INDOCEMENT
HEIDELBERGCEMENT Group
2021
Table of Contents
Daftar Isi ........................................................................ Error! Bookmark not defined.
Daftar Gambar ................................................................ Error! Bookmark not defined.
Daftar Tabel ................................................................... Error! Bookmark not defined.
CHAPTER I. PENDAHULUAN ......................................................................................... v
I.1 Preamble......................................................................................................... v
I.2 Location .......................................................................................................... v
CHAPTER II. COMPANY PROFILE ............................................................................... vii
II.1 Vision, Mission and Corporate Values ............................................................... viii
II.1.1 Vision ..................................................................................................... viii
II.1.2 Mission ................................................................................................... viii
II.1.3 Corporate Vallues .................................................................................... viii
II.2 Business Sector ............................................................................................. viii
II.3 Company Structure ...........................................................................................x
CHAPTER III. TOPOGRAPHIC SURVEY ......................................................................... xii
III.1 Introduction ................................................................................................... xii
III.2 Methodology .................................................................................................. xii
III.2.1 Measuring Horizontal Distance .................................................................. xiii
III.2.2 Measuring Vertical Distance...................................................................... xiii
III.2.3 Difference in Elevation ............................................................................. xiii
III.2.4 Horizontal Distances ................................................................................ xiv
III.2.5 Preparation of Drawing ............................................................................ xiv
III.2.6 Topo-Cadastral Data ................................................................................. xv
CHAPTER IV. HYDROGRAPHIC SURVEY ..................................................................... xvi
IV.1 Introduction .................................................................................................. xvi
IV.1.1 Survey Equipment .................................................................................. xvii
IV.1.2 Navigation Data Processing ...................................................................... xix
IV.2 Horizontal Control .......................................................................................... xix
IV.2.1 Electric Positioning System ....................................................................... xix
IV.3 Vertical Control ............................................................................................... xx
i
Page
ii
Page
List of Figure
Figure I-1. Belawan Cement Terminal Location ................................................................ v
Figure I-2. Belawan Cement Terminal Area ..................................................................... vi
Figure II-1. The Organizational Structure of PT Surveyor Indonesia (Persero) .................... xi
Figure III-1. Methodological Workflow ........................................................................... xii
Figure III-2. Measuring Vertical Distance....................................................................... xiii
Figure III-3. Difference in Elevation .............................................................................. xiv
Figure III-4. Sample Topo Map with Contours ................................................................ xv
Figure IV-1. The Movement of the Boat in Navigating the Sounding Path ........................ xvii
Figure IV-2. Echosounder and GPS Receiver Equipment Placement ................................ xviii
iii
Page
List of Table
Table II-1. Business Sector PT. Surveyor Indonesia (Persero) ........................................... ix
iv
Page
CHAPTER I. PENDAHULUAN
I.1 Preamble
PT. Indocement Tunggal Prakarsa Tbk (ITP - the Employer) in cooperation with Heidelberg
Technology Center (HTC - the Engineer), are referred as Client and Engineer.
The Employer proposes to install cement terminal at Belawan District, South of Sumatera
Province. It is proposed to obtain site details regarding ground undulations and location of the
existing physical features, facilities etc. by carrying out detailed topographic survey, detail
about sea water depth, tides and water stream by conducting hydrographic survey and detail
about soil/geotechnical investigation relevant to off shore jetty work and on shore building
works.
I.2 Location
The proposed terminal site is located at Belawan Terminal of Pelindo-1 (approximately 60 km
from Bandara Internasional Kualanamu and 26 km from Medan City) in the island of North of
Sumatera, Indonesia.
vi
Page
PT Surveyor Indonesia (Persero) was incepted on 1 August 1991. Initially, our mission was to
assist the Government of Republic of Indonesia in expediting the flow of capital goods and
equipment from all over the world to Indonesia, to the world class standard Pre-Shipment
Inspection.
