Ongc. and Contracts: Pvt. LTD

1. Offshore Marinetech Pvt. Ltd. is requesting approval to send two crew personnel to the SHP Process Complex offshore installation of MH Asset for a job replacing utility systems. 2. The company has read and agrees to follow ONGC's standard operating procedures for sending contractual crew to offshore locations. 3. They will strictly follow social distancing, PPE usage, and other COVID-19 guidelines provided by ONGC. Any violations will face consequences up to contract suspension or cancellation.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
394 views3 pages

Ongc. and Contracts: Pvt. LTD

1. Offshore Marinetech Pvt. Ltd. is requesting approval to send two crew personnel to the SHP Process Complex offshore installation of MH Asset for a job replacing utility systems. 2. The company has read and agrees to follow ONGC's standard operating procedures for sending contractual crew to offshore locations. 3. They will strictly follow social distancing, PPE usage, and other COVID-19 guidelines provided by ONGC. Any violations will face consequences up to contract suspension or cancellation.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Regd.

Office: 51/2451, Gandhi Nagar,


OFFSHORE Opp. M.I.G. Cricket Club, Bandra (East),
MARINETECH Mumbai -400 051. (India)
Tel.: 91-22-2645 1733/2642 2554/2651 2427

PVT. LTD. 2645 7586/2651 0026-27-28


Fax:91-22-2644 3275/2577 1779
OMTECH
MARINE & OFFSHORE
Email: [email protected] / [email protected]
TURNKEY PROJECTS

Dt. 06.08.2021
Annexure

1. We, M/s OFFSHORE MARINETECH PVT. LTD. are pleased to inform that (02) nos of erew personnel arerequiredto be sentto
Offshore Installation SHP Process Complex of MH Asset for the job of Replacement of Utility System at SH Complex against the NOA
No. MR/MH/MM/LSTK/Piping Utility Sys/289711/18/Y15SC18006/90300099525 Dtd. 15.11.2021 awarded to us by ONGC.

2. We have read the Standard 0Operating Procedure's prepared by ONGC for sending the contractual crew members to offshore
Installation / Rig / Plant / Vessel.

3. We hereby, confirm that allinstructions and conditions mentioned in Standard Operating Procedure issued byONGC regarding
Contractual crew changes are acceptable to us. We shall strictly follow the social distancing protocol, use of PPE as well as the
guidelines provided by ONGC in this regard.

We have noted that strict action wil be taken for any violations/deviations on the above and will be subject to ONGC Management's
discretion. Our full compliance and cooperation shall be provided to ONGC to carry out Contractual crew change as per the
&
guidelines issued by ONGC. Any violations by contractors and/or Service Providers will face consequences and contracts terms
conditions will be applied subject to a maximum level to Suspension and /or Cancellation of the Contract/Agreement

5. We have noted the following points regarding crew change procedure and confirm to hereby abide by them. to the fullest
a.
Crew personnel under quarantine shall not be allowed to leave the hotel room and its premises without the consent of ONGC
once Check in by hotel has been completed.

b. In case, Crew member is required to check out of the hotel due to any personal issue, ONGC may recoverthecost/ expenditure
borne on behalf of the crew member from the Purchase Order / Contract issued to contractor against which the requirement
for manifest was given.
Crew personnel shall not engage in any kind of misconduct / illegal activity/ bad behaviour/ mischief with Hotel Staff/ ONGC
representative / Medical persons while staying at ONGC provided quarantine hotel and during crew change at Offshore. Any
violations by contractors and/or Service Providers will face consequences and contracts terms & conditions will be applied
subject to a maximum level to Suspension and /or Cancellation of the Contract/Agreement

d In case, any of our crew member is tested positive, M/s. OFFSHORE MARINETECH PVT. LTD shall make necessary
arrangements to evacuate him from the Hotel premises within 12 hours from receipt of COVID-19 positive Report.

In case, M/s. oFFSHORE MARINETECH PVT. LTD fails to evacuatethe crew member by 12.00 PM of next day from Covid-19
Report Generation date, penalty of Rs.10,000 per Day may be levied upon us and cost shall be recovered from the ongoing
Contract/ PO NOA No. MR/MH/MM/LSTK/SM/GI HRD LNE/2018-19/15 KC 19002/9030009674 D.30.01.2020.
No.
6. We authorise Mr.PrathameshSM on behalf on M/s.OFESHOREMARINETECH PVT. LTDto be contacted by ONGC in case of any
emergency required to be attended regarding issues pertaining to Contractual Crew change.

7. We M/s OFFSHORE MARINETECH PVT. LTD confirm that these personne!:

Listofcrew members
PO Date Mobile No.
Sr. Name Designation NED PasS no. Aadhar Card No. Vendor
Code
PO No.
No.

Mr. Tapas Kumar 588368186204 842620 9030009674 30.01.2020


2021MUM77854 08458038921
Mallick Fitter

2 Mr. Manpreet 775000761859 842620 9030009674 30.01.2020


2021MUM78088 09877359360
Singh Rigger

The above-mentioned personnel are representative of M/s OFFSHORE MARINETECH PVT. LTD and do not have any doubtful
antecedents. Insurance coverage has been obtained for the above persons. ONGC is indemnifed towards the claim against acident
causing injury or death of above persons.

they are manifested for MAR


We humbly request you to ksindly approve them for travel to Offshore and provide hotel accommodation from 17.07.2021 to the time
ofshore ARET
Authorized Signatory
OMTECH

(Seal) Fo
W o r k s 6 8 U M B A I

Works -321,TTC Inde rea, MIDC, Rabale, Navi Mumbai - 400 701.
Tel.: 91-22-2764 1155/ 1166 |Webr: www.offshoremarinetech.com CIN No.: U29253MH2007PTC169766
OFFSHORE MARINETECH PVT. LTD
51/2421,Nishigandha Chs,Opp.Mig Cricket Club, Gandhi
Nagar, Bandra(E),Mumbai-400051
NON EMPLOYEE DUTY PASS

Name :Tapas Kumar Mallick


UAN No. :111111111111
Name of Contr :Repaining & Maintanance
Work From To -10-2018/ 09-10-2021
Pi Employer icahi Umarav
Pass No 2021MUM77854
Date of lIssue 02-08-2021 ferk

Signature of contractor
Sign of Cont. Worker
3HEO3ie Ara r i e agaa a t raa, 5, araa ASaI Ti, Ha, T kiiI-70
Corporate Offmice: Deendayal Urja Bhawan, 5, Nelson Mandela Marg, Vasat Kunj, New Delhi-70
onGC
The holder of this entry pass Shri/ Smt / Km. Tapas Kumar Mallick Who is an employee of
tre comractor named below is permitted entry into below ntioned locatons to perfom dudes
assigned to him i her by the contractor pUrsuant to his cor with ONGC. Unless extended, this
pass is valid up to 09/10/2021 and may be revokec ime without notice.\

Name of Contractor: Tushar Varatak


Signature of Incharge Security

Locations of Wor
B193,BPABPB,D1 FIELD,HEERA,Helibase,MH Instructions
This card is non-uransterable. Please
PLATFRM,MUKTA,NEELAM,Nhava,TAPTI surrender this card on expiry. The loss of
this card should be reported immediately to
the nearest Police Staton and / or In-
charge Security, ONGC. On finding the lost
card, please relurn at the above given