Proposal Pengukuran .

This document is a proposal from PT Surveyor Indonesia for topographic, hydrographic, and geotechnical surveying services at a proposed cement terminal in Belawan District, Sumatra, Indonesia. PT Surveyor Indonesia would conduct detailed surveys to obtain information about the ground conditions, existing infrastructure, sea depths and tides, and soil properties to support development of the offshore jetty and onshore buildings. The document provides background on the project location, PT Surveyor Indonesia's company profile and capabilities, and describes the proposed methodology for topographic surveying using distance measurement, elevation data collection, and map production. It also outlines the equipment and procedures for hydrographic surveying of water depths, currents, and navigation data collection, as
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
218 views54 pages

Proposal Pengukuran .

This document is a proposal from PT Surveyor Indonesia for topographic, hydrographic, and geotechnical surveying services at a proposed cement terminal in Belawan District, Sumatra, Indonesia. PT Surveyor Indonesia would conduct detailed surveys to obtain information about the ground conditions, existing infrastructure, sea depths and tides, and soil properties to support development of the offshore jetty and onshore buildings. The document provides background on the project location, PT Surveyor Indonesia's company profile and capabilities, and describes the proposed methodology for topographic surveying using distance measurement, elevation data collection, and map production. It also outlines the equipment and procedures for hydrographic surveying of water depths, currents, and navigation data collection, as
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 54

PT.

SURVEYOR INDONESIA - MEDAN

Jl. Sunggal No. 197 Medan


Telp. 061. 42569565 Fax. 061. 42569564

INDOCEMENT
HEIDELBERGCEMENT Group
2021

TENDER FOR TOPOGRAPHIC SURVEY,


HYDROGRAPHIC SURVEY & GEOTECNICHAL
INVESTIGATION
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

Table of Contents
Daftar Isi ........................................................................ Error! Bookmark not defined.
Daftar Gambar ................................................................ Error! Bookmark not defined.
Daftar Tabel ................................................................... Error! Bookmark not defined.
CHAPTER I. PENDAHULUAN ......................................................................................... v
I.1 Preamble......................................................................................................... v
I.2 Location .......................................................................................................... v
CHAPTER II. COMPANY PROFILE ............................................................................... vii
II.1 Vision, Mission and Corporate Values ............................................................... viii
II.1.1 Vision ..................................................................................................... viii
II.1.2 Mission ................................................................................................... viii
II.1.3 Corporate Vallues .................................................................................... viii
II.2 Business Sector ............................................................................................. viii
II.3 Company Structure ...........................................................................................x
CHAPTER III. TOPOGRAPHIC SURVEY ......................................................................... xii
III.1 Introduction ................................................................................................... xii
III.2 Methodology .................................................................................................. xii
III.2.1 Measuring Horizontal Distance .................................................................. xiii
III.2.2 Measuring Vertical Distance...................................................................... xiii
III.2.3 Difference in Elevation ............................................................................. xiii
III.2.4 Horizontal Distances ................................................................................ xiv
III.2.5 Preparation of Drawing ............................................................................ xiv
III.2.6 Topo-Cadastral Data ................................................................................. xv
CHAPTER IV. HYDROGRAPHIC SURVEY ..................................................................... xvi
IV.1 Introduction .................................................................................................. xvi
IV.1.1 Survey Equipment .................................................................................. xvii
IV.1.2 Navigation Data Processing ...................................................................... xix
IV.2 Horizontal Control .......................................................................................... xix
IV.2.1 Electric Positioning System ....................................................................... xix
IV.3 Vertical Control ............................................................................................... xx
i
Page

IV.3.1 Echo Sounder........................................................................................... xx

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

IV.3.2 Motion Reference Unit (MRU) .................................................................... xx


CHAPTER V. GEOTECHNICAL INVESTIGATION ............................................................. xxi
V.1 Introduction .................................................................................................. xxi
V.2 Field Investigation.......................................................................................... xxi
V.2.1 Boring .................................................................................................... xxi
V.2.2 Trial Pits ................................................................................................ xxii
V.2.3 Down Seismic Test ................................................................................. xxiii
V.2.4 Pressure Metter Test............................................................................... xxiii
V.2.5 Electrical Resistivity Test ......................................................................... xxiii
V.3 Sampling and Laboratory Test........................................................................ xxiii
CHAPTER VI. EXPERIENCES AND PLANT & EQUIPMENT

ii
Page

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

List of Figure
Figure I-1. Belawan Cement Terminal Location ................................................................ v
Figure I-2. Belawan Cement Terminal Area ..................................................................... vi
Figure II-1. The Organizational Structure of PT Surveyor Indonesia (Persero) .................... xi
Figure III-1. Methodological Workflow ........................................................................... xii
Figure III-2. Measuring Vertical Distance....................................................................... xiii
Figure III-3. Difference in Elevation .............................................................................. xiv
Figure III-4. Sample Topo Map with Contours ................................................................ xv
Figure IV-1. The Movement of the Boat in Navigating the Sounding Path ........................ xvii
Figure IV-2. Echosounder and GPS Receiver Equipment Placement ................................ xviii

iii
Page

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

List of Table
Table II-1. Business Sector PT. Surveyor Indonesia (Persero) ........................................... ix

iv
Page

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

CHAPTER I. PENDAHULUAN

I.1 Preamble
PT. Indocement Tunggal Prakarsa Tbk (ITP - the Employer) in cooperation with Heidelberg
Technology Center (HTC - the Engineer), are referred as Client and Engineer.

The Employer proposes to install cement terminal at Belawan District, South of Sumatera
Province. It is proposed to obtain site details regarding ground undulations and location of the
existing physical features, facilities etc. by carrying out detailed topographic survey, detail
about sea water depth, tides and water stream by conducting hydrographic survey and detail
about soil/geotechnical investigation relevant to off shore jetty work and on shore building
works.

I.2 Location
The proposed terminal site is located at Belawan Terminal of Pelindo-1 (approximately 60 km
from Bandara Internasional Kualanamu and 26 km from Medan City) in the island of North of
Sumatera, Indonesia.

Figure I-1. Belawan Cement Terminal Location


Page

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

Figure I-2. Belawan Cement Terminal Area

vi
Page

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

CHAPTER II. COMPANY PROFILE

PT Surveyor Indonesia (Persero) was incepted on 1 August 1991. Initially, our mission was to
assist the Government of Republic of Indonesia in expediting the flow of capital goods and
equipment from all over the world to Indonesia, to the world class standard Pre-Shipment
Inspection.

Today, PT Surveyor Indonesia (Persero) is confident to achieve its vision statement to become
the leading provider of ‘independent assurance’ in every transaction. Our vast experience in
this market so far has become the major power coupled with highly experienced and
competent human resources capable of delivering the best services for our customers.

We focus our Independent Assurance services to four sectors namely Institutional Agency
Empowerment, Infrastructure, Mineral & Coal, Oil & Gas and Power Plant System. Our services
include Volumetrik Survey, Preshipment Inspection, Second Hand Goods (SHG), Verifikasi
impor/ekspor, Draft Survey, Statutory Inspection, QA/QC Supervision.

From the experience that we have had from various fields, we have acquired vast knowledge
on business processes which made us capable of providing customized services that suit any
specific needs of our service users.

We thrive to bring in new innovation of services supported with technology feature so as to


bring in added value to customers.These innovative services carry the suitable benefit and
strategically contributing to the service of national interests in long term.

