Modeling Guide For First Solar Thin Film Technology
Modeling Guide For First Solar Thin Film Technology
Series 6 Product
Family
Q3 2021
| Modeling and Energy Prediction Software Tools
PVsyst PlantPredict Helioscope SAM
● Commonly used in PV ● Specifically built for utility- ● Mostly commonly used for ● Mostly commonly used for
industry scale solar PV modeling commercial and academic applications
and design residential PV projects <
2
First Solar Proprietary & Confidential - General
Reference Documents
| Series 6 Product Family Typical Parameters
Category Parameter Unit Value or Setting
Soiling User-defined monthly soiling loss factor % Site-specific input
Single-axis E-W
11
First Solar Proprietary & Confidential - General
| Array Orientation (Single Axis E-W Tracking)
Rows are oriented on a north-south axis, and
the array tracks east-west
• For a “horizontal tracker” where the
panels are flat at noon, set the Axis Tilt to
0
• If each tracker is tilted-up towards the
south at a fixed tilt, set the Axis Tilt
accordingly
• GCR typical for tracker: ~30-50%
• Tracker range dependent on
manufacturer
12
First Solar Proprietary & Confidential - General
| System Design (Parallel & Series Strings)
Select First Solar CdTe
module. Use the module
denoted with ‘A’ which means
Anti-Reflective Coating
14
First Solar Proprietary & Confidential - General
| System Detailed Losses, continued
PVsyst has added the First Solar spectral correction algorithm as a selection in “Detailed Losses”
*Refer to Application Note: PD-5-423: Module Characterization Energy Prediction Adjustment for Local Spectrum” for implementing spectral correction in PVsyst releases prior to 6.7.6
15
First Solar Proprietary & Confidential - General
| Near Shading
# of trackers
should be
equivalent to #
of rows
17
First Solar Proprietary & Confidential - General
| Near Shading (Tracking), Continued
• Orientation – for S6 modules, long side of the
module to be perpendicular to the tracking axis
• Number of modules in X –axis
— 1 for 1-high, 2 for 2-high, and 3 for 3-high
• Number of modules in Y-axis – depends on the
tracker in use
— Iterations of string length (78-modules, 84-,
etc.)
Adjust to Modules
After changing the number of modules in
18
First Solar Proprietary & Confidential - General
| Simulation Report
Quality check that your report
contains “Spectral Correction”
when modeling First Solar
19
First Solar Proprietary & Confidential - General
Plant Predict
| PlantPredict – Site Selection
Create a new project
21
First Solar Proprietary & Confidential - General
| PlantPredict – Building a PV Plant Prediction
Create new prediction Name the prediction and select
how to build
22
First Solar Proprietary & Confidential - General
| PlantPredict – Build Block by Block Overview
Follow “Start” prompts to complete each required section in order
24
First Solar Proprietary & Confidential - General
| PlantPredict – Environmental: Select Weather
Select weather
from:
• Add New
Weather
• View existing list
of weather files
• Filter through
files
Hierarchy to develop a utility scale PV power plant (Block -> Array -> Inverter -> DC Field)
• View capacity summary • Add blocks for each major design of the project
• Clone blocks and edit
• Define number of
repeat arrays
• Set optional MV
transformer
parameters
• Define other
electrical losses
Losses
• Defaults are preloaded, adjust
according to specific project design
33
First Solar Proprietary & Confidential - General
| PlantPredict – Simulation and Results
Click “Run Prediction” once simulation is complete, and then click “View Results” to go to prediction summary
35
First Solar Proprietary & Confidential - General
Helioscope
| Create New Project
Creating a new project
■ Type in Name and address
■ Center pin on site footprint
Select profile:
■ First Solar Series 6 Fixed Tilt
■ Default Ground-mount
■ None Specified
38
First Solar Proprietary & Confidential - General
| Create New Design – Profile: None or Default Ground-Mount
Creating a new design
■ Type in a Description Name
■ Chose to clone a design if comparing layouts
44
First Solar Proprietary & Confidential - General
| Tracker Design: Default Profile– Mechanical
Start with the First Solar Series 6 Fixed Tilt
– Mechanical
Draw the site layout
■ Adjust DC:AC ratio and capacity limits
■ Adjust tilt angle and azimuth
Adjust system design
■ Change MECHANICAL values to:
— Frame size: 1 up x 6 wide
— Add Frame Spacing: 0.01ft
— Adjust GCR or Row spacing
45
First Solar Proprietary & Confidential - General
| Tracker Design: Spacing, Tracking Angles, Algorithms
Row spacing is calculated as distances
from edges of modules in one row to the
next
■ I.E. 33% GCR is ~13.37 ft. module to
module edge, and 19.97 ft. post to post.
Helioscope does not have tracking angle
selection at this time
■ Typical ranges -52/+52 up to -60/+60
Helioscope does not have algorithm
options at this time
■ I,E, true-tracking versus backtracking