MANUAL - PUZeN e - EN - 170202
MANUAL - PUZeN e - EN - 170202
MODEL
PZEU Series
PZEC Series
PZEM Series
PZEH Series
Please read your instruction manual carefully as it provides instructions on safe installation, use, and
maintenance. The appearance and specifications may be changed without notice to raise the unit’s
quality.
Homepage ☞ http://www.wilo.co.kr
Contents
Contents
0 Contents -------------------------------------------------- 2
1 Introduction ---------------------------------------------- 3
3 Application ------------------------------------------------ 3
4 Specification ---------------------------------------------- 3
8 Installation ------------------------------------------------ 6
10 Operation -------------------------------------------------- 12
11 Maintenance ----------------------------------------------- 13
2
Introduction
▶These instructions for use contain information on PUZeN e booster system.
Before using your booster system, you should read and understand the entire instructions.
Make special note of all danger, warning and caution statements. Keep the instructions for using
as a reference.
▶ If not observing these operating instructions, a serious injury or a death could happen
by electric hazard. Also, install spare products at the special place where serious damages
could be happened by no water supply caused by product troubles.
▶ Don’t use except the normal purpose and installing conditions. If not, It could cause
troubles or accidents. In that case, customers could have responsibility about that.
Characteristics of product
▶ Applying to new technology in booster system.
▶ Optimum structure through the Controller module.
▶ Minimize pressure fluctuations through multi FC
▶ Offering RS-485 Modbus communication port.
▶ Automatically distribute load to each pump.
▶ 7” full color touch screen as standard.
▶ Can control max. 6pumps
Application
▶ Pressurized water supply and pressure boosting in residential, commercial and
public buildings, hotels, hospitals, department stores and for industrial and process engineering.
Specification
Refer to the name plate about capacity, pressure head, voltage, power of a booster system.
Standard specification are as follows. (Some specifications could be changed by option)
▶ Product classification PUZeNe Series : Inverter control system
※ Power source could be changed as each product. Therefore, must check the name plate surely. 3
Safety precautions (Make sure to read & follow carefully.)
These instructions contain basic references which must be strictly adhered to. It is imperative
for the installer and the operator to carefully read these instructions prior to installation and
commissioning. Please observe the safety directions under the main heading and following those.
The following safety marks explain the grades of human and property damage when users ignore
the instructions.
2. Personnel qualification
The personnel installing the pump must have the appropriate qualification for this work.
Failure to observe the safety indications can endanger persons and the installation.
Failure to abide by the safety indications will nullify your right to any claims for compensation.
In particular, failure to observe these indications can create the following dangers:
Local regulations for the prevention of accidents must be observed. Dangers resulting from
electrical energy are to be prevented national/local energy supply company regulations must
be observed.
The operator must ensure that all inspection and assembly is carried out by authorized and
qualified specialist staff who have studied the operating instructions in detail.
In principle, work may only be carried out on the installation when it is at rest.
Changes to the pump/installation may only be made in agreement with the manufacturer. The
use of original spare parts and accessories authorized by the manufacturer will ensure safety.
The use of any other parts may invalidate claims invoking the liability of the manufacturer for
any consequence.
Transport of the unit requires proper preparation and handling. Always make sure that
the pumps and unit remain in horizontal position during transport and cannot slip out
Warning of the transport suspension arrangement. If the pump/unit slip out of the suspension
arrangement, It may cause personnel injury and damage to property!
Components of product
Fig. 1
5
Installation
Check whether products are complete or not!
■ Ascertain the same product as you’ve ordered by a name plate and perhaps,
if any, damage on delivery.
■ Ascertain all components of pumps are complete. (refer to “components of products”)
A booster system is used with a pressure tank which has proper capacity and is
connected to the discharge manifold. Especially, the step control type must use
Warning a pressure tank, unless, it could cause failures by severe pressure fluctuation
and frequently repetition of the start and stop.
1. Install location
- A booster system is for the indoor, nevertheless, if installed outdoor, make devices to avoid
rain, wind and damage by freezing.
- The suction of a pump should be pressurized. (recommended suction pressure : 0.2㎏f/㎠)
- Don’t put the hands or foreign matter such as stick. Serious personal injury and property
damage may result.