PT Surveyor Indonesia (Persero) has its registered office in Jakarta and 12 branches and a
number of geographical working units throughout Indonesia, offering services in both local
and overseas markets.
vii
Page

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

II.1 Vision, Mission and Corporate Values


II.1.1 Vision
To be world recognized national independent assurance company in total solution services

II.1.2 Mission
 Encouraging customers to meet the requirements of global customers with global
competitiveness

 A strategic partner to the government, private sector and others to optimize the resource
utilization and the domestic product on infrastructure, maritime, energy and food security

 Providing national and or international competence human resources and the latest
technology to meet market demands

II.1.3 Corporate Vallues

 Integrity
To reveal the truth objectively

 Competence
To acquire the necessary expertise, knowledge, and adopt such way of conduct and
behavior to help deliver professional services

 Innovation
To generate new solution, new product and more precise business processes

 Care
To show care, appreciation and be helpful

II.2 Business Sector


Business of PT. Surveyor Indonesia (Persero) covers several sectors and competencies,
including :
viii
Page

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

Table II-1. Business Sector PT. Surveyor Indonesia (Persero)

SURVEY INSPECTION CONSULTING


Marine & Mining Survei Technical Inspection &Assessment Technical Consulting
- On/Off hire Survei - Crane Inspection - International Ship and Port Facility
- Towing and Lashing Survei - Pipeline Inspection Security (ISPS Code)
- Cargo and Securing Survei - Pressure Vessel Inspection - Marine Transporting Building
- Draft Survei - Boiler Inspection - Exploration Analysis and
- Liquid and Chemical Cargo - Pressure Safety Valve Inspection (PSV) Evaluation of Natural Resources
Survei - Second Hand Goods Inspection - Feasibility Studi on Marine and
- Vessel Condition Survei Mining
- Recondition Industri Ability Assessment
- Stuffing / Un stuffing Survei - Economic Consulting
- Furnace Inspection
- Lost and Damage Survei - Exhibition and Trade Assistance
- Welding Procedure Certification
- Bunker Survei (WPS/PQR) - Project Monitoring
- Tank Calibration - Welding Certification - Project Feasibility Study
- Shipment Warranty - Tubular Inspection - Regional Potentially Optimalization
Study
- Mining Survei - Welding Inspection
- Applied System of Center of
- Painting/Coating Inspection
License and Developing Regional
- Risk Based Inspection
Information
- Risk Based Inspection
- Study of Increasing Program of
- Remaining Life Assesment Original Regional Income
- Reliability Center Maintenance
- Failure Analysis
Quality Assurance/Quality Control Quality Environment Safety &
Economic Survei
(Testing) Health Quality Safety & Health
- Commodity Survei - Radiographic Testing - Quality Management System
- Labor System Information - Ultrasonic Testing Standards and Conformities
Survei - Magnetic Particle Testing - Strategic Quality Management
- Terresterial/Geodetic Survei - Acoustic Emission Testing System (Life After ISO Certification)
and Mapping - Infra Red/Thermo-graphic Testing - Occupational Health and Safety
- Natural Resources Survei, Management System (OHSAS
- Eddy Current
Mapping & Analysis 18001)
- Helium Leak Detection
- Land Information System - Quality Improvement Program for
Small/Medium Enterprises
- Audit and Training Program
-
Supervision Economic Inspection Environment & Forestry
- New Ship Building and Repair - Pre-Shipment Inspection (PSI) - Environmental Management
Supervision - Appraisal and Asset Inventory System (ISO 14001)
- Port Building Supervision - Environmental Aspect/Impact
ix

- Sea Sand Mining Supervision Assessment (AMDAL)


Page

- Mining Supervision

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

SURVEY INSPECTION CONSULTING


- Petroleum Distributiion - Environmental Monitoring and
Supervision Measurement
- Oil and Gas Volume Lifting - Waste Management
Supervision - Forestry & Agriculture Audit
- Environmental Audit

II.3 Company Structure


PT Surveyor Indonesia (Persero) is confident to achievie its vision statement to become a
provider of independent assurance in every transaction. Our vast experience in this market
has become the major power coupled with highly experienced and competent human
resources capable of delivering the best services for our customers. The sectors that we are
ready to serve include Institutional Agency Empowerment, Infrastructure, Mineral & Coal, Oil
& Gas and Power Plant System. To us, the customers are the source of inspirations to deliver
qualified services.

We thrives to provide the best added-value, by providing total solutions, customized services
using international standards, and which are based on integrity, innovation, and technology
application. We also thrives to develop a conducive working environment for advancing our
competencies, professionalism, innovations, personnel career development in order to ensure
improved performance and sustainable growths for the company.

The attainment of the targeted performance will always call for the concerted actions of all
the strategic management components being implemented in the company management. This
was achieved by putting in place the visions, missions, goals, strategy and strategic programs
of PT Surveyor Indonesia (Persero) which will provide the bases and directions for the business
processes according to the expectation of the management, namely to become the leading
partner in the field of independent assurance with high competence in order to be able to
compete in the global market.

The composition of the PT Surveyor Indonesia (Persero) commissioners and directors, among
others :
x
Page

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

Commissioners

President Commissioners : Imam Prambagyo

Commissioners : Ferry Andrianto

Commissioners : Bambang Adi Winarso

Commissioners : Dody Widodo

Independent Commissioners : Paulus Prananto

Directors

Presiden Director : Dian M Noer

Commercial Director 1 : Tri Widodo

Commercial Director 2 : Darwin Abas

Financial & Strategic Planning


: Rosmanidar Zulkifli
Director

Human Resources Director : Lussy Ariani Seba

The organizational structure of PT Surveyor Indonesia (Persero) is as follows :

Figure II-1. The Organizational Structure of PT Surveyor Indonesia (Persero)


xi
Page

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

CHAPTER III. TOPOGRAPHIC SURVEY

III.1 Introduction
The aim of any topographical survey exercise is to determine the relative locations of point
(Place) on the earth’s surface by measuring horizontal distance (X and Y), differences in
elevation (Z) and direction (ɵ). The topographical maps that the produced often give the
location of places (observable features within the study area) and information about changes
elevation depicted using contours and spot heights. The topographical and cadastral maps
also serve as base maps.

III.2 Methodology
The proposed methodology will focus on primary (field) and secondary data collection and
management including data editing, cartographic map production and quality assurance
control.

Project Planning &


Mobilization of Resources

Establishment of Ground
Field Work
Control Points

Primary Data (Levelling)


Secondary Data Data Sourcing /Collection No
and Traversing

Quality Control & Survey Data


Data Preparation
Errors Adjusment Ok?

Countoring, Cross Section


Profile etc.

Map Production and


Yes
Report Writing

Project handover and


xii

Sign-Off
Page

Figure III-1. Methodological Workflow

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

III.2.1 Measuring Horizontal Distance

In tachymetry method, a rapid optical means of measuring distance using a telecope with
cross hairs and a stadia rod. The method that we shall employ is closed traverse where
readings begin and end at fixed control ppoints of known location. This permits the checking,
calculation and adjustment for closure error obtained during the readings.

III.2.2 Measuring Vertical Distance

The aim of obtaining vertical distances is to determine the differences and changes is elevation
from one location to another. This yask will be done using levelling method with a
digital/automatic level telescope and a stadia rod or levelling staff, or measunring vertical
angles and a slope distances.

Figure III-2. Measuring Vertical Distance

III.2.3 Difference in Elevation

The closure error can be determined for closed and close-loop traverses. The closure error
can be divided by the number of stations on the traverse or correction at each station can be
calculated according to the distance from the origin of the survey :

Ci = bi/L * Ec
Where :
Ci : the correction applied to station l
xiii

bi : the distance to station i from the origin of the traverse


L : the total length of the traverse
Page

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

Ec : the closeure error

Figure III-3. Difference in Elevation

III.2.4 Horizontal Distances

As with levelling the closure error will be determined for closed and close-loop traverses;
where the coordinates of the end points are identical or known. The location in the horizontal
plane is given by x and y coordinates (e.g. northing and easting). Using the measured
horizontal distances and adjusted angles, we shall calculate coordinates of each station. The
difference between the calculated and known coordinates of the end control point is dx and
dy, the course error in x and y. As with leveling, the adjustment will be a function of the
distance traversed (Li) relative to the total length of traverse (L) :

Cdxi = dx * Li/L Cdyi = dy * Li/L

Where Cdx and Cdy are the adjusments in x and y coordinates at station i.

