Stressing Report: Page 1 of 2

This stressing report documents tendon stressing for a specific tendon. It includes information like the tendon location, size, supplier, number of strands, assumed and actual material properties. It outlines the stressing procedure such as the jacking equipment to be used at each end, stressing mode, target gauge pressures and elongations. Measurement data is recorded for elongations at each end during the first stage of stressing in increments of 20% of load.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views3 pages

Stressing Report: Page 1 of 2

This stressing report documents tendon stressing for a specific tendon. It includes information like the tendon location, size, supplier, number of strands, assumed and actual material properties. It outlines the stressing procedure such as the jacking equipment to be used at each end, stressing mode, target gauge pressures and elongations. Measurement data is recorded for elongations at each end during the first stage of stressing in increments of 20% of load.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

STRESSING REPORT Page 1 of 2

Project Name: Job No.


Contractor: Stressing Sub-Contractor:
Tendon Location: Tendon Number:
Tendon Size: PT Steel Supplier:
Assumed for Calculations Actual Values Delivered per Pack or Reel of Strand
Strand from Reel No.
Number of Strands, Ns: Number of Strand per Reel, Nr:
Assumed Strand Area, As: Actual Area of Strands per Reel, Ar:
Assumed Modulus, Es Actual Modulus per Reel, Er:
Product, Ns*As*Es= Product, Nr*Ar*Er=
Sum of Product, Sum (Nr*Ar*Er)=
Adjusted Elongation Expected = [Nr*Ar*Er / Sum (Nr*Ar*Er)]

First Stage of Stressing from End A First Stage of Stressing from End B
Jack Force (KN) Gauge (Kpa) Jack Force (KN) Gauge (Kpa)
Required Force before wedge set: Required Force before wedge set:

Theoretical Elongation, ΔA(mm) = Theo ΔA+ΔB = Theoretical Elongation, ΔB(mm) =


Actual Elongation, ΔA(mm) = Adj. ΔA+ΔB = Actual Elongation, ΔB(mm) =
Expected Wedge Set, End A, Wa: Expected Wedge Set, EndB, Wb:

Jack Gauge Jack Gauge


Equipment Identifiers End A: Equipment Identifiers End B:

Stressing Mode:
One End Only: Both A & B: Both Simultaneous (A and B with 2 sets of equipment):

Target Gauge Pressures and Elongations


End A
Pressure Elongation Wedge Set Pressure Elongation Wedge Set
per increment per increment

Elongation before set at A = ΔA = (Sum) = Elongation before set at B = ΔB = (Sum) =


Net Elongation after wedge set at A = Net Elongation after wedge set at B =
Overall Anticipated elongation=
STRESSING REPORT Page 1 of 2

Project Name: Job No.


Contractor: Stressing Sub-Contractor:
Tendon Location: Tendon Number:
Tendon Size: PT Steel Supplier:
Assumed for Calculations Actual Values Delivered per Pack or Reel of Strand
Strand from Reel No.
Number of Strands, Ns: Number of Strand per Reel, Nr:
Assumed Strand Area, As: Actual Area of Strands per Reel, Ar:
Assumed Modulus, Es Actual Modulus per Reel, Er:
Product, Ns*As*Es= Product, Nr*Ar*Er=
Sum of Product, Sum (Nr*Ar*Er)=
Adjusted Elongation Expected = [Nr*Ar*Er / Sum (Nr*Ar*Er)]

First Stage of Stressing from End A First Stage of Stressing from End B
Jack Force (KN) Gauge (Kpa) Jack Force (KN) Gauge (Kpa)
Required Force before wedge set: Required Force before wedge set:

Theoretical Elongation, ΔA(mm) = Theo ΔA+ΔB = Theoretical Elongation, ΔB(mm) =


Adjusted Elongation, ΔA(mm) = Adj. ΔA+ΔB = Adjusted Elongation, ΔB(mm) =
Expected Wedge Set, End A, Wa: Expected Wedge Set, EndB, Wb:

Jack Gauge Jack Gauge


Equipment Identifiers End A: Equipment Identifiers End B:

Stressing Mode:
One End Only: Both A & B: Both Simultaneous (A and B with 2 sets of equipment):

Target Gauge Pressures and Elongations


End A
Pressure Elongation Wedge Set Pressure Elongation Wedge Set
per increment per increment
1
2
3
4
5
Elongation before set at A = ΔA = (Sum) = Elongation before set at B = ΔB = (Sum) =
Net Elongation after wedge set at A = Net Elongation after wedge set at B =
Overall Anticipated elongation=
STRESSING REPORT Page 2 of 2

Elongation Measurement:
End A End B
First Stage Pressure Elongation Wedge Set Pressure Elongation Wedge Set Increment Elong Average
Stressing at A, Wa at B, WB per 20% of Load per 20%

Initial 20%

40%

60%
I
80% I
I
Final 100% at A V
I
Second Stage of Stressing I
Pick-up at B I
V
Final 100% at B I
I
I
Elongation at A from 20 to 100%= V
Add for Initial 20% Load= <--------------------- <--------------------- <--------------------- <--------------------- <--------------------- <----------
Elongation at A before set=
Total Elongation before set=
Total wedge set=
Deduct elongation insde jack=
Final Elongation=
Expected Elongation= Ratio of (Final/ Expected) = % under or over = < 7% O.K.
(AASHTO LRFD
Approved: Not Approved: Construction or
Project Specs.)
Observations: No popping noises of broken wires O.K. Over elongation is within tolerance, O.K.

Signed- Stressing Forman: Date:

Signed - Inspector: Date: