of
estimated useful life, accordingly those vehicles and machineries which are found in good
condition can be repaired with an estimated routine and periodic maintenance budget of Birr
589,900.00for annual bases which would be needed to annual servicing, maintain and repair the
existing machineries and vehicles.
The carried out measurement and condition assessments of fences encompassing the municipal
buildings and facilities. Attempt has been then made to identify maintenance need of the fences
that surround the municipal social and economic service and administrative buildings and
facilities.Accordingly, the study proposes a total of Birr 40,000.00as annual maintenance to keep
the 2258.45-meter length of fences that are found in good condition.
As per the condition assessment a total length of 0.983kmfence has been found in deteriorated
condition; like foundation failure, wall collapse and rusting. An estimated maintenance backlog
of Birr60,000.00is needed to bring these deteriorated fences in to good condition.
The above table can be summarized by the broad category of assets as below. The highest
maintenance need which is about 63.1% is goes to movement network assets.
Sanitation 43,800.00
Environmental Strategic Area Total 236,400.00
III. Social and Economic Strategic Area
Housing Buildings 2,700,000.00
Social and Economic Strategic Area Total 2,700,000.00
IV. Supporting Services
Machineries and Vehicles
Fences 60,250.00
Supporting Services Total 60,250.00
Total Rehabilitation Cost 15,052,550.00
to easily address the deficits and allocate resource based on functional hierarchy and risks. The
maintenance plan based on such prioritization approach will be held in step eight that may give
three years or shorter lead times to intervention to repair, maintain and renew the deficits
identified.
8.1. Introduction
A
sset valuation is the process of assigning monetary value to an asset. Valuation
enables understanding of the value of the infrastructure assets managed or owned by
a city. Further the monetary reveal the importance of the portfolio of public
investment and the need to preserve its value.
There are many ways and techniques to value the municipal assets. As per the AMP manual and
international practices the valuation of infrastructure assets employed in this study is based on
the calculation of the current replacement cost (CRC) and Depreciated Replacement Cost (DRC).
In order to determine CRC and then DRC and current value of existing assets, establishments of
unit rate for new assets is the basic and the primary task which is however often challenging. To
estimate unit price of acquisition and construction of new assets therefore different source of
information are assessed, reviewed and customized. In doing so efforts have been made to make
the cost information tends to be current and pertinent to local labor and material and adjustment
made for inflation factors when necessary. The followings are sources and procedure employed
to determine the unit cost and price of new assets.
The current Unit rates set by the Bishoftu Municipality for the preparation of the CIP
particularly for major movement assets is directly adopted,
Historical cost data of construction and acquisition of municipal assets are gathered
from the city and other cities,
The actual construction and acquisition cost of some assets are adopted from recent
projects and procurements of other cities
The recent biddings and actual construction cost of road projects of ORCE are
reviewed,
Bill of quantities and cost estimation for major components of buildings collected
from the peer cities are reviewed
AMP and CIP documents of other cities are thoroughly reviewed and compared to
Dukem.
Based on these sources the unit rate for acquisition and construction of each asset is estimated.
Accordingly, in tables below presents the unit rate estimated for new assets.
Valuation plays an important role in enabling reporting of the physical condition of the city
assets in monetary terms. The valuation of the city assets is based on the calculation of DRC
(Depreciated Replacement Cost). This is due to that apart from the challenges to obtain historical
cost date or lack of reliable information of original cost of construction and acquisition, DRC
enable to consider the price increase over the years. Furthermore, applying depreciated
replacement cost (DRC) to estimate current value of the city assets is a common international
practice and recommended by the revised AMP manual.
DRC is based on current replacement cost of assets less an allowance for deterioration of
condition to date, and based on the fraction of remaining useful life over expected useful life. So
DRC is thus simply computed as the ratio of the remaining useful life to the expected useful life
as a percentage of current replacement cost.
According to the AMP manual, due to accelerated depreciation nature of movement network and
drainage channel, the maintenance deficit must be deducted from DRC to obtain an estimated
current value of the asset. For the rest of the asset it is supposed to be that they are not subjected
to accelerated depreciation the DRC itself is supposed to be representing the estimated current
value of the asset.
