BGR ENERGY SYSTEMS LIMITED
POWER PROJECTS DIVISION
1X800 MW Dr.NTTPS
Vijayawada
CALIBRATION OF BATCHING PLANT
Client APGENCO
Contractor M/s Balaji RMC Serial No
Location Model No
Date Of Calibration Due Date Of Calibration
Cement & Water Weigh Batcher
% Error {E}
Digital Indicator Reading
Actual Load applied
Loading Un loading Average {E} Remarks
in Kgs. {A}
in kgs {B) in kgs {C} in kgs {D} (A-D)*100/A
0
20
40
60
80
100
120
140
160
180
200
220
240
260
280
300
AVG.% ERROR
Limits As Per Specification IS: 4926 for cement weigher is +/- 2.0%
Remarks :
BGR (QC) APGENCO
Format No: QAC-CIVIL-FRM 034 Rev-00
BGR ENERGY SYSTEMS LIMITED
POWER PROJECTS DIVISION
1X800 MW Dr.NTTPS
Vijayawada
CALIBRATION OF BATCHING PLANT
Client APGENCO
Contractor M/s Balaji RMC Serial No
Location Model No
Date Of
Due Date of Calibration
Calibration
Admixture Weigher
Digital Indicator Reading
Actual Load
applied in Loading Un loading Average % Error Remarks
Grams
in Gms in Gms in Gms
1000
2000
3000
4000
5000
Avg.% Error
Limits As per Specification IS: 4926 for Chemical Admixture weigher is +/- 3.0%
Remarks :
BGR (QC) APGENCO
Format No: QAC-CIVIL-FRM 034 Rev-00
BGR ENERGY SYSTEMS LIMITED
POWER PROJECTS DIVISION
1X800 MW Dr.NTTPS
Vijayawada
CALIBRATION OF BATCHING PLANT
Client APGENCO
Contractor M/s Balaji RMC Serial No
Location Model No.
Date Of Calibration : Next Due
Aggregate Weigh Batcher
% Error {E} % Error {E}
Digital Indicator Reading Digital Indicator Reading
Actual
Actual Load
Load
applied in Loading Un loading Average {E} Loading Un loading Average {E} Remarks
applied in
Kgs. {A}
in kgs Kgs. {A} in kgs
in kgs {C} in kgs {D} (A-D)*100/A in kgs {C} in kgs {D} (A-D)*100/A
{B) {B)
0 420
20 440
40 460
60 480
80 500
100 520
120 540
140 560
160 580
180 600
200 620
220 640
240 660
260 680
280 700
300 720
320 740
340 760
360 780
380 800
400
Avg.% Error Avg.% Error
Limits As per Specification IS: 4926 for Aggregate weigher is +/- 3.0%
BGR(QC) APGENCO
Format No: QAC-CIVIL-FRM 034 Rev-00