100% found this document useful (2 votes)
589 views18 pages

Completion Basics: © 1996 Baker Hughes Incorporated. All Rights Reserved

Uploaded by

Mohamed Elshora
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
589 views18 pages

Completion Basics: © 1996 Baker Hughes Incorporated. All Rights Reserved

Uploaded by

Mohamed Elshora
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 18

Completion Basics

Part II

© 1996 Baker Hughes Incorporated. school.pkr.cb. Combas2 - 1


All rights reserved. rwp 08/13/97
Completion Design
Examples

© 1996 Baker Hughes Incorporated. school.pkr.cb. Combas2 - 2


All rights reserved. rwp 08/13/97
Completion Design
Reservoir

• Drainage
– Vertical
– Horizontal
– Extended Reach
– Multi-Lateral

• Recovery
– Primary
• Flowing
• Artificial Lift
– Secondary
• Pressure maintenance
• Waterflood
• CO2 flood
• Steam injection

• Well Type
– Production
– Injection
– Disposal
– Storage

© 1996 Baker Hughes Incorporated. school.pkr.cb. Combas2 - 3


All rights reserved. rwp 08/13/97
Completion Design
Well Configuration

• Number of Zones
– Single
– Multiple-
• Selective
• Co-Mingled

• Tubing Strings
– Tubingless
– Single
– Concentric
– Dual

• Formation Interface
– Open Hole
– Slotted Liner
– Sand Exclusion
– Perforated Casing

© 1996 Baker Hughes Incorporated. school.pkr.cb. Combas2 - 4


All rights reserved. rwp 08/13/97
Completion Design
Well Requirements

• Tubulars
– Tensile &
Compressive Ratings
– Burst & Collapse
Ratings
– Material
Requirements

• Downhole Tool
Requirements
– Pressure, Tubing
Load, Temperature
– Material
Requirements
– Tubing-to-Packer
configuration
– Packer Landing
Flexibility
– Installation Method
– Retrievability

© 1996 Baker Hughes Incorporated. school.pkr.cb. Combas2 - 5


All rights reserved. rwp 08/13/97
Completion Design
Efficiencies

• Wellbore
Construction
– Slimhole
– Monobore
– Setting Method
– Number of Trips &
Interventions
Required for Setting

• Completion
Installation
– Number of Trips
Required
– Degrees of Freedom
– Remote Actuation

• “Work-Over”
Flexibility

• Intelligent
Completions

© 1996 Baker Hughes Incorporated. school.pkr.cb. Combas2 - 6


All rights reserved. rwp 08/13/97
Single Zone
Retrievable

On-Off Seal Connector

Mechanical Set, Double Grip

Wireline Entry Guide

© 1996 Baker Hughes Incorporated. school.pkr.cb. Combas2 - 7


All rights reserved. rwp 08/13/97
Single Zone
Permanent

Tubing Retrievable Sub-


Surface Safety Valve

Sliding sleeve

Permanent Packer with


Anchor Seal Assembly

Seating Nipple

© 1996 Baker Hughes Incorporated. school.pkr.cb. Combas2 - 8


All rights reserved. rwp 08/13/97
Single Zone
Open Hole

Hydraulic Set Double Grip


Retrievable Packer

© 1996 Baker Hughes Incorporated. school.pkr.cb. Combas2 - 9


All rights reserved. rwp 08/13/97
Single Zone
HP/HT

15K Metal to Metal Tubing

Locator Type Seal Assembly

Anchor Seal Assembly

© 1996 Baker Hughes Incorporated. school.pkr.cb. Combas2 - 10


All rights reserved. rwp 08/13/97
Single Zone
Gravel Pack

Packer Bore Receptacle

Anchor Type Seal Assembly

GP Extension with Sliding


Sleeve

Shear-Out Safety Joint

Gravel Pack Screens

© 1996 Baker Hughes Incorporated. school.pkr.cb. Combas2 - 11


All rights reserved. rwp 08/13/97
Single Zone
Gas Lift

Gas Lift Mandrels with


Dummy Gas Lift Mandrels

Locator Seal Assembly

© 1996 Baker Hughes Incorporated. school.pkr.cb. Combas2 - 12


All rights reserved. rwp 08/13/97
Single Zone
ESP

Seating Nipple

“Y” Block
Electrical Submersible
Pump (ESP)

Sliding Sleeve

Permanent Packer with


Locator Seal Assembly

Seating Nipple

© 1996 Baker Hughes Incorporated. school.pkr.cb. Combas2 - 13


All rights reserved. rwp 08/13/97
Single Zone
Monobore

CMD Sliding Sleeve

Hydraulic Set, Permanent


Packer

Cement

© 1996 Baker Hughes Incorporated. school.pkr.cb. Combas2 - 14


All rights reserved. rwp 08/13/97
Multiple Zone
Co-Mingled Production

Expansion Joint

Hydraulic Set Double Grip


Retrievable Packer

Sliding Sleeve

Hydraulic Set Double Grip


Retrievable Packer

Seating Nipple

Wire Line Entry Guide

© 1996 Baker Hughes Incorporated. school.pkr.cb. Combas2 - 15


All rights reserved. rwp 08/13/97
Multiple Zone
High Pressure Dual

Latching Type Parallel Flow Tube

Large Bore Alternative Bore


Permanent Packer

Blast Joints

Permanent Packer and Locator


Type Seal Assembly

© 1996 Baker Hughes Incorporated. school.pkr.cb. Combas2 - 16


All rights reserved. rwp 08/13/97
Multiple Zone
Waterflood

Tandem Tension Packer

Side Pocket Mandrel with


Downhole Flow Regulator

Lok-Set Type Packer and On-


Off Seal Connector

© 1996 Baker Hughes Incorporated. school.pkr.cb. Combas2 - 17


All rights reserved. rwp 08/13/97
Multiple Zone
Selective Production

Hydraulic Set Retrievable


Dual String Packer

Seating Nipple

Sliding Sleeve

Permanent Packer with


Locator Seal Assembly

Seating Nipple

© 1996 Baker Hughes Incorporated. school.pkr.cb. Combas2 - 18


All rights reserved. rwp 08/13/97

You might also like