Table 108: Unit Rate for Environmental Activityand Social and Economic Area Assets
Feature Class Unit Unit Rate Per m2 Per ml
(Drainage Type) Replacement Cost
Piped Concrete Drain km 2,275,000.00 2,957.50 2,275.00
Closed Masonry Drain km 2,200,000.00 2,860.00 2,200.00
Closed Concrete Lined Drain km 2,500,000.00 3,250.00 2,500.00
Open Concrete Lined Drain km 1,000,000.00 1,300.00 1,000.00
Open Masonry Drain km 1,500,000.00 1,950.00 1,500.00
Cobble Stone Lined Drain km 457,000.00 594.10 457.00
Semi Pipe Concrete Drain km 850,000.00 1,105.00 850.00
Earth Drain km 30,000.00 39.00 30.00
Replacement cost (RC) is one of the frequent and common asset valuation methods. It is a
measure of replacement value or the cost of replacing an existing asset with a modern asset of
equivalent capacity. RC is essential tool that informs the monetary value that would be credited
to the assets and the cost of replacement to make sure there is sufficient funding to maintain the
network and facilities in the long term. Accordingly, total current replacement cost of the city
assets is estimated to be about Birr 1,332,773,893.91and the residual value of the city is Birr
869,630,161.96.
Table 109: Summary of Current Replacement Cost and Residual Value of the City Assets
Feature Class Current Residual Value Maintenance Asset Deficit
Replacement (ETB) Deficit (ETB)
S.no Cost (ETB)
The Movement Networks 783,683,000.00 505,045,263.00 77,285,861.64 278,637,737.00
1
Water Supply Network Assets 89,881,566.70 24,949,590.02 34,691,400.00 64,931,976.69
2
Environmental Activity Area 110,999,598.05 68,031,720.20 7,027,869.26 42,967,877.80
3
Social, Economic and 348,209,729.16 271,603,588.75 3,485,521.28 76,606,140.42
4 Supporting Activity Area
Total 1,332,773,893.9 869,630,161.96 122,490,652.2 463,143,731.91
1 0
As illustrated in figure below the Socioeconomic activity area assets and Movement Network
assets constitutes nearly an equal amount which is 26.12% and 58.8 % contribution respectively
is the most valued asset of the city, followed by the other two activity areas aggregately share
15.08% of the replacement cost of the city.
Figure 35:Contribution of Asset Classes by Strategic Activity Area for the total Replacement
Value of the city assets.
Regarding the residual value of the city assets the movement network activity area covers almost
have of the current value of the city asset, 58.07% of the total..
Figure36:Contribution of Asset Classes by Strategic Activity Area for the total Residual Value of the city assets.
activity area. The table below demonstrates the replacement value of each feature classes in the
strategic activity area.
Table 110: Current Replacement Cost of the Movement Network Asset- Road
S.no Feature Class Unit Quantity Unit Rate CRC
1 Cobble Stone km 71.6 3,500,000.00 250,600,000.00
2 Gravel km 184.04 2,200,000.00 404,888,000.00
3 Red Ash km 41.245 1,950,000.00 80,427,750.00
4 Earth Pressed km 9.71 850,000.00 8,253,500.00
306.595 744,169,250.00
The cobble stone road valued at about Birr 250Million representing about 33.67 % of the
movement network is the Second highest valued asset of the strategic area. That implies the city
has been investing more in cobble roads over the past years and which is a good approach and
could be a role model for other cities. However, the 54.40 percent coverage of the replacement
cost of the road asset, which is Gravel road, shall be improved to the next best surface material.
cobble stone paved road is though the largest investments; due to their accelerated depreciation
they also constitute the largest asset deficit even though red ash road constitutes the largest share
of the deficit. The situation not only highlights the importance of these infrastructure assets in
terms of the large investment capital but the risk of accelerated capital losses reflected by the
relatively larger asset deficit and implies the need to assign adequate maintenance investment
and plan to minimize deprecation rate.
0
Table 111: Residual Value of the Movement Network Asset- Road
The Current replacement cost of the Walkway assets is estimated to be about Birr 277,500.00
that contributes significant amount to the strategic activity area. The Table below demonstrates
the replacement value of each feature classes in the strategic activity.
Table 112: Current Replacement Cost of the Movement Network Asset- Walkway
S.no Feature Class Unit Quantity Unit Rate CRC
(Walkway Surface Material)
1 Terrazzo Tile km 0.15 1,850,000.00 277,500.00
Total 0.15 277,500.00
The residual value of the Walkway assets is estimated to be about Birr 54,243.00 that indicates
that the asset is depreciated with 19.54% so that it needs focus to eliminate the deficit and
increase the value of this asset. The table below demonstrates the residual value of each feature
classes in these walkway assets.
Road structures such as bridges and culverts have an estimated replacement cost of Birr
37,530,000.00. The analysis indicates that these assets deficit is about 41% of the replacement
cost which means that the current value of this asset is 59% of the replacement cost. Thus
maintenace need has to be addressed and the depreciation cost due to aging need to be
appreciated
Table 114: Current Replacement Cost of the Movement Network Asset- Road structure
Street light,have a replacement cost of Birr1,706,250.00. It can be observable that the city has
Should have to investment on the street light which is appreciable and has its own contiribution
in safeguarding the city resident.
