MEP Work Checklist and Plan For Khairy

The document is a work program and checklist for plumbing, HVAC, fire alarm, electrical, and low current works at a villa. It lists the items to be completed on each floor - basement, ground floor, mezzanine, first floor, roof floor, and upper roof floor. For each item, the checklist tracks status, start date, and finish date. The program is intended to coordinate completion of all necessary works across various trades at the villa.

Uploaded by

Ahmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
574 views6 pages

MEP Work Checklist and Plan For Khairy

The document is a work program and checklist for plumbing, HVAC, fire alarm, electrical, and low current works at a villa. It lists the items to be completed on each floor - basement, ground floor, mezzanine, first floor, roof floor, and upper roof floor. For each item, the checklist tracks status, start date, and finish date. The program is intended to coordinate completion of all necessary works across various trades at the villa.

Uploaded by

Ahmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Wadi Villa Work Program and Check List ( Villa No.

_____ ) Date:__________

Date
SI Item Description Status Remarks
Start Finish

Basement
Plumbing
1 Underground Drainage
2 High Level Drainage
3 High Level Water Supply
4 Concealed Drainage
5 Concealed Water Supply
6 Gravity Test
7 PPR Pressure Test
8 Manhole covers
9 Sump Pump
10 Floor Drain
11 Sanitarywares Installation

HVAC
1 FCU Installation
2 Supply Duct
3 Ventillation Duct
4 Plenum box & Flexible Duct installation
5 VCD and Fire Damper
6 Copper Piping
7 AC Drain
8 Thermostat wiring
9 Thermostat
10 Grills and Diffuser

Fire Alarm
1 Wire Pulling
2 Fire Alarm Device

Electrical
1 Electrical Conduits
2 GI Box
3 Wire Pulling
4 Cable Pulling
5 Wiring Accessories
6 Light Installation
Wadi Villa Work Program and Check List ( Villa No. _____ ) Date:__________
Ground Floor
Plumbing
1 High Level Drainage
2 High Level Water Supply
3 Concealed Drainage
4 Concealed Water Supply
5 Gravity Test
6 PPR Pressure Test
7 Manhole covers
8 Booster Pump
9 Water Meter Box
10 Floor Drain
11 Sanitarywares Installation

HVAC
1 FCU Installation
2 Supply Duct
3 Ventillation Duct
4 Plenum box & Flexible Duct installation
5 VCD and Fire Damper
6 Copper Piping
7 AC Drain
8 Fan
9 Thermostat wiring
10 Thermostat
11 Grills and Diffuser

Fire Alarm
1 Wire Pulling
2 Fire Alarm Device
3 Fire Alarm Panel

Electrical
1 Electrical Conduits
2 GI Box
3 DB Box Enclosure
4 ONU Box
5 Wire Pulling
6 Cable Pulling
7 DB Dressing
8 Wiring Accessories
9 Isolators
10 Earthing works
11 Electrical Meter
12 Light Installation

Low Current
1 Telephone System
2 SMATV System
3 CCTV System
4 Intercom System
Wadi Villa Work Program and Check List ( Villa No. _____ ) Date:__________
Mezzanine
Plumbing
1 High Level Drainage
2 High Level Water Supply
3 Concealed Drainage
4 Concealed Water Supply
5 Gravity Test
6 PPR Pressure Test
7 Floor Drain
8 Sanitarywares Installation

HVAC
1 FCU Installation
2 Supply Duct
3 Ventillation Duct
4 Plenum box & Flexible Duct installation
5 VCD and Fire Damper
6 Copper Piping
7 AC Drain
8 Thermostat wiring
9 Thermostat
10 Grills and Diffuser

Fire Alarm
1 Wire Pulling
2 Fire Alarm Device

Electrical
1 Electrical Conduits
2 GI Box
3 Wire Pulling
4 Cable Pulling
5 Wiring Accessories
6 Light Installation
Wadi Villa Work Program and Check List ( Villa No. _____ ) Date:__________
First Floor
Plumbing
1 High Level Drainage
2 High Level Water Supply
3 Concealed Drainage
4 Concealed Water Supply
5 Gravity Test
6 PPR Pressure Test
7 Floor Drain
8 Sanitarywares Installation

HVAC
1 FCU Installation
2 Supply Duct
3 Ventillation Duct
4 Plenum box & Flexible Duct installation
5 VCD and Fire Damper
6 Copper Piping
7 AC Drain
8 Thermostat wiring
9 Thermostat
10 Grills and Diffuser

Fire Alarm
1 Wire Pulling
2 Fire Alarm Device

Electrical
1 Electrical Conduits
2 GI Box
3 Wire Pulling
4 Cable Pulling
5 Wiring Accessories
6 Isolators
7 Light Installation
Wadi Villa Work Program and Check List ( Villa No. _____ ) Date:__________
Roof Floor
Plumbing
1 High Level Drainage
2 High Level Water Supply
3 Concealed Drainage
4 Concealed Water Supply
5 Gravity Test
6 PPR Pressure Test
7 Floor Drain
8 Sanitarywares Installation

HVAC
1 FCU Installation
2 Supply Duct
3 Ventillation Duct
4 Plenum box & Flexible Duct installation
5 VCD and Fire Damper
6 Copper Piping
7 AC Drain
8 Thermostat wiring
9 Thermostat
10 Grills and Diffuser

Fire Alarm
1 Wire Pulling
2 Fire Alarm Device

Electrical
1 Electrical Conduits
2 GI Box
3 Wire Pulling
4 Cable Pulling
5 Wiring Accessories
6 Isolators
7 Light Installation
Wadi Villa Work Program and Check List ( Villa No. _____ ) Date:__________
Upper Roof Floor
Plumbing
1 High Level Water Supply
2 Concealed Drainage
3 Concealed Water Supply
4 Gravity Test
5 PPR Pressure Test
6 Solar Heater
7 Circulation Pump
8 Floor Drain
9 Sanitarywares Installation

HVAC
1 Ventillation Duct
2 Copper Piping
3 Outdoor AC
4 ERV

Electrical
1 Electrical Conduits
2 GI Box
3 Wire Pulling
4 Cable Pulling
5 Isolators
6 Light Installation