III.2.5 Preparation of Drawing

All survey information will shown in the drawing using guidelines listed below :

 Project title block with all information


xiv

 Project name and location


Page

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

 Drawings shall be prepared in layers; different entities like road, spot levels, drains,
buildings, boundary wall, bench mark, dimension etc. shall have different layers, name of
the layer shall be relevant to the item in the layer (example dimension “DIM” etc.)

 Client, consultant, contractor name

 Drawing size, scale of survey map, contour intervals

 Existing Bench marks, New Benchmarks their co-ordinates and level vii. Relation
between true north and grid north

 Longitudinal and horizontal section is to be shown in drawing wherever there is


change in profile of land.

 Schedule of table showing bench mark number and its coordinates.

III.2.6 Topo-Cadastral Data

The survey plans ibtained from the land record with property boundary information and details
such as acreage, location of beacons and their coordinates will be scanned, georeferenced
and the boundary and beacons digitized in AutoCad software version 2010. The obtained
cadastral information will be overlaid on the topographical data obtained during field work.
Finnaly, topographical-cadastral maps with reasonable scale 1:500 shall be produced with all
details boundary information, topographic features and contours.

xv
Page

Figure III-4. Sample Topo Map with Contours

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

CHAPTER IV. HYDROGRAPHIC SURVEY

IV.1 Introduction
Bathymetric surveys or often referred to as Depth Sounding are intended to determine the
state of the sea topography or the condition of the marine configuration. The method used in
this measurement is by determining the sea depth position on the longitudinal and transverse
paths for cross checks. Depth positioning is done by using GPS.

The methodology for implementing this bathymetric surveys are as follows:


The depth sounding path is the ship's travel path that carries out depth sounding from the
starting point to the end point of the survey area. The distance between the depth sounding
paths depends on the desired precision resolution.

Usually, the distance between the depth sounding paths is 25 meters for each sounding path,
data is taken from the depth of the waters as far as 5 to 10 meters, and for control data is
crossed with 100 m intervals. The starting and ending points for each sounding path are
recorded and then the data is input into a measuring device equipped with a Echosounder
Raytheon type DE-719c facility, to be used as a reference or benchmark for motorboat trips
along the sounding path. An example of a sounding path in the measurement area can be
seen in the following image :

xvi
Page

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

Figure IV-1. The Movement of the Boat in Navigating the Sounding Path

IV.1.1 Survey Equipment


The survey equipment used in bathymetric measurements are:
 The Raytheon Type DE-719C Echo Sounder is equipped with GPS (Global
Positioning System) which will give the instrument position on a horizontal
frame with the help of a satelite. With this facility, position control in a
horizontal frame from a fixed point on the ground is not required.
 Note book is a portable computer unit needed for data storing that are
downloaded from the GPS Receiver device.
 Boat
Boats are used for carrying surveyors and measuring equipment along
designated sounding paths.
In its operation, the boat must meet several criteria, including:
 The boat must be spacious and comfortable enough for surveyors to carry
out measurement activities and data downloading from the equipment to
the computer, and preferably closed and free from engine vibration
 The boat must be stable and easy to maneuver at low speeds
 The fuel capacity must meet or match the length of the sounding path
xvii

 Guessing Board
Page

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

The guessing board is used for observing the sea level fluctuations, in this case
an OTT brand Automatic Water Level Recorder is used
 Safety Equipment
The safety equipment needed during survey activities is life jacket
 Tidal Data Recording Form

Figure IV-2. Echosounder and GPS Receiver Equipment Placement

EMA = Water level elevation is measured from the zero of the guessing board

Z = The water depth as a result of the sounding (distance from the bottom of the water
to the transducer)
A = Distance from transducer to the water surface

From the definitions above, the base elevation of the channel calculated from the zero of the
guessing board is (ED) :
ED = Z + A – EMA
xviii
Page

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

IV.1.2 Navigation Data Processing


Navigation data for bathymetric measurements using the Post Processing Kinematic (PPK)
method as primary navigation and the Absolute method as secondary navigation, the GPS
device is installed on the ship and as a Base Station. The navigation data is then processed
after bathymetric measurements are completed every day. This allows evaluation to be carried
out continuously during the bathymetric measurement process.

The navigation tool installation is installed directly above the Echosounder device assambled
on the ship, so it does not require an offset for the Echosounder position. Navigation tools
(GPS) and Echosounder have been arranged in one system, making it easier to process the
bathymetry data.

IV.2 Horizontal Control


IV.2.1 Electric Positioning System
a. Electronic Positioning system (DGPS/GPS with Beacon Receiver) with a
horizontal accuracy of less than one meter or as specified in IHO standards shall
be used.
b. Wide area GPS corrections are provided by the DGPS, C-DGPS or WAAS
networks. Where the signal cannot be received or when higher accuracy is
required, it may be necessary to install a temporary DGPS or RTK
reference station. This temporary station must be installed on a
permanently marked control point of sufficient accuracy.
c. Before collecting data, it may be necessary to verify the parameters and the
accuracy obtained by the positioning system. This could be achieved by
doing different tests.
d. The positioning system must be monitored to ensure that the quality of
horizontal positioning falls within specifications. The position of the
reference station should be initially verified against a known control point, and a
check of the vessel’s system, relative to a point surveyed on a wharf or accessible
feature, should be done.
xix
Page

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

IV.3 Vertical Control


IV.3.1 Echo Sounder
Single beam echo sounder with dual frequency of 33 kHz and 210 kHz or standard frequency
with an accuracy of 0.01m shall be used. All the time the same frequency shall be
maintained till the completion of the particular survey. The contractor at their risk and
cost may use the multi-beam echo sounder without claiming additional cost but with a prior
permission of employer/engineer. The rate may be quoted only for the survey with single
beam echo sounder

IV.3.2 Motion Reference Unit (MRU)


MRU shall be used, the measured Heave, pitch and Roll correction shall be corrected from
the depth value. Heave, pitch, roll are logged during the acquisition stage and are
to be checked and processed to meet the specifications of the systems used. Spikes
and anomalies within the attitude and heading sensor data should be corrected or removed.

xx
Page

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

CHAPTER V. GEOTECHNICAL
INVESTIGATION

V.1 Introduction
Boring methods are widely used for subsurface investigations to collect samples, in almost all
types of soil, for visual inspection or laboratory testing. There are several boring techniques
like auger boring, rotary drilling, wash boring, percussion drilling, auger drilling, and test pits
that are employed to collect disturbed and undisturbed samples of soils.

These boring methods are selected based on the soil types, the efficiency of boring technique,
types of soil sample (disturbed or undisturbed), and the availability of facility and accuracy by
which soil and groundwater variations can be determined.

V.2 Field Investigation


V.2.1 Boring
Boreholes will be drilled through all types of soil and rock strata at locations indicated in the
drawing showing test points. If hard rock (SPT > 100) is encountered the borehole shall be
terminated after drilling 2.0M inside the hard rock. The exact depth of the boreholes may be
modified at site by the Engineerin-Charge after taking into considerations the soil/rock strata
encountered.

Boring in all types of soil and decomposed rock shall be done by 76 mm diameter rotary drilling
using mild steel or tungsten carbide bits.

