0% found this document useful (0 votes)
127 views

Kanpur Projects

The document lists 50 projects proposed in Kanpur's Smart City Proposal, organized under 7 project umbrellas, and their associated costs in Indian rupees. The projects range from developing commercial centers and improving skills to strengthening utilities like electricity, drainage and sewer systems. Other initiatives include smart parking, traffic management, surveillance systems and promoting the city's culture and identity. The total cost of projects outlined is over 2,000 crore rupees.

Uploaded by

Abhishek Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
127 views

Kanpur Projects

The document lists 50 projects proposed in Kanpur's Smart City Proposal, organized under 7 project umbrellas, and their associated costs in Indian rupees. The projects range from developing commercial centers and improving skills to strengthening utilities like electricity, drainage and sewer systems. Other initiatives include smart parking, traffic management, surveillance systems and promoting the city's culture and identity. The total cost of projects outlined is over 2,000 crore rupees.

Uploaded by

Abhishek Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

List of Projects as per Smart City Proposal : Kanpur

Sl No. Projects in SCP Cost (Rs. In Crore)


Area Based Development (ABD)
PROJECT UMBRELLA - ‘SAMPANN’
1 Commercial and Business centre at VP Srivastav market 17.43
2 Skill Development and Business centre at Chunniganj 94.16
3 Implement e-patashala/ digital learning 2.40
4 Develop Naveen Market as non-vehicle streets 19.01
PROJECT UMBRELLA - ‘SACHAL’
5 Road improvement and maintenance 48.00
6 Pedestrian Infrastructure and Street Furniture 11.65
7 Cycle Track 6.12
8 Multi-level Car Parking 50.51
9 Smart Parking Solutions 30.00
10 Urban Nodes 10.00
PROJECT UMBRELLA - ‘SAKRIYA’
11 Smart City Operation Centre 98.00
12 Free Wi-Fi hotspots 4.20
13 e-CSC 2.00
14 Digital advertisment boards 10.00
PROJECT UMBRELLA - ‘SATAT’
15 Utility Duct (Electricity, Water, Sewer, OFC, Telecom, PNG) 147.15
16 LPG/ PNG smart metering 13.47
Electricity Supply
17 Underground wiring & Strengthening of transformer 150.00
18 SCADA 85.00
19 Smart Metering 40.00
20 Strengthening and augmentation of Drainage network 67.00
21 Strengthening and augmentation of Sewer network 338.35
Water Supply
22 Strengthening and augmentation of network 21.49
23 SCADA 24.67
24 Smart Metering 32.36
Sanitation
25 Public Toilets and Bins 2.53
26 Community Toilets 1.46
Energy Efficiency
27 Intelligent Solar LED street lights 0.18
28 Solar Rooftop 14.32
29 Rain water harvesting 10
30 Waste water recycling 29.32
PROJECT UMBRELLA - ‘SWASTH’
31 Develop Open Gym 0.30
32 Ganga Riverfront Development 125.42
33 Unifying City Identity :-
34 Cuisine and Handicraft Festivals 2.00
35 Cultural Theme Infrastructure & Events 5.00
36 Awareness Campains 3.00
37 Promotion and Advertising 2.00
38 Online, Radio and Media Campaigns 5.00
PAN CITY PROJECT
PROJECT UMBRELLA - ‘SAMPANN’
39 Economic Development Cell 3.00
PROJECT UMBRELLA - ‘SACHAL’
40 Integrated Traffic Management System 75.11
41 City Surveillance System 36.66
42 ICT for City Bus 10.00
43 Smart Travel Stations 40.00
44 Smart Travel Card 8.00
PROJECT UMBRELLA - ‘SAKRIYA’
45
Smart City Management Portal - Integration of Urban Utilities 85.00
46 Capacity Building 7.50
PROJECT UMBRELLA - ‘SATAT’
47 ICT based solid waste collection 40.00
48 Waste to Energy generation plant 40.00
49 Waste processing and disposal 100.00
50 Intelligent LED street lights 98.11
Sl No. Projects in SCP Cost (Rs. In Crore)
PROJECT UMBRELLA - ‘SWASTH’
51 Air and Water Quality Monitoring 15.00
52 Sewerage :-
53 Construction of New STPs and CETP 162.75

Note- This only indicates cost of individual projects given in the SCP. The total value of SCP may additionally include other costs such as DPR preparation, PMC, O&M etc.

You might also like