Today, PT Surveyor Indonesia (Persero) is confident to achieve its vision statement to become
the leading provider of ‘independent assurance’ in every transaction. Our vast experience in
this market so far has become the major power coupled with highly experienced and
competent human resources capable of delivering the best services for our customers.
We focus our Independent Assurance services to four sectors namely Institutional Agency
Empowerment, Infrastructure, Mineral & Coal, Oil & Gas and Power Plant System. Our services
include Volumetrik Survey, Preshipment Inspection, Second Hand Goods (SHG), Verifikasi
impor/ekspor, Draft Survey, Statutory Inspection, QA/QC Supervision.
From the experience that we have had from various fields, we have acquired vast knowledge
on business processes which made us capable of providing customized services that suit any
specific needs of our service users.
PT Surveyor Indonesia (Persero) has its registered office in Jakarta and 12 branches and a
number of geographical working units throughout Indonesia, offering services in both local
and overseas markets.
vii
Page
II.1.2 Mission
Encouraging customers to meet the requirements of global customers with global
competitiveness
A strategic partner to the government, private sector and others to optimize the resource
utilization and the domestic product on infrastructure, maritime, energy and food security
Providing national and or international competence human resources and the latest
technology to meet market demands
Integrity
To reveal the truth objectively
Competence
To acquire the necessary expertise, knowledge, and adopt such way of conduct and
behavior to help deliver professional services
Innovation
To generate new solution, new product and more precise business processes
Care
To show care, appreciation and be helpful
- Mining Supervision
We thrives to provide the best added-value, by providing total solutions, customized services
using international standards, and which are based on integrity, innovation, and technology
application. We also thrives to develop a conducive working environment for advancing our
competencies, professionalism, innovations, personnel career development in order to ensure
improved performance and sustainable growths for the company.
The attainment of the targeted performance will always call for the concerted actions of all
the strategic management components being implemented in the company management. This
was achieved by putting in place the visions, missions, goals, strategy and strategic programs
of PT Surveyor Indonesia (Persero) which will provide the bases and directions for the business
processes according to the expectation of the management, namely to become the leading
partner in the field of independent assurance with high competence in order to be able to
compete in the global market.
The composition of the PT Surveyor Indonesia (Persero) commissioners and directors, among
others :
x
Page
Commissioners
Directors
III.1 Introduction
The aim of any topographical survey exercise is to determine the relative locations of point
(Place) on the earth’s surface by measuring horizontal distance (X and Y), differences in
elevation (Z) and direction (ɵ). The topographical maps that the produced often give the
location of places (observable features within the study area) and information about changes
elevation depicted using contours and spot heights. The topographical and cadastral maps
also serve as base maps.
III.2 Methodology
The proposed methodology will focus on primary (field) and secondary data collection and
management including data editing, cartographic map production and quality assurance
control.
Establishment of Ground
Field Work
Control Points
Sign-Off
Page
In tachymetry method, a rapid optical means of measuring distance using a telecope with
cross hairs and a stadia rod. The method that we shall employ is closed traverse where
readings begin and end at fixed control ppoints of known location. This permits the checking,
calculation and adjustment for closure error obtained during the readings.
The aim of obtaining vertical distances is to determine the differences and changes is elevation
from one location to another. This yask will be done using levelling method with a
digital/automatic level telescope and a stadia rod or levelling staff, or measunring vertical
angles and a slope distances.
The closure error can be determined for closed and close-loop traverses. The closure error
can be divided by the number of stations on the traverse or correction at each station can be
calculated according to the distance from the origin of the survey :
Ci = bi/L * Ec
Where :
Ci : the correction applied to station l
xiii
As with levelling the closure error will be determined for closed and close-loop traverses;
where the coordinates of the end points are identical or known. The location in the horizontal
plane is given by x and y coordinates (e.g. northing and easting). Using the measured
horizontal distances and adjusted angles, we shall calculate coordinates of each station. The
difference between the calculated and known coordinates of the end control point is dx and
dy, the course error in x and y. As with leveling, the adjustment will be a function of the
distance traversed (Li) relative to the total length of traverse (L) :
Where Cdx and Cdy are the adjusments in x and y coordinates at station i.