Standard Penetration Tests (SPT) shall be performed in the boreholes at every 2.0 M depth
or wherever a change of strata is encountered. SPT shall be done in accordance with ASTM D
1586- 99, "Standard Test Method for Penetration Test and Split-barrel Sampling of Soil". The
following information shall be recorded for all the SPTs conducted.
a. Bore hole number and location
xxi

b. Date of conducting SPT


Page

c. Depth at which SPT conducted

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

d. Penetration record and 'N' value


e. Water table information
f. Casing used, if any
g. Weather conditions
h. RL of existing ground level

Rock core drilling will be resorted to when rock is encountered i.e. SPT value exceeds 100.
Rock core drilling shall be carried out using diamond drill bits having minimum core size of
54.7 mm (NX size). Every bit of rock core recovered shall be preserved in core boxes
conforming to the relevant ASTM standards. The drilling information and core description shall
be in accordance with ASTM D 2113-99, “Standard Practice for Rock Core Drilling and
Sampling of Rock for Site Investigation”. Where the core recovery is nil, SPT shall be
performed, and representative samples from such strata shall be preserved in polythene bags.
Where it is not possible to collect such representative samples, wash boring samples shall be
preserved or cuttings obtained from circulating water shall be collected and preserved.

V.2.2 Trial Pits


Trial pits will be open excavations carried up to approximate depths as indicated in the drawing
showing test points. The exact depth of the trial pits, however, may be modified at the site
by the Engineer-in-Charge.

The top of the pits should be large enough such that the minimum bottom dimensions of the
pit may be 1.20 x 1.20M. Depth of pits may be from 2.0 to 3.0M. The sides of the pit shall be
suitably battered to avoid collapse.

The excavated material from the trial pits shall be placed near the pit in stockpiles, separated
when sufficiently different materials are encountered. Marked stakes will be driven in the
stockpiles indicating the depths from which the material has been excavated. The excavated
material shall be sufficiently away from the pit so as not to endanger the stability of the sides.
xxii
Page

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

V.2.3 Down Seismic Test


Down hole seismic test will be conducted to determine the interval velocities from arrival times
and relative arrival times of compression (P) and shear (S) seismic waves generated at surface
down to vertically installed sensors.

V.2.4 Pressure Metter Test


Pressure meter test will be conducted on selected bore holes at every 2.0m interval on good
quality bore holes prepared using mud wash rotary technique. During drilling care should be
taken to monitor the rotation rate advance rate and mudflow rate to obtain high quality
borehole. Suitable membrane should be used.

V.2.5 Electrical Resistivity Test


Purpose of the test is to determine the distribution of subsurface resistivity values. Soil
Electrical Resistivity test shall be done in accordance to IEEE standard 81. It should be carried
out by four point Wenner method or equivalent. Soil Resistivity shall be reported in Ohms
meter.

V.3 Sampling and Laboratory Test


All the above work will be carried out in accordance with the relevant ‘American Society of
Testing Materials' (ASTM) Specifications as noted in table below. All measurements shall be
in the metric system.
Test Reference Standard
Specific Gravity ASTM D- 854-91
Natural Water Content ASTM D- 2216-90
Atterberg Limit ASTM D- 4318-84
Bulk Density ASTM C- 2937
Grain size distribution ASTM D-421, ASTM D-422
Consistency limit ASTM D-423 & ASTM D-424
Triaxial unconsolidated undrained ASTM D-2850
Triaxial consolidated undrained ASTM D- 4767-88
xxiii

Unconfined Compression Test ASTM D- 2166


Consolidation Test ASTM D- 2435
Page

Drilling ( Deep Drilling – Machine) ASTM D- 1452-80

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

Test Reference Standard


SPT ( standard Penetration Test) ASTM D-1586-67
Taking undisturbed sample (UDS) ASTM D- 1587-83
Pressure meter test ASTM D- 4719-07
Down hole seismic survey ASTM D- 7400-08
Cross hole seismic survey ASTM D- 4428/4428M

xxiv
Page

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

CHAPTER VI. EXPERIENCES AND PLANT &


EQUIPMENT
FULL PARTICULARS OF SIMILAR SITE AND DURATION
ACTUAL
WORKS CARRIED OUT BY LOCATION CONTRACT AS PER YEAR OF
No COMPLETION NAME ADRESS OF CLIENT
INVESTIGATOR INCLUDING PROJECT OF THE VALUE CONTRACT COMPLETION
TIME (MONTHS)
NAME AND CAPACITY PROJECT (MONTHS)
1 SID Pelabuhan Penyeberangan Propinsi Propinsi Rp 836.968.000 Jl. Mayjen T. Hamzah
NAD NAD 5 5 2006 Bendahara No. 52 Banda Aceh
23121
2 Pekerjaan Soil Investigation & Survey Sumatra - US$ Gedung Perkantoran Bidakara,
Blanket Contract Sumatra - Singa dan Singa dan 735,703 Lantai 12-17, Jl. Jend. Gatot
24 24 2008
Kalimantan Area Kalimantan Subroto Kav. 71-73, Pancoran,
Area Jakarta 12870
3 Pengawasan Pembangunan Terminal di 5 Propinsi Rp 495.797.000 Jl. Seulawah Lr. Alue Blang
(Lima) Lokasi (Tahap II) NAD 5 5 2007 No. 2-B, Lamlagang, Banda
Aceh
4 Pekerjaan Jasa Soil Investigasi Untuk Belawan Rp 248.160.000 Jl. P. Sicanang No. 1 Belawan
Pembangunan Dermaga Baru PT PLN 3 3 2012
(Persero) Pembangkitan Sumbagut
5 Jasa Studi kelayakan dan Kajian Analisa Medan Rp 228.888.000 Jl. P. Sicanang No. 1 Medan
Struktur Serta Pengembangan Jetty 2 2 2012
Existing
6 Pekerjaan Jasa Studi Detail Design Belawan Rp 142.340.000 Jl. P. Sicanang No. 1 Belawan
Engineering Pembangunan Dermaga Baru
Tipe Dolphin PT PLN (Persero) 4 4 2012
Pembangkitan Sumatera Bagian Utara
Sektor Pembangkitan Belawan
7 Jasa Studi Detail Desain Engineering Medan Rp 142.340.000 Jl. P. Sicanang No. 1 Medan
Pembangunan Dermaga Baru type Dholpin 4 4 2012

8 Studi Kelayakan TUKS (Terminal Untuk Medan Rp 200.000.000 Kuala Tanjung Kec. Sei Suka,
Kepentingan Sendiri) 2 2 2015 Kab. Batu Bara, Sumatera
Utara
9 Jasa Assessment Landscape Penghijauan Pangkalan Rp 104.940.000 Dusun VI Sei Dua Desa
susu Tanjung Pasir Kec. Pangkalan
2 2 2015
Susu Kab. Langkat Sumatera
Utara
10 Survey dan Pembuatan Dokumen Tapanuli Rp 221.000.000 Gedung 600 Bandara Soekarno-
Perencanaan Dalam Rangka Pengadaan Utara Hatta Tanggerang
4 4 2014
Tanah Untuk Pengembangan Bandara
Silangit Siborong-Barong Tapanuli Utara
11 Jasa Konsultansi Pekerjaan Inventarisasi Sumatera Rp 1.012.826.000 Jl. Kasuari No. 8 Medan
dan Penilai Lahan Proyek PLTA Asahan III Utara 5 5 2016
(2x87 MW) Blok A seluas 84,7 Ha
12 Jasa Konsultansi Pekerjaan Inventarisasi Sumatera Rp 357.584.000 Jl. Kasuari No. 8 Medan
dan Penilai Lahan Proyek PLTA Asahan III Utara 5 5 2016
(2x87 MW) Blok B seluas 9,2 Ha
13 Jasa Konsultansi Pekerjaan Inventarisasi Sumatera Rp 543.395.000 Jl. Kasuari No. 8 Medan
dan Penilai Lahan Proyek PLTA Asahan III Utara 5 5 2016
(2x87 MW) Blok C seluas 40,6 Ha

