Compilation of ARCHITECTURAL STRUCTURAL PLUMBING ELECTRICAL PLAN Edolmo Liwanag Jr. Sangalang VIno CE 302

The document is a table of contents for architectural, structural, plumbing, and electrical drawings of a building project. It lists site plans, floor plans, elevations, sections, schedules, and details for the ground floor, second floor, water and sewer lines, septic vault, plumbing fixtures, lighting layout, power layout, and load schedule. The level of detail provided in the table of contents indicates it is for a building permit application to the local Department of Public Works.

Uploaded by

Carlo Edolmo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
92% found this document useful (13 votes)
33K views12 pages

Compilation of ARCHITECTURAL STRUCTURAL PLUMBING ELECTRICAL PLAN Edolmo Liwanag Jr. Sangalang VIno CE 302

The document is a table of contents for architectural, structural, plumbing, and electrical drawings of a building project. It lists site plans, floor plans, elevations, sections, schedules, and details for the ground floor, second floor, water and sewer lines, septic vault, plumbing fixtures, lighting layout, power layout, and load schedule. The level of detail provided in the table of contents indicates it is for a building permit application to the local Department of Public Works.

Uploaded by

Carlo Edolmo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

REPUBLIC OF THE PHILIPPINES

TABLE OF CONTENTS DEPARTMENT OF PUBLIC WORKS & HIGHWAYS

ARCHITECTURAL
A-1 PERSPECTIVE
SITE DEVELOPMENT PLAN OFFICE OF THE
BUILDING OFFICIAL
VICINITY MAP

MUNICIPALITY
A-2 GROUND FLOOR PLAN
SECOND FLOOR PLAN
LAND USE & ZONING
FRONT ELEVATION
LEFT-SIDE ELEVATION
.\240783751_392613035911876_2263696538632883589_n.jpg REAR ELEVATION
RIGHT-SIDE ELEVATION

A-3 CROSS SECTION


LONGITUDINAL SECTION
SCHEDULE OF DOORS AND WINDOWS LINE & GRADE

GROUND FLOOR REFLECTED CEILING PLAN


SECOND FLOOR REFLECTED CEILING PLAN

PLUMBING
1 PERSPECTIVE P-1 WATERLINE LAYOUT ARCHITECTURAL
A 1 SCALE NTS SEWERLINE LAYOUT
ISOMETRIC OF WATERLINE LAYOUT
ISOMETRIC OF SEWERLINE LAYOUT
PROPERTY LINE
2000

2000
P-2 SEPTIC VAULT DETAILS
TYPICAL WATER CLOSET INSTALLATION DETAIL
Fil-Am
Frien PLUMBING NOTES
dship STRUCTURAL
Hway

ELECTRICAL
SANITARY
E-1 LIGHTING LAYOUT
POWER LAYOUT
LOAD SCHEDULE
RISER DIAGRAM
Angeles City Water District Palmera Homes
Central Pumping Station

ELECTRICAL
Arise Car Service Center STRUCTURAL
S-1 CONSTRUCTION NOTES
AS SHOWN

S-2 FOUNDATION PLAN


FLOOR FRAMING PLAN
FOOTING DETAILS
ROAD
3 VICINITY MAP MECHANICAL
A 1 SCALE 1:100M
S-3 ROOF FRAMING PLAN
SCHEDULE OF FOOTINGS
2 SITE DEVELOPMENT PLAN SCHEDULE OF BEAMS
A 1 SCALE 1:100M
SCHEDULE OF COLUMNS

DRAWINGS & SPECIFICATIONS & OTHER


CERTIFIED BY: CONTRACT DOCUMENTS DULY SIGNED, STAMPED PROJECT TITTLE : SHEET CONTENT : OWNER : SHEET NO.:
OR SEALED AS INSTRUMENTS OF SERVICE, ARE
THE INTELLECTUAL PROPERTY & DOCUMENTS OF
THE ARCHITECT WHETHER THE OBJECT FOR

BLDGDESIGN-4521 EDOLMO, CARLO PINEDA, MIGUEL LUIS WHICH THEY ARE MADE IS EXECUTED OR NOT. IT
SHALL BE UNLAWFUL FOR ANY PERSON TO
PERSPECTIVE

A1
DUPLICATE OR TO MAKE COPIES OF SAID
ESPIRITU, JOHN PATRICK SANGALANG, JUSTINE SITE DEVELOPMENT PLAN
PROPOSED TWO STOREY RESIDENCE
DOCUMENTS FOR USE IN THE REPETITION OF &
LIWANAG JR., SHERWIN VINO, TRISHA FOR OTHER PROJECTS/BUILDINGS, WETHER

GROUP 5- SKYSCRAPER REG. NO.: - DATE ISSUED: SEPT 06, 2021


EXECUTED PARTLY OR IN WHOLE, WITHOUT THE
WRITTEN CONSENT OF THE ARCHITECT OR
AUTHOR OF SAID DOCUMENTS.
ALL ARCHITECTS SHALL INCORPORATE THIS
PROVISION IN ALL CONTRACT DOCUMENTS &
LOCATION : PAMPANGA
VICINITY MAP

OTHER INSTRUMENTS OF SERVICE. APPROVED ARCHITECTURAL


P.T.R. NO.: - PLACE: - PAMPANGA ARCHITECT ACT OF 2004, R.A. 9266, SECTION 33
1 2 3 4 5
6042
930 930 1046 813 1394 930

1 2 3 4 5
930

930
W W
3 2
A
1046 813 4853
1806 1402 1645

1185
D
GUEST W
4 W W
ROOM 2
3 1
D A
2324

3 W
W 1
D
1 3

1402
ROOF APEX

1139
1046 813 W

1752
GUEST VIEWING BEDROOM 2
2

1401
ROOM ROOM
NOOK
D
4 D
B 3
D
D 3 W
2 D
W 3 1

1240

78
5
7901

7901
BEDROOM 1

1181
SECOND FLOOR CEILING LINE

3998
3998
1039
W
2324

2324
C DINING 3

5392
AREA
B D
W
4 4

138
LIVING
AREA W
D SECOND FLOOR FINISH FLOOR LINE
3
1

5732
KITCHEN W GROUND FLOOR CEILING LINE

1779
D 2

1255
1 MASTERS

1569
D BEDROOM FAMILY
FAMILY
W HALL

2
C
W
1

87
FINISH FLOOR LINE

W D W W D W NATURAL GROUND LINE


2324

2324

2 6 2 6

971
7 8

890
BALCONY
D
3 LEFT SIDE ELEVATION
A 2 SCALE 1:100M
1806 3047
E
4853

1394 1752 537 1429 930


6042

1 GROUND FLOOR PLAN 2 SECOND FLOOR PLAN


A 2 SCALE 1:100M A 2 SCALE 1:100M

ROOF APEX

ROOF APEX
ROOF APEX

1496
1337

1332
TOP OF BEAM

139
TOP OF BEAM
300

TOP OF BEAM SECOND FLOOR CEILING LINE

123
SECOND FLOOR CEILING LINE
SECOND FLOOR CEILING LINE

4267
1062
3936
1024

3801
946
SECOND FLOOR FINISH FLOOR LINE

139
SECOND FLOOR FINISH FLOOR LINE SECOND FLOOR FINISH FLOOR LINE
128

123
GROUND FLOOR CEILING LINE
GROUND FLOOR CEILING LINE GROUND FLOOR CEILING LINE

1339
1244

1193
FINISH FLOOR LINE FINISH FLOOR LINE FINISH FLOOR LINE
200

82

92
NATURAL GROUND LINE NATURAL GROUND LINE NATURAL GROUND LINE

1
FRONT ELEVATION
A1 SCALE 1:200 MTS

6 REAR ELEVATION
4 RIGHT SIDE ELEVATION 5 FRONT ELEVATION A 2 SCALE 1:100M
A 2 SCALE 1:100M A 2 SCALE 1:100M

DRAWINGS & SPECIFICATIONS & OTHER


CERTIFIED BY: CONTRACT DOCUMENTS DULY SIGNED, STAMPED PROJECT TITTLE : SHEET CONTENT : OWNER : SHEET NO.:
OR SEALED AS INSTRUMENTS OF SERVICE, ARE
THE INTELLECTUAL PROPERTY & DOCUMENTS OF
THE ARCHITECT WHETHER THE OBJECT FOR

BLDGDESIGN-4521 EDOLMO, CARLO PINEDA, MIGUEL LUIS


WHICH THEY ARE MADE IS EXECUTED OR NOT. IT
SHALL BE UNLAWFUL FOR ANY PERSON TO
GROUND FLOOR PLAN

A2
DUPLICATE OR TO MAKE COPIES OF SAID
ESPIRITU, JOHN PATRICK SANGALANG, JUSTINE SECOND FLOOR PLAN
PROPOSED TWO STOREY RESIDENCE
DOCUMENTS FOR USE IN THE REPETITION OF &
FOR OTHER PROJECTS/BUILDINGS, WETHER
LIWANAG JR., SHERWIN VINO, TRISHA
GROUP 5-SKYSCRAPER REG. NO.: DATE ISSUED: SEPT 06, 2021
EXECUTED PARTLY OR IN WHOLE, WITHOUT THE
WRITTEN CONSENT OF THE ARCHITECT OR
AUTHOR OF SAID DOCUMENTS.
ALL ARCHITECTS SHALL INCORPORATE THIS
PROVISION IN ALL CONTRACT DOCUMENTS &
LOCATION : PAMPANGA
ELEVATIONS