All survey information will shown in the drawing using guidelines listed below :
Drawings shall be prepared in layers; different entities like road, spot levels, drains,
buildings, boundary wall, bench mark, dimension etc. shall have different layers, name of
the layer shall be relevant to the item in the layer (example dimension “DIM” etc.)
Existing Bench marks, New Benchmarks their co-ordinates and level vii. Relation
between true north and grid north
The survey plans ibtained from the land record with property boundary information and details
such as acreage, location of beacons and their coordinates will be scanned, georeferenced
and the boundary and beacons digitized in AutoCad software version 2010. The obtained
cadastral information will be overlaid on the topographical data obtained during field work.
Finnaly, topographical-cadastral maps with reasonable scale 1:500 shall be produced with all
details boundary information, topographic features and contours.
xv
Page
IV.1 Introduction
Bathymetric surveys or often referred to as Depth Sounding are intended to determine the
state of the sea topography or the condition of the marine configuration. The method used in
this measurement is by determining the sea depth position on the longitudinal and transverse
paths for cross checks. Depth positioning is done by using GPS.
Usually, the distance between the depth sounding paths is 25 meters for each sounding path,
data is taken from the depth of the waters as far as 5 to 10 meters, and for control data is
crossed with 100 m intervals. The starting and ending points for each sounding path are
recorded and then the data is input into a measuring device equipped with a Echosounder
Raytheon type DE-719c facility, to be used as a reference or benchmark for motorboat trips
along the sounding path. An example of a sounding path in the measurement area can be
seen in the following image :
xvi
Page
Figure IV-1. The Movement of the Boat in Navigating the Sounding Path
Guessing Board
Page
The guessing board is used for observing the sea level fluctuations, in this case
an OTT brand Automatic Water Level Recorder is used
Safety Equipment
The safety equipment needed during survey activities is life jacket
Tidal Data Recording Form
EMA = Water level elevation is measured from the zero of the guessing board
Z = The water depth as a result of the sounding (distance from the bottom of the water
to the transducer)
A = Distance from transducer to the water surface
From the definitions above, the base elevation of the channel calculated from the zero of the
guessing board is (ED) :
ED = Z + A – EMA
xviii
Page
The navigation tool installation is installed directly above the Echosounder device assambled
on the ship, so it does not require an offset for the Echosounder position. Navigation tools
(GPS) and Echosounder have been arranged in one system, making it easier to process the
bathymetry data.
xx
Page
CHAPTER V. GEOTECHNICAL
INVESTIGATION
V.1 Introduction
Boring methods are widely used for subsurface investigations to collect samples, in almost all
types of soil, for visual inspection or laboratory testing. There are several boring techniques
like auger boring, rotary drilling, wash boring, percussion drilling, auger drilling, and test pits
that are employed to collect disturbed and undisturbed samples of soils.
These boring methods are selected based on the soil types, the efficiency of boring technique,
types of soil sample (disturbed or undisturbed), and the availability of facility and accuracy by
which soil and groundwater variations can be determined.
Boring in all types of soil and decomposed rock shall be done by 76 mm diameter rotary drilling
using mild steel or tungsten carbide bits.
Standard Penetration Tests (SPT) shall be performed in the boreholes at every 2.0 M depth
or wherever a change of strata is encountered. SPT shall be done in accordance with ASTM D
1586- 99, "Standard Test Method for Penetration Test and Split-barrel Sampling of Soil". The
following information shall be recorded for all the SPTs conducted.
a. Bore hole number and location
xxi
Rock core drilling will be resorted to when rock is encountered i.e. SPT value exceeds 100.