Water level of a reservoir always keep higher than the top of a pump’s suction for
avoiding dry operation. Keep over recommended suction pressure at the suction
Caution of a pump. Especially, must vent air after cleaning a reservoir entirely! And
fluctuation of the suction pressure should be below 1.0㎏f/㎠
- Install where to be without direct sun light, dirty & humidity and corrosive and inflammable gas
whereas, to have good ventilation. (Admitted surrounding temperature is 0 ~ 40℃.)
- Install where easily to repair and check. Make booster system handled by a qualified personnel.
- Install where is close to water source and the length of a suction pipe should be short.
- If there is a possibility to be frozen to burst, Use complementary goods for avoiding freezing.
Electric Wiring should be performed by electrician having a license. In order to prevent electric shock,
the breaker against electric leakage and the grounding should be installed.
- Electric wiring about the main parts should be completed on installation site for avoiding damage
during the transport.
- The main (R.S.T) and earth (E) should be wired in accordance with the wiring diagram inside of
the control unit.
- When moving and installing the panel, bring each sensor with it to prevent extension electrical
wire. And don’t wire together power and sensor wiring(More than 10cm)
- Don’t connect the earth wire with gas pipes, or it could be the cause of an explosion. 6
Installation
- Please check the following items
① Is a breaker for the electric leakage proper?
② Is the electric wiring proper? (about the connecting state and the diameter of lines)
③ Notice that three terminals of a motor should be firmly assembled.
- Please check the rotating direction of a pump! The direction is marked on a motor fan cover
or a pump. Don’t run the pump reversely.
- Don’t allow the power wires to come into contact with piping, pumps and motors.
- The power source should be in accordance with the name plate.
4. Dry running protector
Booster system may occur fatal damage in driving without water.
Dry running protector is equipped to avoid pump’s dry running.
On the improper suction condition, a electrode bar could work abnormally.
Before installing, please check whether the suction condition is proper or not!
Electrode bar
Caution If abnormal noise happen at the suction, stop the system, and after improving
the suction condition, operate a system again.
Don’t use the system at the place where air is apt to be suctioned with water.
If not, the components for rotating are apt to be broken.
7
Installation
8
Installation
Don’t ramify pump’s terminal for power supply to use another purpose for it.
That is the reason for system fault.
Don’t come metallic foreign substance into internal control panel during the
electric wiring.
Don’t exceed ±10% of working voltage.
Based on 2pumps
9
Operating principle
1. Single Inverter operating mode, PZEU Series
Pressure
Adjustable stop pressure(p- Stop)
Capacity
<Operation condition>
② If the capacity is continuously increasing, FC pump will be operating to max. speed. When the
FC pump reach max. speed, constant speed pump is operating in a row.
10
Operating principle
2. Combi Inverter operating mode, PZEC Series
4-Pumps, 2-FC
Capacity
<Operation condition>
② If the capacity is continuously increasing, FC pump will be operating to max. speed, and second
FC pump will drive. It becomes main pump.
⑤ If the capacity is decreasing continuously, main FC pump stops driving and the next FC pump is
set as the main pump and then operate.
11
Operating principle
3. Multi Inverter operating mode, PZEM Series
Stop 1 Variable speed pump 2 Variable speed pumps …………….. 6 Variable speed pumps
4 FC pumps
Capacity
<Operation condition>
② If the capacity is continuously increasing, Initial FC pump will be operating to max. speed.
When the FC pump reach max. speed, second FC pump will operate. It will be main FC pump.
③ If the capacity is continuously increasing, Second FC pump will be operating to max. speed.
When the FC pump reach max. speed, third FC pump will operate. It will be main FC pump.
④ If the capacity is decreasing, third FC pump is stopped and second FC pump will shift to main
pump.
⑤ If the capacity is decreasing, the main FC pump is stopped. The other FC pumps will shift to
main pump. Main FC pump is maintaining the set pressure.
Stop 1 Constant speed pump 2 Constant speed pumps …………….. 6 Constant speed pumps
3 pumps
Main pump
Pressure Stop pressure
Stop pressure for
step control
On
pressure
Capacity
-q0~q1: one pump is operation/stop repeatedly.