OTHER INSTRUMENTS OF SERVICE. APPROVED ARCHITECTURAL


P.T.R. NO.: PLACE: PAMPANGA ARCHITECT ACT OF 2004, R.A. 9266, SECTION 33
ROOF APEX

1255
1294
TOP OF BEAM

300
SECOND FLOOR CEILING LINE
SECOND FLOOR CEILING LINE
BALCONY FAMILY

3695
HALL

962
3695
930
SECOND FLOOR FINISH FLOOR LINE BEDROOM 1 BEDROOM 2
SECOND FLOOR FINISH FLOOR LINE

120
120
GROUND FLOOR CEILING LINE
GROUND FLOOR CEILING LINE

1168
2900
LIVING GUEST GUEST
FINISH FLOOR LINE AREA ROOM ROOM
FINISH FLOOR LINE

200
NATURAL GROUND LINE

80
NATURAL GROUND LINE

1 CROSS SECTION 2 LONGITUDINAL SECTION


A 3 SCALE 1:100M A 3 SCALE 1:100M

1320 880 600 750 750 1


2 3 4 1 2 3 4
600 240

480 360

480 360
408 432

408 432

1925 807 1344 2296 855 1687


840
840

840

840

840

W W W W W A
1 SLIDING WINDOW w/ 14" THK. REGULAR
2 SLIDING WINDOW w/ 14" THK. REGULAR 3 AWNING WINDOW w/ 14" THK. REGULAR 4 AWNING WINDOW w/ 1 4" THK. REGULAR CLEAR
5 SLIDING WINDOW w/ 1 4" THK. REGULAR CLEAR A
CLEAR GLASS, POWDER COATED WHITE CLEAR GLASS, POWDER COATED WHITE CLEAR GLASS, POWDER COATED WHITE GLASS, POWDER COATED WHITE FRAME GLASS, POWDER COATED WHITE FRAME
FRAME FRAME FRAME
TYPE: TYPE: TYPE: TYPE: TYPE:

905

1078
LOCATION: BEDROOM 1, BEDROOM 2, AND LIVING AREA LOCATION: GUESS ROOM AND MASTERS BEDROOM LOCATION: TOILET AND BATH LOCATION: KITCHEN LOCATION: KITCHEN

SET: 5 SETS SET: 4 SETS SET: 3 SETS SET: 1 SETS SET: 1 SETS BEDROOM 2

B
B
1320 845 500 VIEWING

1224
ROOM
GUEST
ROOM

1458
432

432

NOOK
800
840

840
840

C
BEDROOM 1
40

40

40

1140
C
W W W
6 SLIDING WINDOW w/ 14" THK. REGULAR
CLEAR GLASS, POWDER COATED WHITE
8 FIXED WINDOW w/ 14" THK. REGULAR
CLEAR GLASS, POWDER COATED WHITE
9 FIXED WINDOW w/ 14" THK. REGULAR CLEAR
GLASS, POWDER COATED WHITE FRAME
FRAME FRAME
TYPE: TYPE: TYPE:

1369
DINING
LOCATION: FAMILY AREA LOCATION: MASTERS BEDROOM LOCATION: MASTERS BEDROOM AREA
SET: 2 SETS SET: 1 SET SET: 1 SET D
MASTERS
BEDROOM

1196
LIVING
AREA FAMILY
D HALL
KITCHEN

1538
1000 1000 320 240

2201 BALCONY
840

840

840

840

D D GLASS SLIDING DOOR


D WOOD PANEL DOOR
D FLUSH DOOR
1 WOOD PANEL DOOR WITH GLASS
2 3 4
TYPE: SWING TYPE TYPE: SLIDING TYPE TYPE: SWING TYPE TYPE: SWING TYPE

LOCATION: MAIN DOOR (ENTRANCE) LOCATION: NOOK AND BALCONY LOCATION: BEDROOMS AND VIEWING ROOM LOCATION: TOILET AND BATH

SET: 1 SET SET: 3 SETS SET: 6 SETS SET: 3 SETS F

3 SCHEDULE OF DOORS AND WINDOWS 4 GROUND FLOOR CEILING PLAN 5 SECOND FLOOR CEILING PLAN
A 3 SCALE 1:100M A 3 SCALE 1:100M A 3 SCALE 1:100M

DRAWINGS & SPECIFICATIONS & OTHER


CERTIFIED BY: CONTRACT DOCUMENTS DULY SIGNED, STAMPED PROJECT TITTLE : SHEET CONTENT : OWNER : SHEET NO.:
OR SEALED AS INSTRUMENTS OF SERVICE, ARE
THE INTELLECTUAL PROPERTY & DOCUMENTS OF
THE ARCHITECT WHETHER THE OBJECT FOR

BLDGDESIGN-4521 EDOLMO, CARLO PINEDA, MIGUEL LUIS


WHICH THEY ARE MADE IS EXECUTED OR NOT. IT
SHALL BE UNLAWFUL FOR ANY PERSON TO
CROSS SECTION

A3
DUPLICATE OR TO MAKE COPIES OF SAID
ESPIRITU, JOHN PATRICK SANGALANG, JUSTINE LONGITUDINAL SECTION
PROPOSED TWO STOREY RESIDENCE
DOCUMENTS FOR USE IN THE REPETITION OF &
FOR OTHER PROJECTS/BUILDINGS, WETHER

GROUP 5-SKYSCRAPER LIWANAG JR., SHERWIN

REG. NO.: -
VINO, TRISHA

DATE ISSUED: SEPT 06, 2021


EXECUTED PARTLY OR IN WHOLE, WITHOUT THE
WRITTEN CONSENT OF THE ARCHITECT OR
AUTHOR OF SAID DOCUMENTS.
ALL ARCHITECTS SHALL INCORPORATE THIS
PROVISION IN ALL CONTRACT DOCUMENTS &
LOCATION : PAMPANGA
FLOOR PATTERN PLAN
CEILING PLAN
OTHER INSTRUMENTS OF SERVICE. APPROVED ARCHITECTURAL
P.T.R. NO.: - PLACE: - PAMPANGA ARCHITECT ACT OF 2004, R.A. 9266, SECTION 33
CONSTRUCTION NOTES : REINFORCING BAR ARRANGEMENT
WHEN A BEAM CROSSES A GIRDER, REST BEAM BARS ON TOP OF GIRDER BARS, REINFORCING BARS SHALL BE
NOTE :
1. OMIT TRIMMER BARS WHERE OPENING IS FRAMED BY BEAM.
REFERENCE TO OTHER DRAWINGS SYMMETRICAL ABOUT THE CENTER LINE WHEREVER POSSIBLE & UPPER LAYERS SHALL BE PLACED DIRECTLY ABOVE THOSE IN 2. PROVIDE THESE ADDITIONAL BARS FOR ALL OPENINGS PLUS BARS (NOT SHOWN) PARALLEL TO SIDE OF OPENING
SEE ARCHITECTURAL DRAWINGS FOR KINDS OF FLOOR FINISHES, DEPRESSIONS IN FLOOR SLABS, OPENINGS IN WALLS, SLABS, THE BOTTOM LAYER. EQUAL TO THE NUMBER OF TERMINATED BARS @ OPENING.
10 MMØJOINT TIES
INTERIOR PARTITIONS, & LOCATIONS OF DRAINS ETC. GENERALLY, NO SPLICES SHALL BE PERMITTED ON BEAMS @ POINTS WHERE CRITICAL BENDING STRESSES OCCUR. 3. SEE ARCHITECTURAL & MECHANICAL PLANS FOR SLAB OPENING LOCATION.
SPACED @ 75MM.O.C.
DIMENSIONS LENGTH OF LAPPED SPLICES, WHERE SO PERMITTED, SHALL BE ON THE SPECIFICATIONS FOR WELDING OF REINFORCING BARS
IN THE INTERPRETATION OF THESE DRAWINGS, INDICATED DIMENSIONS SHALL GOVERN & DISTANCES OR SIZES SHALL NOT BE SPLICES SHALL DEVELOP IN TENSION @ LEAST 125% OF THE SPECIFIED YEILD STRENGTH OF THE BARS, NOT MORE THAN 50%
ROOF OR FLOOR
SCALED FOR CONSTRUCTION PURPOSES. OF THE BARS @ ANY ONE SECTION SHALL BE ALLOWED TO BE THERE IN. BEAMS
MAIN REINFORCEMENTS
DISCREPANCIES MASONRY CONCRETE BLOCKS TO BE CONTINUOUS