Rock core drilling shall be carried out using diamond drill bits having minimum core size of
54.7 mm (NX size). Every bit of rock core recovered shall be preserved in core boxes
conforming to the relevant ASTM standards. The drilling information and core description shall
be in accordance with ASTM D 2113-99, “Standard Practice for Rock Core Drilling and
Sampling of Rock for Site Investigation”. Where the core recovery is nil, SPT shall be
performed, and representative samples from such strata shall be preserved in polythene bags.
Where it is not possible to collect such representative samples, wash boring samples shall be
preserved or cuttings obtained from circulating water shall be collected and preserved.
The top of the pits should be large enough such that the minimum bottom dimensions of the
pit may be 1.20 x 1.20M. Depth of pits may be from 2.0 to 3.0M. The sides of the pit shall be
suitably battered to avoid collapse.
The excavated material from the trial pits shall be placed near the pit in stockpiles, separated
when sufficiently different materials are encountered. Marked stakes will be driven in the
stockpiles indicating the depths from which the material has been excavated. The excavated
material shall be sufficiently away from the pit so as not to endanger the stability of the sides.
xxii
Page
xxiv
Page
8 Studi Kelayakan TUKS (Terminal Untuk Medan Rp 200.000.000 Kuala Tanjung Kec. Sei Suka,
Kepentingan Sendiri) 2 2 2015 Kab. Batu Bara, Sumatera
Utara
9 Jasa Assessment Landscape Penghijauan Pangkalan Rp 104.940.000 Dusun VI Sei Dua Desa
susu Tanjung Pasir Kec. Pangkalan
2 2 2015
Susu Kab. Langkat Sumatera
Utara
10 Survey dan Pembuatan Dokumen Tapanuli Rp 221.000.000 Gedung 600 Bandara Soekarno-
Perencanaan Dalam Rangka Pengadaan Utara Hatta Tanggerang
4 4 2014
Tanah Untuk Pengembangan Bandara
Silangit Siborong-Barong Tapanuli Utara
11 Jasa Konsultansi Pekerjaan Inventarisasi Sumatera Rp 1.012.826.000 Jl. Kasuari No. 8 Medan
dan Penilai Lahan Proyek PLTA Asahan III Utara 5 5 2016
(2x87 MW) Blok A seluas 84,7 Ha
12 Jasa Konsultansi Pekerjaan Inventarisasi Sumatera Rp 357.584.000 Jl. Kasuari No. 8 Medan
dan Penilai Lahan Proyek PLTA Asahan III Utara 5 5 2016
(2x87 MW) Blok B seluas 9,2 Ha
13 Jasa Konsultansi Pekerjaan Inventarisasi Sumatera Rp 543.395.000 Jl. Kasuari No. 8 Medan
dan Penilai Lahan Proyek PLTA Asahan III Utara 5 5 2016
(2x87 MW) Blok C seluas 40,6 Ha
xxv
Page
14 Jasa Konsultansi Pekerjaan Inventarisasi Sumatera Rp 532.385.000 Jl. Kasuari No. 8 Medan
dan Penilai Lahan Proyek PLTA Asahan III Utara 5 5 2016
(2x87 MW) Blok D seluas 29,8 Ha
15 Jasa Konsultansi Pekerjaan Inventarisasi Sumatera Rp 541.263.000 Jl. Kasuari No. 8 Medan
dan Penilai Lahan Proyek PLTA Asahan III Utara 5 5 2016
(2x87 MW) Blok E seluas 43,6 Ha
16 Jasa Konsultansi Pekerjaan Inventarisasi Sumatera Rp 541.263.000 Jl. Kasuari No. 8 Medan
dan Penilai Lahan Proyek PLTA Asahan III Utara 5 5 2016
(2x87 MW) Transmisi 150 kV
