The document is a technical drawing showing dimensions for a building foundation. It includes dimensions for footings, plinth beams, columns, beams, and slabs. Notes provide specifications on dimensions, scale, revisions, concrete grade, steel grade, cover requirements, lap lengths, and development lengths.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
109 views1 page

YB21080 Er - Arunachalam ST05-FLOOR SLAB DETAILS STRUCTURAL DRAWING

The document is a technical drawing showing dimensions for a building foundation. It includes dimensions for footings, plinth beams, columns, beams, and slabs. Notes provide specifications on dimensions, scale, revisions, concrete grade, steel grade, cover requirements, lap lengths, and development lengths.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 6 7 8 9 10

W NOTES:

1. ALL DIMENSIONS ARE IN FEET & INCHES, UNLESS OTHERWISE


SPECIFIED.
29'-3" S N 2.
3.
DRAWING SHOULD NOT BE SCALED, FOLLOW FIGURED DIMENSIONS.
ANY DISCREPANCY IN DRAWING SHALL BE BRING TO NOTICE OF
F STRUCTURAL CONSULTANT BEFORE EXECUTION OF WORK. F
11'-9" 6'-9" 10'-9" 4. THIS DRAWING SHOULD BE READ ALONG WITH THE RELEVANT
E ARCHITECTURAL DRAWING.
5. IF THERE IS ANY REVISION IN DRAWING, FURTHER CONSTRUCTION
SHALL BE EXECUTED AS PER THE LATEST REVISED DRAWING, ON THE
ISSUE OF LATEST REVISION.
6 3' 3' B/5 B/10 6. GRADE OF CONCRETE SHALL BE M20.GRADE OF STEEL SHALL BE Fe500

1'-3"
7. CLEAR COVER FOR
FOOTING :2"(50mm)

6'-1012"
3' B/3 B/10 3 "(30mm)

c
S4 PLINTH BEAM :1 16
COLUMN :1 1/2"(40mm)

c/3
c/5

3'
BEAM :1"(25mm)
℄ SLAB :3/4"(20mm)
5

b/5
b/3
8. LAP LENGTH OF BARS : 50Ø, AT COLUMN LAPPING PROVIDE 4"

3'
SPACING OF TIES, NO LAPPING ALLOWED AT BEAM-COLUMN JOINT.
S2 3' 9. DEVELOPMENT LENGTH (Ld) FOR REINFORCEMENT BARS

1'-3"
E IN COMPRESSION : 40Ø E

9'-1012"

b
IN TENSION : 50Ø

b/3
b/5
10. IN CASE OF BEAM REINFORCEMENT, NO LAPPING SHALL BE ALLOWED
℄ IN FOLLOWING PLACES
(a) TOP ROD NEAR COLUMN, L/4 ON EITHER SIDES OF COLUMN

a/5
B/10

a/3
3' B/3 (b) TOP ROD OF CANTILEVER BEAM ALONG THE LENGTH AND
S2
ALSO DEVELOPMENT LENGTH, BEYOND COLUMN
4

a
3' 3' B/5 B/10 (c) BOTTOM ROD AT MID SPAN OF BEAM

1'-3"
11. REMOVAL OF SHUTTERING / FORM WORK
(a) COLUMN : 24 HOURS

a/10

a/10
6'-6"

3'
S1 (b) BEAM SIDES : 24 HOURS
℄ (c) BEAM BOTTOM : LESS THAN 6M SPAN : 14 DAYS

44'-6"
A B1'-3" : MORE THAN 6M SPAN: 28 DAYS
3 ℄ ℄ ℄ (d) SLAB : LESS THAN 20'SPAN : 14 DAYS
: MORE THAN 20'SPAN : 28 DAYS
TYPICAL ONE WAY SLAB REINFORCEMENT DETAILING HOWEVER 7 DAYS STRENGTH OF CONCRETE SHOULD BE 65% OF THE
TARGET STRENGTH, TO REMOVE FORM WORK.
D 12. THIS BUILDING IS DESIGNED FOR GROUND FLOOR + 1. D

10'-412"
S1

S3
NOTE:
2
1. PROVIDE DISTRIBUTION RIENF. 8 @ 8"c/c

2. 10" INVERTED FILLING CONSIDERED


10'-1012"

FOR TOILET PORTION


S1
3. BOTTOM ROD
4. TOP ROD
C C
1
REV NO Date REVISION REMARKS

A B C D
FIRST FLOOR SLAB LAYOUT Er.ARUNACHALAM
CONTRACTOR
SRI AMMAN BUILDERS
b

b/3

b/3

b/3
b/5

b/5

b/5
℄ ------
B CLIENT B
SCHEDULE OF SLABS
a/5

a/5

a/5
a/3

a/3

a/3
SLAB NO THICKNESS SHORTER SPAN LONGER SPAN
REMARKS
REINFORCEMENT REINFORCEMENT FIRST FLOOR SLAB LAYOUT & REINFORCEMENT
A/10 A/5 B/3 B/5 C/3 C/10 DETAIL DETAILS
S1 5" Y8@6"c/c Y8@6"c/c TWO WAY SLAB
a

S2 5" Y10@6"c/c Y8@6"c/c TWO WAY SLAB A/10 A/3 B/5 B/3 C/5 C/10 Er.Y.BOOPATHI M.E(Struct), M.I.S.T.E,
LICENSED STRUCTURAL ENGINEER -GRADE 1
S3 6" Y12@5"c/c Y10@4"c/c TWO WAY SLAB STRUCTURAL
CONSULTANT
PYRAMID STRUCTURAL CONSULTANT
S4 Y10@4"c/c Y8@8"c/c
Contact No : +91 9597691155
5" ONE WAY SLAB
a/10

a/10
a/10
a/10

a/10
a/10
Mail id :[email protected]
℄ Scale 1:100
DRAWN CHECKED APPROVED

A A B C Date 22-11-2021 A
℄ ℄ ℄ ℄ AS KR Y.BOOPATHI Paper A3
Size
TYPICAL TWO WAY SLAB REINFORCEMENT DETAILING Rev.no R0
DRAWING NO:- YB-21080-ST-05
Sheet.no (05 OF 06)

1 2 3 4 5 6 7 8 9 10