Table 116: Current Replacement Cost of the Movement Network Asset- Street light and
road furniture
Table 117:Residual Value of the Movement Network Asset- Street light and
oadfurniturre
Sr. Feature Class Current Depreciated Maintenance Current Value Asset Deficit
Water distribution and transmission lines is representing vast majority of investments of the
sector, and also good proportion of asset deficit indicates their long age that they have been
served almost half of their expected useful life. Thus the municipality would consider
replacement plan of such aged assets along with a need for preventive and reactive maintenance
to extend the service life of water system asset that are expensive to replace in short term.
Table 118: Current Replacement Cost of Above Ground Water Supply Network Assets
Sr.No Feature Class Unit Quantity Unit Rate CRC (Br)
(Br)
1 Borehole no 10 2,166,666.67 21,666,666.70
2 Reservoir no 4 1,650,000.00 6,600,000.00
3 Air Valve no 4 8,500.00 34,000.00
4 Valve Chambers no 16 5,150.00 82,400.00
5 Public tap (Water Point) no 12 100,000.00 1,200,000.00
6 Pump no 9 650,000.00 5,850,000.00
35,433,066.70
Table 119: Current Replacement Cost of Below Ground Water Supply Network Assets
S.n Feature Type Unit Quantit Unit Rate Current
o Class y Replacement Cost
1 Transmissio Steel(GSP) km - 950,000.00 0.00
n Network Cast(DCI) km 3.7 1,780,000.00 6,586,000.00
uPVC km - 750,000.00 0.00
HDPE km 4.3 695,000.00 2,988,500.00
2 Distribution Steel(GSP) km 6.3 850,000.00 5,355,000.00
Net work Cast(DCI) km 75.19 500,000.00 37,595,000.00
uPVC km 4.81 400,000.00 1,924,000.00
Total 94.3 54,448,500.00
The lion share of the water assets is emanated from below ground water lines that constituting as
some as 60.57%, particularly the Distribution line, of the estimated replacement value of water
system assets. It should remind that the municipality would give special attention for
maintenance and preserving actions for water lines.
Figure 37:The Share of Water System Assets for CRC of Water Supply Network
Table 120: Residual Value of Above & Below Ground Water Supply Network Assets
S.n Feature Class Current Depreciate Maintenan Current Asset
o Replaceme d ce Deficit Value (Br) Deficit (Br)
nt Cost Replaceme (Br)
(Br) nt Cost
(Br)
1 Transmission 9,574,500.0 5,553,210.0 2,185,000.0 3,368,210.0 6,206,290.0
Network 0 0 0 0 0
2 Distribution Net 44,874,000. 38,142,900. 24,402,000. 13,740,900. 31,133,100.
work 00 00 00 00 00
Sub Total 54,448,500. 43,696,110. 26,587,000. 17,109,110. 37,339,390.
00 00 00 00 00
1 Borehole 21,666,666. 9,750,000.0 3,600,000.0 6,150,000.0 15,516,666.
70 2 0 2 69
2 Reservoir 6,600,000.0 2,970,000.0 1,700,000.0 1,270,000.0 5,330,000.0
0 0 0 0 0
3 Air Valve 34,000.00 15,300.00 400.00 14,900.00 19,100.00
4 Valve Chambers 82,400.00 37,080.00 24,000.00 13,080.00 69,320.00
5 Public tap (Water 1,200,000.0 540,000.00 280,000.00 260,000.00 940,000.00
Point) 0
6 Pump 5,850,000.0 2,632,500.0 2,500,000.0 132,500.00 5,717,500.0
0 0 0 0
Sub Total 35,433,066. 15,944,880. 8,104,400.0 7,840,480.0 27,592,586.
70 02 0 2 69
Total 89,881,566. 59,640,990. 34,691,400. 24,949,590. 64,931,976.
70 02 00 02 69
The situation is more reflected when looking that it is the drainage network constitutes almost
77.48% of the strategic activity area. In general, the situation indicates the city needed to strive
to invest more in environmental elements particularly in solid and liquid waste facilities.
The growth of the inventory of new facilities, such as land fill and the public and communal
toilets that increase total value of the city facilities over the past few years, is counter balanced
by the ageing of facilities such as the long served drainage channels, that relatively escalate the
asset deficits of the strategic category. The situation implies the need of long term plan to renew,
upgrade and replace the aging assets.