THE CONTRACTOR SHALL COMPARE THE STRUCTURAL DRAWINGS WITH THE ARCHITECTURAL DRAWINGS, LAYOUTS, 1. ALL CONCRETE BLOCKS SHALL BE NORMAL WEIGHT LOAD BEARING TYPE WITH A fc' = 1000 psi.
DIMENSIONS & ELEVATIONS. 2. PROVIDE 1 - 16 mm. DIA. VERTICAL BARS @ CORNER, INTERSECTION, END OF WALL IN EACH SIDE OF OPENING.
POURING SCHEDULE 3. LINTEL BEAMS SHALL ATLEAST BE (0.20 m.) ON EACH SIDE OF MASONRY WALL OPENING.
Ø10x1000 LONG @300 O.C.
THE CONTRACTOR SHALL SUBMIT THE SCHEDULE OF CONCRETE POURING & LOCATION OF CONSTRUCTION JOINTS TO THE 4. WALL REINFORCEMENT SHALL BE AS FOLLOWS :
SLAB 10 MMØ CONFINEMENT TIES
STRUCTURAL ENGINEER @ LEAST THREE (3) DAYS BEFORE POURING FOR APPROVAL, THE CONTRACTOR SHALL KEEP ALL WALL THICKNESS VERTICAL REINFORCEMENT HORIZONTAL REINFORCEMENT
SPACED @ 75MM.O.C.
CONCRETE MOIST FOR A MINIMUM OF SEVEN (7) DAYS IMMEDIATELY AFTER POURING. 6" (150 mm.) EXTERIOR 10 mm.Ø @ 0.60 m. 10 mm.Ø @ 0.60 m.
FORM WORKS 4" (100 mm.) 10 mm.Ø @ 0.60 m. 10 mm.Ø @ 0.60 m.
A. THE CONTRACTOR SHALL FURNISH & MAINTAIN ADEQUATE FORMS & SHORING UNTIL THE CONCRETE HAVE ATTAINED THEIR 5. REINFORCING BARS SHALL BE LAPPED A MINIMUM OF 1.3 fd WHERE SPLICED DOWELS FROM CONCRETE FOOTING SPLICE IN VERTICAL
BARS LOCATE WITHIN
WORKING CONDITIONS & STRENGTH. OR SLAB SHALL BE EXTENDED INTO THE BLOCK WALL. 30 BAR DIAMETER DOWELS TO MTCH VERTICAL REINFORCING THE MIDDLE THIRD OF
B. REMOVAL OF FORMS BARS IN WALLS. CLEAR COLUMN HEIGHT,
1. COLUMNS & BEARING WALLS AFTER THREE (3) DAYS. LAP 40 BAR DIAMETER
6. ALL CELLS SHALL BE SOLIDLY FILLED WITH CONCRETE GROUTS.
AND STAGGER SPLICE
2. BEAMS AND GIRDERS AFTER STRESSING. WHERE JOINT IS AT POINT OF
7. OTHER ALTERNATIVES SHALL BE SUBMITTED FIR THE STRUCTURAL ENGINEERS APPROVAL. A MIN. DISTANCE OF
C. WHEN THE CONCRETE FLOOR IS TO BE POURED, @ LEAST TWO (2) FLOORS SHALL BE SHORED TO SUPPORT THE LOAD. BEAM STRESS, PROVIDE SHEAR RODS 40 BAR DIAMETER, NOT
CONCRETE SIZES OF AGGREGATES TO BE USED WITH ENGINEER'S APPROVAL MORE THAN 33% OF THE
MINIMUM SIZES OF AGGREGATES TO BE USED FOR VARIOUS PURPOSES OF CONCRETE CONSTRUCTION TYPICAL SLAB AND BEAM BARS SHALL BE SPLICE
fc' = 2500 psi (17.30 Mpa) - SLAB ON FILL CONCRETE STRENGTH @ 28 DAYS. IN ANY ONE LEVEL
CONSTRUCTION JOINT DETAIL
fc' = 3000 psi (20.67 Mpa) - FOOTINGS, FOOTING TIE BEAM, COLUMNS, SLAB, CONCRETE STRENGTH, @ 28 DAYS MINIMUM REINFORCED UNREINFORCED HEAVILY LIGHTLY REINFORCED 10 MMØ CONFINEMENT TIES
fc' = 4000 psi (27.58 Mpa) - COLUMNS, R.C. BEAMS, SLAB, CONCRETE STRENGTH, @ 28 DAYS. DIMENSIONS WALLS, BEAMS WALLS REINFORCED OR UNREINFORCED SPACED @ 75MM.O.C.
OF SECTIONS AND COLUMNS SLABS SLABS
ALL CONCRETE SHALL BE VIBRATED WHEN DEPOSITED & CURED, NO CHUTE LONGER THAN 1800 mm. LONG
63.5MM - 127MM 12.7MM - 19MM 19MM 19MM - 25.4MM 19MM - 38.1MM
SHALL BE USED.
152.4MM - 279.4MM 19MM - 38.1MM 38.1MM 38.1MM 38.1 - 76.2MM
SOIL BEARING CAPACITY 100 kPa 304.8MM - 736.6MM 38.1MM - 76.2MM 76.2MM 38.1MM - 76.2MM 76.2MM
STEEL BARS 762MM OR MORE 38.1MM - 76.2MM 152.4MM 38.1MM - 76.2MM 76.2MM - 152.4MM

USE DEFORMED INTERMEDIATE GRADE BARS FOR ALL REINFORCING BARS. RECOMMENDED SIZES 90° HOOK BAR SIZE HOOK
J
Ø A OR B FLOOR BEAM, TIE BEAM
fy = 40,000 psi (248.21 MPa) for 16mm dia and smaller M 6 88.9 MM 101.6 MM OR FOOTING BEAM
fy = 60,000 psi (413.69 MPa) for 20mm dia and larger M 10 139.7 MM 152.4 MM
M 12 190.5 MM 215.4 MM 10 MMØJOINT TIES
CONCRETE PROTECTION FOR REINFORCING BARS M 16 228.6 MM 254.0 MM SPACED @ 75MM.O.C.
THE FOLLOWING SHALL BE THE CLEAR COVER FOR CONCRETE PROTECTION : M 20 266.7 MM 317.5 MM TYPICAL COLUMN DETAIL
FOUNDATIONS 75 MM. D = 7d FOR M6 TO M20 M 25 368.3 MM 431.8 MM
NOT TO SCALE
M 28 419.1 MM 482.8 MM
SLAB ON GRADE 40 MM. FOR M16 OR SMALLER SIZE BARS D = 8d FOR M25 TO M36
M 32 469.9 MM 546.1 MM Ø12x1000 LONG AT MID-DEPTH
SURFACE EXPOSED TO WEATHER 50 MM. FOR M20 OR LARGER SIZE BARS M 36 520.7 MM 609.6 MM OF SLAB AT EACH CORNER
COLUMNS 40 MM. RECOMMENDED SIZES 135° STIRRUPS
BEAMS & GIRDERS 30 MM. BAR SIZE HOOK APPROX.
Ø A OR B H 1-Ø12 TOP &
SUSPENDED SLABS & STAIRS 20 MM. M 6 88.9 MM 57.1 MM BOT. BARS
WALLS 20 MM. M 10 101.6 MM 57.1 MM 38MM CLEAR
M 12 127 MM 76.2 MM IN TWO WAY
REINFORCING STEEL BARS M 16 152.4 MM 95.2 MM SLAB, EXTEND
BARS UP TO
ALL REINFORCING BARS UNLESS OTHERWISE SHOWN ON PLAN SHALL BE INTERMEDIATE GRADE IN ACCORDANCE M 20 177.8 MM 114.3 MM
BEAM SUPPORT
WITH ASTM SPECIFICATION A615 GRADE 40. NOTE :

ALL SPLICES SHALL BE WIRED TOGETHER & SHALL LAP OR EXTEND TO A MINIMUM OF 32 X DIAMETER.
WHEN SUPPORTING BARS ARE USED STIRRUP HOOKS TYPICAL SLAB OPENING DETAIL
MAY BE BENT TO THE DIAMETER OF THE SUPPORT BARS.
UNLESS SHOWN OTHERWISE. VERTICAL BARS SPLICES LOCATION SHALL BE STAGGERED FOR BEAMS & GIRDERS, SPLICE TOP 4-Ø12 @ 1800 LONG TOP
Ø12x1000 LONG AT MID-DEPTH BARS BEND MAIN REINFORCEMENT
BARS @ MID-SPAN, BOTTOM BARS @ SUPPORT BEND BARS @ BEND POINT IN SUPER STRUCTURES. ALL REINFORCING BEAMS
OF WALL AT EACH CORNER 4-12 Ømm. @
SHALL BE FREE FROM OIL OR OTHER SUBSTANCES THAT TENDS TO WEAKEN BOND STRENGTH. 1800 LONG TOP
BARS BEND DOWN
TOLERANCE IN PLACING REINFORCEMENTS INTO EDGE BEAM,
UNLESS OTHERWISE SPECIFIED BY THE ENGINEER, REINFORCEMENT SHALL BE PLACED IN SPECIFIED POSITIONS WITH THE EXTENDED BARS
DOOR MIN. OF 1200 (4'-0")
FOLLOWING TOLERANCES :
WINDOW 1-Ø16 OPENING
1. DEPTH "D" IN FLEXURAL MEMBERS, WALLS & COLUMNS WHERE "D" IS 600 MM. OR LESS ±6 MM. SLEEVES FOR UTILITY
OPENING EACH FACE 4-Ø12
PIPES MAX., D
2. DEPTH "D" IN FLEXURAL MEMBERS & COLUMNS WHERE "D" IS 600 MM. ±12 MM. (TYPICAL) 5 PROVIDE 3-10Ø EXTRA BOT. BARS
3. LONGITUDINAL LOCATION OF BENDS & END OF BARS ±50 MM. EXCEPT SPECIFIED CONCRETE COVER @ END OF STIRRUPS EACH SIDE OF
SLEEVES
MEMBERS SHALL BE REDUCED.
TYPICAL DETAIL FOR SLEEVES
TYPICAL EXTERIOR WINDOWS & TYPICAL DETAIL FOR BEAM TYPICAL CORNER SLAB DETAIL
THRU CONCRETE BEAM
DOOR OPENING OR SLAB CHANGE SOFFIT

