Project Summary
Project Summary
(1) Project Title: Study of the Vientiane Water Supply Development Project
(2) Project Background: Due to an increase of the urban population, up graded living standards,
expanding industrial and domestic areas, solutions are urgently required to deal with the rapid
(3) Purpose of the Project: To contribute to the improvement of basic human needs through
the
improvement of the facilities and the institution of the water supply system. To expand the
service area and increase the population served by utilising the expanded water supply capacity.
(6) Beneficiary of the project: Five hundred and sixty four thousand (564,000) persons to be
served by the system in the target year of the Master Plan 2020, or 85 % of population in the
service area.
1) Sort of the project: Master plan of expansion and improvement of the water supply
system
3) Water Resources and quality: River surface water, acceptable for potable water
4) Water Treatment Plant: Horizontal flow sedimentation, rapid sand filtration, and
disinfection by chlorine.
5) Project Background: Development of the water supply system to deal with a rapid increase
of water demand is urgently required due to urban population increases, upgraded living
standards, and an expanding industrial and domestic area.
2) Sociology
future inhabitants of the urban area of the capital city. The inhabitants desire to have
not satisfied with the present water supply because the water supply pressure in the
service area is inadequate. The inhabitants in the future service area use untreated
water from rivers, ponds or wells. Many inhabitants also buy bottled water for
drinking. The public power company supplies eighty (80) percent of households in Vientiane
Capital City.
Vientiane Capital City is higher than those of the neighbouring nations. There are
many cases of viral disease such as Dengue fever, diarrhoea, etc.