17 Jasa Konsultansi Tapak Tower T/L 275 KV Sumatera Rp 1.258.171.200 Jl. Dr. Cipto No. 13
6 6 2018
Galang – Binjai Utara
18 Jasa Konsultansi Pekerjaan Inventarisasi Sumatera Rp 3.712.555.000 Jl. Kasuari No. 8 Medan
Tanah, Tanaman dan Bangunan Serta Utara
6 6 2017
Penilaian Lahan Proyek PLTA Asahan III
(2x87 MW)
19 Jasa Konsultansi Pelaksanaan Inventarisasi Aceh Rp 934.520.730 Jl. Dr. Cipto No. 12
Trgakan Untuk Izin Pinjam Pakai Kawasan
Hutan Jalur Transmisi di Aceh Sesuai SK
5 5 2018
No. 103/1/IPPKH/PMDN/2016 Seluas 62
Hektar
20 Jasa Konsultansi Pekerjaan Inventarisasi Sumatera Rp 1.604.947.300 Jl. Dr. Cipto No. 12
Tegakan Untuk Izin Pinjam Pakai Kawasan Utara
Hutan Jalur Transmisi di Sumatera Utara
5 5 2018
Sesuai SK No. No. 97/1/IPPKH/PMDN/2016
Seulas 117,49 Hektar
21 Jasa Konsultansi Teknis Pelaksanaan Sumatera Rp 380.820.000 Jl. Dr. Cipto No. 12
Inventarisasi Tegakan IPPKH No. Barat
93/1/IPPKH/PMDN/2016, Tangal 24
November Ijin Pinjam Pakai Kawasan
Hutan Untuk Pembangunan Jaringan 5 5 2018
Transmisi SUTT 275 KV GI Padang
Sidempuan - GI Payakumbuh Seluas 25,78
Hektar di Kabupaten Agam dan Kabupaten
Pasaman Sumatera BARAE
22 Jasa Konsultansi Teknis Pelaksanaan Kepulauan Rp 576.865.300 Jl. Dr. Cipto No. 13
Inventarisasi IPPKH No. Riau
94/1/IPPKH/PMDN/2016 Untuk
Pembangunan SUTT dan SKLTT 150 KV
Batam - Bintan Atas Nama PT PLN 5 5 2018
(Persero) Seluas 84,33377 Hektar dan
Hutan Produksi Tetap di Kota Tanjung
Pinang dan Kabupaten Bintan, Provinsi
Kepulauan Riau
23 Jasa Konsultansi Pengukuran Gardu Induk Sumatera Rp 21.081.000 Jl. Selamet Riyadi No. 28,
150 KV Selayang Utara 3 3 2018 Medan
24 Jasa Konsultansi Pengukuran Gardu Induk Sumatera Rp 21.081.000 Jl. Selamet Riyadi No. 28,
150 KV Tanah Jawa Utara 3 3 2018 Medan
25 Jasa Konsultansi Pengukuran Persil ROW Sumatera Rp 70.261.000 Jl. Selamet Riyadi No. 28,
T/L 150 KV Tanjung Balai - Kisaran Utara 5 5 2018 Medan
(Section 1)
26 Jasa Konsultansi Pengukuran Persil, Aceh Rp 470.519.170 Jl. Dr. Cipto No. 12, Medan
Inventarisasi, Pengumpulan Alas Hak,
Sosialisasi, Pendampingan Pembayaran 5 5 2018
pada Gardu Innduk 150 KV Banda Aceh
(Ext) dan GITET 275 KV Ulee Kareng
27 Jasa Konsultansi Pengukuran Persil, Aceh Rp 242.936.210 Jl. Dr. Cipto No. 12, Medan
Inventarisasi, Pengumpulan Alas Hak,
5 5 2018
Sosialisasi, Pendampingan Pembayaran
pada Gardu Induk 150 KV Lampisang
28 Jasa Konsultansi Pengukuran Persil, Aceh Rp 237.249.210 Jl. Dr. Cipto No. 12, Medan
Inventarisasi, Pengumpulan Alas Hak,
5 5 2018
Sosialisasi, Pendampingan Pembayaran
pada Gardu Induk 150 KV Samalanga
29 Jasa Konsultansi Pengukuran Persil, Aceh Rp 245.301.210 Jl. Dr. Cipto No. 12, Medan
Inventarisasi, Pengumpulan Alas Hak,
5 5 2018
Sosialisasi, Pendampingan Pembayaran
pada Gardu Induk 150 KV Blangkejeren
30 Jasa Konsultansi Pengukuran Persil, Aceh Rp 244.256.210 Jl. Dr. Cipto No. 12, Medan
Inventarisasi, Pengumpulan Alas Hak,
5 5 2018
Sosialisasi, Pendampingan Pembayaran
pada Gardu Induk 150 KV Calang
31 Jasa Konsultansi Pengukuran Persil, Aceh Rp 241.836.210 Jl. Dr. Cipto No. 12, Medan