xxv
Page

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

14 Jasa Konsultansi Pekerjaan Inventarisasi Sumatera Rp 532.385.000 Jl. Kasuari No. 8 Medan
dan Penilai Lahan Proyek PLTA Asahan III Utara 5 5 2016
(2x87 MW) Blok D seluas 29,8 Ha
15 Jasa Konsultansi Pekerjaan Inventarisasi Sumatera Rp 541.263.000 Jl. Kasuari No. 8 Medan
dan Penilai Lahan Proyek PLTA Asahan III Utara 5 5 2016
(2x87 MW) Blok E seluas 43,6 Ha
16 Jasa Konsultansi Pekerjaan Inventarisasi Sumatera Rp 541.263.000 Jl. Kasuari No. 8 Medan
dan Penilai Lahan Proyek PLTA Asahan III Utara 5 5 2016
(2x87 MW) Transmisi 150 kV
17 Jasa Konsultansi Tapak Tower T/L 275 KV Sumatera Rp 1.258.171.200 Jl. Dr. Cipto No. 13
6 6 2018
Galang – Binjai Utara
18 Jasa Konsultansi Pekerjaan Inventarisasi Sumatera Rp 3.712.555.000 Jl. Kasuari No. 8 Medan
Tanah, Tanaman dan Bangunan Serta Utara
6 6 2017
Penilaian Lahan Proyek PLTA Asahan III
(2x87 MW)
19 Jasa Konsultansi Pelaksanaan Inventarisasi Aceh Rp 934.520.730 Jl. Dr. Cipto No. 12
Trgakan Untuk Izin Pinjam Pakai Kawasan
Hutan Jalur Transmisi di Aceh Sesuai SK
5 5 2018
No. 103/1/IPPKH/PMDN/2016 Seluas 62
Hektar

20 Jasa Konsultansi Pekerjaan Inventarisasi Sumatera Rp 1.604.947.300 Jl. Dr. Cipto No. 12
Tegakan Untuk Izin Pinjam Pakai Kawasan Utara
Hutan Jalur Transmisi di Sumatera Utara
5 5 2018
Sesuai SK No. No. 97/1/IPPKH/PMDN/2016
Seulas 117,49 Hektar

21 Jasa Konsultansi Teknis Pelaksanaan Sumatera Rp 380.820.000 Jl. Dr. Cipto No. 12
Inventarisasi Tegakan IPPKH No. Barat
93/1/IPPKH/PMDN/2016, Tangal 24
November Ijin Pinjam Pakai Kawasan
Hutan Untuk Pembangunan Jaringan 5 5 2018
Transmisi SUTT 275 KV GI Padang
Sidempuan - GI Payakumbuh Seluas 25,78
Hektar di Kabupaten Agam dan Kabupaten
Pasaman Sumatera BARAE
22 Jasa Konsultansi Teknis Pelaksanaan Kepulauan Rp 576.865.300 Jl. Dr. Cipto No. 13
Inventarisasi IPPKH No. Riau
94/1/IPPKH/PMDN/2016 Untuk
Pembangunan SUTT dan SKLTT 150 KV
Batam - Bintan Atas Nama PT PLN 5 5 2018
(Persero) Seluas 84,33377 Hektar dan
Hutan Produksi Tetap di Kota Tanjung
Pinang dan Kabupaten Bintan, Provinsi
Kepulauan Riau
23 Jasa Konsultansi Pengukuran Gardu Induk Sumatera Rp 21.081.000 Jl. Selamet Riyadi No. 28,
150 KV Selayang Utara 3 3 2018 Medan

24 Jasa Konsultansi Pengukuran Gardu Induk Sumatera Rp 21.081.000 Jl. Selamet Riyadi No. 28,
150 KV Tanah Jawa Utara 3 3 2018 Medan

25 Jasa Konsultansi Pengukuran Persil ROW Sumatera Rp 70.261.000 Jl. Selamet Riyadi No. 28,
T/L 150 KV Tanjung Balai - Kisaran Utara 5 5 2018 Medan
(Section 1)
26 Jasa Konsultansi Pengukuran Persil, Aceh Rp 470.519.170 Jl. Dr. Cipto No. 12, Medan
Inventarisasi, Pengumpulan Alas Hak,
Sosialisasi, Pendampingan Pembayaran 5 5 2018
pada Gardu Innduk 150 KV Banda Aceh
(Ext) dan GITET 275 KV Ulee Kareng
27 Jasa Konsultansi Pengukuran Persil, Aceh Rp 242.936.210 Jl. Dr. Cipto No. 12, Medan
Inventarisasi, Pengumpulan Alas Hak,
5 5 2018
Sosialisasi, Pendampingan Pembayaran
pada Gardu Induk 150 KV Lampisang
28 Jasa Konsultansi Pengukuran Persil, Aceh Rp 237.249.210 Jl. Dr. Cipto No. 12, Medan
Inventarisasi, Pengumpulan Alas Hak,
5 5 2018
Sosialisasi, Pendampingan Pembayaran
pada Gardu Induk 150 KV Samalanga
29 Jasa Konsultansi Pengukuran Persil, Aceh Rp 245.301.210 Jl. Dr. Cipto No. 12, Medan
Inventarisasi, Pengumpulan Alas Hak,
5 5 2018
Sosialisasi, Pendampingan Pembayaran
pada Gardu Induk 150 KV Blangkejeren
30 Jasa Konsultansi Pengukuran Persil, Aceh Rp 244.256.210 Jl. Dr. Cipto No. 12, Medan
Inventarisasi, Pengumpulan Alas Hak,
5 5 2018
Sosialisasi, Pendampingan Pembayaran
pada Gardu Induk 150 KV Calang
31 Jasa Konsultansi Pengukuran Persil, Aceh Rp 241.836.210 Jl. Dr. Cipto No. 12, Medan
Inventarisasi, Pengumpulan Alas Hak,
5 5 2018
Sosialisasi, Pendampingan Pembayaran
pada Gardu Induk 150 KV Arun
32 Jasa Konsultansi Pengukuran Persil, Aceh Rp 240.725.210 Jl. Dr. Cipto No. 12, Medan
Inventarisasi, Pengumpulan Alas Hak,
5 5 2018
Sosialisasi, Pendampingan Pembayaran
pada Gardu Induk 150 KV Singkil
xxvi

Studi Kelayakan TUKS (Terminal Untuk Sumatera Rp 886.500.000 Kuala Tanjung Kec. Sei Suka,
33 Kepentingan Sendiri) di Pelabuhan PT Utara 3 3 2018 Kab. Batu Bara, Sumatera
INALUM (Persero) Utara
Jasa Konsultansi Penyesuaian Perizinan Sumatera UtaraRp 494.120.000 Brigjend Katamso KM 5,5 Titi
34 Terminal Untuk Kepentingan Sendiri 4 4 2019 Kuning, Medan
(TUKS) PLTU Tembilahan
Page

Jasa Konsultan Proses Perizinan Sumatera UtaraRp 883.278.000 Brigjend Katamso KM 5,5 Titi
Temporary Jetty Menjadi Terminal Untuk Kuning, Medan
35 7 7 2019
Kepentingan Sendiri (TUKS) PLTU Tenayan

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

Equipment

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

Hardware

Acer SE Series III 550 Mhz


1 1 unit 1994 Good Medan Own
PC Workstation (Built Up)

2 6 unit Dell 75 GMT 1996 Good Medan Own


PC Workstation
Acer SND III/U262259 (Built
3 4 unit 2000 Good Medan Own
PC Workstation Up)