Table 123: Replacement Cost of Social and Economic Strategic Area Assets
S/n Feature Class Unit Quantity/No Unit Current Replacement
. of Blocks Rate Cost (Br)
Figure 38:Share of Buildings and Facilities CRC of the Social and Economic Strategic
Category
The supporting services composed of machineries and vehicles including the fence from each
sectoral building. The study tried to include the fences of all municipal facilities and buildings
and valued under this category. The value of supporting services at replacement cost is then
estimated to be Birr 69.76 Million.
Table 125: Estimated Current Value of Social, Economic & Supporting Services
Social and Economic Current Depreciated Residual Value Asset Deficit
Strategic Area and Replacement Replacement
Supportive Area Cost Cost (Br)
1 Administrative 78,687,684.95 61,376,394.26 61,376,394.26
Building 17,311,290.69
2 Educational Buildings 69,805,615.82 54,448,380.30 54,448,380.30 15,357,235.52
3 Health Service 21,305,163.09 16,618,027.21 16,618,027.21 4,687,135.88
Buildings
4 Youth Center 9,870,000.00 7,698,600.00 7,698,600.00 2,171,400.00
Buildings
5 Municipal Markets 2,130,166.44 1,661,529.82 1,661,529.82 468,636.62
6 MSE Buildings 31,782,758.60 24,790,551.71 24,790,551.71 6,992,206.89
7 Housing Buildings 56,300,000.00 43,914,000.00 43,914,000.00
12,386,000.00
8 Other Building 8,564,200.00 6,680,076.00 6,680,076.00 1,884,124.00
Sub Total 278,445,588.90 217,187,559.30 217,187,559.30 61,258,029.60
1 Machineries and 61,278,450.58 47,797,191.45 47,797,191.45
Vehicles 13,481,259.13
2 Fences 8,485,689.68 6,618,837.95 6,618,837.95 1,866,851.73
Sub Total 69,764,140.26 54,416,029.40 54,416,029.40
15,348,110.86
Total 348,209,729.16 271,603,588.75 271,603,588.75 76,606,140.42
T
he proposed new work projects for the year 2013 to 2015 EFY of Dukem is prepared
based on different sources including the city CIP prepared for the same project years.
The CIP plan has been prepared based on the need assessment gathered from repeated
community consultation held in each kebele of the city. The new works projects also consider the
need for rehabilitation works derived from asset inventory and condition inspection of this study.
The new works give emphasis for upgrading of infrastructure and facilities in the existing areas.
Preparation of the new works project proposal passed all necessary project planning steps from
project identification to prefeasibility study and appraising and evaluation from socioeconomic
objectivities, environmental and financial viabilities. The appraising steps has been also includes
prioritizing the proposed projects based on different development perspectives and the city
financial and implementation capacities and other criteria set in the CIP guideline and AMP
manual.
The proposed new works are then presented by CIP format and further presented and discussed
by strategic activity area and feature classes as per the recently revised AMP manual.
One of the basic sources to plan new works has been the need assessments. The community need
for infrastructure assets for the previous years has been systematically gathered from each
Kebeles in the city. For the coming years starting from this year direct community participation
is handled in all kebeles to collect the wish list of the community considering the infrastructure
and service needs in addition to the questionnaire’s distributed to the kebeles. The community
need assessments would indicate to what degree funding shortfalls may exist and may be used as
to make adjustments in the budget allocation to achieve sustainability and addressing the public
needs. It has to be noted that the four Kebeles administrations have been respond to the
questionnaires distributed to identify the infrastructure and service needs.
In total, the plan proposes Birr 314,202,559.00 for new works projects in 2013 EFY excluding
Birr 15.052 Million for rehabilitation works and Maintenance budget identified from condition
assessments of the city assets, the total budget for new works projects for three years rolling
capital investment program is Birr 862,466,134.92In general, the plan focuses on the on
goingprojectsby 43.13% share of the total CIP budget. The second focused area is the Social and
economicservice, capacity building and other Environmental activity area projects of the budget.
It is recommended that the capital investment plan would consider the four strategic areas as
equal proportion.
The development of infrastructures and services increases the community benefits such as
accessibility, mobility, economic development and social justice. Apart from direct and indirect
job opportunities that can be created from the implementation of proposed projects, the potential
local economic development and business establishments, infrastructure and service
development would trigger more job opportunities to the entire community. It is not need to
mention that the developed infrastructure is the main pulling factor for investment.
Significant portions of the proposed new works projects are directly related to movement
network issues. The development of greenery and parks, improving and expanding waste
disposal and sanitation facilities and the drainage network evidenced that the plan would address
critical urban environmental issues.
