Section 5 - Final Summary

The document provides a summary of costs for different sections of a construction project including administration block, guard house, boiler house, CIP shed, and plant foundations. It also includes contingencies, VAT, and a total project cost in US dollars.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views1 page

Section 5 - Final Summary

The document provides a summary of costs for different sections of a construction project including administration block, guard house, boiler house, CIP shed, and plant foundations. It also includes contingencies, VAT, and a total project cost in US dollars.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

 

       
       
       
  FINAL SUMMARY      
   Page  
      US$  

  PRELIMINARY & GENERAL 3 - 26    


     

  ADMINISTRATION BLOCK 4 - 40    
     

  GUARD HOUSE 5 - 33    
     
     
  BOILER HOUSE 6 - 44    
     

  CIP SHED 7 - 22    

PLANT FOUNDATIONS 8 - 18

EXTERNAL WORKS 9-8


       
       
  SUB TOTAL BEFORE CONTINGENCIES US $    

     
  CONTINGENCIES      
Allow 5% (five percent) Contingencies to the Sub Total to be
 5%
used as directed or deducted in whole or in part if not required.
     
       
       
       
  SUB TOTAL BEFORE VAT US$    
       
       
  ADD: 14.5% VAT US$    
       
       
       
       
  TOTAL US$    
       
     
       
       
         