Petrochina International Jabung LTD.: Job Safety Analysis

1) Workers will prepare the necessary permits and conduct a pre-job safety meeting to discuss the job safety analysis and emergency response procedures. Good communication and the right to stop unsafe work will be emphasized. 2) Tools, equipment, and safety signs will be prepared. Workers will wear gloves and pay close attention to avoid pinch points and ensure safe mobilization of heavy equipment. All equipment will be inspected and documentation reviewed prior to starting the job.

Uploaded by

Yosua Situmorang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
124 views7 pages

Petrochina International Jabung LTD.: Job Safety Analysis

1) Workers will prepare the necessary permits and conduct a pre-job safety meeting to discuss the job safety analysis and emergency response procedures. Good communication and the right to stop unsafe work will be emphasized. 2) Tools, equipment, and safety signs will be prepared. Workers will wear gloves and pay close attention to avoid pinch points and ensure safe mobilization of heavy equipment. All equipment will be inspected and documentation reviewed prior to starting the job.

Uploaded by

Yosua Situmorang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 7

1

PCID/J/F2/HSE/EHSMS/4.4.6/30
Date :
PetroChina International Jabung Ltd. Job Safety Analysis Tanggal :

Job : Land Clearing From SB#1 to WB PPF Title of person who does the job : Analyzed by lead of crew :
Pekerjaan : Pembersihan lahan dari SB#1 sampai WB PPF Jabatan personil yang melakukan pekerjaan : Supervisor Di analisa oleh pemimpin regu kerja :

Work Crew Supervisor : Executor Department : Section : Reviewed by HSE : Approved by Area Supv :
Pengawas Regu Kerja : Departemen Pelaksana : Bagian :Project Di Periksa Oleh HSE : Disetujui Oleh pengawas daerah kerja :
Alwan Arif Construction Team

Write down correct specifications of personal


Personal protective equipment (PPE) : 
Put On PPE required for a safe job. protective equipment required (Consult HSE Dept) :
1. Safety hat / helmet √ 6. Face shield √ 11. SCBA 16. Safety shoes / boots √ Tuliskan spesifikasi alat pelindung diri yang
dibutuhkan (Konsultasikan dengan HSE Dept) :
2. Safety glasses √ 7. Ear plugs / muffs 12. Gloves – Ordinary √ 17. Rubber boots
3. Goggles – ordinary 8. Dust mask 13. Gloves - Chemicals 18. Prot. Clothing/ Apron
4. Goggles – tinted lenses 9. Air-purifying respirator 14. Gloves – Thermal √ 19.Body harness-line
5. Goggles – Chemicals 10. Air-line respirator 15. Rubber gloves 20. Life vest
Sequence of Basic Job Steps Potential Hazards Protective Equipment Safe Procedures
Urutan Pekerjaan Potensi Bahaya Peralatan Pelindung Prosedur Aman
1) Preparation  Miscommunication  Prepare Permit To Work
 Misunderstanding  Pre-job safety meeting.
 Failure  Discuss JSA to workers before
job
 Discuss emergency response
preparedness to workers if
emergency situation happen
 Good communication with
personnel
 Everyone has permission to
stop the job when any unsafe
condition.
1) Persiapan  Miskomunikasi  Persiapan Izin Kerja
 Kesalahpahaman  Melakukan pembicaraan
 Terjadi kegagalan keselamatan sebelum bekerja
 Membicarakan JSA kepada
2

pekerja sebelum bekerja


 Membicarakan tanggap
darurat ke pekerja jika terjadi
situasi darurat
 Komunikasi yang baik antar
personil
 Setiap orang mendapatkan hak
untuk menghentikan pekerjaan
jika dapat membahayakan
pekerja di segala kondisi.
2) Preparation of Tools, and Equipment and Safety  Pinch point  Use hand gloves  Ensure all the equipment has
Sign  Miscommunication been inspected and check by
 Misunderstanding PCI and fit for use
 Failure  Be careful when pick up tools
 Watch body position
 Everyone must pay attention at
all times
 Stay focused
 Ensure tools ready to use
 Ensure all document for
already accepted and reviewed
by PCI
 Proper Safety Sign and
barricade will be install prior
execution
 During Mobilization to the
work location, ensure that
proper access and safe for
heavy equipment layout and
position
 The equipment layout do not
interfere with another traffic or
transportation
 Check list all equipment and
tools will be use before work
activity.
2) Mempersiapkan Izin Kerja dan alat-alat  Terjepit  Menggunakan sarung tangan  Pastikan semua peralatan
3

