Program of Works SBM

The document outlines projects and budgets for improving facilities at Dolores Elementary School using SBM funds. It includes rehabilitation of the school stage, improvement of the foot walk, lobby enhancement of a building, and improvement of the school perimeter fence, each with itemized budgets and approvals.

Uploaded by

jerick gascon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
84 views6 pages

Program of Works SBM

The document outlines projects and budgets for improving facilities at Dolores Elementary School using SBM funds. It includes rehabilitation of the school stage, improvement of the foot walk, lobby enhancement of a building, and improvement of the school perimeter fence, each with itemized budgets and approvals.

Uploaded by

jerick gascon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

PROGRAM OF WORKS

Program Title: SBM FY 2014 GRANT


Implementing Office: Dolores Elementary School
Budget Allocation: P75, 000.00
Project: ” Rehabilitation of School Stage”
Unit Cost Total Cost
Item Description Quantity Unit Materials Labor Materials Labor Total Amount
Hollow blocks 174 Pcs P12.00 P2,088.00 P2,088.00
Gravel 2 Cu. m. P600.00 P1,200.00 P1,200.00
Sand 2 Cu. m. P500.00 P1,000.00 P1,000.00
10 mm Round bar 7 Pcs P130.00 P910.00 P910.00
9 mm Round bar 7 Pcs P92.00 P644.00 P644.00
Tie wire 18” 1 Kl. P63.00 P63.00 P63.00
Cement 7 Bags P285.00 P1,995.00 P1,995.00
P2,100.00 P2,100.00
TOTAL: P7,900.00 P2,100.00 P10,000.00

Prepared by: Reviewed by: Approval Recommended: Approved:

RICKY F. GASCON MARLON V. CLARITO MARLON P. DESTREZA, Ed. D. MIGUEL MAC D. APOSIN, Ed.D., CESO V
School Head Engineer III Chief Education Supervisor, SGOD Schools Division Superintendent
Contact no. 09176800441
PROGRAM OF WORKS
Program Title: SBM FY 2014 GRANT
Implementing Office: Dolores Elementary School
Budget Allocation: P75, 000.00
Project: ” Improvement of Foot walk”
Unit Cost Total Cost
Item Description Quantity Unit Materials Labor Materials Labor Total Amount
Cement 11 bags P285.00 P3,135.00 P3,135.00
Gravel 4 Cu. m. P600.00 P2,400.00 P2,400.00
Sand 3 Cu. m. P500.00 P1,500.00 P1,500.00
8 mm RSB 12 pcs P78.00 P936.00 P936.00
Tie wire #16 ½ Kl P70.0 P30.00 P30.00
C.W Nails #2 1 Kl P49.00 P49.00 P49.00
P1,950.00 P1,950.00

TOTAL: P8,050.00 P1,950.00 P10,000.00

Prepared by: Reviewed by: Approval Recommended: Approved:

RICKY F. GASCON MARLON V. CLARITO MARLON P. DESTREZA, Ed. D. MIGUEL MAC D. APOSIN, Ed.D., CESO V
School Head Engineer III Chief Education Supervisor, SGOD Schools Division Superintendent
Contact no. 09176800441
PROGRAM OF WORKS

Program Title: SBM FY 2014 GRANT


Implementing Office: Dolores Elementary School
Budget Allocation: P75, 000.00
Project: ” Lobby Enhancement of 1 Unit 2 Classroom Building”
Unit Cost Total Cost
Item Description Quantity Unit Total Amount
Materials Labor Materials Labor
G.I. Pipe 2” 6 pcs P820.00 P4,920.00 P4,920.00
Welding Rod Kl ½ P120.00 P60.00 P60.00
Cement 6 bags P285.00 P1,710.00 P1,710.00
Sand 2 Cu. m. P500.00 P1,000.00 P1,000.00
QDE Paint 1 L P145.00 P145.00 P145.00
Paint 1 Can P65.00 P65.00 P65.00
P2,100.00 P2,100.00

TOTAL: P7,900.00 P2,100.0 P10,000.00


0

Prepared by: Reviewed by: Approval Recommended: Approved:

RICKY F. GASCON MARLON V. CLARITO MARLON P. DESTREZA, Ed. D. MIGUEL MAC D. APOSIN, Ed. D., CESO V
School Head Engineer III Chief Education Supervisor, SGOD Schools Division Superintendent
Contact no. 09176800441
PROGRAM OF WORKS

Program Title: SBM FY 2014 GRANT


Implementing Office: Dolores Elementary School
Budget Allocation: P75, 000.00
Project: ” Improvement of School Perimeter Fence”
Unit Cost Total Cost
Item Description Quantity Unit Total Amount
Materials Labor Materials Labor
Hollow Blocks 115 Pcs P12.00 P1,380.00 P1,380.00
9 mm RSB 7 Pcs P92.00 P644.00 P644.00
10 mm RSB 8 Pcs P140.00 P1,120.00 P1,120.00
Cyclone wire 5 Ft. 2 Rolls P380.00 P760.00 P760.00
Cement 8 Bags P285.00 P2,280.00 P2,280.00
Tie Wire #16 1 Kl P76.00 P76.00 P76.00
G.I. Pipe 2” 2 Pcs P820.00 P1,640.00 P1,640.00
P2,100.00 P2,100.00
P7,900.00 P2,100.00 P10,000.00

Prepared by: Reviewed by: Approval Recommended: Approved:

RICKY F. GASCON MARLON V. CLARITO MARLON P. DESTREZA, Ed. D. MIGUEL MAC D. APOSIN, Ed. D., CESO V
School Head Engineer III Chief Education Supervisor, SGOD Schools Division Superintendent
Contact no. 09176800441
PROGRAM OF WORKS

Program Title: SBM FY 2014 GRANT


Implementing Office: Dolores Elementary School
Budget Allocation: P75, 000.00
Project: ” Repair of School Feeding Center”
Unit Cost Total Cost
Item Description Quantity Unit Materials Labor Materials Labor Total Amount
¼ Marine Plywood 15 Pcs P480.00 P7,200.00 P7,200.00
2x2x8 Lumber 14 Pcs P52.00 P728.00 P728.00
2x2x6 Lumber 15 Pcs P40.00 P600.00 P600.00
Nails #1 1 Kl P60.00 P60.00 P60.00
Nails #2 1 Kl P57.00 P57.00 P57.00
Nails #4 1 Kl P55.00 P55.00 P55.00
P1,300.00 P1,300.00

TOTAL: P8,700.00 P1,300.00 P10,000.00

Prepared by: Reviewed by: Approval Recommended: Approved:

RICKY F. GASCON MARLON V. CLARITO MARLON P. DESTREZA, Ed. D. MIGUEL MAC D. APOSIN, Ed. D., CESO V
School Head Engineer III Chief Education Supervisor, SGOD Schools Division Superintendent
Contact no. 09176800441