INSTALASI SACRIFICIAL ANODE
CATHODIC PROTECTION
CATHODIC PROTECTION SYSTEM
INSTALASI SACRIFICIAL ANODE CATHODIC PROTECTION
APR 2021
INSPECTION AND TEST PLAN
Nomor Dokumen
JWFP-UGSP-PRS-PRO-001
V SMH
Sonatry
elec eng
07april21
JIRAK WATERFLOOD PROJECT
PT PERTAMINA EP
IFI 02-02-2021 ISSUED FOR INFORMATION KSK AHK DP/JP
IFI 08-01-2021 ISSUED FOR INFORMATION KSK AHK DP/JP
IFI 30-12-2020 ISSUED FOR INFORMATION KSK AHK DP/JP
IFI 22-12-2020 ISSUED FOR INFORMATION KSK AHK DP/JP
DISIAPKAN DIPERIKSA DISETUJUI DIPERIKSA DISETUJUI
REV TANGGAL URAIAN
PT ELNUSA Tbk. PT PERTAMINA EP
INSTALASI SACRIFICIAL ANODE
CATHODIC PROTECTION
CATHODIC PROTECTION SYSTEM
INSTALASI SACRIFICIAL ANODE CATHODIC PROTECTION
INSPECTION AND TEST PLAN
Nomor Dokumen
JWFP-UGSP-PRS-PRO-001
Nomor PO.
4110097189
0 02-02-2021 ISSUED FOR CONSTRUCTION IDS ASP EDK
B1 08-01-2021 ISSUED FOR APPROVAL IDS ASP EDK
B 30-12-2020 ISSUED FOR APPROVAL IDS ASP EDK
A 22-12-2020 ISSUED FOR REVIEW IDS ASP EDK
DISIAPKAN DIPERIKSA DISETUJUI DIPERIKSA DISETUJUI
REV TANGGAL URAIAN
PT. PERPRO PT ELNUSA TBK.
TABULASI HALAMAN REVISI
INSTALASI SACRIFICIAL ANODE
CATHODIC PROTECTION
No. Dokumen JWFP-UGSP-PRS-PRO-001
INSPECTION AND TEST PLAN Revisi 0
Halaman 4 dari 7
Revisi Revisi
Hal Hal
A B C 0 A B C 0
1
2
3
4
5
6
7
Electronic File name : JWFP-UGSP-PRS-PRO-001
INSTALASI SACRIFICIAL ANODE
CATHODIC PROTECTION
No. Dokumen JWFP-UGSP-PRS-PRO-001
INSPECTION AND TEST PLAN Revisi 0
Halaman 5 dari 7
RANGKUMAN REVISI
No. Rev. Hal. Deskripsi Revisi Keterangan
Electronic File name : JWFP-UGSP-PRS-PRO-001
INSTALASI SACRIFICIAL ANODE
CATHODIC PROTECTION
No. Dokumen JWFP-UGSP-PRS-PRO-001
INSPECTION AND TEST PLAN Revisi 0
Halaman 6 dari 7
DAFTAR ISI
1 INSPECTION AND TEST PLAN ..................................................................................... 7
Electronic File name : JWFP-UGSP-PRS-PRO-001
INSTALASI SACRIFICIAL ANODE
CATHODIC PROTECTION
No. Dokumen JWFP-UGSP-PRS-PRO-001
INSPECTION AND TEST PLAN Revisi 0
Halaman 7 dari 7
1 INSPECTION AND TEST PLAN
(TERLAMPIR)
Electronic File name : JWFP-UGSP-PRS-PRO-001
Doc. No. JWFP-UGSP-PRS-PRO-001
INSPECTION & TEST PLAN
Rev. 0 Page 6 of 7
Date : 02 Feb 2021
INSTALASI SACRIFICIAL ANODE CATHODIC PROTECTION
Item Description CATHODIC PROTECTION AND ACCESSORIES I : Inspection
T/C : Test Certificate Required
Client Name PT. PERTAMINA EP WATERFLOOD PROJECT P : Prepared
H : Hold Point
Purchaser/Contractor Name PT. ELNUSA W1, W2 : Witnessed M : Monitoring
Project Name INSTALASI SACRIFICIAL ANODE CATHODIC PROTECTION R1,R2 : Review of Documentation A : Approved
Quantum of Reference Document / Verified Acceptance Inspection Level
No Qualities Activity Procedure / Description
Check Drawing Document Criteria PERPRO ELN PEP
INSPECTION & TEST PLAN
1 Pre Inspection Meeting meeting between vendor and main contractor P W1 R1
2 Document Review & Approval send the approval document to main contractor Sample JWFP-UGSP-PRS-DSS-001 As per drawing/catalog sheet P R2 R1
JWFP-UGSP-PRS-GAD-001
3 SAT (Site Acceptance Test)
A Sacrificial Ribbon Magnesium Anodes Mfc Certificate + (1) ASTM G97-97 P W2
Inspection Record (2) ASTM B843
(3) AS 2239
(4) Manufacturer's Standard
a Visual Inspection Visually check anode to ensure that workmanship, good Sample No damage P W2 W2,R2
practice & finished were maintained during manufacturing.
b Dimensional / Weight / Type Visually check the anode and package dimension, net and Sample JWFP-UGSP-PRS-DWG-001 As per drawing, Weight and P W2 W2,R2
gross weight, & type/model to follow the specification/ Dimension Tolerance + 3%
approved drawing
c Anode-Cable Connection Measure the resistance between each anode and cable tail Sample ≤ 0,5 Ohm P W2 W2,R2
d Quantitatives Count the quantity of Magnesium Anode as per approved 100% JWFP-UGSP-PRS-LST-002 As per drawing/Bill of Material P W1 W1
Bill of Material
B Test Point Inspection Record Manufacturer's Standard (MS)
a Visual Inspection Visually check Test Station Box (Cover, Support, Terminal, Sample No Damage P W2 W2,R2
Hinge, Lock, Name Plate) to ensure that workman-ship,
good practice, and finished were maintained during
manufacturing
b Dimensional / Size / Type / Model Visually/measure the goods dimension and type/model to Sample JWFP-UGSP-PRS-DWG-002 As per drawing, dimension P W2 W2,R2
follow the specification /approved drawing tolerance ± 5%.
c Quantitatives Count the quantity of Test Station Box as per approved Bill 100% JWFP-UGSP-PRS-LST-002 As per drawing/Bill of Material P W1 W1
of Material