FINAL SUMMARY
Page
US$
PRELIMINARY & GENERAL 3 - 26
ADMINISTRATION BLOCK 4 - 40
GUARD HOUSE 5 - 33
BOILER HOUSE 6 - 44
CIP SHED 7 - 22
PLANT FOUNDATIONS 8 - 18
EXTERNAL WORKS 9-8
SUB TOTAL BEFORE CONTINGENCIES US $
CONTINGENCIES
Allow 5% (five percent) Contingencies to the Sub Total to be
5%
used as directed or deducted in whole or in part if not required.
SUB TOTAL BEFORE VAT US$
ADD: 14.5% VAT US$
TOTAL US$
1918 10 - 1