DRAWINGS & SPECIFICATIONS & OTHER


CERTIFIED BY: CONTRACT DOCUMENTS DULY SIGNED, STAMPED PROJECT TITTLE : SHEET CONTENT : OWNER : SHEET NO.:
OR SEALED AS INSTRUMENTS OF SERVICE, ARE
THE INTELLECTUAL PROPERTY & DOCUMENTS OF
THE ARCHITECT WHETHER THE OBJECT FOR

BLDGDESIGN - 4521 EDOLMO, CARLO PINEDA, MIGUEL LUIS


WHICH THEY ARE MADE IS EXECUTED OR NOT. IT
SHALL BE UNLAWFUL FOR ANY PERSON TO
AS SHOWN

S1
DUPLICATE OR TO MAKE COPIES OF SAID
ESPIRITU, JOHN PATRICK SANGALANG, JUSTINE
PROPOSED TWO STOREY RESIDENCE
DOCUMENTS FOR USE IN THE REPETITION OF &
FOR OTHER PROJECTS/BUILDINGS, WETHER

GROUP 5 - SKYSCRAPER LIWANAG JR., SHERWIN

REG. NO.: 0148677


VINO, TRISHA

DATE ISSUED: OCT 18, 2021


EXECUTED PARTLY OR IN WHOLE, WITHOUT THE
WRITTEN CONSENT OF THE ARCHITECT OR
AUTHOR OF SAID DOCUMENTS.
ALL ARCHITECTS SHALL INCORPORATE THIS
PROVISION IN ALL CONTRACT DOCUMENTS &
LOCATION : PALMERA HOMES, PAMPANGA

OTHER INSTRUMENTS OF SERVICE. APPROVED STRUCTURAL


P.T.R. NO.: PAM-0225250 PLACE: PAMPANGA ARCHITECT ACT OF 2004, R.A. 9266, SECTION 33
C

COLUMN LINKS

COLUMN LINKS
COLUMN LINKS

COLUMN LINKS
A B D E F G

LD

LD
LD

LD
1390 1520 2200

1050 950
#10@135 C/C (T) #10@135 C/C (T)
#12@210 C/C (B) #12@210 C/C (B) #12@210 C/C (B) #12@210 C/C (B)
1050

1050

6 950
EL. 0.000 EL. 0.000 EL. 0.000 EL. 0.000

300

300
C27 C16 C17 BOF BOF

300

300
BOF BOF

FC27 FC16 FC17


1150

1000

5 1050
1100 #10@135 C/C (T) 100 THK PCC #10@135 C/C (T) 100 THK PCC
C13 C19 100 THK PCC
#12@210 C/C (B)
100 THK PCC
#12@210 C/C (B) #12@210 C/C (B)
1320

#12@210 C/C (B)


FC13 900
FC19 100 1050 100 1050
1050 100 1050 100 1050
1100

1150

1150

1150

4 C5 SECTION 1-1 SECTION 2-2 SECTION 3-3 SECTION 4-4


C22 C21 C20 DETAIL OF FOOTING FC16 DETAIL OF FOOTING FC16
1100

DETAIL OF FOOTING FC27 DETAIL OF FOOTING FC27


(SCALE 1:25) (SCALE 1:25)
FC5 1050
FC22 FC21
1050 1050
FC20 (SCALE 1:25) (SCALE 1:25)
1000

1000

3 950 1000
C26 C24
1230

1800
FC26 900
FC24 4
2
1200

1000

1
950

C28 C3 C23 C25


FC3 FC23 FC25 #10@135 C/C (T) #12@210 C/C (B)
1100 #12@210 C/C (B)
2320

900 900

3 3 (B)
#12@210 C/C
7 1 1 (B)
900

900

#12@210 C/C
C10 C29

1050
1050

FC10 FC29

#10@135 C/C (T)

2 FOOTING 1 DETAIL 3 FOOTING 2 DETAIL


2 2
SCALE 1 : 50 SCALE 1 : 50
1050
1050 100 THK PCC
100 THK PCC

1 FOUNDATION PLAN 2
4
2
SCALE 1 : 100
FOOTING FC16- PLAN
FOOTING FC27- PLAN
(SCALE 1:25)
(SCALE 1:25)

C21 : Fy414 , COVER = 50MM C21 : Fy414 , COVER = 50MM


CONFINING ZONE = FULL HEIGHT CONFINING ZONE = FULL HEIGHT BEAM SCHEDULE (C21:Fy414) (LEVEL: GF)

BEAM SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT SHEAR STIRRUPS

NUMBERS B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT

VARIES

VARIES
B1,B3,B4 250 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 4-2L-#10@125 C/C 2-2L-#10@125 C/C 4-2L-#10@125 C/C

B2,B9 250 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 11-2L-#10@100 C/C - 11-2L-#10@100 C/C

DIAMETER

DIAMETER
DOWELS

DOWELS
Z1 MAIN LINK Z1 OTHERS Z2 LINKS Z1 MAIN LINK Z1 OTHERS Z2 LINKS

30 BAR

30 BAR
B5,B17 250 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 3-2L-#10@125 C/C 1-2L-#10@125 C/C 3-2L-#10@125 C/C
#10 @ 75 #10 @ 75 --- #10 @ 75 #10 @ 75

600 (MIN.)

600 (MIN.)
B6,B16 250 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 4-2L-#10@125 C/C 2-2L-#10@125 C/C 4-2L-#10@125 C/C

B7,B13,B22 250 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 5-2L-#10@100 C/C - 5-2L-#10@100 C/C

250

250
B8 250 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10-2L-#10@100 C/C - 10-2L-#10@100 C/C
300
300

B10 250 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 7-2L-#10@100 C/C - 7-2L-#10@100 C/C
#16
B11,B14 250 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 9-2L-#10@100 C/C 3-2L-#10@125 C/C 9-2L-#10@100 C/C
300 400
B12,B18,B21,B23 250 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 6-2L-#10@100 C/C - 6-2L-#10@100 C/C
8-#16 6-#16 400 400
B15,B20 250 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 7-2L-#10@125 C/C 5-2L-#10@125 C/C 7-2L-#10@125 C/C

B19,B24 250 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 5-2L-#12@100 C/C - 5-2L-#12@100 C/C
C17 C13

COLUMN AND WALL SCHEDULE


(SCALE 1:25)
4 WALL FOOTING DETAIL
2
SCALE 1 : NTS

DRAWINGS & SPECIFICATIONS & OTHER


CERTIFIED BY: CONTRACT DOCUMENTS DULY SIGNED, STAMPED PROJECT TITTLE : SHEET CONTENT : OWNER : SHEET NO.:
OR SEALED AS INSTRUMENTS OF SERVICE, ARE
THE INTELLECTUAL PROPERTY & DOCUMENTS OF
THE ARCHITECT WHETHER THE OBJECT FOR

BLDGDESIGN - 4521 EDOLMO, CARLO PINEDA, MIGUEL LUIS


WHICH THEY ARE MADE IS EXECUTED OR NOT. IT
SHALL BE UNLAWFUL FOR ANY PERSON TO
AS SHOWN

S2
DUPLICATE OR TO MAKE COPIES OF SAID
ESPIRITU, JOHN PATRICK SANGALANG, JUSTINE
PROPOSED TWO STOREY RESIDENCE
DOCUMENTS FOR USE IN THE REPETITION OF &
FOR OTHER PROJECTS/BUILDINGS, WETHER

GROUP 5 - SKYSCRAPER LIWANAG JR., SHERWIN

REG. NO.: 0148677


VINO, TRISHA

DATE ISSUED: OCT 18, 2021


EXECUTED PARTLY OR IN WHOLE, WITHOUT THE
WRITTEN CONSENT OF THE ARCHITECT OR
AUTHOR OF SAID DOCUMENTS.
ALL ARCHITECTS SHALL INCORPORATE THIS
PROVISION IN ALL CONTRACT DOCUMENTS &
LOCATION : PALMERA HOMES, PAMPANGA

OTHER INSTRUMENTS OF SERVICE. APPROVED STRUCTURAL


P.T.R. NO.: PAM-0225250 PLACE: PAMPANGA ARCHITECT ACT OF 2004, R.A. 9266, SECTION 33
C C
A B D E F G A B D E F G
1390 1520 2200 1390 1520 2200