The financial forecast for capital investment plan indicates that the fund for the proposed new
work projects can be obtained from the city own revenue, regional grant. The forecasted own
sources, regional, and external pledged financial sources would ensure that the proposed projects
would be financed with minimum budget risks in the project period. The Table below presents
the financial plan by possible sources for the proposed new works projects
1 Roads
1.1 Cobblestone Road km 5 I
1.2 Gravel Road km 20 I
2 Road structures No 25 I
3 Street Light
B Water Supply
1 Water meter No 30 I
1 Drainage km 3 I
10 Kera Block 1 I
1 Dump truck No 2 I
2 Grader No 1 I
3 Shower Truck No 1 I
4 Pick up No 1 I
5 Motor Bike No 4 I
6 Bajaj No 2 I
7 Tractor No 1 I
8 Mini Bus No 1 I
9 Pick Up No 1 I
ON GOING PROJECTS
12 ME Shop % 100 I
MAINTENANCE
636
ck 00 00
12 Security Office Blo 1 1,500,000.0 1,500,000.0 I Dukem
ck 0 0
13 Red cross Pharmacy Blo 1 700,000.00 700,000.00 I Dukem
ck
14 Cattle Market Fence % 100 2,000,000.0 2,000,000.0 I Dukem
0 0
15 Secondary school % 100 32,000,000. 32,000,000. I Dukem
00 00
Sub-total Economic & Social Services 128,671,25
8.00
CONSULTING SERVICE AND CAPACITY BUILDING
1 Dump truck No 2 2,100,000.0 4,200,000.0 I Dukem
0 0
2 Grader No 1 3,400,000.0 3,400,000.0 I Dukem
0 0
3 Shower Truck No 1 1,000,000.0 1,000,000.0 I Dukem
0 0
4 Pick up No 1 2,000,000.0 2,000,000.0 I Dukem
0 0
5 Motor Bike No 4 80,000.00 320,000.00 I Dukem
13 Agriculture Office Waiting room and Guard house % 100 290,000.00 290,000.00 I Dukem
10.1. General
T
he role of maintenance to ensure proper functioning of the urban economy and social
system cannot be over emphasized. Maintenance has very important bearing on both
the physical and economic lives and performance of infrastructure and urban facilities.
Infrastructure deterioration and break down are though inevitable but they are controllable. That
can only be achieved through effective maintenance, which is again possible only through proper
maintenance plan, program, and efficient implementation of the program.
The maintenance plan presents the three years maintenance schedules and summarizes
maintenance needs identified in former step and the recommended maintenance measures. The
maintenance plan should also entail prioritizing the maintenance need at least for 2011 EFY and
generally will insight the overall maintenance program to be executed in the three years project
period.
Normal maintenance comprises actions performed to preserve an asset in its desired condition or
standard and sets out to prevent failure by providing systematic inspection and monitoring to
detect prevent deterioration and or failure and includes from testing to confirm correct operation.
According to the revised AMP manual, a maximum maintenance budget of 20% of the 10% of
CIP budget would be allocated to routine and periodic maintenance and the rest 80% would be
allocated to the maintenance backlog. Thus, the maximum budget for normal maintenance
activity from the CIP would be Birr 4,615,000.00 for 2013 EFY, which addresses only 11.4% of
the total normal maintenance need that is 40,485,461.60. However, the city has not allocated
budget for normal maintenance activities, which are found in the condition assessment.
Here the list of strategic areas, i.e. the movement network, environmental services; and the social
and economic services, provides a good basis for evaluation. Note that the maintenance of water
supply assets (the fourth major activity area) operates within its own budgetary framework and
as a result is excluded from this process, although the next bullet points on internal prioritization
are equally relevant to that activity area.
In movement, network activity area each maintenance activity is described in detail and the
priority level of maintenance activity also putted within the feature class.
Table 134: Proposed Maintenance Activities to Address the Maintenance Deficit-Water assets
Asset Type Maintenance Activity Priority
Above Ground Regular inspection, repair damages and leakages, maintain from any 1
Water Lines risks causes breakage, and replace and /or upgrade if severely
damaged and needs to raise the capacity.
Below Ground Regular inspection, repair damages and leakages, maintain from any 2
Water Lines risks causes breakage, and replace and /or upgrade if severely
damaged and needs to raise the capacity.
