0% found this document useful (0 votes)
110 views1 page

Ramp For Temporary Access Layout Plan Enoc SD)

Uploaded by

zubair khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
110 views1 page

Ramp For Temporary Access Layout Plan Enoc SD)

Uploaded by

zubair khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

KEYPLAN

Emirates National Oil Company Ltd. (ENOC) L.L.C.


ENOC Complex, P.O.Box : 6442
Dubai, United Arab Emirates.
AL GAROUD BRIDGE Tel. : +9714 3374400
Fax : +9714 3374402

Group Engineering & Projects


SEE DETAIL
R.O.W/PLOT LINE ALTERNATE
Transmittal Ref.:
ACCESS PLOT LIMIT
EP2 R=
60
00

16.3

2.4
Received Date :
UNDER GROUND CABLING

136.8 m²
WATER TANK
WORKSHOP 5 (HOT)
WORKSHOP 4 MAINTENANCE)
ATR (GENERAL REPAIR
WORKSHOP 3 (COLD FIBER GLASS) Pr
ATR
WORKSHOP 2 (CHEMICAL) op
RTA
WORKSHOP 1 ROOM 27.39m2 os
RTA
SUBSTATION ed
R
A TR

AM ROOM
A TR

P f ELECTRICAL
Reviewed & NO Comments Review Not Required
RTA

LIMIT

RAMP FOR TEMPORARY


or
RTA

RT PLOT PLOT LIMIT


m² 23.65M2
A
PUMP ROOM 97 E1 LV ROOM
SA
LIK
TEL.T
CONCRETE RED AND WHITE SAFETY BARRIERS
ACCESS
LIFT

Reviewed & Commented Information


EA D1
M
ES
AC E1
E1
D1
WITH FLICKERING LIGHT
S STAIR 1

HALL

Resubmission Required For Reference


ENTRANCE
RECEP.

3.0 M WIDE PEDESTRAIN WAY


MAIN ENTRAN
CE

Noted
+0
.00

R.O.W ROOM
RMU
R.O.W/PLOT LINE
AL GARHOUD RTA MARINE
A
/PLOT LINE
7.9

4 3
5.0
0M
13

MAINTENANCE CENTER
TANK 4
WATER HOLDING
ROOF RAIN
11mx6mx3.6m GUARD
10

SITE
.00

3
7

WASH HOLDING TANK E


Slop

Name :
M

PLOT NO-3153798
e 5%

13mx7mx3.5m VEHICL
6

2 11
ENTRY PLOT N0
5

EXIT
2.1

3150107
D1
6.5 E1
4.6

A +0
.50

Date : Signature :
2.75 F

F
C I C

I
0

D
B H

D
B

H
EP2 E

E
A

A
1 M GATE

T1
FOR DECANDING
LOCKABLE OPENING

T2
E

OLD ACCESS
1 EP1 2

PROPOSED METAL
The Contractor is liable to complete the works in
DEWATERING PLATFORM
00
60
R=

ACCESS (3.5m *4.85m)

FENCING
TEMPORARY RAMP FOR

WITH SLIGH
T SLOPE

accordance to the Contract. The review made by the


EXTENTION
OF TRENCH

Employer /Employer's representative does not relieve


LIMIT
PLOT
M.H. - 1

2 "Ø FUEL PIPEL


PLOT LIM
IT
the Contractor of his Contractual liabilities and/or
responsibility to ensure or verify the accuracy of the
INES (OVER

LEGENDS:-
L WIDE TRENCH)
GROUND 1.25 M DELIV
ERY PIPE LINE
Ø2" ABOVE
GROUND
SLIPW
150MM BLAC
K
OVER GROU SAND ON THE TOP (300M EXIST AY
deliverables, works and existing features.
ND 1.25MTR M) & BOTT
WIDE TREN OM (150MM)
CH OF PIPE ING
REEK
DUBAI C
SAND AREA

Proposed underground Diesel fuel line


ASPHALT ROAD
Proposed underground Petrol fuel line
Proposed underground Electrical cable
R.O.W
/PLOT LINE Proposed underground Data cable
PLOT-3150187
NEW ALTERNATE ACCESS R.O.W limit
Concrete barrier red&white barrier
New alternate access
ALTERNATE
ACCESS
Old access
Ramp for temporary access
Existing interlock tile

GENERAL NOTES:-
1. DO NOT SCALE FROM DRAWINGS.

2. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED.

3. ANY DISCREPANCIES ON THE DRAWINGS TO BE REPORTED


IMMEDIATELY TO THE ARCHITECT/ENGINEER.

REV. DRAWN BY DESCRIPTION DATE

PROJECT: EU-246

PROJECT :

PROPOSED FUEL FACILITY FOR RTA MARINE


MAINTENANCE CENTER ON PLOT NUMBER
3150107 IN UM HURAIR SECOND

CLIENT :

ENOC COMMERICAL AND INDUSTRIAL


PRODUCTS (ECIP)

AUTHORITY:
Pr
op
ROOM 27.39m2 os
SUBSTATION ed
ROOM RA
ELECTRICAL
MP
LIMIT

RAMP FOR TEMPORARY


for
RT.65M2 PLOT PLOT LIMIT
23 A
LV ROOM
SA E1 CONSULTANT:
LIK
TE CONCRETE RED AND WHITE SAFETY BARRIERS
ACCESS
LIFT
AM D1

ES
AC E1
E1
D1
WITH FLICKERING LIGHT
S STAIR 1

HALL
ENTRANCE
RECEP. PROJECT MANAGER:

3.0 M WID E PEDESTRAIN WAY


MAIN ENTRANCE
Existing kerb stone
PROPOSED RAMP FOR TEMPORARY ACCESS +0
Existing heel kerb .0

R.O.W
0
Proposed Ramp Slope 5%
ROOM

R.O.W/PLOT LINE
Existing tile area
Existing tile area RMU
+0.00 Drive way A
/PLOT LINE
7.9

4
CONTRACTOR :
3
5.0
0M

GUARD

10 SITE
.00
Existing tile area
Slo

Existing tile area

M
10.00
pe
5%

ENTRY PLOT N0 DRAWING TITLE :


5
EXIT 3150107
1 D1
2.
6.5
ACCESS DETAILS LAYOUT PLAN
+0 E1
4.6

2.75 A 0
.50 I
F

B
C

H
I
F

B
C

D
H

D
EP2 A
E
A
E

1 M GATE
SCALE : N.T.S DRAWING SIZE : A3 DATE :31-03-2022

T1
FOR DECANDING
LOCKABLE OPENING

T2
E
1 EP1 2 DRAWN BY : CHECKED BY : APPROVED BY:

PROPOSED METALSH
DEWATERING PLATFORM

MSM NQ

00
60
SECTION AA R=
ACCESS (3.5m *4.85m)

REV.DATE
FENCING DRAWING NUMBER: REV
TEMPORARY RAMP FOR

WITH SLIG
HT SLOPE
EXTENTIO
N OF TREN

DETAIL ESIC-27122021-246-SFT-01
CH
00 SHEET NO.

00
LIMIT

You might also like