BEAM SCHEDULE (C21:Fy414) (LEVEL: 2F)

BEAM SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT SHEAR STIRRUPS


B1 B2 B1 B2
6 C27 C16 C17
6 NUMBERS B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT
C27 C16 C17
B19

B24

B17

B23
B17

B1,B3,B7 250 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10-2L-#10@100 C/C - 10-2L-#10@100 C/C
B3
B2,B8 250 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 11-2L-#10@100 C/C - 11-2L-#10@100 C/C
5 5
B20
B14

B19
B13
C13 C19 C13 C19 B4,B9 250 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 7-2L-#10@100 C/C - 7-2L-#10@100 C/C
B16

B18

B23

B16

B22
1320

1320
B5 250 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 4-2L-#10@125 C/C 2-2L-#10@125 C/C 4-2L-#10@125 C/C
B4 B5 B6 B3 B4 B6,B12,B21 250 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 5-2L-#10@100 C/C - 5-2L-#10@100 C/C
4 C5
4 B10,B13 250 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 9-2L-#10@100 C/C 3-2L-#10@125 C/C 9-2L-#10@100 C/C
C22 C21 C20 C5 C22 C21 C20
B13

B22

B12

B21
1100

1100
B11,B16,B20,B22 250 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 6-2L-#10@100 C/C - 6-2L-#10@100 C/C

B18
B5 B14,B19 250 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 7-2L-#10@125 C/C 5-2L-#10@125 C/C 7-2L-#10@125 C/C
3

B15
3
C26 C24 C26 C24 B15 250 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 9-2L-#10@100 C/C 2-2L-#10@125 C/C 9-2L-#10@100 C/C
B12

B21
1230

B11

B20
1230
B17,B23 250 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 5-2L-#12@100 C/C - 5-2L-#12@100 C/C
B7 B8 B9 B6 B7 B8 B18 250 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 4-2L-#10@125 C/C 2-2L-#10@125 C/C 4-2L-#10@125 C/C
1 C28 C3 C25
1
C23 C28 C3 C23 C25
B15
B11

B14
B10
2320

2320

B10 B9
7 C10 C29
7 C10 C29

FOR SIZE AND SPACING OF


STIRRUPS, SEE REINFORCED
C
L INTERIOR SUPPORT C
L INTERIOR SUPPORT CONCRETE BEAM SCHEDULE C
L INTERIOR SUPPORT

STIRRUPS (TYPICAL)
40mm CLEAR TO
O.25 LC1 TOP BAR O.25 L O.25 L TOP BAR O.25 L O.25 L
SPLICE ZONE SPLICE ZONE

(TYPICAL)
(TYP.) (TYP.)

0mm
STANDARD 90 TOP BARS TOP BARS CONT. TOP BARS

1 GROUND FLOOR FRAMING PLAN 2 SECOND FLOOR FRAMING PLAN DEGREE HOOK
(TYPICAL)
3 3
SCALE 1 : 100 SCALE 1 : 100

TYPICAL
0mm
0.165 EXTRA 0.165 0.165 EXTRA 0.165
BOTTOM BOTTOM

STIRRUPS (TYPICAL)
LC1 LC1 LC2 LC2

40mm CLEAR TO
BARS BOTTOM BAR BARS BOTTOM BAR
SPLICE ZONE (TYP.) SPLICE ZONE (TYP.)
CONTINUOUS CONTINUOUS
BOTTOM BARS BOTTOM BARS SIDE BARS (TYP.) SEE
SCHEDULE FOR SIZE
40MM CLEAR MIN. AND NUMBER
CONCRETE CONCRETE
75MM CLEAR MAX.
COLUMN COLUMN
OR BEAM OR BEAM
(TYPICAL) (TYPICAL)
LC1 LC2 LC1 OR LC2
(CLEAR SPAN) (CLEAR SPAN)
EXTERIOR SUPPORT INTERIOR SUPPORT INTERIOR SUPPORT
(DISCONTINUOUS END) (CONTINUOUS END) (CONTINUOUS END)

3 TYPICAL BEAM DETAIL


3
SCALE 1 : NTS

DRAWINGS & SPECIFICATIONS & OTHER


CERTIFIED BY: CONTRACT DOCUMENTS DULY SIGNED, STAMPED PROJECT TITTLE : SHEET CONTENT : OWNER : SHEET NO.:
OR SEALED AS INSTRUMENTS OF SERVICE, ARE
THE INTELLECTUAL PROPERTY & DOCUMENTS OF
THE ARCHITECT WHETHER THE OBJECT FOR

BLDGDESIGN - 4521 EDOLMO, CARLO PINEDA, MIGUEL LUIS


WHICH THEY ARE MADE IS EXECUTED OR NOT. IT
SHALL BE UNLAWFUL FOR ANY PERSON TO
AS SHOWN

S3
DUPLICATE OR TO MAKE COPIES OF SAID
ESPIRITU, JOHN PATRICK SANGALANG, JUSTINE
PROPOSED TWO STOREY RESIDENCE
DOCUMENTS FOR USE IN THE REPETITION OF &
FOR OTHER PROJECTS/BUILDINGS, WETHER

GROUP 5 - SKYSCRAPER LIWANAG JR., SHERWIN

REG. NO.: 0148677


VINO, TRISHA

DATE ISSUED: OCT 18, 2021


EXECUTED PARTLY OR IN WHOLE, WITHOUT THE
WRITTEN CONSENT OF THE ARCHITECT OR
AUTHOR OF SAID DOCUMENTS.
ALL ARCHITECTS SHALL INCORPORATE THIS
PROVISION IN ALL CONTRACT DOCUMENTS &
LOCATION : PALMERA HOMES, PAMPANGA

OTHER INSTRUMENTS OF SERVICE. APPROVED STRUCTURAL


P.T.R. NO.: PAM-0225250 PLACE: PAMPANGA ARCHITECT ACT OF 2004, R.A. 9266, SECTION 33
C C
BEAM SCHEDULE (C21:Fy414) (LEVEL: ROOF)

A B D E F G A B D E F G BEAM SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT SHEAR STIRRUPS

NUMBERS B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT
1390 1520 2200 1390 1520 2200
B1,B3,B5 250 300 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 7-2L-#10@100 C/C 4-2L-#10@100 C/C 7-2L-#10@100 C/C

B2,B6,B8,B9 250 300 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 7-2L-#10@100 C/C 7-2L-#10@100 C/C 7-2L-#10@100 C/C

B4,B10,B11,B12 250 300 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 7-2L-#10@100 C/C 7-2L-#10@100 C/C 7-2L-#10@100 C/C

B7 250 300 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 7-2L-#10@100 C/C 8-2L-#10@100 C/C 7-2L-#10@100 C/C

B1 B2
6 6
C27 C16 C17 RAFTER

5 5
B10

B12
B8

C13 C19
1320

1320
HSS 6" X 6" X 1/4" HSS 6" X 6" X 1/4" ANGLE BAR 1 1/2" X 1 1/2" X 1/4"

B3 B4
4 C5
4
C22 C21 C20 RAFTER
1100

1100
3 3
B11
B7

B9

C26 C24 HSS 6" X 6" X 1/4"


1230

1230
RAFTER
B5 B6 ANGLE BAR 1 1/2" X 1 1/2" X 1/4"

1 C3 C25
1
C23
2320

2320
7 7
HSS 6" X 6" X 1/4" HSS 6" X 6" X 1/4" ANGLE BAR 1 1/2" X 1 1/2" X 1/4"

PLAN

/C #10@175 C/C
5C
17
0@ #10@175 C/C
#1 0
450
45

125
#10@175 C/C
#10@175 C/C

1 ROOF BEAM FRAMING PLAN 2 STRUCTURAL TRUSS FRAMING PLAN


4 4
SCALE 1 : 100 SCALE 1 : 100

125 THK

C/C

66
5
17

.47
0@
/C #1

16
5C
17
0@
#1 0
45
#10@175 C/C
#10@175 C/C
#10@175 C/C
#1
0 #10@175 C/C 0@

125
45 17
5C
#10@175 C/C
450 /C
#10@175 C/C
450 45
0
NOTES:

125
#10@175 C/C
#10@175 C/C
#10@175 C/C

STRUT BEAM
125 THK

#1
0@

16
17
5C

.47
/C #1
0@

66
17
5C
450 /C
#10@175 C/C
4 STAIR DETAIL #10@175 C/C
#10@175 C/C

4 45
0

125
SCALE 1 : NTS
3 TRUSS SCHEMATIC DRAWING #10@175 C/C
4 450
SCALE 1 : 50

STRUT BEAM SECTION #10@175 C/C

DRAWINGS & SPECIFICATIONS & OTHER


CERTIFIED BY: CONTRACT DOCUMENTS DULY SIGNED, STAMPED PROJECT TITTLE : SHEET CONTENT : OWNER : SHEET NO.:
OR SEALED AS INSTRUMENTS OF SERVICE, ARE
THE INTELLECTUAL PROPERTY & DOCUMENTS OF
THE ARCHITECT WHETHER THE OBJECT FOR