Inventarisasi, Pengumpulan Alas Hak,
5 5 2018
Sosialisasi, Pendampingan Pembayaran
pada Gardu Induk 150 KV Arun
32 Jasa Konsultansi Pengukuran Persil, Aceh Rp 240.725.210 Jl. Dr. Cipto No. 12, Medan
Inventarisasi, Pengumpulan Alas Hak,
5 5 2018
Sosialisasi, Pendampingan Pembayaran
pada Gardu Induk 150 KV Singkil
xxvi
Studi Kelayakan TUKS (Terminal Untuk Sumatera Rp 886.500.000 Kuala Tanjung Kec. Sei Suka,
33 Kepentingan Sendiri) di Pelabuhan PT Utara 3 3 2018 Kab. Batu Bara, Sumatera
INALUM (Persero) Utara
Jasa Konsultansi Penyesuaian Perizinan Sumatera UtaraRp 494.120.000 Brigjend Katamso KM 5,5 Titi
34 Terminal Untuk Kepentingan Sendiri 4 4 2019 Kuning, Medan
(TUKS) PLTU Tembilahan
Page
Jasa Konsultan Proses Perizinan Sumatera UtaraRp 883.278.000 Brigjend Katamso KM 5,5 Titi
Temporary Jetty Menjadi Terminal Untuk Kuning, Medan
35 7 7 2019
Kepentingan Sendiri (TUKS) PLTU Tenayan
Equipment
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
Hardware
4 Plotter 1 unit A0 - HP DJT 610 Seri Q6712A 2008 Good Medan Own
1
7 1 unit Canon BJC 2100 1996 Good Medan Own
Printer
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
2
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
3
28 2 unit Epson LQ 300+ II 2008 Good Medan Own
Printer
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
UWK
37 2 unit Compac Built-up 2002 Good Own
Personal Computer Lhokseumawe
4
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
5
Personal Computer
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
6
PTSDS090070250AOA7300
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
7
65 1 unit Serial Cable RS-232 1996 Good Medan Own
Page
Connectivity
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
8
75 1 unit COMPAQ 2000 Good Medan Own
Page
Komputer Server
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
9
86 1 unit Xerox DC-236 2006 Good Medan Own
Mesin Fotocopy
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
87 1 unit Canon MF 4680 s/n ABB 02080 2008 Good Medan Own
Mesin Fotocopy
88 1 unit Xerox DC 236 2005 Good Medan Own
Mesin Potocopy
89 1 unit DAHLE 561 2000 Good Medan Own
Guillotine Cutter
90 1 unit HD-12L / 17 2000 Good Medan Own
MAX STAPLER
91 1 unit IBIMASTER 2000 Good Medan Own
IBICO MACHINE
92 2 unit Nikon AF-240 SV 2000 Good Medan Own
Camera Digital
93 Camera Digital 1 unit Canon IXUS 2003 Rusak Medan Own
94 Camera Digital 8 unit Canon Power Shot A420 2006 Good Medan Own
10
97 Camera Digital 1 unit DMC FX9 2006 Good Medan Own
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
11
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
12
114 1 unit 2009 Good Medan Own
Note Book LXAC60X034903059761601
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
13
121 1 unit 2010 Good Medan Own
Note Book LUSDR02703553BDB1601
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
122 Note Book 1 unit Toshiba M100 S/N : 66187777K 2007 Good Medan Own
127 Laptop ` 3 unit Toshiba Satelit A-105 S 4547 2007 Good Medan Own
