0% found this document useful (0 votes)
50 views6 pages

Jefrey Tomala Ogoc: Position Applied For: Boiler Maker / Pipe Fitter

The document provides details about an applicant named Jefrey Tomala Ogoc who is applying for the position of Boiler Maker/Pipe Fitter. It includes personal information, career objectives, qualifications, trainings and certificates, educational background, and extensive work experience in related positions for various companies.

Uploaded by

Sofriano Sarita
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views6 pages

Jefrey Tomala Ogoc: Position Applied For: Boiler Maker / Pipe Fitter

The document provides details about an applicant named Jefrey Tomala Ogoc who is applying for the position of Boiler Maker/Pipe Fitter. It includes personal information, career objectives, qualifications, trainings and certificates, educational background, and extensive work experience in related positions for various companies.

Uploaded by

Sofriano Sarita
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

JEFREY TOMALA OGOC

Purok Germelina, Brgy. I San Carlos City


Negros Occidental, Philippines, 6127
09351228652 / 09388501151
[email protected]
______________________________________________________________________

POSITION APPLIED FOR: BOILER MAKER / PIPE FITTER

PERSONAL INFORMATION:

Age : 45
Birthday : November 7, 1975
Place of Birth : Dipolog City
Gender : Male
Marital Status : Married
Civil Status : Roman Catholic
Nationality : Filipino

CAREER OBJECTIVES:
To obtain employment wherein my qualifications and interest can be utilized
advantageously.

To gain experienced and expertise on Construction Industry.

Wherein my skills and knowledge can be versified widely.

QUALIFICATION:

Excellent communication, interpersonal, organizational and leadership skills.


Exceptional versatility with the ability to manage multiple tasks in a pressured
environment.
Dedication and drive as a hard-working individual.

TRAININGS, CERTIFICATES and AWARDS:

PIPEFITTING (National Certificate II)


(Actual Fit-up of Pipe Spool)
April 16, 2016
Boiler Maker Training
(Actual Erection and Pressure parts Fit-up)
Nov. 3, 2015 – Nov. 27, 2015
AMG Training Center
San Ildefonso, Bulacan

Safest Worker Awardee


DAELIM Phil. Inc.
Month of March 2016
Pagbilao 3, 420 MW CFPP
Isla Grande, Ibabang Polo
Pagbilao, Quezon Province

Safest Worker Awardee


EEI Corporation
Month of February 2016
Pagbilao 3, 420 MW CFPP
Isla Grande, Ibabang Polo
Pagbilao, Quezon Province

EDUCATIONAL BACKGROUND:

College: BS in Mechanical Engineering


Andres Bonifacio College
1993-1998

High School: Zamboanga del Norte School of Arts and Trades


1989-1993

Elementary: Minaog Elementary School


Purok Parpagayo, Minaog, Dipolog City
1983-1989

WORKING EXPERIENCES:

Company: AG & P – JG SUMMIT PETROCHEMICAL CORP.


Stage 1 Expansion Project
Brgy. Simlong, Batangas City, Batangas
Position: Pipe Fitter
Duration: February 7, 2020 – June 5, 2021
JOB RESPONSIBILITIES:

 Line checking and qualification of balance pipe spool and supports in all piping
system
 Erection and fit-up of pipe spool and supports
 Fabricate and fit-up of fire suppression system
 Reinstatement of valves prior for final bolt tightening
 Erection of conveying system parts accessories
 Fit- up of boiler tubes
 Installation and fit-up of HPCO2 five suppression system

Company: San Carlos Construction Solution, Inc.


San Carlos Biopower project / La Carlota City biopower project
Position: Pipe Fitter
Duration: August 10, 2018 – December 17, 2019

JOB RESPONSIBILITIES:

 Material Preparation and ground assembly of pressure parts


 Erection of pressure parts and non-pressure parts
 Fit-up of boiler tubes
 Erection of conveying parts and accessories
 Re-installment of flange prior for bolt tightening

Company: Al Rushaid Cons. Co.Ltd.


Jazan Refinery and Terminal Facilities
Naptha and Aromatic
Kingdom of Saudi Arabia
Position: Leadman Piping / Line Checker
Duration: January 16 – July 7, 2018

JOB RESPONSIBILITIES:

 In-charge manpower distribution


 In-charge line-checking in preparation for the next activity of every crew
 In-charge documentation( Daily production report ;Request for inspection for
every finished pipe spool joint fit-up and its supports)
 In-charge material preparation and fit-up of pipe spool and supports

Company: EEI Corporation


Pagbilao 3, 420 MW CFPP
Isla Grande, Ibabang Polo
Pagbilao, Quezon Province
Position: Boiler Maker / Pipefitter
Duration: January 12, 2016 – June 30, 2017

JOB RESPONSIBILITIES:

 Material Preparation and ground assembly of pressure parts


 Fit-up of boiler tubes and installation of backstay system
 Erection of conveying system parts accessories
 Erection and fit-up of pressure parts and non-pressure parts

Company: EEI Corporation / Siemens Project


San Gabriel 450 MW Combine Cycle
Power Plant
San Rita Karsada, Batangas City
Batangas
Position: Pipefitter
Duration: December 3, 2014 – September 22, 2015

JOB RESPONSIBILITIES:

 Lead the group for Material Preparation, Erection and Fit-up of Pipe spool and
supports
 Erection and Fit-up of Boiler steel structure
 In-charge manpower distribution

Company: EEI Corporation


Therma South Energy Project
Lower Binugaw, Toril, Davao Ciy
Position: Pipefitter
Duration: December 2013 – October 2014

JOB RESPONSIBILITIES:

 Lead the group for Material Preparation, Erection and Fit-up of Pipe spool and
supports
 Erection and Fit-up and erection of boiler parts
 Fit-up of boiler tubes

Company: EEI Corporation


Singapore Parallel Train Olefins
Recovery Project, Jurong Island,
Singapore
Position: Pipefitter
Duration: July 2012 – December 2012

JOB RESPONSIBILITIES:

 Fit-up pipe spool and supplies


 Re-installment of flange
 Fabricate temporary spool prior to air blowing

Company: EEI Corporation


Bio-Ethanol and Co-Generation Power Plant
San Carlos City, Negros Oriental
Position: Pipefitter
Duration: February 2008 – February 2009

JOB RESPONSIBILITIES:

 Erection of Boiler pressure parts


 Fit-up of boiler tube
 Erection and installation of backstay system
 Material Preparation and ground assembly of pipe spool

Company: EEI Corporation


Steag Power Plant
Villanueva, Misamis Oriental
Position: Pipefitter
Duration: June 2007 – October 2007

JOB RESPONSIBILITIES:

 Lead the group for Material Preparation, Erection and Fit-up of boiler pressure
pipes and supports
 Erection and Fit-up of boiler steel structure
 Material Preparation and ground assembly of pipe spool
 Erection of pipe spool and support

REFERENCES:

MR. WALTER JUANGA


Boiler Supervisor
09302257814
ROBERTO M. ARCAY
Construction Superintendent
09272882082

HON. ELIAS LARTAR


Brgy. Kagawad
Brgy. 1, SCC