BLDGDESIGN - 4521 EDOLMO, CARLO PINEDA, MIGUEL LUIS


WHICH THEY ARE MADE IS EXECUTED OR NOT. IT
SHALL BE UNLAWFUL FOR ANY PERSON TO
AS SHOWN

S4
DUPLICATE OR TO MAKE COPIES OF SAID
ESPIRITU, JOHN PATRICK SANGALANG, JUSTINE
PROPOSED TWO STOREY RESIDENCE
DOCUMENTS FOR USE IN THE REPETITION OF &
FOR OTHER PROJECTS/BUILDINGS, WETHER

GROUP 5 - SKYSCRAPER LIWANAG JR., SHERWIN

REG. NO.: 0148677


VINO, TRISHA

DATE ISSUED: OCT 18, 2021


EXECUTED PARTLY OR IN WHOLE, WITHOUT THE
WRITTEN CONSENT OF THE ARCHITECT OR
AUTHOR OF SAID DOCUMENTS.
ALL ARCHITECTS SHALL INCORPORATE THIS
PROVISION IN ALL CONTRACT DOCUMENTS &
LOCATION : PALMERA HOMES, PAMPANGA

OTHER INSTRUMENTS OF SERVICE. APPROVED STRUCTURAL


P.T.R. NO.: PAM-0225250 PLACE: PAMPANGA ARCHITECT ACT OF 2004, R.A. 9266, SECTION 33
C C C

A B D E F G A B D E F G A B D E F G
1390 1520 2200 1390 1520 2200
1390 1520 2200

B1 B2 B1 B2
B1 B2

#10@175 C/C
6

#10@175 C/C
6 6 C27 C16 #10@175 C/C
C17 C27 C16 #10@175 C/C C17

300

B17

B23
#10@175 C/C

435
C27 C16 C17

B17

B23
#10@175 C/C
S1 S2
B17

B23
S1 S2 S1 435 S2

#10@175 C/C

#10@175 C/C
#10@175 C/C

#10@175 C/C

#10@175 C/C

#10@175 C/C
435 490
490 290 300
5

B19
5

B13
B19
B13
5
B19
B13

C13 C19 C13 C19


C13 C19 #10@175 C/C #10@175#10@175
#10@175
C/C #10@175
C/C
C/C C/C
#10@175 C/C

B16

B22
1320
B16

B22
C/C
(125THK) (125THK)

1320

#10@175 C/C
B16

B22 (125THK) (125THK)


1320

(125THK) (125THK)

#10@175 C/C
#10@175 C/C

#10@175#10@175
#10@175 C/C B3 B4

435
B3 B4

300
B3 B4
4 S4

C/C
4 S4 4 S4

C/C C/C
C5 490
C22 C21 C20 C5 C22 C21 C20

435
C5

B12

B21
C22 C21 C20 #10@175 C/C

B12

1100
B21
S5

#10@175
1100
B12

S5

B18
B21

490

B18
1100

435 #10@175
S5

#10@175 C/C
C/C
B5
B18

#10@175 C/C
435
B5 B5

#10@175

B15
3

B15
(125THK)

#10@175 C/C
3 C/C(125THK)
B15

3 (125THK) C26 C24

#10@175 C/C
#10@175#10@175 C/C
#10@175 C/C C26 #10@175 C/C C24

490
490
C26 C24

#10@175 C/C

B11

B20
#10@175 C/C

#10@175 C/C
(125THK)

1230
B11

B20
(125THK)

1230
B11

B20

(125THK)
1230

#10@175 C/C #10@175#10@175


C/C C/C
B6 B7 B8

490
435
B6 B7 B8 B6 B7 B8

#10@175 C/C
1 1 #10@175 C/C
1 C28 C3 C25
C28 C3 C25 #10@175 C/C C23

300
C28 C3 C23 C25 C23
S6 300 S6
S6

#10@175 C/C
#10@175 C/C

#10@175 C/C
300

B14
B10
2320
B14
B10
2320
B14
B10
2320

#10@175 C/C
#10@175 C/C
(125THK)

#10@175 C/C
(125THK) (125THK)
#10@175 C/C
B9 B9

300
B9
7 7 7 C10 C29
C10 C29 C10 C29

PLAN AT 2ND FLOOR LEVEL TOP REINFORCEMENT LAYOUT - 2ND FLOOR LEVEL BOTTOM REINFORCEMENT LAYOUT - 2ND FLOOR LEVEL
(SCALE: H = 1:100 / V = 1:100) (SCALE: H = 1:100 / V = 1:100)

BEAM LEGEND

SIZE
BEAM
B D

B1,B2,B3,B4,B5,B6,B7,B8,B9,B10,B11 250 400


B12,B13,B14,B15,B16,B17,B18,B19
B20,B21,B22,B23

DRAWINGS & SPECIFICATIONS & OTHER


CERTIFIED BY: CONTRACT DOCUMENTS DULY SIGNED, STAMPED PROJECT TITTLE : SHEET CONTENT : OWNER : SHEET NO.:
OR SEALED AS INSTRUMENTS OF SERVICE, ARE
THE INTELLECTUAL PROPERTY & DOCUMENTS OF
THE ARCHITECT WHETHER THE OBJECT FOR

BLDGDESIGN - 4521 EDOLMO, CARLO PINEDA, MIGUEL LUIS


WHICH THEY ARE MADE IS EXECUTED OR NOT. IT
SHALL BE UNLAWFUL FOR ANY PERSON TO
AS SHOWN

S5
DUPLICATE OR TO MAKE COPIES OF SAID
ESPIRITU, JOHN PATRICK SANGALANG, JUSTINE
PROPOSED TWO STOREY RESIDENCE
DOCUMENTS FOR USE IN THE REPETITION OF &
FOR OTHER PROJECTS/BUILDINGS, WETHER

GROUP 5 - SKYSCRAPER LIWANAG JR., SHERWIN

REG. NO.: 0148677


VINO, TRISHA

DATE ISSUED: OCT 18, 2021


EXECUTED PARTLY OR IN WHOLE, WITHOUT THE
WRITTEN CONSENT OF THE ARCHITECT OR
AUTHOR OF SAID DOCUMENTS.
ALL ARCHITECTS SHALL INCORPORATE THIS
PROVISION IN ALL CONTRACT DOCUMENTS &
LOCATION : PALMERA HOMES, PAMPANGA

OTHER INSTRUMENTS OF SERVICE. APPROVED STRUCTURAL


P.T.R. NO.: PAM-0225250 PLACE: PAMPANGA ARCHITECT ACT OF 2004, R.A. 9266, SECTION 33
PLUMBING LEGEND :

WC WATER CLOSET SV SEPTIC VAULT


LAV LAVATORY DC DIGESTIVE CHAMBER
FD FLOOR DRAIN LC LEACHING CHAMBER
SD SHOWER DRAIN PVC POLY VINYL CHLORIDE
URI URINAL PPR POLYPROPYLENE
CO CLEANOUT WC WATER CLOSET
KS KITCHEN SINK SHO SHOWER
SP SOIL PIPE FAU FAUCET
DP DRAIN PIPE HB HOSEBIB
SS SOIL STACK BD BIDET
VSTR VENT STACK THRU ROOF WM WATER METER
WATERLINE TO
SECOND FLOOR WATERLINE TO RD ROOF DRAIN CV CHECK VALVE
GV SECOND FLOOR

GV LAV SHO CB CATCH BASIN GV GATE VALVE


SHO WC

WC LAV
GENERAL PLUMBING NOTES :

GV 1. ALL PLUMBING WORKS SHALL BE DONE IN ACCORDANCE WITH THE LATEST EDITION OF THE
NATIONAL PLUMBING CODE OF THE PHILIPPINES AND LOCAL REGULATIONS AND ORDINANCES.

SHO 2. THE PLUMBING CONTRACTOR SHALL LOCATE AND DETERMINE THE ACTUAL LOCATIONS OF
EXISTING SANITARY FACILITIES TO CONFIRM WITH THE PROPOSED DESIGN.
LAV
3. ALL PIPES SHALL BE INSTALLED AS INDICATED IN THE WORKING DRAWINGS. ANY
WC
RELOCATION REQUIRED FOR PROPER EXECUTION OF OTHER TRADES SHALL BE UPON THE APPROVAL
OF THE SANITARY ENGINEER.

4. ALL PIPES PASSING THROUGH WALLS BE PROVIDED WITH SLEEVES. ANGULAR SPACE
BETWEEN PIPE AND SLEEVE SHALL BE FILED WITH COAL TAR, ASPHALTIC COMPOUND OR ANY
OTHER MATERIAL FOUND EQUALLY APPROVED.

5. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DIMENSIONS.


KS
GV
6. PROVIDE CONTROL VALVE FOR EACH GROUP OF FIXTURES.

7. UNLESS OTHERWISE SPECIFIED, ALL PLUMBING FIXTURES SHALL BE PROPERLY VENTED,


MAXIMUM DISTANCE OF VENTILATION FROM FIXTURE SHALL BE 1.50METERS MEASURED ALONG
THE LENGTH OF PIPE.

