Chemsysolu-Tech Enterprises: Ms. Mary Joy Soliven

1) Chemsysolu-Tech Enterprises submitted a quotation to STI Academic Center Global City for the supply of materials, tools, and technical supervision for the installation of air conditioning units. 2) The total cost quoted was 1,000,193.72 PHP which included discounts. 3) Chemsysolu-Tech also submitted a quotation to Polaris Corporate Center for the supply of materials, tools, and technical supervision for re-piping of diesel tank pipelines with a total quoted price of 119,812.71 PHP including discounts.

Uploaded by

Edward Alfaro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
185 views5 pages

Chemsysolu-Tech Enterprises: Ms. Mary Joy Soliven

1) Chemsysolu-Tech Enterprises submitted a quotation to STI Academic Center Global City for the supply of materials, tools, and technical supervision for the installation of air conditioning units. 2) The total cost quoted was 1,000,193.72 PHP which included discounts. 3) Chemsysolu-Tech also submitted a quotation to Polaris Corporate Center for the supply of materials, tools, and technical supervision for re-piping of diesel tank pipelines with a total quoted price of 119,812.71 PHP including discounts.

Uploaded by

Edward Alfaro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

CHEMSYSOLU-TECH ENTERPRISES

Chemicals, Projects, Refrig. Design & Build, Air-Con. & Services

TO: MS. MARY JOY SOLIVEN


Purchasing and Asset Management Officer II

STI ACADEMIC CENTER GLOBAL CITY


University Parkway Drive, Bonifacio Global City, Taguig City

RE: SUPPLY OF MATERIALS, TOOLS with Technical Supervision for installation of LG ceiling
concealed Inverter 4.0HP and LG Wall Mounted Inverter 1.0HP

Date: SEPTEMEBER 01, 2021


REF #: 21-CHE2949PRO-STI,BGC

Dear Sir,

In response to the above subject, we are pleased to submit our quotation for your evaluation and approval.

GENERAL REQUIRMENTS
QTY
Unit TOTAL
1 SUPPLY OF UNIT

A. LG CEILING CONCEALED TYPE


1 PCS
INVERTER 4.0HP 290,001.60 290,001.60
B. LG WALL MOUNTED TYPE
1 PC
INVERTER 1.0HP 67,200.00 67,200.00
2 SUPPLY OF MATERIALS

LG CEILING CONCEALED TYPE INVERTER


1 LOT
4.0HP 202,524.00 202,524.00
LG WALL MOUNTED TYPE INVERTER
1 LOT
1.0HP 164,524.00 164,524.00
3 Labor with Tech Supervision 1 LOT 92,400.00 92,400.00
4 Mobilization and Demob 1 LOT 84,000.00 84,000.00
5 Bond/Insurances/ Health and Etc 1 LOT 20,000.00 20,000.00
 
 

TOTAL 920,649.6
Discount: 27,619.49
TOTAL LESS DISCOUNT 893,030.11
Grand Total Price Vat-In 1,000,193.72

#21 CLP Complex Bldg, 3flr. U7 Mercedes Ave., San Miguel,


1600 Pasig City, Philippines
E-mail: [email protected]
Tel.: (02) 794-0708/231-1216
Mobile: 0949-6799291/ 0995-6124397
CHEMSYSOLU-TECH ENTERPRISES
Chemicals, Projects, Refrig. Design & Build, Air-Con. & Services

Amount in words:

ONE MILLION ONE HUNDRED NINETY-THREE PESOS AND 72/100 ONLY

Prices quote are VAT- INCLUSIVE

Validity: Ten (10) days upon submission of quotation.


Delivery: 1 to 2 months after of Down Payment mentioned below.
Work Durations: 1 TO 10 DAYS.
Terms of Payment: 60% Down Payment/ 30% Upon Completion of Projects/ 10% Retentions

Scope of Work: (Note: Copper tube to be used for 2 units must be in Hard Drone type and Electrical wiring
supply will be retained).

