Machine Information: Total Fixed Costs (INR/SMH)

The document contains information about calculating the costs of owning and operating a machine over its lifetime, including depreciation, interest and insurance costs, repair and maintenance costs, labor costs, and total costs per scheduled hour.

Uploaded by

Emba Madras
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
90 views

Machine Information: Total Fixed Costs (INR/SMH)

The document contains information about calculating the costs of owning and operating a machine over its lifetime, including depreciation, interest and insurance costs, repair and maintenance costs, labor costs, and total costs per scheduled hour.

Uploaded by

Emba Madras
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

Note: Change only the numbers in the white squares

Machine Information Depreciation/hour (INR/SMH)


Purchase Price (INR) 200,000 Interest, Taxes, & Insurance (INR/SMH)
Salvage Value (INR) 20000 Total Fixed Costs (INR/SMH)
Life in years (yrs) 8
Scheduled hours /yr (SMH) 2000 Fuel and Lube (INR/PMH)
Interest Insurance &Taxes (%) 12 Tires and Tracks (INR/PMH)
Repair and Maint. (%/Depr) 80 Repair and Maintenance (INR/PMH)
Labor Fringe (% LR) 45 Total Variable Cost (INR/PMH, INR/SMH)
Expected Utilization (%) 70

Average Fixed investment ₹ 121,250 Labor Rate (INR/SMH)


Labor Fringe (INR/SMH)

Equations
Depreciation = (Purchase Price - Salvage Value) / (Life in years x scheduled hours)

Average Fixed Investment = (Purchase Price - Salvage Value) x (Life in years + 1) / (2 x Life in years) + Salvage value

Interest, Taxes and Insurance cost = (Interest, Taxes and Insurance%) x Average Fixed Investment / Scheduled hours

Repair and Maintenance ($/PMH) = Depreciation * Repair and Maint. (%/Depr.)

Labor Fringe = Labor Rate x Labor Fringe (%)

Total Variable Cost ($/SMH) = Total Variable Cost ($/PMH) x Utilization (%)
₹ 11.25
₹ 7.28
₹ 18.53

₹ 12.00
₹ 5.00
₹ 9.00
₹ 26.00 ₹ 18.20
₹ 36.73 Machine Cost (INR/SMH)

₹ 12.00
₹ 5.40
₹ 17.40 Labor Cost (INR/SMH)

₹ 54.13 Total Cost (INR/SMH)

n years) + Salvage value

stment / Scheduled hours