-q1~q2: one pump is operation continuously.
-q2~q3: one or two pumps are operation among the whole pumps.
-q3~q4: two pumps are continuously operating.
-q4~q5: two or three pumps are operation among the whole pumps.
-q5~q6: three pumps are continuously operating.
<Operation condition>
⑤ If there is no capacity, last operating pump will raise set pressure and stop.
13
Operation
Close the door of a control unit on operating for avoiding electric accidents
by high voltage and hazards caused by the leakage of pumps and pipes.
Besides, electric appliances around a system should be treated in the same
Warning
way.
Care not to block the motor ventilator with unexpected materials before
operating. It could cause a fire, damages of a product.
Caution Please Re-drive after turning off all lamps when stopping booster
system.
1. Initial operating order
Air vent
valve
Ready to ① Check a main power breaker and a protector capacity.
operate ② Check the cable square of main power.
③ Check a main power voltage.
④ Check connecting state of pipes and wires.
⑤ Check water level in a suction reservoir. Fig 6. Air vent valve
At each pump, close a isolating valve in the suction and release a air vent valve(Fig
6.) and slowly open a isolating valve in the suction. Water and air come out together.
Air vent
If air vents sufficiently, fasten the plug again and open the isolating valve
completely.(The operation with a isolating valve close could cause dry operation and
troubles.)
Check the rotating direction of a pump as operating each pump in a short term
Check the
rotating by pump operating switch(page19,6) placed “Manual”. the rotating direction of a
direction pump is marked on the motor fan cover or the pump. If the direction is reverse,
change two of pump power lines (R.S.T).
If you separate panel and motor’s wiring, CONNET it in same order as before
separation. Otherwise, it will be cause of fault about different direction of
Caution rotation FC and direct operation.
If pump operating switch(page19,6) is placed “Auto” and touching “Auto” icon on the
Automatic
7” touch screen display, the system is operated in accordance with operating data.
operating
Please, check operating state and whether it work normally or not.
At initial operation, Must vent the air which stayed inside pipes or pumps as
opening an air vent plug.
If air does not vent sufficiently, even if opening a tap, water could not come out.
On operating, check whether pressure, vibration, and noise are normal or not.
14
Maintenance
When repairing or checking the system, must cut off all powers and make
pumps stop for the safety. On automatically operating, there is the hazard
Warning that the system could be operated unexpectedly.
When flooded the product, there is concern about electric shock. You must drive after
repairing and safety checking trough WILO service center.
1. General check
- In case that on-pressure, off-pressure, electric current and noise are higher than normal value,
refer to 『trouble - shooting』.
- If a mechanical seal is normal, there is almost not leakage.
If the leakage is too much, replace it with new one.
- Check up the leakage and the damage of pipes.
Adjusting of the on-pressure only in case that the discharge pressure is too high or low
In the winter, when not using for long time to avoid being frozen to burst, use thermal insulations
for pipes and manifolds or drain water from pumps and manifolds through plugs.
On checking up the pressure tank, if the pre-loading pressure of a tank is too low, charge air
as the following way. After completely draining the water in the tank, open the cap on the top of
a tank and charge air with a air compressor. Be careful not to charge the oil, which is mixed with air,
to the pressure tank. If the pre-loading pressure is too low, the pressure tank does not normally
work. Oppositely, if the pre-loading pressure is higher than the on-pressure, the on/off of the pump
is too much repeated. in that case, vent air as pressing a part popped out in the center of a air valve.
Cap
Valve stopper
Air valve
Don’t arbitrarily change the structure and installation except the operating data.
The personnel checking the control unit must have the appropriate qualifications.
Must turn off the main power before the inspection or the maintenance of a control unit.
- Carefully check up the following items periodically.
① The cooling state of a inverter.
② The overheat, the abnormal smell, the color deformation of a part in a control box.
③ The state of wiring.
④ The vibration and the noise.
- Never do a insulation test nor a withstand voltage test. It could breakdown the semiconductors
in the control unit.
- The static electricity that is occurred by touching, damages the electric circuit. Therefore, must
handle the circuit board with care.
- In a inverter type, even after the main power has already been off, it takes 3~4 minutes to
completely discharge a inverter. Therefore, wait until the inverter is completely discharged.