8. ALL HORIZONTAL WASTE PIPING (75ØMM) AND SMALLER SHALL BE LAID WITH A MINIMUM
SLOPE OF (2%) PERCENT AND 100mm AND LARGER PIPES SHALL HAVE ONE PERCENT (1%) SLOPE.

9. ALL FIXTURES OR GROUP OF FIXTURES SHALL BE EQUIPPED WITH INDIVIDUAL AIR CHAMBER.

10. SWEEP QUARTER BEND. ONE EIGHT BENDS WHEN THE CHANGE OF FLOW IS FROM
HORIZONTAL TO VERTICAL A SINGLE ONE EIGHT BEND COMBINATION MAY BE USED ONLY ON VENT
PIPE.
CV

WM M 11. NO DOUBLE HUB OR DOUBLE TEE BRANCH SHALL BE USED ON HORIZONTAL SOIL OR WASTE
GV LINES.

FROM EXISTING 12. PROVIDE PIPE SLEEVES AT WALL, COLUMNS OR SLAB ONE SIZE BIGGER THAN THE ACTUAL
WATER SOURCE LINES PASSING THROUGH WALL COLUMN OR SLAB TO PROTECT FROM BREAKAGE.

13. CLEANOUTS ARE REQURIED UNDER THE FOLLOWING CONDITIONS :


A. EVERY CHANGES IN HORIZONTAL DIRECTION
B. EVERY 15.00M IN HORIZONTAL LINE OF PIPE
C. AT THE END OF ANY HORIZONTAL PIPE LINE

14. ENGINEER-IN-CHARGE TO VERIFY ACTUAL LOCATION AND ELEVATION OF STREET DRAINAGE


AND STREET WATER MAINS FOR CONNECTION BEFORE CONSTRUCTION.
1 GROUND FLOOR WATERLINE LAYOUT 2 SECOND FLOOR WATERLINE LAYOUT 15. PROVIDE GRAVEL BEDDING FOR CATCH BASIN AND TRENCH BOTTOM SLAB, AND SAND
P 1 SCALE 1:100M P 1 SCALE 1:100M BACKFILL FOR ALL PVC PIPE AND CONCRETE PIPES FOR STORM AND SEWERAGE PIPES: REFER TO
DETAILS OF BEDDING AND BACKFILLING.

DRAWINGS & SPECIFICATIONS & OTHER


CERTIFIED BY: CONTRACT DOCUMENTS DULY SIGNED, STAMPED PROJECT TITTLE : SHEET CONTENT : OWNER : SHEET NO.:
OR SEALED AS INSTRUMENTS OF SERVICE, ARE
THE INTELLECTUAL PROPERTY & DOCUMENTS OF

BLDGDESIGN-4521
THE ARCHITECT WHETHER THE OBJECT FOR
WHICH THEY ARE MADE IS EXECUTED OR NOT. IT WATERLINE LAYOUT
EDOLMO, CARLO PINEDA, MIGUEL LUIS SHALL BE UNLAWFUL FOR ANY PERSON TO

P1
DUPLICATE OR TO MAKE COPIES OF SAID
ESPIRITU, JOHN PATRICK SANGALANG, JUSTINE SEWERLINE LAYOUT
PROPOSED TWO STOREY RESIDENCE
DOCUMENTS FOR USE IN THE REPETITION OF &
FOR OTHER PROJECTS/BUILDINGS, WETHER

GROUP 5-SKYSCRAPER LIWANAG JR., SHERWIN

REG. NO.: -
VINO, TRISHA

DATE ISSUED: SEPT 06, 2021


EXECUTED PARTLY OR IN WHOLE, WITHOUT THE
WRITTEN CONSENT OF THE ARCHITECT OR
AUTHOR OF SAID DOCUMENTS.
ALL ARCHITECTS SHALL INCORPORATE THIS
PROVISION IN ALL CONTRACT DOCUMENTS &
LOCATION : PAMPANGA
ISOMETRIC OF WATERLINE LAYOUT
ISOMETRIC OF SEWERLINE LAYOUT
OTHER INSTRUMENTS OF SERVICE. APPROVED PLUMBING
P.T.R. NO.: - PLACE: - PAMPANGA ARCHITECT ACT OF 2004, R.A. 9266, SECTION 33
4.90
1.80 1.80 1.30
O R
ET O
IN LO
RL F
TE OND
WAEC
S
5"CHB WALL WITH 10MMØ
VERTICAL & HORIZONTAL
BARS @ 600MM & 800MM
RESPECTIVELY
CO CO

4"CHB WALL
V
LA

1.70
O
GV SH
WC
100MMØ PVC
PIPE INLET MANHOLE MANHOLE MANHOLE
CO
125MM THICK REINFORCED
CONCRETE SLAB WITH12MMØ 100MMØ PVC
PIPE OUTLET
REINFORCED BAR @ 200MM
ON CENTER BOTHWAYS

G
CV IN CE SEPTIC VAULT PLAN DETAILS
IST UR
M
WM
GV
EX SO
OM ER
FRWAT
KS
GV

500 x 500MM MANHOLE


COVER WITH 12MM 4.90
1.80 1.80 1.30
HANDLE BARS
MANHOLE CO

A I R S P A C E A I R S P A C E
INLET WATER LEVEL WATER LEVEL

1 GROUND FLOOR ISOMETRIC OF WATERLINE LAYOUT 5"CHB WALL WITH 10MMØ


VERTICAL & HORIZONTAL
BARS @ 600MM & 800MM OUTLET
P 2 SCALE 1:100M RESPECTIVELY
DIGESTIVE CHAMBER DIGESTIVE CHAMBER LEACHING

4"CHB WALL

4"CHB WALL

1.7O
10MMØ TEMPERATURE WELL
BARS @ 400MM ON
CENTER BOTHWAYS ON
100MM THICK SLAB

3-10MMØ CONTINUOUS GRAVEL


BARS WITH 10MMØ TIES
@ 250MM ON CENTER
O R
E TOO
LIN FL
ER D
AT CON
WS E
SEPTIC VAULT SECTION DETAILS

GV

SH
O CONCRETE WALL

WC LA
V VENT PIPE (SEE WATER CLOSET CONCRETE WALL
PLANS FOR COLD WATER
CONTINUATION SUPPLY (SEE WATER CLOSET
AND PIPE SIZE) PLANS FOR
COLD WATER CONTINUATION
SUPPLY (SEE AND PIPE SIZE)
FINISHED FLOOR LINE
GV PLANS FOR
O V
SH LA
CONTINUATION
WC
AND PIPE SIZE) VENT PIPE (SEE
PIPE SLEEVE (TYP)
PLANS FOR
100 (SEE PLANS FOR
CONTINUATION (SEE PLANS FOR
50MM Ø VENT PIPE CONTINUATION
AND PIPE SIZE) CONTINUATION
AND PIPE SIZE)
SECTION PLAN AND PIPE SIZE)

SECOND FLOOR ISOMETRIC OF WATERLINE LAYOUT


2
P 2 SCALE 1:100M
DRAWINGS & SPECIFICATIONS & OTHER
CERTIFIED BY: CONTRACT DOCUMENTS DULY SIGNED, STAMPED PROJECT TITTLE : SHEET CONTENT : OWNER : SHEET NO.:
OR SEALED AS INSTRUMENTS OF SERVICE, ARE
THE INTELLECTUAL PROPERTY & DOCUMENTS OF

BLDGDESIGN-4521
THE ARCHITECT WHETHER THE OBJECT FOR
WHICH THEY ARE MADE IS EXECUTED OR NOT. IT WATERLINE LAYOUT
EDOLMO, CARLO PINEDA, MIGUEL LUIS SHALL BE UNLAWFUL FOR ANY PERSON TO

P2
DUPLICATE OR TO MAKE COPIES OF SAID
ESPIRITU, JOHN PATRICK SANGALANG, JUSTINE SEWERLINE LAYOUT
PROPOSED TWO STOREY RESIDENCE
DOCUMENTS FOR USE IN THE REPETITION OF &
FOR OTHER PROJECTS/BUILDINGS, WETHER

GROUP 5-SKYSCRAPER LIWANAG JR., SHERWIN

REG. NO.: -
VINO, TRISHA

DATE ISSUED: SEPT 06, 2021


EXECUTED PARTLY OR IN WHOLE, WITHOUT THE
WRITTEN CONSENT OF THE ARCHITECT OR
AUTHOR OF SAID DOCUMENTS.
ALL ARCHITECTS SHALL INCORPORATE THIS
PROVISION IN ALL CONTRACT DOCUMENTS &
LOCATION : PAMPANGA
ISOMETRIC OF WATERLINE LAYOUT
ISOMETRIC OF SEWERLINE LAYOUT
OTHER INSTRUMENTS OF SERVICE. APPROVED PLUMBING
P.T.R. NO.: - PLACE: - PAMPANGA ARCHITECT ACT OF 2004, R.A. 9266, SECTION 33
50mm Ø WASTE STACK PIPE

F
ROOIN
CO
SHO
50mm Ø WASTE STACK PIPE CB
GV 100mm Ø WASTE STACK PIPE 50mm Ø WASTE STACK PIPE
DRA
LAV
CB WATERLINE TO
SD SECOND FLOOR
SHO GV

