Commissioning Design Review Summary
The 95% Construction Documents were reviewed for issues related to commissioning. The review was
restricted to those systems being commissioned; security electronics, mechanical systems (plumbing, irrigation,
and HVAC) and the electrical system including the fire alarm system. Suggestions have been included to
facilitate commissioning related issues such as documentation, testing, training and warranty.
As part of the commissioning process, some new specification sections have been drafted. These are included
as a separate document.
A. Project Information:
1. Project Description:
2. Owner:
3. Project
Architect:
4. Subconsultants:
B. Project Manual:
1. Contents:
The reviewed Specification contained documents in the following Divisions: 2 through 13, 15 and 16.
Division 14 (Conveying Systems) was not used.
2. Specification Summary:
Comments related to the specifications are included in the appropriate discipline section below.
C. Drawings
1. Electrical Summary:
The electrical specifications and drawings were reviewed. Comments were primarily related to the
specifications. Most of the comments had to do with documenting the tests that have been specified
and suggesting additional testing.
2. Electronics Security:
The electronic security specifications and drawings were reviewed. Comments were primarily related
to the specifications. Most of the comments related to better organizing the commissioning related
comments to clarify what the performance and testing requirements are.
3. Mechanical/ Plumbing Summary:
The Mechanical Drawings and Specifications were reviewed. Comments were primarily related to
providing installation details and clarification on drawings on all devices required for balancing and
testing of the mechanical systems. Some comments contained recommendations for a more consistent
design methodology and coordination between the mechanical and electrical disciplines.
D. Drawing Information:
A complete list of all drawings reviewed immediately follows this review summary.
June 2006
<insert project name and location>
COMMISSIONING DESIGN REVIEW SUMMARY
Design Review - 1
Commissioning Design Review Summary
June 2006
<insert project name and location>
COMMISSIONING DESIGN REVIEW SUMMARY
Design Review - 2
Commissioning Design Review Summary
E. Responding to Design Review Comments
Please use the Action Codes on the top of each page. Any responses and/or explanations should be
written in the “RESPONSE” field provided for that comment. Responding to the comment helps
expedite our review of the next submittal.
***** ***** ***** REVIEWER/DISCIPLINE LIST ***** ***** *****
The reviewers and disciplines reviewed are as follows:
Reviewers Name Discipline Drawings Specifications Initials
Electrical
Electronic Security
Mechanical
The initials and markings indicate that the drawings and specifications were reviewed for technical and
design concepts. All of the Kitchell reviewers above can be reached at (916) 648-9700.
The design review comments are not intended to be directives, but to provide assistance to the Owner and
Design Team. The use of these comments in no way relieves the design team of the responsibility and
liability for their final project design.
***** ***** ***** ***** ***** ***** ***** ***** ***** *****
Report Reviewed By: Date:
Report Approved By: Date:
June 2006
<insert project name and location>
COMMISSIONING DESIGN REVIEW SUMMARY
Design Review - 3
Commissioning Design Review Summary
The following list consists of the drawing number listed on each sheet, the title in the title block, and the
date found on the drawing.
June 2006
<insert project name and location>
COMMISSIONING DESIGN REVIEW SUMMARY
Design Review - 4
Sheet No. Description Date