Wadi Villa Work Program and Check List ( Villa No.
_____ ) Date:__________
Date
SI Item Description Status Remarks
Start Finish
Basement
Plumbing
1 Underground Drainage
2 High Level Drainage
3 High Level Water Supply
4 Concealed Drainage
5 Concealed Water Supply
6 Gravity Test
7 PPR Pressure Test
8 Manhole covers
9 Sump Pump
10 Floor Drain
11 Sanitarywares Installation
HVAC
1 FCU Installation
2 Supply Duct
3 Ventillation Duct
4 Plenum box & Flexible Duct installation
5 VCD and Fire Damper
6 Copper Piping
7 AC Drain
8 Thermostat wiring
9 Thermostat
10 Grills and Diffuser
Fire Alarm
1 Wire Pulling
2 Fire Alarm Device
Electrical
1 Electrical Conduits
2 GI Box
3 Wire Pulling
4 Cable Pulling
5 Wiring Accessories
6 Light Installation
Wadi Villa Work Program and Check List ( Villa No. _____ ) Date:__________
Ground Floor
Plumbing
1 High Level Drainage
2 High Level Water Supply
3 Concealed Drainage
4 Concealed Water Supply
5 Gravity Test
6 PPR Pressure Test
7 Manhole covers
8 Booster Pump
9 Water Meter Box
10 Floor Drain
11 Sanitarywares Installation
HVAC
1 FCU Installation
2 Supply Duct
3 Ventillation Duct
4 Plenum box & Flexible Duct installation
5 VCD and Fire Damper
6 Copper Piping
7 AC Drain
8 Fan
9 Thermostat wiring
10 Thermostat
11 Grills and Diffuser
Fire Alarm
1 Wire Pulling
2 Fire Alarm Device
3 Fire Alarm Panel
Electrical
1 Electrical Conduits
2 GI Box
3 DB Box Enclosure
4 ONU Box
5 Wire Pulling
6 Cable Pulling
7 DB Dressing
8 Wiring Accessories
9 Isolators
10 Earthing works
11 Electrical Meter
12 Light Installation
Low Current
1 Telephone System
2 SMATV System
3 CCTV System
4 Intercom System
Wadi Villa Work Program and Check List ( Villa No. _____ ) Date:__________
Mezzanine
Plumbing
1 High Level Drainage
2 High Level Water Supply
3 Concealed Drainage
4 Concealed Water Supply
5 Gravity Test
6 PPR Pressure Test
7 Floor Drain
8 Sanitarywares Installation
HVAC
1 FCU Installation
2 Supply Duct
3 Ventillation Duct
4 Plenum box & Flexible Duct installation
5 VCD and Fire Damper
6 Copper Piping
7 AC Drain
8 Thermostat wiring
9 Thermostat
10 Grills and Diffuser
Fire Alarm
1 Wire Pulling
2 Fire Alarm Device
Electrical
1 Electrical Conduits
2 GI Box
3 Wire Pulling
4 Cable Pulling
5 Wiring Accessories
6 Light Installation
Wadi Villa Work Program and Check List ( Villa No. _____ ) Date:__________
First Floor
Plumbing
1 High Level Drainage
2 High Level Water Supply
3 Concealed Drainage
4 Concealed Water Supply
5 Gravity Test
6 PPR Pressure Test
7 Floor Drain
8 Sanitarywares Installation
HVAC
1 FCU Installation
2 Supply Duct
3 Ventillation Duct
4 Plenum box & Flexible Duct installation
5 VCD and Fire Damper
6 Copper Piping
7 AC Drain
8 Thermostat wiring
9 Thermostat
10 Grills and Diffuser
Fire Alarm
1 Wire Pulling
2 Fire Alarm Device
Electrical
1 Electrical Conduits
2 GI Box
3 Wire Pulling
4 Cable Pulling
5 Wiring Accessories
6 Isolators
7 Light Installation
Wadi Villa Work Program and Check List ( Villa No. _____ ) Date:__________
Roof Floor
Plumbing
1 High Level Drainage
2 High Level Water Supply
3 Concealed Drainage
4 Concealed Water Supply
5 Gravity Test
6 PPR Pressure Test
7 Floor Drain
8 Sanitarywares Installation
HVAC
1 FCU Installation
2 Supply Duct
3 Ventillation Duct
4 Plenum box & Flexible Duct installation
5 VCD and Fire Damper
6 Copper Piping
7 AC Drain
8 Thermostat wiring
9 Thermostat
10 Grills and Diffuser
Fire Alarm
1 Wire Pulling
2 Fire Alarm Device
Electrical
1 Electrical Conduits
2 GI Box
3 Wire Pulling
4 Cable Pulling
5 Wiring Accessories
6 Isolators
7 Light Installation
Wadi Villa Work Program and Check List ( Villa No. _____ ) Date:__________
Upper Roof Floor
Plumbing
1 High Level Water Supply
2 Concealed Drainage
3 Concealed Water Supply
4 Gravity Test
5 PPR Pressure Test
6 Solar Heater
7 Circulation Pump
8 Floor Drain
9 Sanitarywares Installation
HVAC
1 Ventillation Duct
2 Copper Piping
3 Outdoor AC
4 ERV
Electrical
1 Electrical Conduits
2 GI Box
3 Wire Pulling
4 Cable Pulling
5 Isolators
6 Light Installation