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%
rk ea ea
two y Ar y Ar
e it i t
ntN tiv tiv
e l Ac Ac
v em ta m
ic
o en o
M nm on
iro Ec
v d
En l an
cia
So
Table 141: A summary of the budget allocated to the reduction of the maintenance deficit, by activity area
S/N Name of Project Uni Maintenance Condition Unit rate Qty Total cost Priority
o t activity Level
A Movement
Network
1 Cobble Stone m2 EdgeFailure+Dep Moderate 403.01 1426. 575,000.00 I
Road including ression+Lifting +Poor 44
pedestrian
2 Gravel Road m2 Depression+Was Moderate 801.76 2494 2,000,000.00 I
haway+Channeli +Poor
ng
Sub-total 2,575,000.00
Movement
Network
B Environmental
Services
1 Open Masonry km Joint Moderate+ 176500 11.33 2,000,000.00 I
Drainage Damage+FloorD Poor
amage+Siltation+
Cover Material
Sub-total 2,000,000.00
Environmental
Services
C Soocial and
economic
1 MSE Shop m2 Servicing+Repair Moderate+ 320 125 40,000.00 I
ing building Poor
components
Sub-total Social 40,000.00
and Economic
Total Maintenance Cost 4,615,000.00
T
he three years’ new works and maintenance projects are identified in the previous
sections. In parallel, the budget required for new works and maintenance projects
are estimated. In this section, efforts have made to summarize and convert the new
work project proposal and maintenance plan into three years rolling program.
The Plan proposes a total of about Birr 862,466,134.92for new works projects in the three
years rolling program excluding Birr needed for rehabilitation identified in the condition
assessment.
In line with the approved budget, the new projects quantities and budgets are structure within
the three project years as tabulated in the table below.
Table 142:Structured New Works Projects around the 3 Years Implementation Program
No ECSPG Pillar & Project Name Un prio EFY 2013 EFY 2014 EFY 2015 Three Year Total
it rity Qty Birr Qty Birr Qty Birr Qty Birr
A Movement Network
1 Roads Net Work
1.1 coble stone road km I 11,000,000.00 - 12,100,000.00 - 13,310,000.00 - 36,410,000.00
1.2 Gravel Road km I 4,000,000.00 - 4,400,000.00 - 4,840,000.00 - 13,240,000.00
2 Road Structure
2.1 Culvert No I 25.00 2,500,000.00 27.5 2,750,000.00 30.25 3,025,000.00 82.75 8,275,000.00
3. Road Furnitures
3.1 Street Light km I 3.00 3,000,000.00 3.30 3,300,000.00 3.63 3,630,000.00 9.93 9,930,000.00
3.2 Light Meter No I 30.00 200,000.00 33 220,000.00 36.3 242,000.00 99.3 662,000.00
Sub-total Movement Network 20,700,000.00 - 22,770,000.00 - 25,047,000.00 - 68,517,000.00
B Water Supply Network
1 Water Meter No I 200,000.00 - 220,000.00 - 242,000.00 - 662,000.00
2 Water Line km I 1,500,000.00 1,650,000.00 - 1,815,000.00 - 4,965,000.00
Sub-total Water Supply Network 1,700,000.00 1,870,000.00 2,057,000.00 5,627,000.00
C Economic & Social Services
1 G+6 Dukem Adminstration I 36,365,036.00 40,001,539.6 44,001,693.56 76,366,575,56
2 OdaNabe G+2 School I 8,500,000.00 9,350,000.00 10,285,000.00 28,135,000.00
3 MSE Cluster I 6,000,000.00 6,600,000.0 7,260,000.00 19,860,000.00
4 Health Center Operation Room I 1,106,222.00 1,216,844.20 1,338,528.62 3,661,594.82
Table 143: Summary of Approved 3-Year New Works Rolling Program by Strategic Activity
Areas
Financial Plan of Projects for Three Years
2013 E.C 2014 E.C 2015E.C Total project
Cost
Movement 20,700,000.00 6.58% 22,770,000.0 11.58% 25,047,000.00 11.58% 68,517,000.00
Network 0
Water Supply 1,700,000.00 0.54% 1,870,000.00 0.9% 2,057,000.00 0.9% 5,627,000.00
Environmental 9,075,000.00 2.89% 9,982,500.00 5.07% 10,980,750.00 5.07% 30,038,250.00
Activity Area
Social and 128,671,258.0 40.95% 141,538,383, 72.05% 155,692,222.1 72.05% 425,901,863.9
Economic 0 8 8 8
Activity Area
Consultancy
Services,
Capacity
Building, 18,526,274.00 5.89% 20,378,901.4 10.40% 22,416,791.54 10.40% 61,321,966.94
0
On Going 135,530,027.0 43.15% 135,530,027.0
projects 0 0
Total cost of 314,202,559.0 100.00 196,539,785. 100.00 216,193,763.7 100.00 862,466,134.9
the CIP 0 % 2 % 2 % 2
including
rolled
As can be seen from the Figure below, the lion share of the proposed new work projects are for
the accomplishment of Ongoing projects. Social and economic activity area is the next focused
area of the municipality which constitutes a good proportion of the proposed projects in the next
year.
