MC/MEP/Cable
RFWI No. :
Cable/ Wire Installation
Reference Drawing Attached : YES / NO
Project Name : 1st 2nd (Re-Inspection)
Location/ Gridline/ Area : dd/mm/yy dd/mm/yy
1) Preparatory Works SC MC CR SC MC CR
a) Approved materials (type, brand, size, etc.)
b) No visible damage to cable/ wire
2) Installation of Cable/ Wire SC MC CR SC MC CR
a) Cable tray/ ladder/ trunking alignment properly installed
b) Adequate space for cable/ wire
c) Cable/ wire is marked/ numbered
d) Cable/ wire is concealed (where applicable)
e) Connection of conductors checked and accepted
f) Routing of cables/ wires in safe zones
g) Properly earthed
h) Connector provided for other trade/ fixtures (i.e. lighting)
3) Others SC MC CR SC MC CR
a) Fire stop at wall penetration area completely done according to specification
b) Completed works protected from any paint drops/ stains
c) Sufficient headroom clearance according to drawing
Remark for Failure / Re-inspection :
Non-Conformance Report (NCR) Raised During Inspection / Re-inspection
NCR No.: _______________________________________________ Closed Outstanding
Inspected & Confirmed by : Sub-Contractor Main Contractor Consultant Representatives
Signature
Name
Designation
Date
Inspection Status : = Acceptable, X = Not Acceptable, - = Not Applicable