Case Study - JCB Cab Systems (En)
Case Study - JCB Cab Systems (En)
JCB CAB
SYSTEMS
For eight years, Rugeley based JCB Cab
ARGENTINA- BRASIL- MÉXICO- CHILE- USA- DEUTSCHLAND- ESPAÑA- FRANCE- ITALIA- POLSKA- PORTUGAL- UNITED KINGDOM- CHINA- INDIA- TURKIYË- KOREA- JAPAN
At JCB Cab Systems, the world steel shortage
focused attention on the efficient use of
material. It uses sheet steel ranging in
thickness from 1.2 mm to 15 mm. During
its seven day week, four shift pattern, it
consumes around 7,000 sheets, producing
more than 40,000 piece parts every week.
ARGENTINA- BRASIL- MÉXICO- CHILE- USA- DEUTSCHLAND- ESPAÑA- FRANCE- ITALIA- POLSKA- PORTUGAL- UNITED KINGDOM- CHINA- INDIA- TURKIYË- KOREA- JAPAN
The ability to nest the week’s requirements is
made possible by the transfer of this information.
Once the nesting is complete, the Lantek system
is able to feed information back to SAP about
material utilisation and machine run times.
Stephen Dunion explained, “The nesting is quite
complex. There are groups of parts which will
not nest well together, and additionally there are
different thicknesses and grades of material to
be considered.” On completion of each nest the
Lantek system automatically generates NC code
to drive the laser profiling machines.
ARGENTINA- BRASIL- MÉXICO- CHILE- USA- DEUTSCHLAND- ESPAÑA- FRANCE- ITALIA- POLSKA- PORTUGAL- UNITED KINGDOM- CHINA- INDIA- TURKIYË- KOREA- JAPAN
Case Study
ARGENTINA- BRASIL- MÉXICO- CHILE- USA- DEUTSCHLAND- ESPAÑA- FRANCE- ITALIA- POLSKA- PORTUGAL- UNITED KINGDOM- CHINA- INDIA- TURKIYË- KOREA- JAPAN
FACT SHEET
ACTIVITY/INDUSTRIAL Excavators
SECTOR
ARGENTINA- BRASIL- MÉXICO- CHILE- USA- DEUTSCHLAND- ESPAÑA- FRANCE- ITALIA- POLSKA- PORTUGAL- UNITED KINGDOM- CHINA- INDIA- TURKIYË- KOREA- JAPAN