1000000000
800000000
600000000
400000000
200000000
0
rk ly re
a
re
a g, ts d 2013 E.C
wo pp A A in jec olle
t u ld o r 2014 E.C
e rS ity ity Bu
i r g
n tN a te ctiv ctiv y n gp din 2015 E.C
t i
em
e W lA ic
A ci Go clu
v n ta m apa n P
in Total project Cost
o e no ,C O I
M
onm Eco ces h eC
i t
vir an
d rv
to
f
En l y Se s
cia nc al
co
So u lta ot
ns T
Co
Figure 40: Three years rolling plan of new works by strategic activity area
Table 144: Three Years Rolling Program Summary for Maintenance Projects
Strategic Activity Maintenance Deficit Distribution for the Three Years Rolling Total
Area Plan Maintenance
2013 EC 2014 EC 2015EC Need (Birr)
The Movement 2,575,000.00 55.79% 2,832,500.00 55.79% 3,115,750.00 55.79% 8,523,250.00
Network total
Water Supply -
Total
Environmental 2,000,000.00 43.33% 2,200,000.00 43.33% 2,420,000.00 43.33% 6,620,000.00
Strategic Area
Total
Social & 40,000.00 0.88% 44,000.00 0.88% 48,400.00 0.88% 132,400.00
Economic
Strategic Area
Total
4,615,000.00 1.00 5,076,500.00 1.00 5,584,150.00 1.00 15,275,650.00
16000000
12000000
8000000
4000000
0 2013 EC
al al al al 2014 EC
tot Tot Tot Tot
r k ly a a 2015 EC
wo pp Are A re
et Su ic ic Total
tN er teg teg
en at tra ra
em W lS c St
ov ta i
en om
eM m on
Th on Ec
vir &
En ic al
So
A
ll steps to be undertaken for the preparation of AMP are consecutively presented in
nine steps mentioned above. Well established AMP also needs effective
implementation strategy including monitoring system and measuring performance to
ensure the process and outcomes in the most effective manner and continuous improvement the
way that is done. On the other hand, the development of an asset management implementation
strategy, like the development of a comprehensive plan requires a long-term view and the
engagement of the leadership and staffs of all sectoral offices of the city administration. It has to
be noted that the implementation strategy will not be static and it needs to be reviewed
periodically as part of a continuous improvement cycle. It is also important to remember that
asset management plan is not only a plan as such; rather it is a program or process that relates to
all the municipal functions and operation. In respect to implementation procedures of AMP
maintaining database and ensuring the ongoing integrity of the data will be the primary task. In
order to do so and ensuring the effective implementation of the AMP, the first task is to arrange
and fulfill essential institutional requirements. That will include fulfilling all necessary hardware
and software requirement and creation of clear institutional responsibilities and duties. In
general, the city will follow the following implementation procedures.
Providing GIS training for core staffs who will be involved in the implementation of asset
management function and related works,
Assign competent AMP focal persons for database management,
Fulfill the required Hardware and Software: There should be high capacity computer in
AMP unit to work with the GIS software, together with external drive to back up the data.
Fulfill the required Software; the city administration and the AMP team should have an
official copy of the latest version of ArcInfo, the GIS software from ESRI.
12.3. Implementation and Monitoring Procedures for New works and
Maintenance Projects
This section of implementation procedures dwells on developing system for managing transition
of new works and maintenance projects in to existing assets. The meaning of transition in this
context describes the process by which new works and maintenance projects once known as new
plans and then new capital investment project during construction get status of existing asset
after completion of construction and handed over to the city. Managing of the transition requires
tracking and recording of new works and maintenance projects along the way they pass through,
starting from checking whether they exist on the planning list and looking after the processes, till
the completed assets are handed over to project owners. The overall activities to be undertaken
for effective transition of the projects can be organized in to three core activities of project
management, procurement management and construction management. Besides, it requires
cordial effort of the key expertise to be engaged in carrying out the core activities, namely,
project manager of works, the procurement specialist and the construction manager. Therefore,
the overall activities to be undertaken for managing of the transitions are systematically
organized in the recently prepared Asset Management Manual (MUDH, 2016) in such a way that
could be easily understood and practiced by implementing bodies as follows.
Track the start and end dates for each maintenance activity and enter these in the
TDS 5
Once each maintenance activity has been completed, change the condition
indicator for the asset in question to reflect the new status.
Similarly, the procedures to be followed for undertaking these activities are presented as follows.
