0% found this document useful (0 votes)
40 views2 pages

Lucid Energy Information

Uploaded by

Ivan Handjiev
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views2 pages

Lucid Energy Information

Uploaded by

Ivan Handjiev
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Lucid Energy, Inc

TM
2420 NE Sandy Blvd Ste 203
Portland, OR 97232
[email protected]

The LucidPipe™ System


generates kilowatts of clean energy
from an otherwise untapped resource:
Excess pressure head in gravity-fed
water pipelines.

Generator
Converts mechanical
work to electricity

Connection
The LPS can be attached
to the existing pipeline via
The LucidPipe System Is Suited To standard pipe flanges

• Municipal water agencies with gravity-fed


Lift-based
pipelines
Spherical
Turbine
Spins as water
flows
The Electricity Generated Can Be
• Grid-tied and sold to an electrical utility
• Behind the meter
• Used to charge batteries or power other
devices

Advantages
• Does not affect water delivery
• Pressure reduction as low as 5psi per turbine
• In-line, no bypass needed
• Continuous energy – not affected by
fluctuations in wind or sun
• Flow and pressure monitoring provided to
water utility SCADA Safe for Bearings, Brake, &
Drinking Water Mechanical Seals
The LPS is certified by All components which
NSF to NSF/ANSI 61 require maintanence are
outside the pipe

www.LucidEnergy.com
www.LucidEnergy.com

Site Assessment Key Parameters

Pipe Size
24” (0.6m) diameter or larger,
gravity-fed pipeline – Multiple
turbines must be spaced 4 24” 42” 60”
diameters apart.

Minimum Flow Rate Minimum Upstream Pressure Head Pressure Extracted


Pipeline must supply at least Each turbine needs 45–50 psi (30–35m) of Each 50kW turbine will take 5 psi (3.5m) out of
14 million gallons per day upstream pressure head to operate. the system (keep in mind that there must still
(0.5–1.0 cms).* be enough pressure after the turbine for water
delivery).

*Average flow can be misleading; flow exceedence is a better measure of whether or not a site qualifies. It is preferable to have a steady, year-round flow
instead of periods of extreme high and extreme low flows. Please contact Lucid Energy to discuss applicability of your site.

Typical Layout for a 4-Turbine, 200kW LucidPipe™


Power System in a 42in [1m] Diameter Pipe

2420 NE Sandy Blvd Ste 203


Portland, OR 97232
[email protected]