Waterflooding Pilot Projects Overview

This document discusses waterflooding pilot projects in oil fields to increase oil recovery. It specifically discusses the Culebra oil field project in Ecuador. 22 secondary recovery projects have increased oil reserves by 57 million barrels. The Culebra project started water injection in January 2017 into the lower Napo U reservoir through well CLBB-017. This has increased oil production from 3,200 to 4,000 barrels per day and raised reservoir pressure from 1,100 to 1,400 psi. A graph shows that incremental oil production from secondary recovery is projected to be 28 million barrels over 28 years. Facility changes have improved injectivity and injection water quality at the Culebra field.

Uploaded by

Jose Condor
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
274 views23 pages

Waterflooding Pilot Projects Overview

This document discusses waterflooding pilot projects in oil fields to increase oil recovery. It specifically discusses the Culebra oil field project in Ecuador. 22 secondary recovery projects have increased oil reserves by 57 million barrels. The Culebra project started water injection in January 2017 into the lower Napo U reservoir through well CLBB-017. This has increased oil production from 3,200 to 4,000 barrels per day and raised reservoir pressure from 1,100 to 1,400 psi. A graph shows that incremental oil production from secondary recovery is projected to be 28 million barrels over 28 years. Facility changes have improved injectivity and injection water quality at the Culebra field.

Uploaded by

Jose Condor
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Introduction to Waterflooding Projects: Overview of waterflooding pilot projects conducted by Petroamazonas EP, highlighting initial goals and key figures.
  • Fields and Reserves: Illustrates fields with secondary recovery and reserves increment, displaying strategic locations.
  • Secondary Recovery Analysis: Analyzes the necessity of secondary recovery at Sacha Field through pressure graphs and predictions.
  • Injection Systems Details: Describes the specifics of injection systems, including well-to-well and processing facilities setups.
  • Culebra Project Overview: Introduction and general description of the Culebra project, including production data and field maps.
  • Culebra Field Geology: Geological exploration of the Culebra Field, highlighting structural and stratigraphic details.
  • Culebra Field Injection History: Time-series data on the injection history and behavior at the Culebra field, with system charts.
  • Well Influence Analysis: Evaluation of well influences at the Culebra field, displaying various performance metrics and impact assessments.
  • Future Projects and Expansion: Plans for future drilling and field reactivation activities at Culebra and Yulebra fields.

WATERFLOODING PILOT PROJECTS

FIELDS WITH SECONDARY RECOVERY

22 PROJECTS OF
SECONDARY
RECOVERY
INCREASE OF RESERVES FOR IOR
CURRENT PROJECTS: 57 MM BLS
WHY SECONDARY RECOVERY IS NEEDED? SACHA FIELD
40% P res

Injection 40% P res


Start

40% P res
Is Needed? Injection
Start
MASIFICATION OF PROJECTS IOR:184MM BLS
INVESTMENT PER RESERVE BARREL BY IOR
INJECTION SYSTEMS / WELL TO WELL

WATER PRODUCER WATER INJECTOR


MEASURER
INJECTION SYSTEMS / PROCESSING FACILITIES
PRODUCTION WATER
BOOSTER TRANSFER
FILTERS PUMP SYSTEM
HPS INJECTION PUMPS

OIL PRODUCER WATER INJECTOR


CULEBRA PROJECT
CULEBRA FIELD - GENERALITIES

General description:

Culebra

• Production start date: Marzo 1981


• Initial Pressure: 3500 Psi
• Bubble Pressure: 850 Psi
• N° Perforated Wells: 23
• N° Produce Wells: 15
• Current production (bopd)?: 4,000
• API average: 16
• BSW (%): 13
• Accumulated Oil (MMbbl): 28.4
• Accumulated Water (MMbbl): 4.5

Injection Start Date: January 10, 2017

• Injector Wells CLBB-017


• Reservoir UI
PRODUCTION HISTORY UI
Before After
Pr : 1100 Psi Pr : 1300 Psi
BOPD: 3200 BWPD: BOPD: 4000
233 BWPD: 893

INJECTION START
January 2017
INCREMENTAL PRODUCTION UI:28 MMbls

PRIMARY RECOVERY SECONDARY RECOVERY

10000 CAMPO: CULEBRA PAD: PAD B(12)

ROCK AND FLUID WATER INJECTION


PETROLEO PROM DIA CAL ( bbl/d )
LIQUIDO PROM DIA CAL ( bbl/d )

EXPANSION
AGUA PROM DIA CAL ( bbl/d )
ACUM. INYECCION AGUA ( Mbbl )

1000

FR: 21%
Pr: 1100 Psi
FR: 30%
Barrels per day

100
Pr: 1400 Psi

10

1
2013 14 15 16 17 18 19 20 Date
21 22 23 24 25 26 27 28

Years
CULEBRA FIELD - GEOLOGY
Injection Arrangement

Culebra field corresponds to an anticline with E-O The greater thickness of sandstone increases from East
orientation to West.
CULEBRA FIELD - CONTINUITY OF SAND
Structural-stratigraphic correlation U lower

CLBB-017 (SSTVD)

Facies
The lower U-reservoir shows a lithology of grain
type retrograde, shown by the disposition of the
Superficie de inundación layers during their deposition, product of the
transgression caused by the entry of the sea to
the continent. It is identified as a depositional
Superficie de
inundación sequence of a distributary channel.

Depósitos
transgresivos
INJECTOR WELL
Water Injection System
CLBB-017 CULEBRA-17D injects water into the lower Napo U reservoir to mobilize the remaining oil
reserves. The injection water comes from the Lower Hollin sandstone of the well CULEBRA-
18D.

