Item No. Description Unit Quantity Minimum Number of Test: 1 Set Concrete Beam Sample/day of Pouring 7 Set Min

This document outlines the tests to be performed on a road construction project located in Negros Occidental, Philippines. It lists over 20 items to be tested, including construction of a field office, permanent monuments, clearing and grubbing, excavation, embankment, subgrade preparation, aggregate base course, Portland cement, reinforcing steel, concrete, pavement thickness, curing compound, and asphalt sealant. It also includes computation of quality control costs based on contract cost and regional memos, breaking costs down into categories for service field tests, quality tests, and miscellaneous others.

Uploaded by

Mae Ann Gonzales
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views

Item No. Description Unit Quantity Minimum Number of Test: 1 Set Concrete Beam Sample/day of Pouring 7 Set Min

This document outlines the tests to be performed on a road construction project located in Negros Occidental, Philippines. It lists over 20 items to be tested, including construction of a field office, permanent monuments, clearing and grubbing, excavation, embankment, subgrade preparation, aggregate base course, Portland cement, reinforcing steel, concrete, pavement thickness, curing compound, and asphalt sealant. It also includes computation of quality control costs based on contract cost and regional memos, breaking costs down into categories for service field tests, quality tests, and miscellaneous others.

Uploaded by

Mae Ann Gonzales
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

CONTRACTOR : TSD Builders Construction and Supply COST : P 6,616,254.

12 LIMITS :
LOCATION : EB Magalona, Negros Occidental PAVT. SOURCE : FMR-DA
LENGTH : WIDTH : 5.0 meters PAVT.
EFFECTIVITY DURATION THICKNESS : 0.23 meter
DATE : June 12 , 2018 (C.D.) : 94 CD EXPIRY DATE : September 13, 2018

A. TESTS TO BE PERFORMED

ITEM NO. DESCRIPTION UNIT QUANTITY MINIMUM NUMBER OF TEST


A.1.1(3) Construction of Field Office for the Engineers ls 1.00 IR
B.4(8) Permanent monuments and markers each 2.00 IR
100(1) Clearing and Grubbing ha 0.36 IR
102(2) Surplus Common Excavation m³ 395.06 IR
104(1)a Embankment from Roadway Excavation (Common Soil) m³ 406.35 GPC-1;FDT-4
105(1)a Sub Grade Preparation m² 3,612.00 GPC-1;FDT-8
200(1) Aggregate Sub Base Course m³ 1,128.75 Q-1;CBR-1;GP-4;FDT-12
311(1)c1 PCCP Pavement (Unreinforced) 230 mm, 14 days m³ 2,257.50 DM w/ TM
a. Portland cement bags 4,933 Q-3;FT-25
b. Fine Aggergates m³ 259.61 Q-1;G-4
c. Coarse Aggregates m³ 519.23 Q-1;G-7
d. Reinforcing Steel kgs 970.72 Q-2;UW-2
e. Concrete m³ 519.23 1 Set Concrete Beam Sample/day of Pouring;7 Set Min.

f. Completed Pavement m² 2,257.50 Thickness det./5 holes/km/ lane


g. Curing Compound liters 654.68 Q-1 per shipment
h. Aphalt Sealant liters 270.90 Q-1 per shipment
B.5 Project Billboard / Sign Board each 2.00 IR
B.7 Occupation Safety and Health Program months 3.13 IR
B.8 Traffic Management months 3.13 IR
B.9 Mobilization/Demobilization ls 1.00 IR

B. COMPUTATION, BREAKDOWN AND APPOINTMENT OF QUALITY CONTROL COST:

1. Contract Cost (Direct Cost Sub-Total) P %(Q. C. Chart) P


2. Breakdown of Cost (per Regional Memos, dated December 12, 1978 and July 17, 1974)

a.) Service Field Test - (65%) (B-1) - -


b.) Quality Test (15%) (D-1) - - - - - - -
c.) Misc. & Others (20%) (B-1) - - - - -
d.) TOTAL COST - - - - - - - - - - - - - -