130 Laptop 5 unit Toshiba L 310 S/N 48316264W 2008 Good Medan Own
14
131 2 unit 100 Mb 2001 Good Medan Own
Zip Drive
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
132 Hub 3 com Swicting up 1 unit 3 com Swicting up 16 port 2001 Good Medan Own
16 port
133 1 unit super stack 2003 Good Medan Own
Hub 3 com super stack
134 3 unit HUB 2004 Good Medan Own
HUB 3Com
135 1 unit 8x4x32 Eksternal 2001 Good Medan Own
CD Read Writer
136 1 unit Writer External 2003 Good Medan Own
CD Writer External
TLP471Z
137 1 unit 2002 Good Medan Own
LCD Projector
15
LCD Projector Ansi
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
146 1 unit Samsung 739 MGB 17" 2008 Good Medan Own
Monitor PC
147 3 unit - 2002 Good Medan Own
Stabilizer
148 1 unit Link Builder 2002 Good Medan Own
HUB Link Builder
149 1 unit Datascript 2002 Good Medan Own
Mesin Absensi
150 11 unit Mobile Finger 2006 Good Medan Own
Mobile Finger Print
16
151 6 unit Mobile Finger 2007 Good Medan Own
Mobile Finger Print
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
17
162 1 unit Seagate 200 GB 2007 Good Medan Own
External Hardisk
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
3CRWE776075 s/n
171 Wifi Router 3Com Acces 1 unit 2010 Good Medan Own
18
Point 9TZ4BXP563E40
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
19
5 2 unit MapInfo 2001 Good Medan Own
Map Info Rel 5.5 dan 6.0
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
20
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
6 Tranducer 1 unit DHC 711-RM Tranducer, 5,0 Mhz 2008 Good Medan Own
21
16 GPS MAP 55 unit Garmin 76CSx 2008 Good Medan Own
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
21 Pocket Dosimeter 2 unit 874979 dan 874982 2004 Good Medan Own
Charger Pocket
22 1 unit Charger Pocket 2003 Good Lhokseumawe Own
Dosimeter
23 Survey meter 1 unit Type 2000A SN.42586 2004 Good Medan Own
24 Survey Meter 1 unit Type 2000A SN.42634 2003 Good Medan Own
22
26 Survey Meter 1 unit Type 2000A SN.44463 2004 Rusak Medan Own
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
27 Survey Meter 1 unit ND 2000A S/N 31636 2008 Good Medan Own
23
37 1 unit SB-900XN 2002 Rusak Medan Own
Viewer Remsco
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
42 MPI Yoke Permanent 1 unit M129 WX, Series 2007 Good Medan Own
24
Straight Connector
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
25
55 Charger Pendos 1 unit Pendos 2004 Good Lhokseumawe Own
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
60 Esi Track H360 2 unit Track H360 2006 Good Medan Own
62 Pressure Gauge 1 unit 0-300 Psi Scrhaft 2006 Good Medan Own
26
Page
PT Surveyor Indonesia (Persero)
PROPOSAL
Topographic Survey, Hydrographic Survey & Geotechnical Investigation
YPE AND
DESCRIPTION OF THE NUMBER OF MACHINERY AND EQUIPMENT INVESTIGATOR HAS IN POSITION
No.
MACHINERY AND
EQUIPMENT
1 2 3 5 6 7 8 9
Lhokseumawe
67 2 unit O148O61O, 071551608 2008 Good Own
Ultrasonic Flow Detector
27
Page
PT Surveyor Indonesia (Persero)