75mm Ø WASTE STACK PIPE


100mm Ø WASTE STACK PIPE

75MM Ø DOWNSPOUT
WC WC SD
SV VSTR
75mm Ø WASTE STACK PIPE

100MM Ø PVC SOIL STACK


VSTR
LAV

F
ROOIN
DRA
GV

63MM Ø VSTR
75MM Ø DOWNSPOUT
SHO CB
IPE
C KP
SD STA
CB WA
STE
Ø
IP E mm
CO50
LAV C KP V IPE
TA O
LA
KP
ES SH AC
ST CB
ST
GV SD STE
WC WA WC Ø
WA
Ø mm
mm 75STR
50
V
VSTR

50mm Ø WASTE STACK PIPE


75mm Ø WASTE STACK PIPE
CO
50mm Ø WASTE STACK PIPE

CB CB
KS
GV
SV
CO

R
WE
CB 50
mm KS SE
IC
CB Ø GV CO BL
PU
WA
CB STE
STA TO
CK
PIP
EB
C

CB

2 SECOND FLOOR ISOMETRIC OF SEWERLINE LAYOUT BL


IC
SE
WE

PU
TO
P 3 SCALE 1:100M

3 GROUND FLOOR ISOMETRIC OF SEWERLINE LAYOUT


P 3 SCALE 1:100M
TO PUBLIC SEWER
TO PUBLIC SEWER
1 GROUND FLOOR OF SEWERLINE LAYOUT
P 3 SCALE 1:100M

O R
ET O
IN LO
RL F
TE ND
63MM Ø VSTR

EWA ECO
PIP S
CK
STA
TE
WAS
Ø
mm
50

GV
O
SH
SD

E WC V
PIP LA
75
CK mm
ST
R
STA ØV
63MM Ø VSTR

STE WA
WA STE
Ø STA
m CK
0m
10 PIP
E
10
0m
m
Ø
WA
STE
STA
CK V E
PIP G PIP
E SH
O
V CK
SD LA STA
STE
WA
WC TR Ø
VSmm
75
50
mmCO
Ø
WA
STE
STA
CK
PIP
E

4 SECOND FLOOR ISOMETRIC OF SEWERLINE LAYOUT


P 3 SCALE 1:100M

DRAWINGS & SPECIFICATIONS & OTHER


CERTIFIED BY: CONTRACT DOCUMENTS DULY SIGNED, STAMPED PROJECT TITTLE : SHEET CONTENT : OWNER : SHEET NO.:
OR SEALED AS INSTRUMENTS OF SERVICE, ARE
THE INTELLECTUAL PROPERTY & DOCUMENTS OF

BLDGDESIGN-4521
THE ARCHITECT WHETHER THE OBJECT FOR
WHICH THEY ARE MADE IS EXECUTED OR NOT. IT WATERLINE LAYOUT
EDOLMO, CARLO PINEDA, MIGUEL LUIS SHALL BE UNLAWFUL FOR ANY PERSON TO

P3
DUPLICATE OR TO MAKE COPIES OF SAID
ESPIRITU, JOHN PATRICK SANGALANG, JUSTINE SEWERLINE LAYOUT
PROPOSED TWO STOREY RESIDENCE
DOCUMENTS FOR USE IN THE REPETITION OF &
FOR OTHER PROJECTS/BUILDINGS, WETHER

GROUP 5-SKYSCRAPER LIWANAG JR., SHERWIN

REG. NO.: -
VINO, TRISHA

DATE ISSUED: SEPT 06, 2021


EXECUTED PARTLY OR IN WHOLE, WITHOUT THE
WRITTEN CONSENT OF THE ARCHITECT OR
AUTHOR OF SAID DOCUMENTS.
ALL ARCHITECTS SHALL INCORPORATE THIS
PROVISION IN ALL CONTRACT DOCUMENTS &
LOCATION : PAMPANGA
ISOMETRIC OF WATERLINE LAYOUT
ISOMETRIC OF SEWERLINE LAYOUT
OTHER INSTRUMENTS OF SERVICE. PLUMBING
P.T.R. NO.: - PLACE: - PAMPANGA ARCHITECT ACT OF 2004, R.A. 9266, SECTION 33
PB PB PB
PB
S1 ONE GANG SWITCH WEATHER PROOF OUTLET 6 3 11
WP 2
S2 TWO GANG SWITCH RANGE
RANGE OUTLET

ACU

ACU
S3 THREE GANG SWITCH CENTER LIGHT FIXTURES

DUPLEX CONVENIENCE OUTLET PENDANT LIGHT GUEST


ROOM
REF REFRIGERATOR OUTLET PB VIEWING BEDROOM 2
POWER PANELBOARD ENCLOSED CIRCUIT
ROOM
BREAKER 9 ACU

GCFI
GROUND FAULT CIRCUIT INTERUPTER OUTLET

1 LEGEND NOOK
GUEST
ROOM
ACU
PB
7

E 1 BEDROOM 1
ACU
PB
10
SERVICE
ENTRANCE
240V, 2P,
60HZ PB
12 REF

EYEBOLT

CONCRETE PEDESTAL
MDP DINING

2 -38mm² THW.
LP AREA

LIVING
PB
8
ACU
MASTERS
BEDROOM FAMILY
HALL
1 -1/4"mm² TW AREA
AREA PB
11/2" @ ø RSC CONDUIT PIPE ACU
5
KITCHEN
PB
1
KHM
TEL TV
5-6ft HEIGHT
PB
13
BALCONY
WITH GI WIRE

PB
4

1
E 1

LP/PP
CIRCUIT #1
1 2 CIRCUIT #2 2 GROUND FLOOR POWER LAYOUT 3 SECOND FLOOR POWER LAYOUT
E 1 SCALE 1:100M E 1 SCALE 1:100M
20 A 20 A PB
14
240 V, 1O CIRCUIT #3 CIRCUIT #4
3 WIRE BY LOCAL POWER CO. 3 4
20 A 20 A
CIRCUIT #5 CIRCUIT #6
5 6 BEDROOM 2

30 A 30 A Sq Slm
Sm Sno
CIRCUIT #7 CIRCUIT #8
7 8
KWH 30 A 30 A VIEWING
ROOM
Skl
GUEST
CIRCUIT #9 CIRCUIT #10
9 10 Sno ROOM
30 A 30 A NOOK Sj

CIRCUIT #11 CIRCUIT #12


11 12 Sk
Sij
BEDROOM 1
30 A 30 A Sfgh
Si
CIRCUIT #13 CIRCUIT #14 Sh
13 14 Sabc

20A 20 A
CIRCUIT #15 CIRCUIT #16
15 16 DINING
Sfg

20A 20 A AREA
S1(6)
MASTERS
BEDROOM
MCB LIVING
AREA
AREA
FAMILY
HALL
100 AT SN KITCHEN

Se Sd
Scde
Sb Sa
G ECB

BALCONY

6 PANEL BOARD DESIGN PB


15
E 1

4 GROUND FLOOR LIGHTING LAYOUT 5 SECOND FLOOR LIGHTING LAYOUT


E 1 SCALE 1:100M E 1 SCALE 1:100M

DRAWINGS & SPECIFICATIONS & OTHER


CERTIFIED BY: CONTRACT DOCUMENTS DULY SIGNED, STAMPED PROJECT TITTLE : SHEET CONTENT : OWNER : SHEET NO.:
OR SEALED AS INSTRUMENTS OF SERVICE, ARE
THE INTELLECTUAL PROPERTY & DOCUMENTS OF
THE ARCHITECT WHETHER THE OBJECT FOR

BLDGDESIGN-4521 EDOLMO, CARLO PINEDA, MIGUEL LUIS


WHICH THEY ARE MADE IS EXECUTED OR NOT. IT
SHALL BE UNLAWFUL FOR ANY PERSON TO
GENERAL NOTES

E1
DUPLICATE OR TO MAKE COPIES OF SAID
ESPIRITU, JOHN PATRICK SANGALANG, JUSTINE DOCUMENTS FOR USE IN THE REPETITION OF & GROUND FLOOR POWER LAYOUT
FOR OTHER PROJECTS/BUILDINGS, WETHER
PROPOSED TWO STOREY RESIDENCE
GROUP 5-SKYSCRAPER LIWANAG JR., SHERWIN

REG. NO.: -
VINO, TRISHA

DATE ISSUED: SEPT 06, 2021


EXECUTED PARTLY OR IN WHOLE, WITHOUT THE
WRITTEN CONSENT OF THE ARCHITECT OR
AUTHOR OF SAID DOCUMENTS.
ALL ARCHITECTS SHALL INCORPORATE THIS
PROVISION IN ALL CONTRACT DOCUMENTS &
LOCATION : PAMPANGA
SECOND FLOOR POWER LAYOUT
GROUND FLOOR LIGHTING LAYOUT
OTHER INSTRUMENTS OF SERVICE. APPROVED ARCHITECTURAL
P.T.R. NO.: - PLACE: - PAMPANGA ARCHITECT ACT OF 2004, R.A. 9266, SECTION 33 SECOND FLOOR LIGHTING LAYOUT