- After turning off the power, check the rust of bolts and nuts. Tighten loosened screws and nuts.
- In case of a inverter type, when there is a foreign matter by the cooling fan of a inverter, cooling
capacity becomes down. Therefore, removes it, after turning off the main power and completely
discharging the inverter.
- Check up the rotating troubles of cooling fans, the troubles of magnetic contactors, the abnormal
noise, and if there is any trouble, replace it with new one.
6. The replacement time of major components
The expected life of each component is calculated on the normal operating condition. Replace
the component by the following criteria.
Classification Component Life time Criterion of replacement
Mechanical seal 1year Excessive leakage
Pump &
O-ring and gasket Each time Whenever disassembling
motor
Motor bearing 3years Abnormal noise or severs noise
• When disposing a printed circuit board or electric components, observe the relevant law!
• Our product include a printed circuit board. Don’t dispose it at a common garbage can!
16
Trouble-shooting
1. General faults
Even if all tape are closed, • Off-pressure is high. • Reset the off-pressure.
pump don’t stop. • Trouble in a pressure transmitter. • Replace.
• The operation mode is “Manual” • Change the operation mode to
“AUTO”.
• Trouble in a control unit. • Repair or replace.
• Leakage in pipes. • Repair or replace.
• The performance of pump is low. • Repair or replace.
The MCCB in a control unit • Short of wiring between pump • Repair or replace.
is tripped. and power.
• A circuit wiring short or a • Repair or replace.
damaged breaker
• Short of power line. • Repair or replace.
Pressure fluctuation • Inflow air because a suction pipe • Reduce the pipe’s length & enlarge
is severe. is too long or the diameter is too the diameter of pipes.
small.
• Operating without a pressure • Check pre-loading pressure of a tank
tank or the pre-loading pressure and adjust it.
is incorrect.
• Electric valve works or shifts on • Install a pressure reducing valve and
water demand is severely large. enlarge capacity of a pressure tank.
17
Operating Instructions of Control Panel
Construction of control panel
5 PCU+G22 1 Controller
19
Safety rules
1. General
Installation and commissioning by trained and qualified personal only!
2. Safety
These instructions contain important information which must be followed when installing
and operating. These operating instructions must therefore be read before assembly and
commissioning by the installer and the responsible operator. Both the general safety
instructions in the "safety precautions" section and those in subsequent sections
indicated by danger symbols should be carefully observed.
4. Scope of application
The PUZeNe is used to automatically control of pressure boosting systems.
It is used in water supplies of residential high rise buildings, hotels, hospitals,
administrative and industrial buildings. 20
Product and Accessories
1. Functional description
PUZeN e system is controlled and managed by the PCU+G22 in conjunction with the
respective pressure and transmitters. The unit pumps are started and stopped in cascade
mode in response to demand variations by pressure-actuation within the range between the
set pressure levels. Splitting the unit capacity onto a number of small pumps ensures
constant adaption to the actual demand situation within the limits of the set pressure level.
3. Operation Mode
3.1 FC operation
An electronic pressure sensor provides the actual system pressure value as a 4-20 mA
current signal. The controller(PCU+G22) then keeps the system pressure constant by
comparing the desired and actual values. The speed controlled base load pump will start
up if required. Here the speed of the pump depends on consumption. If the power
requirements of this pump can't be met, a second pump is switched on. With increasing
requirement further pumps will be switched on. If the requirement drops such that the
controlling pump is operating in its lower power range and is not needed to meet
requirements, one pump after the other switches off. At last the base load pump
switches off by the zero flow detection. With decreasing system pressure under the set-
point, the system switches on again.
Function
Pressure Trigger
Display the set point pressure and actual pressure by real time graph.
21
Function
Indication of pump load rate
Display each pump load rate as circle graph.
Help
Display each function’s description for user.
Schedule operation
Automatically change the pressure set value according to hourly, monthly, weekly, seasonal
schedule mode which can be set by users.
Standby pumps
The standby pump, which is defined by user, does not run during the normal operation. If the
normal operating pump is stopped due to fault, the standby pump is cut-in.
Pump changeover
The pump with the lowest running hours is initially started and lastly stopped for the running
time optimization.