4 Plotter 1 unit A0 - HP DJT 610 Seri Q6712A 2008 Good Medan Own

5 1 unit Epson LQ 1170 1994 Good Medan Own


Printer
6 1 unit HP Laser 4 Jet V 1996 Good Medan Own
Printer

1
7 1 unit Canon BJC 2100 1996 Good Medan Own
Printer

Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

8 1 unit HP 660c 1996 Good Medan Own


Printer
HP Lasser Jet 1100A 8/600
9 1 unit 2000 Good Medan Own
Printer dpi/A4

10 1 unit HP 930 C 20m01 Good Medan Own


Printer
11 1 unit 840 C HP 2001 Good Medan Own
Printer
12 1 unit HP dj 845 c 2002 Good Medan Own
Printer
13 1 unit Laser HP 1000 Laser Jet 2001 Good Medan Own
Printer
14 1 unit Canon BJC 85 Colour (Portable) 2002 Good Medan Own
Printer
15 1 unit HP DJ 6122 2003 Good Medan Own
Printer
16 1 unit HP LJ 1200 series 2003 Good Medan Own
Printer
17 1 unit HP DJ 1220 cse 2003 Good Medan Own
Printer

2
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

18 1 unit Hp 5652 2003 Good Medan Own


Printer
19 1 unit HP 6540 Desk Jet (211) 2004 Good Medan Own
Printer
20 1 unit HP Deskjet 1300 2004 Good Medan Own
Printer
21 1 unit LaserJet 2550 L Colour 2004 Good Medan Own
Printer
22 2 unit HP 6540 2005 Good Medan Own
Printer
23 1 unit HP 6540 2005 Good Medan Own
Printer
24 1 unit HP 5740 2005 Good Medan Own
Printer
25 1 unit HP 1280C 2006 Good Medan Own
Printer
26 2 unit Dot Matrik LQ 300 2006 Good Medan Own
Printer
27 1 unit HP 1280C 2006 Good Medan Own
Printer

3
28 2 unit Epson LQ 300+ II 2008 Good Medan Own
Printer

Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

29 1 unit Sharf FO-145 1996 Good Medan Own


Fax Machine
30 1 unit Panasonic UF-V60 1996 Good Medan Own
Fax Machine
31 1 unit Canon L - 220 2005 Good Medan Own
Fax Machine
32 1 unit B-115 2001 Good Medan Own
Fax Machine
33 1 unit Accer SX - built up 2001 Good Medan Own
Personal Computer
Accer Power (Built Up
34 1 unit 2001 Good Medan Own
Personal Computer Multimedia)

35 1 unit Compaq, Core Duo 1996 Good Medan Own


Personal Computer
Compaq- Surplus Monitoring
36 2 unit 2002 Good Medan Own
Personal Computer (Built Up)

UWK
37 2 unit Compac Built-up 2002 Good Own
Personal Computer Lhokseumawe

4
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

38 2 unit Rakitan 2002 Good Medan Own


Personal Computer
39 2 unit Compaq 2002 Good UWK Aceh Own
Personal Computer
40 1 unit Built up 2003 Good Medan Own
Personal Computer
41 4 unit Rakitan 2003 Good Medan Own
Personal Computer
42 1 unit Built-up 2003 Good Medan Own
Personal Computer
43 3 unit Pentium IV 2005 Good Medan Own
Personal Computer
UWK
44 1 unit Rakitan 2003 Good Own
Personal Computer
Lhokseumawe

45 9 unit Rakitan 2004 Good Medan Own


Personal Computer
46 2 unit Built-up 2006 Good Medan Own
Personal Computer
47 5 unit Rakitan 2005 Good Medan Own

5
Personal Computer

Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

48 2 unit HP Pavilion A1345L 2006 Good Medan Own


Personal Computer
49 2 unit HP Pavilion G 3233L 2008 Good Medan Own
Personal Computer
50 3 unit Built Up-Accer 2001 Good Medan Own
Personal Computer
51 1 unit Aptiva E Series – Built up 2002 Good Medan Own
Personal Computer
52 3 unit Superstack II 2002 Good UWK Aceh Own
Personal Computer
53 1 unit Dell type 160 L – Built Up 2003 Good Medan Own
Personal Computer
Personal Computer Acer M 1900 S/N
54 1 unit 2010 Good Medan Own
PTSDS09007022039073000

Personal Computer Acer M 1900 S/N


55 1 unit 2010 Good Medan Own
PTSDS090070220391D3000

Personal Computer ACER Aspire M1900 + Monitor


56 1 unit LCD 15" 2010 Good Medan Own

6
PTSDS090070250AOA7300

Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

Personal Computer ACER Aspire M1900 + Monitor


57 1 unit LCD 15" 2010 Good Medan Own
PTSDS0900702509E283000`

Personal Computer ACER Aspire M1900 + Monitor


58 1 unit LCD 15" 2010 Good Medan Own
PTSDS090070250A4683000

59 1 unit Cisco 2500 1996 Good Medan Own


Communication
60 1 unit US Robotic 1996 Good Medan Own
Communication Device
61 Comm Protocol 1 unit Reflectio 4.2 1996 Good Medan Own
Application
62 1 unit 3 Com 1996 Good Medan Own
Concentrator
63 1 unit Cable Instalation 1996 Good Medan Own
Connectivity
64 1 unit System Integration 1996 Good Medan Own
Connectivity

7
65 1 unit Serial Cable RS-232 1996 Good Medan Own

Page
Connectivity

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

66 1 unit Serial Cable V-35 1996 Good Medan Own


Connectivity
67 1 unit Transciver allied tel. 1996 Good Medan Own
Connectivity
68 Pesawat Telepon dan 12 unit Panasonic PABX 1996 Good Medan Own
pesawat ext.
69 1 unit Direct Line 1996 Good Medan Own
Telepon Direct Line
Exide electronics Power Prestige
70 1 unit 1996 Good Medan Own
UPS 3000

71 1 unit Vektor Jupiter 12 VA 2006 Good Medan Own


UPS
72 1 unit CT 1082B 2000VA 2008 Good Medan Own
UPS
ICA - 2022 B , ICA-1082 B, ICA-
73 6 unit 2008 Good Medan Own
UPS CT1682B

74 1 unit DELL Optiplek GMT 5100 1996 Good Medan Own


Komputer Server

8
75 1 unit COMPAQ 2000 Good Medan Own

Page
Komputer Server

PT Surveyor Indonesia (Persero)


PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

76 1 unit Built Up 2001 Good Medan Own


Komputer Server
77 1 unit Built Up 2002 Good UWK Aceh Own
Komputer Server
78 1 unit Built-up 2003 Good Medan Own
Komputer Server
79 1 unit Dell Power Edge SC 420 2004 Good Medan Own
Komputer Server
80 1 unit Built -up 2010 Good Medan Own
Komputer Server
81 Komuputer Server 1 unit HP Proliant ML110 G4 SATA 2007 Good Medan Own

82 1 unit shreder 1996 Good Medan Own


Mesin shreder
83 1 unit Dell 9900 2007 Good Medan Own
Paper shreder
84 1 unit Cannon 1996 Good Medan Own
Mesin Fotocopy
85 1 unit Minolta EP 3000 2000 Good Medan Own
Mesin Fotocopy

9
86 1 unit Xerox DC-236 2006 Good Medan Own
Mesin Fotocopy

Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

87 1 unit Canon MF 4680 s/n ABB 02080 2008 Good Medan Own
Mesin Fotocopy
88 1 unit Xerox DC 236 2005 Good Medan Own
Mesin Potocopy
89 1 unit DAHLE 561 2000 Good Medan Own
Guillotine Cutter
90 1 unit HD-12L / 17 2000 Good Medan Own
MAX STAPLER
91 1 unit IBIMASTER 2000 Good Medan Own
IBICO MACHINE
92 2 unit Nikon AF-240 SV 2000 Good Medan Own
Camera Digital
93 Camera Digital 1 unit Canon IXUS 2003 Rusak Medan Own

