0% found this document useful (0 votes)
57 views1 page

Nmr-601 Rev 03 PZV Po 1345 Binzagr Mrp-061 - Copy 22

Uploaded by

Hajarath Ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views1 page

Nmr-601 Rev 03 PZV Po 1345 Binzagr Mrp-061 - Copy 22

Uploaded by

Hajarath Ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Page: 1 of 3

Sizing acc. to Date: 2020-03-15 10:08:32


API 520 for Liquid Project: Saudi Aramco Contract #
VALVESTAR® - v.7.3.1.60920 Tag No: J60-PZV-2495
LESER Job № 65017817

Sizing - Medium
1000 Designation ULSD
1004 Formula
1005 Density ρ 789 kg/m³
1006 Viscosity µ or ή 1.7 cP

Sizing - Service condition


1100 Maximum allowable working pressure
1101 Set pressure p 6.895 bar-g
1102 Constant superimposed back pressure paf
2102 Variable superimposed back pressure
1103 Built up back pressure pae 0.689 bar
1104 Backpressure 0.689 bar-g
1105 Overpressure dp 10.00 %
1106 Environmental pressure pu 1.013 bar
1107 Relieving Temperature T 50 °C
1111 Operating Temperature 50 °C
1108 Required massflow qm,ab
1109 Volume flow to be discharged (working condition) qvb,ab
1120 Rupture disc correction factor Kc 1.000

Sizing - Calculation
1200 Certified massflow qm,zu 6,268.15 kg/h
1201 Certified volumeflow (operating condition) qvb,zu 7.944 m³/h
1203 Certified volumeflow (standard condition) qvn,zu
1204 Maximum mass flow qm,max 6,964.611 kg/h
1205 Maximum volume flow (working condition) qvb,max 8.827 m³/h
1206 Maximum volume flow (standard condition) qvn,max
1207 Capacity exceed

Name Akash
Date 2020-03-15 10:06:12
Rev.No 1