Petrophysical Parameters

Net Thickness: 69 (ft) Porosity: 14.5 (%) Permeability: 506 (mD)


Multi-rate Test
Well WHP (PSI) BWPD

CLBB-017 5000 3200


CULEBRA FIELD – INJECTION HISTORY

INJECTION START
January 2017

Current Parameters
Pinj: 500 PSI
Vw inj: 3964 bwpd
Accumulated inj: 2101Mbls
Salinity: 260
IMPROVEMENT OF THE
CHANGE OF FACILITIES INJECTION WATER
QUALITY
CULEBRA FIELD – CONTROL
Hall Plot Injectivity Index
375000 6000
1.50 6000
Axis 1
Pi / Wi
Axis 2
INY DE AGUA ( bbl/d )
300000 1.25
4500
4500

1.00
225000

3000
0.75 3000
150000

0.50
1500
1500
75000
Change of facilities
Axis 1
Hall Function
0.25
Axis 2
INY DE AGUA ( bbl/d )

0 0 0.00 0
0 500000 1000000 1500000 2000000 2500000 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL
ACUM. INYECCION AGUA ( bbl ) 2017 Date
2018

Changes in the trend of the curve by facility arrangements Current injectivity index is 0.25 psi for each barrel of water injected.
Replacement Index
3.0
VC.VRR_MOD CAMPO: CULEBRA PAD: PAD B(12)

2.5

2.0

1.5

1.0

0.5

0.0 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JULAUG
2017 Date
2018

Current Replacement Index: 1.5 bls of water injection per barrel produced of fluid.
WATER ADVANCE BEHAVIOR

Injection water influences nearby wells, currently has a preferential migration to the
North.
CULEBRA FIELD – WELLS INFLUENCED

PERFORATED AFTER PULLING - RUN ESP


INJECTION. (UPSIZING)
PREFERENTIAL AREA
OF WATER
ADVANCEMENT

PULLING ESP
PULLING BES, PREFERENTIAL AREA OF
CHANGE TO JET WATER ADVANCEMENT.
PUMPING / TCP
Cerrado
Abierto
Inyector

PULLING - RUN ESP


PULLING RUN UP SIZE PUMP PREFERENTIAL AREA OF
FRACTURE WATER ADVANCEMENT.
ESP + TCP

CHANGE HYDRAULIC
LIFTING TO ESP
CULEBRA FIELD – WELLS INFLUENCED

PERFORATED AFTER PULLING - RUN ESP (UPSIZING)


INJECTION. PREFERENTIAL AREA OF
WATER ADVANCEMENT.

PULLING BES, CHANGE


TO JET PUMPING / TCP

PULLING ESP
PREFERENTIAL AREA OF WATER
Cerrado ADVANCEMENT
Abierto
Inyector

PULLING RUN ESP + TCP


FRACTURE
UP SIZE PUMP

CHANGE HYDRAULIC
LIFTING TO ESP

PULLING - RUN ESP


PREFERENTIAL AREA OF
WATER ADVANCEMENT.
CULEBRA FIELD – WELLS INFLUENCED

PERFORATED AFTER
INJECTION.

PULLING - RUN ESP (UPSIZING)


PREFERENTIAL AREA OF WATER
ADVANCEMENT.

PULLING ESP
PREFERENTIAL AREA OF WATER
ADVANCEMENT

PULLING BES, CHANGE


TO JET PUMPING / TCP
Cerrado
Abierto
Inyector

PULLING RUN ESP +


FRACTURE TCP

CHANGE HYDRAULIC
LIFTING TO ESP

PULLING - RUN ESP


PREFERENTIAL AREA OF WATER
UP SIZE PUMP ADVANCEMENT.
FUTURE PROJECTS – CULEBRA YULEBRA

FIELD RESERVOIR
REACTIVATION OF CHANGES OF WELLS NEW WELLS CONVERSION OF WELLS NEW
CLOSED WELLS ZONE PRODUCERS RE-ENTRY INJECTOR WELLS INJECTORS

Culebra -
UI 1 1 19 2 1 8
Yulebra

FIELD PERFORATION WELLS DRILLS WELLS


PRODUCERS INJECTORS

Culebra 8 4

Yulebra 11 4

FIELD ASSOCIATED INCREASE


(MMBLS)

Culebra - 28.5
Yulebra
Thank you

¿Questions?

Well Integrity Excellence in a Low Oil Price Environment

WATERFLOODING PILOT PROJECTS
22 PROJECTS OF 
SECONDARY 
RECOVERY
FIELDS WITH SECONDARY RECOVERY
INCREASE OF RESERVES FOR IOR 
CURRENT PROJECTS: 57 MM BLS
WHY SECONDARY RECOVERY IS NEEDED? SACHA FIELD
40% P res
Injection
Start
40% P res
Injection
Start
40% P res
Is Needed?
MASIFICATION OF PROJECTS IOR:184MM BLS
INVESTMENT PER RESERVE BARREL BY IOR
WATER PRODUCER
WATER INJECTOR
MEASURER
INJECTION SYSTEMS /  WELL TO WELL
(https://www.google.com/url?sa=i&rct=j&q=&esrc=s&source=images&cd=&cad=rja&uact=8&ved=2ahUKEwiimfbqyPLcAhVvuVkKHespCPUQjRx6B
CULEBRA PROJECT
General description:
Culebra
•
Production start date:
Marzo 1981
•
Initial Pressure:                                   3500 P

You might also like