0% found this document useful (0 votes)
64 views1 page

Legend Notes and Specifications: Plumbing Layout Plan

The document provides specifications for a septic system layout. It includes notes specifying that the septic vault must be at least 0.2 meters from the top of the sewage and ventilated 10 feet above. All sanitary branches must be sloped and joined with PVC cement. The system must be installed under a licensed plumber according to the Philippines National Plumbing Code.

Uploaded by

Rod Najarro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views1 page

Legend Notes and Specifications: Plumbing Layout Plan

The document provides specifications for a septic system layout. It includes notes specifying that the septic vault must be at least 0.2 meters from the top of the sewage and ventilated 10 feet above. All sanitary branches must be sloped and joined with PVC cement. The system must be installed under a licensed plumber according to the Philippines National Plumbing Code.

Uploaded by

Rod Najarro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

LEGEND NOTES AND SPECIFICATIONS

4" dia. UPVC pipe


12mm. dia. Temp. Bars

SV - SEPTIC VAULT
WC - WATER CLOSET 1. THERE SHOULD BE NO SEPTIC VAULT WITHIN OR UNDER THE BUILDING.
2. TANKS MUS BE BUILT WATER-TIGHT OF CONCRETE, STONE OR CHB.
FD - FLOOR DRAIN 2.400
3. NOT LESS THAN 0.20m. OF AIRSPACE SHOULD BE LEFT FROM THE TOP
LAV - LAVATORY OF THE SEWAGE.
KS - KITCHEN SINK 4. THE VAULT MUST BE PROVIDED WITH MANHOLES AND TIGHT COVERS
FOR CLEANING AND NECESSARY REPAIRS. 1.000 1.400
CO - CLEAN OUT
5. ALL SANITARY BRANCHES SHOULD BE SLOPED FROM ITS ORIGINAL LEVEL 0.500
MH - MANHOLE 0.500
AND MUST BE JOINED WITH PVC SOLVENT CEMENT.
F. - FAUCET 6. PROVIDE AT LEAST ONE SANITARY VENTILATION THAT WILL EXTEND 10ft. C.O. C.O. C.O.

SH - SHOWER HEAD FROM THE TOP OF THE SEWAGE. Nat. Grade Ln. M.H. M.H. 0.100

HB - HOSE BIBB 7. ALL WORKS AND INSTALLATION HEREIN SHALL BE DONE UNDER THE 0.20 m. AIRSPACE 0.200
STRICT SUPERVISION OF A DULY LICENSED MASTER PLUMBER.
VTR - VENT. THRU ROOF OUTLET
8. ALL WORKS AND INSTALLATION SHALL CONFORM WITH THE RULES AND INLET
SANITARY LINE
REGULATION OF THE NATIONAL PLUMBING CODE OF THE PHILIPPINES, REP.
WATER LINE
ACT. 1318 SHALL PREVAIL. 1.100
LS - LAUNDRY SINK 4" thk CHB
LEACHING DIGESTIVE CHAMBER
CHAMBER
F 6" thk. Concrete Flooring

4" Ø UPVC Sanitary Pipe


1" Ø UPVC Supply Pipe
KS

0.450
2" X 2" X 41" Angle Bar Frame w/ 0.150
0.350 10 mm.Ø DRSB @ 0.05 moc
0.031 H A R D C O R E

F F Sh.
Lav. SECTION DETAILS
WC FD 0.450
2" thk Conc. Wall
FD WC
Lav.
Sh. F F 1" Ø UPVC Supply Pipe
CO 4" Ø UPVC Sanitary Pipe 4" Ø UPVC Sanitary Pipe 10 mm.Ø DRSB Temp. Bars
0.050 0.350 0.050
SEPTIC
VAULT 1.000 1.400

CATCH BASIN DETAILS 0.50m. x 0.50m. Concrete Manhole


1" Ø UPVC Supply Pipe

12mm. dia. Temp. Bars @


SCALE: 1: 80 MTS .20 moc, BW.

4"
C.O.
1/2"Ø UPVC Pipe

Ø
UP
F
VC
3/4 Sa
"Ø nit
a
Lav. UPVC ry Pipe
Su
pp
yP
ly Pipe ipe
PVC
Supp 4" M.H. M.H. 1.200
U 3/4 Ø
2"Ø
SH WC "Ø UP
VC
1/2"Ø UPVC Pipe

UP Sa
VC nit
Su ary
pp Pip
yP e OUTLET INLET
F FD ipe
C.O. C.O.
1" Ø UPVC Supply Pipe

ENTRY
PLAN DETAILS

PLUMBING LAYOUT PLAN


ISOMETRIC PLUMBING SEPTIC VAULT DETAILS
RAMP SCALE: 1: 80 MTS SCALE: 1: 25 MTS
SCALE: 1: 100 MTS UP

PREPARED : APPROVED : SEAL : PROJECT TITLE : AS PREPARED FOR : REVISION : SHEET NO.

A THREE BEDROOM RESIDENTIAL BLDG. 6


REG. CERT. NO. DATE ISS. DRAWN BY:
A 7
PTR NO. DATE ISS.

T.I.N. PLACE ISS. OWNER

You might also like