94 Camera Digital 8 unit Canon Power Shot A420 2006 Good Medan Own

95 2 unit Fuji FinePix A202 2003 Good Medan Own


Camera Digital
96 Camera Digital 3 unit Canon A410 2006 Good Medan Own

10
97 Camera Digital 1 unit DMC FX9 2006 Good Medan Own

Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

98 4 unit Canon A460 s/n 4846024005 2008 Good Medan Own


Camera digital
99 10 Unit SonyDSC 730 2008 Good Medan Own
Camera Digital
100 Camera Digital 3 unit benQ 740 s/n 9703376 2008 Good Medan Own

101 43 unit Canon A470 2008 Good Medan Own


Camera Digital
102 1 unit VISIPRO 2000 Good Medan Own
Memory Card
103 1 unit HP 4300 C 2001 Good Medan Own
Scanner
104 1 unit Acer 525 TE 2001 Good Medan Own
Note Book
105 2 unit Compaq Presario 2819 AP 2002 Good Medan Own
NoteBook
105 1 unit Toshiba Satelit M 45 2006 Good Medan Own
Notebook
107 2 unit IBM R52 2006 Good Medan Own
Notebook

11
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

Intel Centrino M750 ( Toshiba


108 1 unit 2006 Good Medan Own
Notebook Qosmio F20 )

Compaq Presario s/n


109 1 unit 2008 Good Medan Own
Note Book 2CE8101BWN

HP Compaq Presario V3906 s/n


110 1 unit 2008 Good Medan Own
Note Book 2CE8200 CRP

HP Compaq Presario V3906 s/n


111 1 unit 2008 Good Medan Own
Note Book 2CE8200 DFL

HP Compaq Presario V3906 s/n


112 1 unit 2008 Good Medan Own
Note Book 2CE8200 CP1

HP Compaq Presario V3906 s/n


113 1 unit 2008 Good Medan Own
Note Book 2CE8200 CXR

Acer Aspire 4935 S/N

12
114 1 unit 2009 Good Medan Own
Note Book LXAC60X034903059761601

Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

Acer Aspire 4935 S/N


115 1 unit 2009 Good Medan Own
Note Book LXAC60X0349030C91A1601

Axioo Neon MNC 815C s/n


116 1 unit 2009 Good Medan Own
Note Book NKM740SAC009E12045

Axioo Neon MNC 115P s/n


117 1 unit 2009 Good Medan Own
Note Book NKM740SAC009E04119

Axioo Neon MNC 115P s/n


118 1 unit 2009 Good Medan Own
Note Book NKM740SAC009E02708

Neon MNC 115P s/n


119 1 unit 2009 Good Medan Own
Note Book NKM740SAC009E92682

Acer Aspire D255 s/n


120 1 unit 2010 Good Medan Own
Note Book LUSDK0C001033135571601

Acer Aspire One D255 W7 s/n

13
121 1 unit 2010 Good Medan Own
Note Book LUSDR02703553BDB1601

Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

122 Note Book 1 unit Toshiba M100 S/N : 66187777K 2007 Good Medan Own

123 1 unit IBM ThinIPAD RA40 2004 Good Medan Own


Laptop
124 1 unit IBM R 51 KA5 Centrino 2005 Good Medan Own
Laptop
125 1 unit Sony Vaio VGN-TX27GP 2006 Good Medan Own
Laptop
HP HTC TyTN II IMEI
126 1 unit 2008 Good Medan Own
Laptop No.355757015456771

127 Laptop ` 3 unit Toshiba Satelit A-105 S 4547 2007 Good Medan Own

128 5 unit Toshiba A200-E531 2008 Good Medan Own


Laptop
129 Laptop 1 unit Toshiba L310 S/N 48032351W 2008 Good Medan Own

130 Laptop 5 unit Toshiba L 310 S/N 48316264W 2008 Good Medan Own

14
131 2 unit 100 Mb 2001 Good Medan Own
Zip Drive

Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

132 Hub 3 com Swicting up 1 unit 3 com Swicting up 16 port 2001 Good Medan Own
16 port
133 1 unit super stack 2003 Good Medan Own
Hub 3 com super stack
134 3 unit HUB 2004 Good Medan Own
HUB 3Com
135 1 unit 8x4x32 Eksternal 2001 Good Medan Own
CD Read Writer
136 1 unit Writer External 2003 Good Medan Own
CD Writer External
TLP471Z
137 1 unit 2002 Good Medan Own
LCD Projector

138 1 unit Toshiba TDP-SC25 2006 Good Medan Own


LCD Projector
139 1 unit NEC NP 500 G s/n 8Z40472EC 2009 Good Medan Own
LCD Projector
EPSON -EMPX 7 CXGA-2200
140 1 unit 2010 Good Medan Own

15
LCD Projector Ansi

Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

141 1 unit TLP S 40 2004 Good Medan Own


LCDProjector
142 1 unit TLP S 41 2004 Good Medan Own
LCDProjector
144 1 unit 18,5" Acer X193 HQ 2010 Good Medan Own
Monitor LCD
Acer P205HL 20"
145 1 unit 2010 Good Medan Own
Monitor LCD ETL108001020000F54220

146 1 unit Samsung 739 MGB 17" 2008 Good Medan Own
Monitor PC
147 3 unit - 2002 Good Medan Own
Stabilizer
148 1 unit Link Builder 2002 Good Medan Own
HUB Link Builder
149 1 unit Datascript 2002 Good Medan Own
Mesin Absensi
150 11 unit Mobile Finger 2006 Good Medan Own
Mobile Finger Print

16
151 6 unit Mobile Finger 2007 Good Medan Own
Mobile Finger Print

Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

152 1 unit UTP UPS 2002 Good Medan Own


Cable UTP UPS
153 1 unit 2002 Rusak Medan Own
Probe Cable Probe Cable
154 1 unit PABX 2004 Good Medan Own
Mesin PABX
155 1 unit C 111 C TI 2004 Good Medan Own
Travel Mate
156 1 unit Mitsubishi MGS 50 2005 Good Medan Own
Mesin Genset
157 1 unit Mitsubishi 2005 Good Medan Own
Mesin Genset
158 1 unit Mitsubishi 2900 VA 2006 Good Medan Own
Genset
159 1 unit Honda Excell 11000 VA 2006 Good Medan Own
Genset
160 1 unit Swicth HUB 2005 Good Medan Own
Swicth HUB
161 1 unit Matsuyama 7500 VA 2006 Good Medan Own
AVR

17
162 1 unit Seagate 200 GB 2007 Good Medan Own
External Hardisk

Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

163 2 unit Seagate 320 GB 2007 Good Medan Own


External Hardisk
164 1 unit Seagate 750 GB 2007 Good Medan Own
External Hardisk
Pouch Master 12VT (SN: IB
165 1 unit 2007 Good Medan Own
Mesin Laminating 277474)

166 2 unit Rakitan 2009 Good Medan Own


CPU
167 1 unit WRT 610N s/n CTG01HB14635 2009 Good Medan Own
Wifi Router Linksys
168 1 unit WRT 610N s/n CTG01HB14638 2009 Good Medan Own
Wifi Router Linksys
169 1 unit WRT 610N s/n CTG01HB14557 2009 Good Medan Own
Wifi Router Linksys
3CRWE776075 s/n
170 Wifi Router 3Com Acces 1 unit 2010 Good Medan Own
Point 9TZ4BXP564BCO