1. Final Inspection And Coordination


2. Site and Safety Orientation
3. Mobilization
4. Removing of Existing Unit Ceiling Concealed
5. Installation of Ceiling Concealed
6. Laying Copper Tube
7. Removing of Existing Wall Mounted Unit
8. Installations of New Unit Wall Mounted
9. Laying of Copper tubes
10. Flushing and Leak Testing
11. Conduct Quality Control
12. Run Testing
13. Clean as you go SOP
14. Issuance of Work Certificate of Completion
15. Turn Over of Finished Project and acceptance

Sincerely yours, Conforme:

EDWARD M ALFARO MS. MARY JOY SOLIVEN


Technical Department Head
WTC/WTA, HVAC, Mechanical and Project.
Mobile: 09194646122/ 09356962281
E-mail: [email protected]

#21 CLP Complex Bldg, 3flr. U7 Mercedes Ave., San Miguel,


1600 Pasig City, Philippines
E-mail: [email protected]
Tel.: (02) 794-0708/231-1216
Mobile: 0949-6799291/ 0995-6124397
CHEMSYSOLU-TECH ENTERPRISES
Chemicals, Projects, Refrig. Design & Build, Air-Con. & Services

Noted By:

Joshua P. Bulaso
President/ BD Sales Manager
Mobile:0995-6124397/ 0949-6799291
E-mail: [email protected]

TO: Engr. John Oliver Milano


Building Engr

POLARIS CORPORATE CENTER |Innoprime Property Services, Inc.


Alabang, Muntinlupa City

RE: SUPPLY OF MATERIALS, TOOLS with Technical Supervision FOR Re-piping of Diesel tank pipe
lines

Date: AUGUST 18, 2021


REF #: 21-CHE2941PRO-PU,MC

Dear Sir,

In response to the above subject, we are pleased to submit our quotation for your evaluation and approval.

GENERAL REQUIRMENTS
QTY
Unit TOTAL
1 SUPPLY OF MATERIALS

A. PRESSURE GAUGE 1 ½ Ø(250 PSI) 1 PC


2,927.40 2,927.40
B. LIQUID PETROLEUM HYDRAULIC
1 PC
HOSE 1 ½ Ø 9,690.24 9,690.24
C. OTHER CONSUMABLE
1 LOT
MATERIALS 38,567.16 38,567.16
2 Labor with Tech Supervision 1 LOT 13,566.34 13,566.34
3 Mobilization and Demob 1 LOT 19,380.48 19,380.48
4 Bond/Insurances/ Health and Etc 1 LOT 23,072.00 23,072.00

#21 CLP Complex Bldg, 3flr. U7 Mercedes Ave., San Miguel,


1600 Pasig City, Philippines
E-mail: [email protected]
Tel.: (02) 794-0708/231-1216
Mobile: 0949-6799291/ 0995-6124397
CHEMSYSOLU-TECH ENTERPRISES
Chemicals, Projects, Refrig. Design & Build, Air-Con. & Services

 
 

TOTAL 110,284.16
Discount: 3,308.52
Grand Total Price Vat-In 119,812.71
Amount in words:

ONE HUNDRED NINETEEN THOUSAND EIGHT HUNDRED TWELVE PESOS AND 71/100
ONLY

Prices quote are VAT- INCLUSIVE

Validity: Fifteen (15) days upon submission of quotation.


Delivery: 2 to 4 weeks after of Down Payment mentioned below.
Work Durations: 1 TO 2 DAYS.
Terms of Payment: 60% Down Payment/ 30% Upon Completion of Projects/ 10% Retentions

Scope of Work:

1. Final Inspection And Coordination


2. Site and Safety Orientation
3. Mobilization
4. Removing of Existing Damage pipes and fittings
5. Installations of new pipes and fittings
6. Conduct Quality Control
7. Run Testing
8. Clean as you go SOP
9. Issuance of Work Certificate of Completion
10. Turn Over of Finished Project and acceptance

Sincerely yours, Conforme:

EDWARD M ALFARO ENGR. JOHN OLIVER MILLANO


#21 CLP Complex Bldg, 3flr. U7 Mercedes Ave., San Miguel,
1600 Pasig City, Philippines
E-mail: [email protected]
Tel.: (02) 794-0708/231-1216
Mobile: 0949-6799291/ 0995-6124397
CHEMSYSOLU-TECH ENTERPRISES
Chemicals, Projects, Refrig. Design & Build, Air-Con. & Services

Technical Department Head


WTC/WTA, HVAC, Mechanical and Project.
Mobile: 09194646122/ 09356962281
E-mail: [email protected]

Noted By:

Joshua P. Bulaso
President/ BD Sales Manager
Mobile:0995-6124397/ 0949-6799291
E-mail: [email protected]

#21 CLP Complex Bldg, 3flr. U7 Mercedes Ave., San Miguel,


1600 Pasig City, Philippines
E-mail: [email protected]
Tel.: (02) 794-0708/231-1216
Mobile: 0949-6799291/ 0995-6124397

You might also like