100% found this document useful (5 votes)
3K views3 pages

Department of Education: Schools Division Office of Camarines Sur

This document contains guidelines for schools in Camarines Sur, Philippines to prepare project proposals. It includes instructions on providing information such as the project title, location, goals, activities, budget, and approvals. Schools must follow this 13-point format that requires details on implementation schedules, beneficiaries, funding sources, and evaluations to recommend projects for approval and funding.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (5 votes)
3K views3 pages

Department of Education: Schools Division Office of Camarines Sur

This document contains guidelines for schools in Camarines Sur, Philippines to prepare project proposals. It includes instructions on providing information such as the project title, location, goals, activities, budget, and approvals. Schools must follow this 13-point format that requires details on implementation schedules, beneficiaries, funding sources, and evaluations to recommend projects for approval and funding.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Republic of the Philippines

Department of Education
Region V
SCHOOLS DIVISION OFFICE OF CAMARINES SUR
Enclosure No. 2-A to Div. Memo No.156 s, 2021 re: GUIDELINES IN THE PREPARATION OF PROPOSALS

SCHOOL:
ADDRESS:
DISTRICT:

PROJECT PROPOSAL
(1) TITLE (2) SCHEDULE OF (3) PROPONENT
IMPLEMENTATION

(4) PROJECT LOCATION:

(5) GOALS/OBJECTIVES:

(6) IMPLEMENTING UNIT/OFFICE:

(7) OVERVIEW/RATIONALE:

(8) ACTIVITIES/STRATEGIES: (sequentially arranged activities/process/time frame/ person responsible)

(9) BENEFICIARIES:

(10) SOURCE OF FUND:

(11) BUDGETARY REQUIREMENTS (please refer to the attached specifications per item)

IMPLEMENTATION MATERIALS LABOR TOTAL

QUARTER-1

QUARTER-2

QUARTER-3

QUARTER-4

GRAND TOTAL

(12) REPORTING AND EVALUATION:

(13) ENCLOSURES:

Prepared/Submitted by: Recommending Approval:

Officer In-Charge SGOD Chief

Approved:

_____________________________________
ASDS / SDS
Republic of the Philippines

Department of Education
Region V
SCHOOLS DIVISION OFFICE OF CAMARINES SUR
Enclosure No. 3 to Div. Memo No.156 s, 2021 re: GUIDELINES IN THE PREPARATION OF PROPOSALS

DESCRIPTION / SPECIFICATION OF ITEM/ARTICLE


DESCRIPTION/SPECIFICATION
(size, color, material used,
UNIT
NO. ITEM capacity, features, thickness, QUANTITY TOTAL
COST
height, weight, length, diameter,
other specific details)

Material Cost

Labor Cost

Total Project Cost

Prepared by: Checked and Reviewed:

School Head
Concurred:

Division Engineer
PFU, SDO Cam. Sur

Republic of the Philippines

Department of Education
Region V
SCHOOLS DIVISION OFFICE OF CAMARINES SUR

Project Title:
Allocation:
Source of Fund:
Mode of Implementation:
Project Duration:
Physical Target:

PROGRAM OF WORKS

ITEM DESCRIPTION (Scope of Works) % QUANTIT UNIT COST REMARKS


NO. TOTAL Y

You might also like