0% found this document useful (0 votes)
473 views1 page

Orig 230007885568

This electricity bill from June 2021 provides details of consumption and charges for a customer named Halsa Ram in Una, including a meter reading of 177 kWh resulting in a current statement of payment of Rs. 547.11 due by June 26th. It lists the tariff rates, subsidies applied, fixed charges, and notices that non-payment may result in disconnection of service.

Uploaded by

Shivam Khosla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
473 views1 page

Orig 230007885568

This electricity bill from June 2021 provides details of consumption and charges for a customer named Halsa Ram in Una, including a meter reading of 177 kWh resulting in a current statement of payment of Rs. 547.11 due by June 26th. It lists the tariff rates, subsidies applied, fixed charges, and notices that non-payment may result in disconnection of service.

Uploaded by

Shivam Khosla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

HPSEBL (A State Govt. Undertaking) HPSEBL Help Line No.

: 18001808060 or 1912
Electricity Bill June-21 CGRF: B No.8 SDA Complex,Kasumpti [email protected] 0177-2626104
Sub-Division: - MEHATPUR Electricity Ombudsman: First Floor, Sharma Sadan, Khalini Shimla-2
SUB-DIVISION [email protected], 0177-2624525
Consumer Info
Name HALSA RAM . . Consumer Id 100001469469 Bill No. 230007885568
Address P0VLAM SAS UNA 2413 Legacy A/c no. 1241302370 Issue Date 15.06.2021
. 174315 A Std.Supply Voltage(KV) 0.23 Last Reading Date 12.05.2021
Supply Voltage(KV) 0.23 Current Reading Date 11.06.2021
Metering Voltage(KV) Billing Cycle Bi-Monthly
Tariff Type DS Cash/Draft Due Date 26.06.2021
Conn.Load(KW) 0.78 Cheque Due Date 24.06.2021
Meter Reading Unit B24130LA No. of Days 30

Meter Reading & Consumption


Meter No. New Old Difference Multiplier Adjustment/ Consumption
Estimated units
kWh main 14631798 5007.000 4830.000 177.000 1.000 0 177.000
Power Factor
Concession unit
Bill Particulars
Particulars Base Value Rate Amount (Rs.)
Energy Charge 123.000 kWh 3.95 (Rs./kWh) 485.85
54.000 kWh 4.85 (Rs./kWh) 261.90

Total energy charge 747.75


Disturbing Load Penalty 0
Govt. Subsidy 123.000 kWh 2.10 (Rs./kWh) -258.30
54.000 kWh 0.90 (Rs./kWh) -48.60

Total Govt. subsidy -306.90

Total Board Employee Consession 0


Fixed Charge 30 day 70.00 (Rs./month) 69.04
Meter Rent 30 day 15.00 (Rs./month) 14.79
Net Current SOP 524.68
Electricity Duty 747.75 (Rs.) 3.000 % 22.43
MC Tax 177.000 kWh 0.00 (Paisa) 0
Payment Info
Security Deposit SOP(Rs.) ED(Rs.) M.Tax(Rs.) Other(Rs.) Total (Rs.)

SD Paid Date Current Charges 524.68 22.43 0 547.11


Sundry $ 0 0
Last Paid amount(Rs.)
Neg. Sundry$ 0
Last Paid Date Allowances
Arrears(Nor) % 0 0 0.00 0
Arrears (Disputed) 0.00 0.00 0.00 0
Othrs/Adv/Int(Cr/Dr) 0.11- 0.11-
Total Amount payable 524.68 22.43 0 0.11- 547.00
before Due Date

Late Payment Surch. 7.87


Total Amount Payable 532.55 22.43 0 0.11- 555.00
After Due Date

1 : Advance Amount0.11-Rs.has been Released


2 Normal Meter Reading (SBM)
3 Electricity Duty calculated on Energy Charge
4 Notice: In the event of non-payment of all dues by due date, connection shall be disconnected after expiry of 15
days notice period as per section 56(1) of Electricity Act, 2003.

You might also like