Plan at 15.4 M

This document provides reinforcement details for slabs and beams at elevation 15.4 meters. It includes schedules for bottom and top reinforcement of slabs S1 and S2, with #10 rebar spaced at 150mm along spans and supports. Beam reinforcements B1 through B8 are also specified with #10 rebar at 150mm spacing.

Uploaded by

Jersey Perlas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views4 pages

Plan at 15.4 M

This document provides reinforcement details for slabs and beams at elevation 15.4 meters. It includes schedules for bottom and top reinforcement of slabs S1 and S2, with #10 rebar spaced at 150mm along spans and supports. Beam reinforcements B1 through B8 are also specified with #10 rebar at 150mm spacing.

Uploaded by

Jersey Perlas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

1 2 3 4 5 6 7 8

2000 3000 6000 3000 6000 3000 2000

A
5000

B
3000

B1 B2
C
C18 C19 C22 C23

S1 S2
4000

B5

B6

B7

B8
B3 B4
D
C26 C27 C30 C31
3000

E
5000

PLAN AT 15.4 M
SLAB SCHEDULE (C28 : FY276) (LEVEL : 15.4 M)
BOTTOM REINFORCEMENT TOP REINFORCEMENT

SLAB SLAB ALONG SHORT SPAN ALONG LONG SPAN OVER LONG SUPPORT OVER SHORT SUPPORT REMARKS
MARKED THICKNESS DISTRIBUTION
FULL LENGTH CURTAILED FULL LENGTH CURTAILED CONTINUOUS END CONTINUOUS END
SUPPORT SUPPORT SUPPORT SUPPORT
S1, S2 100 #10 @ 150 C/C --- #10 @ 150 C/C --- --- #10 @ 150 C/C --- #10 @ 150 C/C #10 @ 150 C/C ---
1 2 3 4 5 6 7 8
2000 3000 6000 3000 6000 3000 2000

A
5000

B
3000

B1 B2
#10@150 C/C

#10@150 C/C
C
650

650
#10@150 C/C
C18 C19 #10@150 C/C
C22 C23

650 650 650 650


#10@150 C/C

#10@150 C/C

#10@150 C/C

#10@150 C/C
S1 S2
4000

B5

B6

B7

B8
#10@150 (100THK)
C/C #10@150 C/C #10@150 (100THK)
C/C #10@150 C/C
#10@150 C/C

#10@150 C/C
#10@150 C/C #10@150 C/C
650

650
B3 B4
D
C26 C27 C30 C31
3000

E
5000

TOP REINFORCEMENT LAYOUT - 15.4 M


1 2 3 4 5 6 7 8
2000 3000 6000 3000 6000 3000 2000

A
5000

B
3000

B1 B2
C
C18 C19 C22 C23
#10@150 C/C #10@150 C/C
#10@150 C/C

#10@150 C/C
S1 S2
4000

B5

B6

B7

B8
(100THK) (100THK)

B3 B4
D
C26 C27 C30 C31
3000

E
5000

BOTTOM REINFORCEMENT LAYOUT - 15.4 M