3CRWE776075 s/n
171 Wifi Router 3Com Acces 1 unit 2010 Good Medan Own

18
Point 9TZ4BXP563E40

Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

Electric Olympia 12 " S/N


172 1 unit 2009 Good Medan Own
Mesin Ketik T120400385

173 1 unit Yamaha 2009 Good Medan Own


Amplifre wireless
174 1 unit Digital Krisbow s/n 20075256 2010 Good Medan Own
Mesin Hitung Uang
SOFTWARE

Auto GHS for Ship


1 1 unit Ver 5.20 1998 Good Jakarta Own
Stability & Safety
Analysis
Auto-Ship for Geometric
2 1 unit Ver 4.0 1998 Good Jakarta Own
maker & Tank Table
Maker
3 2 unit Autodesk 2000 Good Medan Own
Autocad Rel 14
4 1 unit Microsoft Project 2000 Good Medan Own
Microsoft Project

19
5 2 unit MapInfo 2001 Good Medan Own
Map Info Rel 5.5 dan 6.0

Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

6 2 unit Esri 2001 Good Medan Own


ArcView Ver 3.1
Software Terrasync
7 1 unit V 3,21 2008 Good Medan Own
Proffesional

8 Software Pathfinder 1 unit V 4,10 s/n 2008 Good Medan Own

9 2 unit XP Proffesional Original 2008 Good Medan Own


CD Software Windows
PERALATAN INSPEKSI DAN SURVEY

1 1 unit 2002 Good Lhokseumawe Own


Tang Ampere Tang Ampere
2 1 unit 2002 Good Medan Own
Vacum Test Vacum Test
3 1 unit Medium Size With Case 2002 Good Medan Own
Welding Gauge Kit
4 1 unit 2002 Good Medan Own
Tranducer Tip Tranducer Tip
5 Trancuder 1 unit A551S-SM Trancuder 5,0 Mhz 2008 Good Medan Own

20
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

6 Tranducer 1 unit DHC 711-RM Tranducer, 5,0 Mhz 2008 Good Medan Own

7 1 unit 2002 Good Medan Own


Tacho Meter Tacho Meter
8 1 unit 2002 Rusak Medan Own
Straigh Bean Probe Straigh Bean Probe
9 1 unit B2S-N 2002 Rusak Medan Own
Probe type
10 1 unit B2S 2002 Good Medan Own
Probe type
11 Probe Cable 1 unit Probe 2004 Good Medan Own

12 1 unit 84516895 dan 37067740 2002 Good Medan Own


GPS 12
84543758 , 84516900 dan
13 GPS Garmin 12 XL 1 unit 2003 Good Medan Own
84543756

14 10 unit SN. 68205211 2006 Good Medan Own


GPS Garmin 12 XL
15 GPS 10 unit Garmin 60i 2006 Good Medan Own

21
16 GPS MAP 55 unit Garmin 76CSx 2008 Good Medan Own

Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

17 59 unit Trimble Juno ST 2008 Good Medan Own


GPS
Spectra Precssion EPOCH 10 L1
18 1 unit 2008 Good Medan Own
GPS System

19 1 unit 055513 dan 055512 2003 Good Medan Own


Pocket Dosimeter
20 Pocket Dosimeter 3 unit 064150, 064155 dan 064139 2003 Good Medan Own

21 Pocket Dosimeter 2 unit 874979 dan 874982 2004 Good Medan Own

Charger Pocket
22 1 unit Charger Pocket 2003 Good Lhokseumawe Own
Dosimeter

23 Survey meter 1 unit Type 2000A SN.42586 2004 Good Medan Own

24 Survey Meter 1 unit Type 2000A SN.42634 2003 Good Medan Own

25 1 unit Type 2000A SN.37058 2003 Good Lhokseumawe Own


Survey meter

22
26 Survey Meter 1 unit Type 2000A SN.44463 2004 Rusak Medan Own

Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

27 Survey Meter 1 unit ND 2000A S/N 31636 2008 Good Medan Own

28 1 unit D 1361 2003 Good Medan Own


Camera Gamma X-Ray
29 Camera X-Ray 4 unit D 1295, D 1438, D 1361, 2004 Good Medan Own

30 Camera X Ray 1 unit D 1438 2003 Good Lhokseumawe Own

31 Camera X Ray 1 unit D 1693 2004 Good Lhokseumawe Own

32 1 unit S/N : 250301 2003 Good Medan Own


Densitometer
33 Densitometer 1 unit S/N : 280228 2004 Good Lhokseumawe Own

34 Viewer 1 unit Viewer 2004 Good Medan Own

35 Viewer Remsco 1 unit SB-900XN 2004 Good Medan Own

36 1 unit 2003 Rusak Medan Own


Viewer Radiography Viewer Radiography

23
37 1 unit SB-900XN 2002 Rusak Medan Own
Viewer Remsco

Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

38 1 unit 2003 Good Medan Own


Temperatur sensor Temperatur sensor
High Temperatur
39 1 unit High Temperatur 2003 Good Medan Own
Couplant

DA-400S 230 VAC Parker S/N


40 MPI Electrik 1 unit 2003 Rusak Medan Own
12391

DA-400S 230 VAC Parker S/N


41 MPI Electrik 1 unit 2005 Rusak Medan Own
13343

42 MPI Yoke Permanent 1 unit M129 WX, Series 2007 Good Medan Own

DA-400S 230 VAC Parker S/N


43 MPI Electrik 1 unit 2007 Good Medan Own
15106

44 Test Bench 1 unit Bench 2003 Good Medan Own

Armored Cable With


45 1 unit With Straight Connector 2003 Good Medan Own

24
Straight Connector

Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

46 For A- Scans 1 unit For A 2003 Good Medan Own

Adaptor Lpug Lemo To


47 1 unit Lemo To BNC 2003 Good Medan Own
BNC

48 Hardnes Tester 1 unit Hardnes 2003 Good Medan Own

Pesawat UT EPOCH III &


49 1 unit UT EPOCH 2003 Good Medan Own
Acsesoriesnya

50 Pesawat UT EPOCH 1 unit 4 SN 071551608 Panametrik 2008 Good Medan Own

51 Whallthickness 1 unit DMS 2 2003 Good Medan Own

52 Long Tounge 1 unit Long Tounge 2003 Good Medan Own

53 Colimator 1 unit Colimator 2003 Good Medan Own

54 Blok Kalibrasi 1 unit Blok Kalibrasi 2003 Good Medan Own

25
55 Charger Pendos 1 unit Pendos 2004 Good Lhokseumawe Own

Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

56 Tangki Procesing 1 unit Procesing 2004 Good Medan Own

57 1 unit Processing 2006 Good Medan Own


Tangki Processing
58 Load Calibrator 1 unit Calibrator 2004 Good Medan Own

59 Longtounge 1 unit Longtounge 2004 Good Medan Own

60 Esi Track H360 2 unit Track H360 2006 Good Medan Own

61 Nafax Pro20 1 unit Pro20 2006 Good Medan Own

62 Pressure Gauge 1 unit 0-300 Psi Scrhaft 2006 Good Medan Own

BCM-74-6 Cable ( Fits BCM-74-6 Cable ( Fits BNC &


63 1 unit 2008 Good Medan Own
BNC & Microdot Microdot

BCMD-316-5F ( Dual BCMD-316-5F ( Dual BNC-


64 1 unit 2008 Good Medan Own
BNC- Microdot ) Microdot )

26
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation

YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT

1 2 3 5 6 7 8 9

Derjat Angle Beam


65 3 unit ABWM-7T-45 2008 Good Medan Own
Wedge

66 Battery 2 unit EPOCH III 2008 Good Medan Own

Lhokseumawe
67 2 unit O148O61O, 071551608 2008 Good Own
Ultrasonic Flow Detector

27
Page
PT Surveyor Indonesia (Persero)