22
Function
Warning at abnormal low pressure
For the detecting of the leakage in the outlet pipe or dry running when the actual pressure is
lower than pressure set value.
Kick-off
The pump kicks off in case of fault.
Auto re-start
User can choose auto re-start or manual re-start when the electrical power is re-supplied after
power failure.
Locking password
Password can be set for the preventing from the unauthorized changing of the important
setting values and operation parameters of system except the basic setting values.
PID control
Change the number of operating pump or speed as frequency with PID control in case of there
is a difference between feedback value and set value.
23
Function
Compensation for friction loss
Change the pressure set value to compensate the friction loss according to user s definition.
Diminishing(Reduction) operation
Pump system does not operate as maximum capacity in case of the electrical power shortages
or water shortages.
Starting up
When you are starting up the pump, you should have service from the WILO service center.
Before the first putting into power, performing moderate connecting wire. In particular,
checking the connection. Starting up pump, you will check the whole of procedure. And refer to
installation and operating instructions.
Re-tighten all supply terminals before putting the unit into operation !
1. Factory setting
The controller is preset factory side. This factory presetting can be restored again by
WILO-Service.
2. Overcurrent protection
OCR(Over Current Relay)in MCCB or Frequency converter protect motor from overcurrent
damage.
24
Fault message
When occur system fault, the cause of the fault must be removed.
System stop or
FC # Fault Fault of FC. Check # FC
run peak pump
Continuously
Low discharge Low discharge pressure even Check discharge
operating
Pressure if all pumps running. condition
but still alarm
Abbreviation
PR : Pressure
PRE : Previous
DIS : Discharge
PT : Pressure transmitter
SUC : Suction
MIN : Minimum
MAX : Maximum
FC : Frequency converter
FREQ : Frequency
DTC : Detecting
25
Icon
Icon Action
Move to Home
Move to Info
Move to Set
Move to Alarm
Alarm occurred
26
Handling method
1. How to use pop-up screen
② ①
1) If you want to change “B-01. Set PR”, touch “①”. Pop-up screen “②” turn up.
2) Enter the value by “②” keypad.
3) On the keypad ‘Esc’ means cancel, ‘←’ means delete 1 digit, ‘Clear’ means delete all,
‘↵’ means save.
4) If save the value or cancel the value, pup-up screen will turn off.
5) Can’t input the outside of setting range. When you enter the value, refer to help.
27
Handling method
2. How to use touch screen
28
Menu tree
Pump 1 Page. 35
Pump 2
Pump 3
…
Pump 6
29
Menu tree
F-02. SUC PT
F-09. Date
F-12. Password
30
Home
Home
① ② ③ ④ ⑤
⑥
⑦ ⑧
⑩ ⑪
⑫
PUZeN e home screen.
⑥
: Touch Auto run start(Water drop animation rotate)
31
Home
Home
100%
: Green and pump load rate display, Indicates pump run by frequency converter
(40% ~ 100%, Display by 1% unit )
Move to “Info>>Pump #” screen directly(refer to page 34)
Installation help
Move to installation help page, when touch the manifold at “Home” display.
32
Home
Home >> Installation help
33
Info
Info >> System
① PUZeN e ⑤
② ⑥
③ ⑦
④ ⑧
This is the system information screen(“Info” icon touch), display the information of
PUZeN e booster system
34
Info
Info >> Pressure trigger
Pressure trigger : Show the set pressure and discharge pressure by graph.
Time cycle is 60 sec.
⑤
①
②
③
④
①
②
③
④
36
Set
Basic
37
Set
Basic
38
Set
Basic
39
Set
Basic
40
Set
Extra
41
Set
Extra
42
Set
Extra
43
Set
Extra
44
Set
Extra
45
Set
Extra
46
Set
Extra
47
Set
Extra
48
Set
Extra
49
Set
Extra
50
Set
Factory
- Touch the menu to set the schedule, after “No” “Yes” set the setting pressure.
52
Set
Schedule
53
Set
Schedule
54
Alarm
Alarm
① ② ③
④
55
Designation of PUZeN e booster system
PZe -
4 4 pcs
5 5 pcs
6 6 pcs