Tracking and evaluation of past projects not only tells trends of past performance and the actual
capacity of project implementing entity, it also gives opportunity to learn from past practices so
as to minimize weaknesses and scale up strengths in the future. As AMP is due for completion
towards the end of the (Ethiopian Calendar) year, it is not possible to provide a complete analysis
for the year in which the assessment of existing assets is being carried out. Thus, the analysis
should begin by focusing on the previous year, i.e.; AMP year minus 2, where a full set of
statistics should be available to make trust worthy tracking process. This provides the
comparative analysis. The tables below provide templates for measuring the performance of new
works projects and maintenance activities respectively. The table for maintenance activities is
more comprehensive because it is able to draw on activities completed in the year. Also, this is
the more important table for the AMP since the maintenance performance is more directly
associated with the AMP, whereas the performance of new works project starts falls under the
CIP.
Table 145: Sample Financial and Physical project progress report of 2011 EFY
SN Project Name Unit Measu Estimated Contart Starting Completio Physical and
rement Amount Amount Date n date Financial
achievement
todate
A COBBLE STONE ROAD
1 Tesfaye Mandebo to RahelKifle (Koticha ) m phy
sintayehuBulng to 2011 new ditch (koticha)
ETB Fin
As mentioned above, tracking of new works and the subsequent management of the new works
projects requires integrated efforts of the AMP team and the associated expertise, including
project manager, procurement specialist and construction manager. Implementation time of
planned projects could be affected by procurement or financial flow which in turn needs the
input of the procurement specialist to amend the starting and end date of construction or
completely remove the project from the list. In addition, the tracking process shall be
complemented by recording of new projects on database and processing of the data using GIS
analysis tools. The list below covers all the key dates that should be noted and entered into the
fields provided in the new works projects database.
Approval
Date of tender invitation
Date of tender closure
Date of signing of a contract
Date of start of activity
Date of project completion
Date of handover to the city
Date when the new projects is entered into the database for existing assets
Approval
Date of signing of a contract
Date of start of activity
2 Gravel 4,000,000.
00
1 NaannooGabaaMoofaaHangaBlto,KeellaaBaabubraaH km 5 720.000,0
angaDaggafaaDamee 0
2 hadiidaahangamanaIzaanaa km 2 450.000,0
0
3 manaGoshimeeZawudee.GilleeZawudeehangahadiida km 2 450.000,0
a 0
4 manawandimmaagenyhangaHaddidaa km 1.2 563,500.0
0
5 manaMokonninBalaayhangamanaAddisuuAlaqaa km 1 500,000.0
0
4 Street Light
WATER SUPPLY
1 Water meter No 30
The infrastructure projects are increasing from time to time. The involvement of private sector
and community is very significant. So many projects are outsourced to the private sector in the
form of contractors and other sectors. The initiation of creating internal capacity for internal staff
is very promising
Finance and Economic Office for bidding, procurement, expenditure activities etc.
Municipality for d/t infrastructure development like road, drains, culverts, sanitations etc.
Revenue office for revenue collection
Water supply office for water infrastructure like borehole, expansion lines etc.
EEPCo. For street light infrastructure. Not including solar street light
The staffing schedule is an integral component of this AMP of Dukem, which needs a proper
plan by mentioning all staffs that will participate in the maintenance activity of the AMP.
Accordingly, the AMP has been prepared inconsideration of this task as depicted in table below.
Table 147: Staffing Schedule for Maintenance Activities of All Strategic Areas of Dukem AMP 2011
No Categories of Assets Responsible Responsible Remarks
Department(staff Names
plan) Person/Group
1 Movement Network Team Members Infrastructure Development Main Business Process
1.1 Asphalt Road Infrastructure Of the process is responsible to open new roads based on the
1.2 Cobble Stone Road Development Main City’s Structure Plan; While Design,
1.3 Gravel Road process owner Construction, & Contract Administration
1.4 Red Ash Road &Infrastructure Process is responsible for
1.5 Earth Pressed Road construction, Maintenance and Management of
1.6 Culvert the Road
1.7 Street Light
2 Environmental Services Infrastructure Team Members Responsible for construction, maintenance and
2.1 Drainage Development Main Of the process management
2.2 Parks and Greenery process owner
3 Water Supply Dukem Water Supply Team Members Dukem Water Supply Service Office are
Systems Service Office Of the process responsible for provision /supply of water for the
people of Dukem
4 Social and Economic Each Sectorial Team Members Concerned sectors &Beautification and Green
Services Department of the Of the process Development Office
4.1 Edu Bldgs. City`s Administration
4.2 Health Bldgs.
4.3 Youth Bldgs.
4.4 Other Bldgs.
4.5 MSE Bldgs.
4.6 Housing Bldgs.
5 Supporting Services City Service and Team Members City Service and Supply Office
Supply Office Of the process
Contract management
Bidding Process