 Miskomunikasi yang dipergunakan untuk


 Kesalahpahaman pekerjaan sudah lulus inspeksi
 Terjadi kegagalan dan baik untuk digunakan.
 Berhati-hati ketika mengambil
peralatan
 Memperhatikan posisi tubuh
 Setiap orang harus
memperhatikan pekerjaannya
dan lingkungannya setiap
waktu
 Tetap focus
 Memastikan semua peralatan
siap untuk digunakan
 Memastikan semua dokumen
telah disetujui dan ditinjau
kembali oleh pihak PCI
 Tanda Tanda Keselamatan
dan barricade terpasang
sebelum aktivitas dimulai.
 Ketika mobilisasi alat berat ke
lokasi dipastikan lokasi
penempatan alat berat yang
aman dan tidak menganggu
aktivitas lalu lintas
transportasi
 Periksa semua peralalatan dan
alat-alat yang akan digunakan
selama pekerjaan.
3) Land Clearing using excavator  Excavator swing and collision  Using Standard PPE  Ensure the excavator position
is not at the edge of the soil
 Hit by excavator bucket on existing heap.
pipe on location
 Make sure the position of
 Hit by excavator bucket, personnel excavator is stable
injury  Ensure the workers position
 Erosion out of radius bucket swing
 Make sure the operator of view
is not blocked
 Working with full
4

concentration
 Endure the excavator is
operated on hard land base
 Ensure that working area is
safe for excavator movement
 Provide signalman to handle
excavator activity
 Provide barricade and warning
board at the working area
 CTR provide certificate for
Operator
 Uninvolved personnel to keep
away from working area
 Daily check the excavator
condition before use
 Use manual handling if
required.
 Ensure all the worker
competent and authorize to
perform the activity
 Provide Rain Coat
3) Pembersihan lahan menggunakan excavator  Excavator terjungkal  Gunakan Peralatan APD  Pastikan excavator berada
tidak di posisi pinggir/tepi
 Terkena bucket dari excavator pada tumpukan tanah/galian.
lokasi pipa yang sudah ada.
 Patikan posisi excavator stabil
 Tertabrak bucket ketika mengayun,  Memastikan pekerja jauh daru
cidera personil radius cangkul dari excavator
 Tanah longsor  Pastikan pandangan dari
operator tidak tertutup
 Bekerja dengan penuh
konsentrasi
 Pastikan excavator beroperasi
di tanah landasan yang
keras/padat
 Pastikan area excavator aman
dari pergerakan.
 Sediakan barricade dan
5

rambu rambu keselamatan .


 Semua certificate peralatan
dan operator harus
disediakan.
 Pekerja yang tidak terlibat
diharapkan tidak berada
dilokasi penggalian.
 Pemeriksaan harian excavator
harus dilakukan dan peralatan
aman untuk digunakan.
 Pastikan pekerja yang bekerja
sudah diotorisasi dan cakap
melakukan pekerjaan
penggalian tanah.
 Sediakan jas hujan
4) Land Clearing Using Hand tools  Personnel injury / Hand Injury  Using Standard PPE  Ensure working area are in a
good condition
 Soil erosion
 Pre check hand tools before use
 personnel exposed to direct sunlight  Ensure working area are in a
 Access slippery / soft ground good condition
 Wild animal attack (e.g. snake on the  Barricade area that potential to
bush) settlement
 Bring drinking water while
working in sunny day
 Check walking path / access for
unseen hazards (e.g. soft soil /
ground)
 Check area before work
 Protect the body from wild
animal attack with wear high
safety shoes, coverall, bring
knife, anti toxic & first aid kit,
long stick
 Clear the bush if will use as
working area.
 Be watch and more careful to
anticipate wild animal attack.
6

 Work as a team when working


at remote area
 Sprinkle salt at working area
4) Pembersihan lahan menggunakan Hand tools  Personal terluka  Gunakan Peralatan APD  Pastikan area bekerja dalam
 Longsor kondisi yang baik
 Inspeksi alat sebelum
 Personal terpapar langsung sinar digunakan
matahari
 Pastikan area bekerja dalam
 Jalan licin kondisi yang baik
 Serangan binatang buas  Barikade area yang berpotensi
longsor
 Membawa air minum
 Cek area berjalan dari bahaya
yang tidak terlihat (tanah
lembek)
 Check area before work
 Lindungi tubuh dari serangan
binatang buas dengan
menggunakan safety shoes,
coverall, pisau dan kayu
panjang.
 Bersihkan / potong semak-
semak jika bekerja di area
tersebut.
 Selalu waspada dan hati-hati
terhadap serangan hewan
buas.
 Bekerja sama dengan tim di
area lokasi.
 Sebarkan garam di area kerja
5) Housekeeping  Bad housekeeping  Proper PPE  Ensure housekeeping
implemented before and after
working hours.
 All equipment and tools is
stored in a safe place
5) Kebersihan  Housekeeping yang buruk  Gunakan PPE yang benar  Pastikan housekeeping
dilakukan sebelum dan
7

sesudah jam kerja


 Semua peralatan dan alat-alat
disimpan di tempat yang aman.
Note : - Stop jobs, if found irregularities or changed from the JSA to further discuse with all departments involved.
- Do manual excavation near the existing pipeline.
- Good communication between operator and signalman, ensure the operator follow instruction/sign from signalman.
Catatan : - Stop pekerjaan, jika didapati penyimpangan atau perubahan dari JSA untuk di diskusikan lebih lanjut dengan semua departemen yang terlibat.
- Lakukan penggalian manual di dekat jalur pipa existing
- Komunikasi yang baik antara operator excavator dengan signalmen, yankinkan operator mengikuti instruksi/ tanda dari signalman.